• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 5
  • 5
  • 4
  • 4
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Veřejné zakázky mezi subjekty ve veřejném sektoru (in-house zadávání veřejných zakázek v judikatuře ESD) / Public contracts between persons within public sector (In-house procurement in judgments of the European Court of Justice)

Uruba, David January 2016 (has links)
The aim of this study is to provide a comprehensive analysis of the applicability of the exceptions of vertical (in-house) and horizontal cooperation among contracting authorities within the framework of public procurement law. For this purpose is in the thesis used descriptively analytic approach, which included the valid legislation of public procurement Czech Republic, as well as the relevant directives of European Union, although the focus of the thesis was based on the jurisprudence of the Court of Justice of the European Union. The thesis is structured into five chapters. The first chapter discusses the legislative framework of the European Union and the Czech Republic. The second chapter focuses on the basic principles of public procurement law. The third chapter deals with basic concepts and terminology of public procurement law.. The fourth chapter is divided into two major parts. The first part focuses on various factors related to the use of the exemption of vertical cooperation between contracting authorities (participation of private capital in the person of the supplier and contracting authority; the fulfillment of the control criterion and activity criterion; various forms of this exception). The second part is concentrated on the use of exception of horizontal cooperation between contracting...
2

Preliminariosios sutarties institutas viešuosiuose pirkimuose / The institute of framework agreement in public procurement

Grambaitė, Rasa 25 June 2014 (has links)
Darbe atskleidžiama preliminariosios viešųjų pirkimų sutarties instituto samprata, aptariama paskirtis, įrodoma, jog šis institutas yra specifinis ir modernus teisinis įrankis, leidžiantis optimizuoti viešųjų pirkimų procedūrų vykdymą. Darbe nuosekliai išanalizuojamas ir paaiškinamas šiuo metu galiojantis su preliminariosios viešųjų pirkimų sutarties institutu tiesiogiai/netiesiogiai susijęs teisinis reguliavimas. Ypatingas dėmesys skiriamas tų teisės normų, kurios potencialiai gali sukelti jų probleminį praktinį pritaikymą, aptarimui, taip pat pateikiama nemažai situacinių pavyzdžių ir hipotetinių problemų sprendimų variantų. / This paper deals with the conception of the Institute of Framework Agreement in Public Procurement. Purposes of concluding such agreements are discussed, the point about this institute as a specific and modern legal mean, which optimizes the performance of public procurement procedures, is substantiated. The current legal regulation of the institute of framework agreement in public procurement is analysed coherently. Ambiguous legal rules, which generate potential problems of use of these agreements in practice, are taken as one of the main topics for consideration. There are also situational examples and various hypothetical practical problems solutions proposed in this paper.
3

Comment la maîtrise d’ouvrage urbaine conçoit-elle les choix d’aménagement ? : élaboration et assemblage des choix énergétiques à Bordeaux Euratlantique / The design activity of urban development authorities : insights from energetical design at Bordeaux Euratlantique

Blanchard, Guilhem 12 December 2018 (has links)
« Comment sont opérés les choix énergétiques dans les projets d’aménagement ? » Cette question, de curiosité, s’inscrit par ailleurs dans des préoccupations d’actualité. Face à la montée en puissance des enjeux environnementaux et plus particulièrement énergétiques dans la fabrique urbaine, le monde de l’aménagement cherche en effet à renouveler ses manières de faire. Cependant, la mise en oeuvre de tels changements se heurte à une méconnaissance de la mécanique opérationnelle des projets d’aménagement. Dès lors, notre thèse s’est construite autour de la compréhension des mécanismes de production des choix d’aménagement dans les projets urbains français. Nous nous sommes plus précisément intéressés à l’espace d’action de la maîtrise d’ouvrage urbaine, qui s’étend à l’interface entre les orientations « stratégiques » de la planification (planning) et les choix « techniques » de la conception formelle (design). Nous écartant de la division artificielle des tâches entre maîtrise d’ouvrage et maîtrise d’oeuvre, nous postulons que la maîtrise d’ouvrage urbaine est responsable d’une véritable activité de conception qui se décline sous plusieurs formes :- la participation à l’élaboration et à l’actualisation des orientations stratégiques et des choix de programmation et de composition du projet d’aménagement ;- l’encadrement des couples maîtrise d’ouvrage/maîtrise d’oeuvre dans la fabrique des différentes composantes matérielles (bâtiments, infrastructures, espaces publics) de l’espace urbain ;- l’élaboration et le pilotage des dispositifs et des processus d’organisation de l’action collective.Dans ce cadre, la thèse propose d’abord de documenter empiriquement la « boîte noire » que constitue encore l’activité de conception de la maîtrise d’ouvrage urbaine. Nous appuyant sur une analyse approfondie des choix énergétiques opérés à l’occasion de l’opération d’intérêt national Bordeaux Euratlantique, il s’agit de traiter les questions suivantes : quelles sont les scènes de conception internes et externes à la maîtrise d’ouvrage urbaine et comment s’articulent-elles ? quels sont les processus qui aboutissent aux formulations et aux reformulations des choix d’aménagement au cours du projet ? et quelle instrumentation maîtrise d’ouvrage urbaine mobilise-t-elle dans son activité de conception ?Pour ce faire nous reconstruisons, sous forme de récit, les principales séquences d’action ayant abouti à la définition d’une stratégie énergétique et environnementale, à l’organisation de la prise en compte des aspects énergétiques dans la fabrique du bâti, et à la mise en place de systèmes d’approvisionnement en chaleur et en froid. Adoptant une approche pragmatique, nous combinons des grilles de lecture issues de différentes disciplines (sociologies des organisations et des techniques, sciences de gestion) pour interpréter chacune de ces séquences d’action en mettant en lumière leurs dimensions politique, cognitive et productive.La lecture transversale du récit nous permet ensuite de mettre en évidence le rôle primordial alloué à la décision, comprise comme un dispositif d’engagement et d’irréversibilisation de l’action collective. Comme la qualité, les coûts et les délais, la décision peut alors être considérée comme un macro-objectif qui guide la maîtrise d’ouvrage dans son activité de conception.Toutefois, le pilotage de la conception par la facilitation de la décision entre parfois en conflit avec la complexité des assemblages sociotechniques de la fabrique urbaine, caractérisés par des interdépendances qui poussent à un traitement intégré de certaines interfaces. La thèse se conclut donc par une relecture des objectifs de qualité-coûts-délais-décision au prisme d’une tension entre la logique du « définir », guidée par la performance technico-économique, et la logique du « faire advenir », guidée par l’effectivité opérationnelle / “How is energetical design done in urban development projects?” This question goes beyond curiosity, in line with current preoccupations. Facing the growing pressure of environment and energy challenges within urban fabric, urban development is trying to renew its practices. Such changes, however, need to address the general lack of understanding about the actual logics of collective action during urban development projects.Our research aims to better understand the generation processes of design choices in French urban development projects. We focus on the space of “maîtrise d’ouvrage urbaine” (local development authority), which stretches at the interface between strategic orientations of planning authorities and technical choices of formal designers. Moving away from the traditional division of labour, we assume that local development authorities are actually responsible for a design activity, which covers the generation and update of strategic orientations for urban development, the regulation of buildings, infrastructures and public spaces productions, and the organisation and management of collective design activity.Within this framework, this research first provides empirical insights of the urban development authority’s energy design activity at Bordeaux Euratlantique, France. Through an extensive account of energy choices in this project, we document the various, intertwined design arenas, the processes for designing and updating design choices, and the instrumentation of urban development authority’s design activity. To understand these phenomena from political, cognitive and managerial perspectives, we combine various theoretical frameworks derived from pragmatic approaches of organizational studies, science & technology studies and management sciences.The cross-analysis of our empirical account allows us to highlight the key role of collective action initiation and lock-in, which are embodied by the concept of decision. Decision then become a macro-objective for urban developers alongside quality, costs and delays. But the management of design activity from a decision-making perspective sometimes comes into conflict with the complexity of urban sociotechnical assemblages, which call for an integrated processing of interfaces and interdependencies. The thesis then concludes on the tension between the logic of “definition”, which is steered by techno-economic performance objectives, and the logic of “implementation”, which is steered by operational effectivity challenges
4

Jäv utan konsekvenser? : - En komparativrättslig studie mellan svensk och finsk jävsreglering vid offentlig upphandling / Conflict of interests without consequences? : - A comparative legal study between Swedish and Finnish regulation of conflict of interest within public procurement

Rakhimova, Nina, Jöesaar, Kettlin January 2020 (has links)
The study is mainly to reflect on how the two members of the European Union, Sweden and Finland has chosen to implement the directive 2014/24/EU of the European Parliament and of the Council of the European Union. To limit the study the focus has been to investigate the width of ‘conflict of interest’ as well as the width of ‘contracting authorities’. The conflict of interest may appear in all phases within the purchasing process with a risk for unjust advantages for the wanted supplier or the opposite, where a supplier is excluded by purpose. The actual procurement process is presented in the study in a wider context where the procurement document, the publication of the document as well as the establishing of the winning tender is defined as the second phase. The total process of purchasing begins with a first phase, the analysis of the actual need, market orientation and an evaluating of the previous contract. The third phase, contract management, is very critical as the risk of becoming caught altering the contracts during the term is low. Therefore, is not only the conflict of interest connected to the prior involvement of candidates or tenderers that need to be addressed. The regulation of the two national procurement laws does not contain the wider sense of conflict of interest. Instead, one Finnish inferior law, regulating administration and conflict of interest there in, appears to be the most comprehensive legislation to include all organizations that the procurement law applies to. The Swedish regulation as oppose to the Finnish spread out on a general administrative law and a law applied to the municipal organizations. However, this is not including all the organizations that must process their procurations according to law. The legislator refers to the constitutional principle, the principle of equality, and a mandate for the procurement authority to support all procurement organizations that are obliged to implement procurement under public procurement laws. Above is a simplified description of how the procurement directive has been implemented in Sweden and Finland. What has been noted is that is does not appear to be any penalties for those who shows a behavior indicating that there is a conflict of interest in any of the steps of the purchasing process. On the other hand, it is the contracting organization that may face penalties such as a waste of resources when a procurement is reviewed and fails, which means further time spent on yet another process of procurement. A contracting organization that does not manage its contracts according to the stated demands in the procurement might make such incorrect purchases or concessions that could lead to considerable sanctions.
5

La notion de quasi-régie en droit public français / In-house providing in french public law

Mouriesse, Elise 03 December 2015 (has links)
Les enjeux de la quasi-régie (traduction française du « contrat « in house » ») sont multiples car elle constitue avant tout une dérogation aux règles de passation des contrats publics. Elle est de ce fait entièrement conditionnée par cette caractéristique et repose sur une combinaison particulière entre plusieurs modalités liées au fonctionnement des prestataires intégrés et aux relations qu’ils entretiennent avec leurs détenteurs. Seules les situations qui ne sont pas susceptibles de porter atteinte au bon fonctionnement du marché peuvent donc être qualifiées de mécanismes interorganiques. La quasi-régie est ainsi clairement distincte d’autres notions, telles les associations transparentes ou les montages artificiels, et constitue une véritable construction juridique légitime que les acteurs du secteur peuvent manier. Sa malléabilité est toutefois révélée par l’étude des modes d’intervention multiples avec lesquels elle est compatible en France : la société publique locale n’est par exemple qu’un moyen parmi d’autres de la mettre en oeuvre. Cette flexibilité est confirmée par le fait que les disciplines financière et fiscale françaises ne se saisissent pas de ce mécanisme, de telle sorte que la quasi-régie ne constitue pas un mode de gestion intermédiaire entre régie et externalisation. La qualité de contrat spécial, plus précisément celle de « contrat interorganique », semble toutefois pouvoir lui être attribuée car la quasi-régie repose sur une combinaison de circonstances contractuelles et institutionnelles spécifiques qui impliquent avant tout des modalités particulières en termes de passation, sans pour autant exclure certaines singularités en matière d’exécution. / “In-house providing procurements” concern contracts awarded by contracting authorities without application of the procedures laid down in european secondary law. They thus have to be first considered as a derogation, which reveals their stakes but also the way they’ve been shaped. To make sure that it would’nt be used to abuse european law, european institutions have paid special attention to in-house operation’s conditions. In-house contracting parties have to prove the existence of particular conditions relating to the functioning of the contractor and its relations with its holders. Through those characteristics lies the particularity of in-house providing, which can be distinguished from other notions, such as “transparent associations” or “artificial schemes”. This is also a way to affirm in-house procurements’ legitimacy and to make it a real legal construction. This naturally leads to its qualification. Studying its manifestations in french public law makes clear that this construction is not complete. In-house contractor may take many legal forms, which brings to light in-house providing’s flexibility. It also prevents financial and fiscal french law to seize this derogation. In house-contracts can’t therefore be described as a an intermediary governance mode, between outsourcing and internal governance (in-house operations stricto sensu). Nevertheless, in-house providing procurements embody a type of special contracts, “les contrats interorganiques”, which implies particular rules relating to their passation and admits a certain particularity concerning their execution.

Page generated in 0.0946 seconds