31 |
Gångavstånd till utrymningsvägar : En studie om gångstånden till utrymningsvägar och dess dimensioneringsmöjligheter med hjälp av förenklad dimensionering / Distances to evacuation routes : A study of walking distances to escape routes and its design possibilities using simplified dimensioningUllström, Stefan January 2015 (has links)
ABSTRACT The title of this degree project after three years long education of construction engineering is “Distances to evacuation routes” with the subtitle “A study of walking distances to escape routes and its design possibilities using simplified dimensioning”. The idea for the project came from the company Fire AB in Västerås. They are oriented in fire protection dimensioning. When specifying the fire protection for a building you can choose from two different methods, simplified dimensioning or analytical dimensioning. The simplified dimensioning is an easier way of designing the fire protection, you just follow the rules in BBR given by the swedish national board of housing, bulding and planning. Analytical dimensioning is a more complicated method which places higher demands on the user. In some cases analytical dimensioning is a demand. There has been a problem with the simplified method when you dimension the distance to an emergency exit. The maximum distance to an escape route is given in BBR 19/20 and can’t be exceeded at any time. If you have a distance of 31 meters and the acceptable distance is 30 m you would have to solve it with analytical dimensioning, but if you have a normal ceiling height this is very difficult because the calculation values are very high compared to the values used in simplified dimensioning. The only way to get that extra meter accepted is to install some kind of fire alarm which increases the cost of the building. Before BBR 19/20 you could do a report with a risk analysis of that extra meter. That extra meter is often a corner in a room and doesn’t affect the evacuation. When you calculate that extra meter it will affect the evacuation time considerably but in reality it doesn’t make any major difference. It’s not reasonable to install a fire alarm that increases the cost of the building with an extra hundred thousand SEK. The question that will be answered is: How has the maximum walking distance to escape routes changed over time in the different regulations? The requirements for walking distances to escape routes being used today, how where these created and have they been tested in any way? How do they do in Norway, Finland and New Zealand when they decide the maximum distance to an escape route? What do the calculations say? Would a longer distance to an escape route or a higher ceiling height be better for the people that evacuate? There are differences in the maximum distance to an escape route between the countries that has been compared in this essay. In some cases has Norway and Finland has a longer distance than Sweden but overall they are very simlilar. New Zeeland is the country with the longest walking distance in all scenarios. In some cases New Zeeland has the double amount of meters than Sweeden to an escape route. The capter about walking distances to an escape route in the swedish ordinance “Boverkets byggregler” has looked almost the same since 1975. It is time for that chapter to be revised after todays building techniques and materials. Keywords: distance, evacuations, routes, fire, dimensioning, housing, building and planning. / SAMMANFATTNING När en byggnad konstrueras är utrymningssäkerheten för byggnaden väldigt viktig. En del inom utrymningssäkerhet är gångavstånden till utrymningsvägar. Det maximalt tillåtna gångavståndet till utrymningsvägarna bestäms med hjälp av tabellvärden genom förenklad dimensionering eller genom att beräkna tiden till kritiska förhållanden och därefter beräkna maximala gångavstånd detta kallas analytisk dimensionering. Det förstnämnda har behandlats i detta arbete. Med hjälp utav förenklad dimensionering bestäms det maximala gångavstånden till utrymningsvägar efter vilken typ av verksamhet samt dess förutsättningar som råder i det tänkta utrymmet. Max tillåtna gångavstånd varierar från 15 m upp till 60 m beroende på verksamhetsklass och förutsättningar. Syftet med detta arbete är att utreda metoden för att ta fram de längsta gångavstånden samt hur relevant denna är i dagsläget, ytterligare ett syfte är att jämföra denna metod mot Norge, Finland och Nya Zeelands metod för att bestämma längsta gångavstånd. Arbetet består av en litteraturstudie som är baserad på lagtext från de olika länderna. Intervjuer har gjorts med människor som jobbar inom det berörda området i de olika länderna. En teoretisk del presenteras i slutet på arbetet i form av beräkningar, där användes datorsimuleringsprogrammet CFast. Från och med 1947 fram tills idag så har det funnits 4 olika regelverk för byggande i Sverige som alla behandlat gångavståndskraven till utrymningsvägar. Dessa regelverk är Byggnadsstyrelsens anvisningar till byggnadsstadgan (BABS) 1947-1967, Svensk byggnorm (SBN) 1968-1989, Boverkets nybyggnadsregler (NR) 1989-1994 och Boverkets byggregler (BBR)1994-. I BABS var kraven näst intill obefintliga, det kom krav om gångavstånd till utrymningsvägar för bostäder 1960 men nämndes ytterst kort. Till BABS 1960 kom de första kraven som var indelade efter verksamhetsklasser och förutsättningar, det hade dock inget krav för verksamheter där det förelåg en hög risk för bränder. I SBN 1975 infördes gångavståndskraven som används än idag med den enda skillnaden att brandbelastningen för 60 meters gångavstånd är 250MJ/m2 golvarea istället för 40 MJ/m2 omslutande area. I NR användes också denna tabell för att bestämma det maximala gångavståndet till utrymningsvägar. När BBR 1 kom gick man över från detaljkrav till funktionskrav, detta gjordes för att främja alternativa lösningar och teknisk utveckling. Gångavståndskraven flyttades från BBR till rapporten 1994:10 Utrymningsdimensionering sedan Utrymningsdimensionering 2004 och sist till Utrymningsdimensionering 2006 innan de togs tillbaka in till BBR 19. Det var alltså till BBR 19 som kraven återinfördes i BBR. Anledningen till detta var att det skulle bli enklare för användaren. Målet med BBR 19 var att öka verifiering utav brandskyddet i byggnaderna. Det rådde tidigare stor variation utav säkerhetsnivån då Boverket inte reglerat detta tillräckligt. Konkurrens mellan företagen kunde uppstå då företagen kunde tolka reglerna olika. En följd utav detta blev att det blev svårare för branschen att kunna göra alternativa lösningar, t.ex. längre gångavstånd då det i BBR 19 var tydligare gränser för vad som var acceptabelt och inte. Detta ledde till irritation inom vissa delar utav branschen då utrymmet för diskussion med kommunerna kring ett för långt gångavstånd blev mindre. I BBR 20 är kraven desamma som i BBR 19 och snart kommer även BBR 21 att släppas och även där är kravnivån densamma. I våra grannländer Finland och Norge används ett liknande system. I Finland använder man inte verksamhetsklasser utan skriver ut exempel på byggnader och vad de har för maximalt gångavstånd. Finland är medlem i EU och det kan därför tyckas att kraven för gångavstånd till utrymningsvägar borde överensstämma med Sverige men så är inte fallet. Det finns inget krav på att byggreglerna ska vara enhetliga inom EU även om det skulle underlätta arbeten utom landets gränser. Gångavstånden är t.ex. längre för samlingslokaler men kortare för industrilokaler. Detta beror på att de två länderna ser olika på olika typer utav risker. Norge delar in sina utrymmen i olika riskklasser där varje riskklass har ett maximalt gångavstånd till utrymningsvägar. Norge är inte medlem i EU och kraven för maximala gångavstånd är hårdare än Sveriges. Norges krav för bostäder är 30 m jämfört med Sveriges 45 m och Norges krav för industrier är 50 m mot Sveriges 60 m. Det sista landet som utreddes i detta arbete är Nya Zeeland. Regelverket i Nya Zeeland skiljer sig mycket mot de övriga. Regelverket delas in i två grenar, verification methods (VM) och acceptable solutions (AS). VM är en analytisk dimensionerings metod där brandskyddet dimensioneras genom att personen som dimensionerar brandskyddet går igenom 10 olika scenarion, när dessa har gåtts igenom och målen har uppfyllts ska byggnaden vara godkänd. AS är förenklad dimensionering, den delas in i AS 1-7, där varje nummer är en byggnadstyp. Gångavstånden skiljer sig kraftigt mot de Svenska då de är mycket längre. I Nya Zeeland kan byggherren välja vilka nivå på brandskyddet ett visst utrymme ska ha och får därefter olika långa gångavstånd. Grundkraven är generellt sett högre än de svenska och används den högsta klassen på brandskydd, t.ex. automatiskt brandlarm och sprinklers med rökdetektorer så är gångavstånden i vissa fall dubbelt så långa som de svenska. Sista delen i arbetet är beräkningar över gångavstånd och takhöjd kontra tid till kritisk nivå. Kritisk nivå kan uppstå på olika sätt i ett rum, t.ex. att brandgaslagrets höjd kommer till en viss nivå, att toxiciteten är för hög eller att värmestrålningen är för stark. Beräkningsexempel utfördes på två olika lokaler med olika gångavstånd, 30 och 45 m. Takhöjden höjdes sedan med en tredjedel i de båda lokalerna och tiden till kritisk nivå jämfördes sedan. Beräkningsexempel avslöjar att takhöjden och gångavstånden (byggnadens storlek) har stor inverkan på tiden till kritisk nivå. När takhöjden höjs eller gångavståndet förlängs så ökar lokalens volym och därmed får röken en större yta att sprida ut sig på. I förenklad dimensionering tar man inte hänsyn till takhöjden och blir ett gångavstånd för långt måste analytisk dimensionering användas. Beräkningarna visar just att en större byggnad som har ett längre gångavstånd eller en högre takhöjd är gynnsamt då tiden för en säker utrymning ökar. Det vore kanske lämpligt att införa en paragraf i förenklad dimensionering att alla utrymmen som har en viss takhöjd eller en takhöjd över standard kan tillgodogöra sig en tredjedels längre gångavstånd precis som man får göra om en sprinklerinstallation görs. Den specifika takhöjdsgränsen bör tas fram genom riktiga försök samt beräkningar. Detta är en av arbetets slutsatser. Nyckelord: gångavstånd, utrymning, branddimensionering, Boverket.
|
32 |
Método para planejamento de capacidade de redes ATM baseado em simulação / Capacity planning method for atm networks based on simulationGoncalves, Adriano Ramos January 2001 (has links)
O processo de dimensionar redes de comunicação tem sido um desafio para pesquisadores e projetistas. A partir da especificação, passando pela operação, controle e gerenciamento de redes, as estimativas de comportamento do desempenho são úteis para o dimensionamento adequado dos equipamentos. O detalhamento e precisão na capacidade de avaliar o impacto de carga futura melhoram as chances de prever dificuldades em atingir metas de serviços. Com redes de banda larga, como ATM, não tem sido diferente. Pela sua concepção de oferecer garantia de qualidade para serviços com diferentes requisitos, ATM se empenha em evitar a sobrecarga da rede. De início, essa premissa é preservada naturalmente através da restrição da quantidade e tipo de conexões ingressas na rede. Portanto, a adequação dos recursos que compõem a estrutura de uma rede ATM determina o grau de disponibilidade em atender certa quantidade de serviços. A pergunta que desejamos responder é: como estimar com precisão a quantidade de serviço suportada por determinada rede ATM? O limite da rede é alcançado quando os recursos disponíveis são menores que os recursos necessários à carga de serviço. Com o emprego cada vez maior de ATM por empresas de telecomunicações, conhecer o limite da rede é estar ciente da potencialidade de negócios sem comprometimento da qualidade. É poder prever expansões evitando bloqueio de novos serviços. O processo de dimensionamento de capacidade de uma rede ATM revela a quantidade de recursos necessários para suportar determinada carga de serviço. Quando os recursos necessários forem maiores que os recursos disponíveis, o limite da rede foi alcançado. Nesse caso, são duas as possibilidades para o equilíbrio: aumentar os recursos da rede ou diminuir a carga de serviço desejado. Esta dissertação propõe um método para dimensionamento dos recursos de uma rede ATM. A principal técnica empregada no método é a simulação do comportamento de tráfego sobre comutadores ATM. Para determinada carga de tráfego são executadas diferentes simulações variando os recursos disponíveis dentro de parâmetros prováveis. As seguintes medidas de desempenho são obtidas nas simulações como resultados estatísticos médios: razão de perda de células (CLR), atraso de transferência de células (CTD) e variação do atraso de células (CDV). Conhecendo o desempenho desejado (QoS) pela carga de serviço, o método pode determinar a quantidade necessária de recursos que satisfazem os requisitos de QoS. A ferramenta escolhida para implementar o modelo foi o simulador orientado a eventos ATM/HFC do National Institute of Standards and Technology (NIST). O simulador é composto por diferentes modelos de elementos, cada qual com seus atributos, que podem ser combinados para caracterizar determinadas configurações de rede que se deseja avaliar. Os elementos podem ser desde representações de tipos de comutadores ATM até diferentes técnicas de controle de tráfego a serem utilizadas na simulação. A carga de serviço na simulação é provida por elementos modeladores que caracterizam diferentes tipos de aplicações geradoras de tráfego, permitindo arranjos de serviços CBR, VBR, ABR e UBR através de seus respectivos parâmetros descritores. A validação do método é efetuada através da comparação dos resultados obtidos com outro trabalho similar desenvolvido utilizando simulação. / The process of planning communication networks has been a challenge for researchers and designers. From the specification, through the operation, control and management of networks, the behavior performance estimates are useful for the adequate equipment dimensioning. The detailing and accuracy in the capacity to evaluate the future load impact increase the possibilities to forecast difficulties in reaching goals of services. With broadband networks, as ATM, it has not been different. ATM efforts in preventing network overload by its conception to offer quality guarantee for services with different requirements. From beginning, this premise is naturally preserved through restriction of the amount and type of connections that can enter the network. Therefore, the adequacy of the resources that compose the ATM network structure determines the degree of availability in attending certain amount of services. The question that we wish to answer is: how can we estimate accurately the amount of services supported by specific ATM network? The limit of the network is reached when the available resources are below the necessary resources to service load. With the higher use of ATM for telecommunications companies, to know the limit of network is to be aware of the potentiality without damage to the quality. It's to be able to forecast expansions to prevent new services blocking. The capacity planning process of an ATM network shows the amount of resources needed to support a specific workload. When the resource need is greater than the available resource, the network limit has been reached. In this case, there are two possibilities to reach balance: increase the network resources or lower the load of desired service. This work is about a method for ATM network resources dimensioning. The main technique used in the method is the traffic behavior simulation over ATM switches. For specific workload, different simulations are executed and they vary according to the resources available inside the probable parameters. The following measures of performance are gotten in the simulations as average statistics results: cell loss ratio (CLR), cell transfer delay (CTD) and cell delay variation (CDV). Knowing the workload desired performance (QoS), the method can determine the necessary amount of resources that will satisfy the QoS requirements. The chosen tool to implement the model was the event driven simulator ATM/HFC of the National Institute of Standards and Technology (NIST). The simulator is made up of different models of elements, each one with its attributes, which can be combined to characterize specific network configurations that are to be evaluated. The elements can range from representations of types of ATM switches to different techniques of traffic management to be used in the simulation. The workload in the simulation is provided by modeler elements that characterize different types of traffic generator applications, allowing sets of CBR, VBR, ABR and UBR services through their respective traffic parameters. The method validation is carried out through the matching of the results gotten with other similar work developed using simulation.
|
33 |
Método para planejamento de capacidade de redes ATM baseado em simulação / Capacity planning method for atm networks based on simulationGoncalves, Adriano Ramos January 2001 (has links)
O processo de dimensionar redes de comunicação tem sido um desafio para pesquisadores e projetistas. A partir da especificação, passando pela operação, controle e gerenciamento de redes, as estimativas de comportamento do desempenho são úteis para o dimensionamento adequado dos equipamentos. O detalhamento e precisão na capacidade de avaliar o impacto de carga futura melhoram as chances de prever dificuldades em atingir metas de serviços. Com redes de banda larga, como ATM, não tem sido diferente. Pela sua concepção de oferecer garantia de qualidade para serviços com diferentes requisitos, ATM se empenha em evitar a sobrecarga da rede. De início, essa premissa é preservada naturalmente através da restrição da quantidade e tipo de conexões ingressas na rede. Portanto, a adequação dos recursos que compõem a estrutura de uma rede ATM determina o grau de disponibilidade em atender certa quantidade de serviços. A pergunta que desejamos responder é: como estimar com precisão a quantidade de serviço suportada por determinada rede ATM? O limite da rede é alcançado quando os recursos disponíveis são menores que os recursos necessários à carga de serviço. Com o emprego cada vez maior de ATM por empresas de telecomunicações, conhecer o limite da rede é estar ciente da potencialidade de negócios sem comprometimento da qualidade. É poder prever expansões evitando bloqueio de novos serviços. O processo de dimensionamento de capacidade de uma rede ATM revela a quantidade de recursos necessários para suportar determinada carga de serviço. Quando os recursos necessários forem maiores que os recursos disponíveis, o limite da rede foi alcançado. Nesse caso, são duas as possibilidades para o equilíbrio: aumentar os recursos da rede ou diminuir a carga de serviço desejado. Esta dissertação propõe um método para dimensionamento dos recursos de uma rede ATM. A principal técnica empregada no método é a simulação do comportamento de tráfego sobre comutadores ATM. Para determinada carga de tráfego são executadas diferentes simulações variando os recursos disponíveis dentro de parâmetros prováveis. As seguintes medidas de desempenho são obtidas nas simulações como resultados estatísticos médios: razão de perda de células (CLR), atraso de transferência de células (CTD) e variação do atraso de células (CDV). Conhecendo o desempenho desejado (QoS) pela carga de serviço, o método pode determinar a quantidade necessária de recursos que satisfazem os requisitos de QoS. A ferramenta escolhida para implementar o modelo foi o simulador orientado a eventos ATM/HFC do National Institute of Standards and Technology (NIST). O simulador é composto por diferentes modelos de elementos, cada qual com seus atributos, que podem ser combinados para caracterizar determinadas configurações de rede que se deseja avaliar. Os elementos podem ser desde representações de tipos de comutadores ATM até diferentes técnicas de controle de tráfego a serem utilizadas na simulação. A carga de serviço na simulação é provida por elementos modeladores que caracterizam diferentes tipos de aplicações geradoras de tráfego, permitindo arranjos de serviços CBR, VBR, ABR e UBR através de seus respectivos parâmetros descritores. A validação do método é efetuada através da comparação dos resultados obtidos com outro trabalho similar desenvolvido utilizando simulação. / The process of planning communication networks has been a challenge for researchers and designers. From the specification, through the operation, control and management of networks, the behavior performance estimates are useful for the adequate equipment dimensioning. The detailing and accuracy in the capacity to evaluate the future load impact increase the possibilities to forecast difficulties in reaching goals of services. With broadband networks, as ATM, it has not been different. ATM efforts in preventing network overload by its conception to offer quality guarantee for services with different requirements. From beginning, this premise is naturally preserved through restriction of the amount and type of connections that can enter the network. Therefore, the adequacy of the resources that compose the ATM network structure determines the degree of availability in attending certain amount of services. The question that we wish to answer is: how can we estimate accurately the amount of services supported by specific ATM network? The limit of the network is reached when the available resources are below the necessary resources to service load. With the higher use of ATM for telecommunications companies, to know the limit of network is to be aware of the potentiality without damage to the quality. It's to be able to forecast expansions to prevent new services blocking. The capacity planning process of an ATM network shows the amount of resources needed to support a specific workload. When the resource need is greater than the available resource, the network limit has been reached. In this case, there are two possibilities to reach balance: increase the network resources or lower the load of desired service. This work is about a method for ATM network resources dimensioning. The main technique used in the method is the traffic behavior simulation over ATM switches. For specific workload, different simulations are executed and they vary according to the resources available inside the probable parameters. The following measures of performance are gotten in the simulations as average statistics results: cell loss ratio (CLR), cell transfer delay (CTD) and cell delay variation (CDV). Knowing the workload desired performance (QoS), the method can determine the necessary amount of resources that will satisfy the QoS requirements. The chosen tool to implement the model was the event driven simulator ATM/HFC of the National Institute of Standards and Technology (NIST). The simulator is made up of different models of elements, each one with its attributes, which can be combined to characterize specific network configurations that are to be evaluated. The elements can range from representations of types of ATM switches to different techniques of traffic management to be used in the simulation. The workload in the simulation is provided by modeler elements that characterize different types of traffic generator applications, allowing sets of CBR, VBR, ABR and UBR services through their respective traffic parameters. The method validation is carried out through the matching of the results gotten with other similar work developed using simulation.
|
34 |
Automated Iterative Tolerance Value Allocation and AnalysisJanuary 2016 (has links)
abstract: Tolerance specification for manufacturing components from 3D models is a tedious task and often requires expertise of “detailers”. The work presented here is a part of a larger ongoing project aimed at automating tolerance specification to aid less experienced designers by producing consistent geometric dimensioning and tolerancing (GD&T). Tolerance specification can be separated into two major tasks; tolerance schema generation and tolerance value specification. This thesis will focus on the latter part of automated tolerance specification, namely tolerance value allocation and analysis. The tolerance schema (sans values) required prior to these tasks have already been generated by the auto-tolerancing software. This information is communicated through a constraint tolerance feature graph file developed previously at Design Automation Lab (DAL) and is consistent with ASME Y14.5 standard.
The objective of this research is to allocate tolerance values to ensure that the assemblability conditions are satisfied. Assemblability refers to “the ability to assemble/fit a set of parts in specified configuration given a nominal geometry and its corresponding tolerances”. Assemblability is determined by the clearances between the mating features. These clearances are affected by accumulation of tolerances in tolerance loops and hence, the tolerance loops are extracted first. Once tolerance loops have been identified initial tolerance values are allocated to the contributors in these loops. It is highly unlikely that the initial allocation would satisfice assemblability requirements. Overlapping loops have to be simultaneously satisfied progressively. Hence, tolerances will need to be re-allocated iteratively. This is done with the help of tolerance analysis module.
The tolerance allocation and analysis module receives the constraint graph which contains all basic dimensions and mating constraints from the generated schema. The tolerance loops are detected by traversing the constraint graph. The initial allocation distributes the tolerance budget computed from clearance available in the loop, among its contributors in proportion to the associated nominal dimensions. The analysis module subjects the loops to 3D parametric variation analysis and estimates the variation parameters for the clearances. The re-allocation module uses hill climbing heuristics derived from the distribution parameters to select a loop. Re-allocation Of the tolerance values is done using sensitivities and the weights associated with the contributors in the stack.
Several test cases have been run with this software and the desired user input acceptance rates are achieved. Three test cases are presented and output of each module is discussed. / Dissertation/Thesis / Masters Thesis Mechanical Engineering 2016
|
35 |
Conservação de energia em sistemas de iluminação pública e os seus efeitos na rede elétrica de distribuição /Damato, Júlio Carlos. January 2005 (has links)
Resumo: O trabalho busca trazer uma contribuição na utilização da energia elétrica, através do melhor uso das lâmpadas de descarga à alta pressão, de vapor de mercúrio e de sódio. Dois aspectos são tratados: a influência deste tipo de lâmpada na qualidade de energia, uma vez que esta avaliação é difícil, por se tratar de uma carga distribuída por toda a cidade e o aspecto do dimensionamento dos condutores para os circuitos que têm uma alimentação exclusiva através de transformadores dedicados. A parte prática do trabalho está baseada em experimentos e medições feitas em uma subestação experimental montada no Laboratório de Alta Tensão na UNESP, campus de Guaratinguetá. Através de oscilografia, as formas de ondas de corrente e tensão, no lado de baixa tensão e média tensão, foram medidas, analisadas e avaliadas. Com a utilização de softwares gráficos foram comparadas as formas de ondas mostradas pelo equipamento com as curvas traçadas a partir de valores calculados. Foram avaliadas as influências dos transformadores de corrente e dos transformadores de potencial sobre as medições dos parâmetros elétricos de uma instalação. / Abstract: The work wants to give a contribution in the use of the electric power, trough the best use of the high pressure discharge lamps, of mercury and sodium. Two aspects are treated: the lamp type influence in Energy Quality, once this evaluation is difficult, for treating of a load distributed by the whole city, and the aspect of the dimensioning of the feeders for circuits that have and exclusive feeding through transformers.A brief revision of lighting concepts is made and also a study of harmonic current is presented. It was looked for, in research, to know the state of the art for the subject. The practical part of work is based on experiments and measurements made in a mounted experimental substation in UNESP High Tension Laboratory, campus of Guaratinguetá. Through oscilograph voltage and current waves formats, in low and high voltage sides, they were measured, analyzed and appraised. With utilization of graphics software was a made a comparison between the equipment oscilographed curves and curves acquire on calculated values. They were appraised the influences of voltage and current transformers about the measurents of the electric parameters of an installation. / Orientador: Oscar Armando Maldonado Astorga / Coorientador: José Luz Silveira / Banca: Agnelo Marotta Cassula / Banca: José Policarpo Gonçalves de Abreu / Mestre
|
36 |
Conservação de energia em sistemas de iluminação pública e os seus efeitos na rede elétrica de distribuiçãoDamato, Júlio Carlos [UNESP] 21 December 2005 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:29:52Z (GMT). No. of bitstreams: 0
Previous issue date: 2005-12-21Bitstream added on 2014-06-13T18:59:49Z : No. of bitstreams: 1
damato_jc_me_guara.pdf: 907873 bytes, checksum: 1173d249b00c8dc682ed7ae9dce890c3 (MD5) / Universidade Estadual Paulista (UNESP) / O trabalho busca trazer uma contribuição na utilização da energia elétrica, através do melhor uso das lâmpadas de descarga à alta pressão, de vapor de mercúrio e de sódio. Dois aspectos são tratados: a influência deste tipo de lâmpada na qualidade de energia, uma vez que esta avaliação é difícil, por se tratar de uma carga distribuída por toda a cidade e o aspecto do dimensionamento dos condutores para os circuitos que têm uma alimentação exclusiva através de transformadores dedicados. A parte prática do trabalho está baseada em experimentos e medições feitas em uma subestação experimental montada no Laboratório de Alta Tensão na UNESP, campus de Guaratinguetá. Através de oscilografia, as formas de ondas de corrente e tensão, no lado de baixa tensão e média tensão, foram medidas, analisadas e avaliadas. Com a utilização de softwares gráficos foram comparadas as formas de ondas mostradas pelo equipamento com as curvas traçadas a partir de valores calculados. Foram avaliadas as influências dos transformadores de corrente e dos transformadores de potencial sobre as medições dos parâmetros elétricos de uma instalação. / The work wants to give a contribution in the use of the electric power, trough the best use of the high pressure discharge lamps, of mercury and sodium. Two aspects are treated: the lamp type influence in Energy Quality, once this evaluation is difficult, for treating of a load distributed by the whole city, and the aspect of the dimensioning of the feeders for circuits that have and exclusive feeding through transformers.A brief revision of lighting concepts is made and also a study of harmonic current is presented. It was looked for, in research, to know the state of the art for the subject. The practical part of work is based on experiments and measurements made in a mounted experimental substation in UNESP High Tension Laboratory, campus of Guaratinguetá. Through oscilograph voltage and current waves formats, in low and high voltage sides, they were measured, analyzed and appraised. With utilization of graphics software was a made a comparison between the equipment oscilographed curves and curves acquire on calculated values. They were appraised the influences of voltage and current transformers about the measurents of the electric parameters of an installation.
|
37 |
Tolerance Analysis of Parallel Assemblies using Tolerance-Maps® and a Functional Map Derived from Induced DeformationsJanuary 2012 (has links)
abstract: This thesis concerns the role of geometric imperfections on assemblies in which the location of a target part is dependent on supports at two features. In some applications, such as a turbo-machine rotor that is supported by a series of parts at each bearing, it is the interference or clearance at a functional target feature, such as at the blades that must be controlled. The first part of this thesis relates the limits of location for the target part to geometric imperfections of other parts when stacked-up in parallel paths. In this section parts are considered to be rigid (non-deformable). By understanding how much of variation from the supporting parts contribute to variations of the target feature, a designer can better utilize the tolerance budget when assigning values to individual tolerances. In this work, the T-Map®, a spatial math model is used to model the tolerance accumulation in parallel assemblies. In other applications where parts are flexible, deformations are induced when parts in parallel are clamped together during assembly. Presuming that perfectly manufactured parts have been designed to fit perfectly together and produce zero deformations, the clamping-induced deformations result entirely from the imperfect geometry that is produced during manufacture. The magnitudes and types of these deformations are a function of part dimensions and material stiffnesses, and they are limited by design tolerances that control manufacturing variations. These manufacturing variations, if uncontrolled, may produce high enough stresses when the parts are assembled that premature failure can occur before the design life. The last part of the thesis relates the limits on the largest von Mises stress in one part to functional tolerance limits that must be set at the beginning of a tolerance analysis of parts in such an assembly. / Dissertation/Thesis / M.S. Mechanical Engineering 2012
|
38 |
Tempo de assistência de enfermagem: identificação e análise em instituição hospitalar de ensino. / Time of nursing care: identification and analisys of a teaching hospital.Karin Emilia Rogenski 06 September 2006 (has links)
Estudo de abordagem quantitativa, elaborado com o objetivo de identificar e analisar o comportamento do tempo médio de assistência de enfermagem despensado aos pacientes, das Unidades de Internação do HU-USP, no período de 2001 a 2005. A identificação das variáveis intervenientes no cálculo do tempo médio de assistência de enfermagem, possibilitou a aproximação com a realidade das Unidades, permitindo visualizar a distribuição dos leitos, a quantidade média diária de pacientes assistidos, a quantidade média de pessoal existente nas Unidades de Internação e o Índice de Segurança Técnica, segundo as categorias profissionais. Verificou-se que o número e a distribuição de leitos das Unidades sofreu alterações ao longo do período analisado. O percentual de ausência prevista sofreu variação entre os índices encontrados em cada Unidade, evidenciando que, as ausências previstas por folga mostraram-se superiores ao indicados pela literatura, apontando para a possibilidade da Instituição conceder um número maior de feriados do que aqueles estabelecidos pelas leis e decretos federais, estaduais e municipais, como por exemplo, as emendas de feriados. Com relação as ausências não previstas, verificou-se que as faltas, as licenças médicas e as licenças maternidade constituíram os tipos mais constantes de ausências, no entanto, constatou-se que o percentual de ausência não prevista por licença INSS foi bastante significativo na categoria técnico/auxiliar de enfermagem. O tempo médio de assistência de enfermagem, apesar de algumas variações, manteve-se equilibrado durante todo o período para a maioria das Unidades, com exceção das Unidades de UTIP e BER que sofreram diminuição do tempo de assistência de enfermagem nos anos de 2003 e 2004, respectivamente. Constatou-se, ainda, que o tempo médio de assistência identificado, na maioria das Unidades de Internação, apresentou variações conforme as alterações observadas no quantitativo médio de pessoal de enfermagem e no número médio de pacientes. Os resultados apontados, referentes a distribuição percentual do tempo de assistência entre os profissionais da equipe de enfermagem, corroboram os encontrados em outros estudos, que já demonstraram que a proporção de horas atribuídas às enfermeiras, são inferiores aquelas atribuídas aos técnicos e auxiliares de enfermagem, e estão muito distantes daquilo que é preconizado pelo COFEN. O desenvolvimento desse estudo evidencia perspectivas para a realização de outras pesquisas que complementem as análises realizadas e verticalizem o conhecimento das variáveis que interferem no processo de identificação do tempo médio de assistência despensado aos pacientes das instituições hospitalares. / Study of quantitative approach, created for aiming to identify and analyze the average time behavior of nursing care delivered for the patients from the Internment Units at HU-USP from 2001 to 2005. The identification of intervenient variables in the average time calculus of nursing care made it possible the contact with the reality in the Units, allowing us to visualize the bed distribution, daily average amount of attended patients, the average amount of personnel working in the Internment Units and the Technical Safety Index, according to professional categories. It was verified that the number and distribution of beds in the Units had changes throughout the analyzed period. The percentage of predicted absence had variations among the indexes found in each Unit, proving that predicted absences for days off were higher than the ones seen in literature, pointing to the possibility of the facility to concede a greater number of holidays than those established by laws and local, state and federal decrees, as for example, the holiday bridges. Regarding to the unpredicted absences, it was verified that the missing days, medical leaves and maternity leaves were the most constant kinds of absence. However, it was noticed that the percentage of unpredicted absence for INSS leaves was quite high in the nursing technician/auxiliary categories. Average time of nursing care, despite of some variations, kept stable throughout the period in most Units, except for UTIP and BER Units, which suffered a reduction of nursing care time in the years of 2003 and 2004 respectively. It was also evidenced that the average time of care identified in most Internment Units presented variations as the observed changes in the average amount of nursing staff and the average number of patients. The results obtained, referring to the percentage of distribution of time for care among the nursing staff professionals confirm the ones found in other studies, which showed that the proportion of hours attributed to nurses are lower than those attributed to nursing technicians and auxiliaries, which are very far from what is advised by COFEN. The development of this study shows perspectives for making other researches that complement the analyses made to deepen the knowledge of the variables that interfere in the process of identification of the average time devoted for caring the patients in the hospital institutions.
|
39 |
Metodologia para eficientização do processo de elaboração e análise de projetos de linhas aéreas rurais de distribuição de energia elétricaRibeiro, Cássio Landim 29 September 2017 (has links)
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2017-10-13T13:21:48Z
No. of bitstreams: 2
Dissertação - Cássio Landim Ribeiro - 2017.pdf: 3929731 bytes, checksum: 438916584696fc0815c232bacc624152 (MD5)
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2017-10-13T13:22:21Z (GMT) No. of bitstreams: 2
Dissertação - Cássio Landim Ribeiro - 2017.pdf: 3929731 bytes, checksum: 438916584696fc0815c232bacc624152 (MD5)
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2017-10-13T13:22:21Z (GMT). No. of bitstreams: 2
Dissertação - Cássio Landim Ribeiro - 2017.pdf: 3929731 bytes, checksum: 438916584696fc0815c232bacc624152 (MD5)
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Previous issue date: 2017-09-29 / This paper presents a new methodology aimed at increasing efficiency in the dimensioning and approval stage of aerial rural electricity distribution lines projects. As a substitute for the sequential process currently employed, the approach proposed here is based on Simultaneous Engineering, where all the actors of the process have access to the computational tool, in a web platform, that allows implementing the methodology, enabling the multidisciplinary activity to be carried out in a parallel way. The estimates gathered indicate that the tool will allow the reduction of the time spent for the elaboration and approval of the projects, allowing: to reduce the total cost in man-hour spent by the electric utility; satisfy the customer's needs more quickly; optimize the mechanical dimensioning of distribution lines; and provide additional financial gain to the concessionaire due to the reduction of the average time to effectively start supplying electric power. / Neste trabalho, é apresentada uma nova metodologia dirigida ao aumento da eficiência nas etapas de dimensionamento e de aprovação de projetos de linhas rurais aéreas de distribuição de energia elétrica. Em substituição ao processo sequencial atualmente empregado, a abordagem proposta aqui é baseada em Engenharia Simultânea, onde todos os atores do processo têm acesso à ferramenta computacional, em plataforma web, que permite implementar a metodologia, possibilitando realizar a atividade multidisciplinar, em paralelo, de maneira mais ágil. As estimativas realizadas indicam que a ferramenta possibilitará a redução do tempo gasto para a elaboração e aprovação dos projetos, permitindo: reduzir o custo total em homem-hora despendido pela concessionária de energia elétrica; satisfazer a necessidade do cliente de maneira mais rápida; otimizar os dimensionamentos mecânicos das linhas de distribuição; e prover ganho financeiro adicional à concessionária devido à redução do tempo médio para efetivamente iniciar o fornecimento da energia elétrica.
|
40 |
Dimensionamento de profissionais de enfermagem em ambulatório de oncologia e hematologia / Dimensioning of nursing professionals at an oncology and hematology outpatient unitLelia Gonçalves Rocha Martin 22 November 2013 (has links)
Introdução: Os ambulatórios de oncologia vêm atendendo, a cada dia, um número crescente de pacientes que necessitam de cuidados clínicos complexos; todavia, boa parte desses serviços não possui informações que possam dar suporte às decisões relativas ao dimensionamento de profissionais de enfermagem. Objetivos: Identificar e analisar as intervenções / atividades realizadas pelos profissionais de enfermagem e definir parâmetros para dimensionar o quadro de pessoal de enfermagem em ambulatório especializado em oncologia e hematologia. Método: Pesquisa metodológica de campo que utiliza a técnica de amostragem de trabalho realizada em um ambulatório de oncologia e hematologia de uma organização de saúde privada localizada na cidade de São Paulo. Os dados foram coletados de 15 a 19 de abril de 2013 e foram organizados nas etapas seguintes: (1) Construção do instrumento de medida da frequência e do tempo despendido em intervenções de enfermagem; (2) Validação das intervenções / atividades do instrumento; (3) Identificação da frequência e do tempo despendido pelos profissionais de enfermagem em intervenções / atividades; (4) Dimensionamento de profissionais de enfermagem em ambulatório de oncologia e hematologia. Resultados: O instrumento construído e validado englobou 34 intervenções e três atividades. Foram registradas pelos observadores de campo 3694 observações dos profissionais de cada categoria na execução das intervenções / atividades de enfermagem. A documentação foi a intervenção que despendeu maior tempo da equipe (24,1%). Seguida desta, as intervenções que mais interferiram na carga de trabalho dos enfermeiros foram: Manutenção de dispositivos de acesso venoso (9,2%), Controle da quimioterapia (7,9%), Acompanhamento por telefone (5,1%) e Presença (4,7%); e, para os técnicos de enfermagem: Controle do ambiente em conforto (12,3%), Punção de vaso para amostra de sangue venoso (11,9%), Presença (10,1%) e Monitorização de Sinais Vitais (9,4%). A média diária dos pacientes correspondeu a 37,2 (±4,4) pacientes. O tempo médio de cuidado por paciente relativo aos cuidados de enfermagem, atividades associadas, tempo de espera e atividades pessoais correspondeu a 3,3h (80% de enfermeiros e 20% de técnicos de enfermagem). A produtividade encontrada foi de 81,3%. Conclusão: Este estudo possibilitou indicar parâmetros para o dimensionamento, bem como identificar o tipo e a proporção das intervenções de enfermagem que interferem na carga de trabalho e aplicar equações para o cálculo de profissionais de enfermagem. Entretanto, ainda constitui-se em uma visão restrita da realidade, necessitando ser replicado em vários e diferentes ambulatórios especializados em oncologia / Introduction: Oncology outpatient units have been receiving an increasing number of patients who need complex clinical care; however, most of them do not have appropriate information to support nursing staffing decisions. Objectives: To identify and analyze interventions/ activities performed by nursing professionals and to define parameters used to determine nursing staffing in a specialized oncology and hematology outpatient centers. Methods: Field methodology study that uses sampling technique, carried out in an oncology and hematology outpatient center of a private healthcare organization located in the city of Sao Paulo. Data were collected between April 15 to 19, 2013 and organized into steps: (1) Design a tool to measure frequency and duration of nursing interventions; (2) Validation of interventions/ activities of the tool; (3) Identification of frequency and time spend by nursing professionals in their interventions/ activities; (4) Dimensioning of nurses in an oncology and hematology outpatient unit. Results: The tool was designed and validated and encompassed 34 interventions and three activities. The field observers documented 3,694 observations of professionals in each category of nursing interventions/ activities. Documenting (24.1%) was the intervention that required more time from the team. Next, the activities that required more time from the nursing team were: maintenance of devices: venous access (9.2%), chemotherapy control (7.9%), telephone follow-up (5.1%) and person-to-person follow-up (4.7%). To nursing technicians, the activities were: environment control - comfort (12.3%); venous puncture - venous blood sample (11.9%); presence (10.1%), and monitoring of vital signs (9.4%). The mean daily number of patients corresponded to 37.2 (±4.4) patients. The average time spent on patient care, related to nursing care, associated activities, waiting time and personal activities corresponded to 3.3 hours (80% of nurses and 20% of nursing technicians). Productivity was 81.3%. Conclusion: This study led to the definition of parameters for staffing, plus the identification of type and proportion of nursing interventions that interfered on the workload and the application of equations to calculate nursing staffing. However, it still is a restricted view of the reality, which has to be multiplied in several and different specialized oncology outpatient centers.
|
Page generated in 0.0978 seconds