• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 175
  • 14
  • Tagged with
  • 189
  • 89
  • 70
  • 49
  • 46
  • 41
  • 39
  • 28
  • 27
  • 26
  • 26
  • 25
  • 25
  • 22
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Energianvändning på Volvo Lastvagnar Tuve

Albinsson, Kristoffer January 2007 (has links)
<p>Volvo Trucks is the second largest manufacturer of heavy trucks, with factories in several countries and with around 21 000 employees. At the plant in Tuve, trucks have been built since 1982 and the activity mainly consists of producing side members and to assemble and packing kits of trucks.</p><p> </p><p>In 2005, the factory in Tuve launched the ambition to be the first carbon dioxide neutral vehicle factory in the world. This will be implemented by streamlining and investing in renewable energy.</p><p> </p><p>The aim of this degree thesis is to map the usage of energy within production, and also to prepare a method to measure key figures (use of energy per produced unit). The purpose with the thesis is to make it possible to measure and analyze performed energy saving measurements, and to identify areas within production where there is potential to save energy. The report also considers proposals for energy saving measurements in both production and in the factory in general.</p><p> </p><p>It appears that the assembly of trucks represented a tiny part of the total usage of energy in the factory, while the process of side member production and application of rust protection used the most energy.</p><p> </p><p>The thesis gives proposals for four methods to key figures measurements. These are connected only to the assembly part of the factory, and the difference between the methods depends on the way of measure the heat consumption.</p><p>Key words</p><p>Use of energy, mapping/survey, key figures, streamlining use of energy</p>
12

Energianvändning i badhus : Simulering och jämförelse av gamla och nya system / Energy use in public baths : simulation and comparsion of old and new systems

Fredriksson, Lisa January 2012 (has links)
Every year new premises are built in Sweden, and even if they are made as energy efficient as possible, this will not reduce the energy demands, but the rate of the increase of the energy use will be reduced. One type of facility in Sweden that is a major energy user is public baths, and this makes public baths an interesting facility to study more closely. There are around 500 public baths in Sweden and about 75 % of those can be seen as older baths with large need of renovation, and they all require a high level of energy efficiency measures. To show how the energy demand increase or decrease depending on the changes chosen to be made, the simulation application IDA Indoor Climate and Energy was used. Simulations were made and compared for several cases, with two extreme cases as starting points. The cases were older and newer ventilation systems, with and without return air flow, older and newer building envelopes and how the indoor climate and the energy demand is affected by the swimming pool covered or not covered during the night. The biggest difference in heat demand was found to be in the two extreme cases, and the use of recirculated air has the highest impact.
13

Energianalys av äldre flerbostadshus : Kvarter Kommissionären i Mariestad / Energy analysis of older multi-family buildings : Housing block Kommissionären in Mariestad

Zayton, Hedro Gabriel, Singh Nagra, Jaspreet January 2015 (has links)
Syftet med detta examensarbete är att göra en energianalys av sex äldre flerbostadshus. Fastigheterna befinner sig på kvarter Kommissionären och tillhör Mariehus AB. Detta är ett företag som förvaltar hyresfastigheter och ger trygghet i boendet. Syftet med studien är att hjälpa företaget att energianalysera sina fastigheter ur både ett byggtekniskt och energitekniskt perspektiv. Målet med examensarbetet är att redovisa energianvändningen och energiförlusterna för de sex byggnaderna. Inom detta arbete togs ett par åtgärder för att minska energianvändningen och samtidigt effektivisera energianvändningen. De sex undersökta byggnaderna är byggda mellan 1940- och 1960-talen och är i behov av renovering för att de ska bli mer energieffektiva. Orsaken är de stora värmeförluster som sker genom de olika byggdelarna och otätheterna i klimatskalet. Avseende ventilationen förlorars mycket energi årligen och med några enkla åtgärder kan energianvändningen effektiviseras. Resultatet visar att fastigheterna idag är i relativt gott skick med tanke på deras ålder men möjligheter till att minska byggnadernas höga energianvändning finns. / This bachelor thesis does an energy analysis of six multi-family houses. The properties are located in the housing block called Kommissionären and are owned by Mariehus AB. This company manages and develops renting apartments and make sure that their residents feel good in their properties. The purpose of this diploma work is to help the company analyze their properties from both an energy and a building technical point of view. The purpose is to study energy usages and energy losses. This proposes a couple of steps to reduce and improve the energy efficiency in the houses. The six houses were built between in the 1940´-s and the 1960’-s and are in need of refurbishment to become more energy efficient. The reason is large energy losses through different parts of climate shell. Regarding ventilation, a lot of energy is lost annually which, through simple measures, can be saved. In summary, the six multi-family houses are in fairly good condition considering their age, but that there is still potential for saving energy due to the high energy losses.
14

Energianvändning på Volvo Lastvagnar Tuve

Albinsson, Kristoffer January 2007 (has links)
Volvo Trucks is the second largest manufacturer of heavy trucks, with factories in several countries and with around 21 000 employees. At the plant in Tuve, trucks have been built since 1982 and the activity mainly consists of producing side members and to assemble and packing kits of trucks. In 2005, the factory in Tuve launched the ambition to be the first carbon dioxide neutral vehicle factory in the world. This will be implemented by streamlining and investing in renewable energy. The aim of this degree thesis is to map the usage of energy within production, and also to prepare a method to measure key figures (use of energy per produced unit). The purpose with the thesis is to make it possible to measure and analyze performed energy saving measurements, and to identify areas within production where there is potential to save energy. The report also considers proposals for energy saving measurements in both production and in the factory in general. It appears that the assembly of trucks represented a tiny part of the total usage of energy in the factory, while the process of side member production and application of rust protection used the most energy. The thesis gives proposals for four methods to key figures measurements. These are connected only to the assembly part of the factory, and the difference between the methods depends on the way of measure the heat consumption. Key words Use of energy, mapping/survey, key figures, streamlining use of energy
15

Översyn av uppvärmning

Revelj, Jonas, Svensson, Patrik January 2008 (has links)
The heating of companies premises is today functional with electrical heating and heating of fossil fuel. The energy cost for these kinds of heating in buildings has heavily increased during the last years and the influence on the environment has become more visual. This leads to that enterprises today become more anxious to render energy more effective and find alternative solutions to their ancient heating systems. This is something that Skandinaviska kraftprodukter AB in Halmstad has become aware of. The purpose with this examination is to find the most cost-efficient and environmental measures for the office and workshop premises of SKP AB. Where one of the bigger things is to find a good alternative for their current oil furnace, which was heating the workshop. Another big thing was to take forward suggestions for measures of rendering energy more effective for the buildings. By taking contact with people in the business and by inspecting the premises and the heating system, we got an idea about the measures that could be of current interest. We analysed these measures to see if they could last financially and environmentally. At the financial analysis we used LCC-method which means that you calculate the cost of the investment during its life. With the heating system this means, among other things, running, maintenance and initial costs. To examine the affect on the environment from the different heating alternatives we chose to make a easier LCA, which we based on the local conditions. In an existing building it is the simple measures of rendering energy that dominates financially, the bigger investments don’t create financial expectations high enough with the energy prices of today. In the workshop it was foremost a number of industrial gates that led to great heating losses, which would best be taken care off by PVC-stripes curtain or automatic shutoff of the heating system when the gates are open. Another alternative would be to invest in aircurtain. This would reduce the heating losses a lot, but because of the large investment cost is this not an option. The most cost-efficient measure is to increase the awareness of the employees, about how their behaviour is affecting the use of energy and to make sure that heat and ventilation doesn’t run unnecessarily. While going through possible heating alternatives for the workshop, three alternatives seemed the most interesting, air-to-air heat pump district heating and pellets. When it came to the financial aspects where there no great difference between the three alternatives, when you looked at a calculation period over 30 years. Environmentally heat pump was the best choice because the electricity of HEM is water produced. The district heating had the highest affect on the environment because it partially comes from waste burning, which leads to large emissions. From comfort and maintenance point of view we think that the district heating is the best alternative for the enterprise, foremost because you don’t have to maintain the system and it can heat the premises even during the coldest days. The downside with pellets is that it brings a curtain amount of maintenance and that pellets storage takes a lot of place. The downside of heat pump is that it doesn’t have enough effect to cope with the coldest days. Our recommendation of heating system is district heating. It is true it has the biggest influence on the environment but because it can handle the need for heat during all parts of the year and that it is free of maintenance ways up for its influence on the environment.
16

Energianalys av kvarteret Borgen 10 : En utredning av ökande energianvändning med förslag på åtgärder för energieffektivisering

Samuelsson, Therése, Olsson, Robert January 2016 (has links)
No description available.
17

Verifiering av en kontorsbyggnads energianvändning / Verification of an office building’s energy use

Byström, Jonas January 2016 (has links)
This thesis was commissioned by the department Fastighet (Real estate) at Umeå municipality in the spring of 2016. Since Fastighet represents Umeå municipality as landlords they are obliged by the Swedish law (2006:985) energy certification of buildings to declare a building’s energy use within two years after the building started operating. In this thesis an investigation was made regarding the energy use of an office building named Kuben, located at the city hall area in Umeå, Sweden. The purpose of the project was to investigate whether the building met the demands regarding its energy use. In addition an analysis was made during the project to indicate the reasons for the discrepancies between the energy consumption for the simulation model in IDA ICE and the measured energy consumption of Kuben in the year of 2015. According to the energy balance calculation in IDA ICE, it was found that the building was expected to have a specific energy use (BSE) of 52 kWh/m2,year, while in reality the building had a measured BSE of 91,1 kWh/m2,year in the year of 2015. Therefore Kuben did not fulfill the main requirement of the Green Building which is 90 kWh/m2,year, but it did however fulfill the BBR requirement. The reason behind the large deviation in BSE is primarily due to the occupants having used significantly less electricity than expected, combined with a higher use of domestic hot water and higher indoor temperatures than expected. Another detection factor that has further increased the differences is the fact that the ventilation system has been switched on basically around the clock during the year of 2015. Something which is very common during the building’s first year of operation since the building is setting and the construction body is in a dry-phase and emissions are being vented. To be able to perform a follow-up on a building’s energy consumption, it is very important to have access to real data of the energy sources included in BSE, in order to really be able to verify whether the building meets the requirement or not. It is also an advantage if there is a possibility to have access to lots of sub-meters, since it makes it easier to determine and verify the causes that lead to deviation between the energy use for the simulation model and measured data. It is recommended that a follow-up regarding the buildings energy use should take place during the building’s second year of operation or later, since the first year contains more reasons that can cause deviation and that the BSE is higher than normal because of the complications. / Detta examensarbete utfördes på uppdrag av Umeå kommun, Fastighet under våren 2016. Eftersom Fastighet företräder Umeå kommun som fastighetsägare är det skyldiga enligt lag (2006:985) om energideklaration för byggnader att verifiera nybyggnationers energianvändning senast två år efter att de har tagits i drift. I det här arbetet verifierades Kubens energianvändning som är en kontorsbyggnad belägen på Stadshusområdet i Umeå, Sverige. Syftet med arbetet var att undersöka om byggnaden uppfyllde det energikrav som ställdes på byggnaden. Utöver detta utfördes det även en analys för att indikera orsaker till avvikelser mellan energianvändningen för en projekterad energibalansberäkning i IDA ICE och uppmätta användningen för Kuben under året 2015. Utifrån energibalansberäkningen konstaterades det att byggnaden förväntades ha en specifik energianvändning (BSE) på 52 kWh/m2,år medan för året 2015 hade byggnaden en BSE på 91,1 kWh/m2,år. Utifrån det erhållna resultatet uppfyllde inte Kuben huvudkravet från Green Building på 90 kWh/m2,år däremot klarades kravet från BBR. Orsaker till den stora avvikelsen på BSE beror främst på att brukarna har använt sig av betydligt mindre verksamhetsenergi, haft en högre tappvarmvattenanvändning och högre inomhustemperaturer, än projekterat. En annan påvisande faktor som gett upphov till de stora avvikelserna är att ventilationen har i stora drag varit på hela tiden under året 2015, vilket är väldigt vanligt under byggnadens första driftår då byggnaden är i en inkörningsperiod där både byggstomme torkas och emissioner ventileras bort. För att kunna utföra en uppföljning på en byggnads energianvändning är det viktigt att ha tillgång till verklig data för delposterna inom BSE, detta för att verkligen kunna verifiera om byggnaden uppfyller kravet eller inte. Det är också en fördel om det finns tillgång till många undermätare för det underlättar analysen mellan energianvändningen för energibalansberäkningen och uppmätta, så att orsaker till avvikelser kan verifieras. Det rekommenderas att en uppföljning bör ske tidigast under byggnadens andra driftår, eftersom under första året förekommer det mer orsaker som kan ge upphov till avvikelse och för att BSE är högre än normalt.
18

Halvering av energianvändningen i ett äldre flerbostadshus : Simulering av energireducerande åtgärder och lönsamhetsbedömning för fastigheten Bollnäs Lillanda 6:1

Söderlind, Gustav January 2013 (has links)
Denna rapport är en beskrivning av olika lösningar för att halvera energianvändningen hos ett äldre flerbostadshus i Gävleborgs län. Rapporten utgör en del i projektet EnergiKompetent Gävleborg – fastighetssektorn, inom vilket totalt elva flerbostadshus spridda i länets kommuner studerats. Projektets syfte är att föreslå de mest effektiva åtgärderna för att på sikt halvera energianvändningen och minska klimatpåverkan i Gävleborgs läns bostadsbestånd, i linje med de mål på energieffektivisering i bostadssektorn till år 2050 som ställts upp av Sveriges Riksdag. Inom ramen för denna rapport har fastigheten Bollnäs Lillanda 6:1 detaljstuderats. Byggnaden är ett mindre flerbostadshus med stomme i lättbetong beläget i landsorten Segersta i Bollnäs kommun, byggår 1955. Uppvärmningen sker med pellets. Mätningar, observationer och beräkningar har utförts för att fastställa byggnadens aktuella energisituation, och energiprogramvaran BV2 2010 har använts för att bygga en simuleringsmodell och utvärdera effekten av olika renoveringslösningar och energiåtgärder. Kostnaderna för de olika åtgärderna har studerats och en lönsamhetsbedömning har gjorts. Resultatet av simuleringarna visar att det går att nå en halvering av byggnadens energianvändning och två åtgärdspaket redovisas som minskar energianvändningen från dagens 160 kWh/m2·år ner till 78 kWh/m2·respektive 82 kWh/m2. Kostnaden för åtgärdspaketen beräknas till 770 000 respektive 1 350 000 kr. Det motsvarar ca 1300 respektive 2300 kr/m2. Utöver detta visas en rad enskilda åtgärder fastighetsägaren kan vidta för att uppnå en i stort sett valfri energibesparing beroende på investeringsviljan. Exempel på åtgärder som ingår i åtgärdspaketen är tilläggsisolering av ytterväggar och källarväggar, från- och tilluftsventilationssystem med värmeåtervinning, nya fönster, solfångare för varmvattenproduktion och sänkning av inomhustemperaturen. Med de förutsättningar och antaganden som gjorts i arbetet om energiprisets utveckling, åtgärdernas investeringskostnader och liknande, är inget av de åtgärdspaket som når en halvering lönsamma inom sin livslängd, så länge investeringskostnaderna till fullo ska bäras av den kostnadsbesparing som uppstår till följd av reducerad energianvändning. Ett tredje åtgärdspaket beräknas som uppnår en energibesparing på 33 % mot dagens läge, och som i sin helhet blir lönsam inom sin livslängd. Detta till en beräknad kostnad av 270 000 kr.
19

Renoveringsinsatsers ordningsföljd och dess påverkan på energianvändningen

Toreberg, Kristin January 2014 (has links)
Denna rapport utgör det avslutande momentet i högskoleingenjörsprogrammet i byggteknik, institutionen för teknikvetenskaper vid Uppsala universitet. Syftet med studien var att undersöka om renoveringsarbeten i projekt av renoverings- och tillbyggnadstyp (förkortat ROT) går att utföra i en annan ordningsföljd än traditionellt och om detta kan minska energianvändningen under renoveringstiden. Studien utfördes hos ett av Sveriges största bostadsaktiebolag, Rikshem, som äger och förvaltar ett stort antal miljonprogramsbyggnader i hela landet i behov av renovering. Studien begränsades därför till miljonprogramsfastigheter och ett studieobjekt inom Rikshems bestånd valdes ut. Tillvägagångssättet var att ta reda på de vanligaste renoveringsåtgärderna för miljonprograms-fastigheter generellt, samt åtgärder för studieobjektet specifikt. Miljonprogrammet byggdes under 60- och 70-talen. P.g.a. sin ålder är därför stora delar av fastigheterna i behov av, eller har redan genomgått renovering. Ämnet är därigenom aktuellt och generella åtgärdsförslag återfinns i allt från tidningsartiklar till universitetsuppsatser. Åtgärder specifika för studieobjektet hämtades ur tidigare gjorda konsultutredningar, gjorda på uppdrag av Rikshem. Åtgärderna bedömdes sedan med hjälp av en erfaren projektledare om de var möjliga att utföra i ett tidigt skede av renoveringsfasen eller ej. De åtgärder som bedömdes som intressanta simulerades sedan i energianalysverktyget VIP Energy för att räkna ut en eventuell besparing. I programmet byggs först en digital modell av verkligheten upp, där bland annat mått, byggnadsmaterial, klimatdata, geografisk placering och vridning i förhållande till väderstrecken tas hänsyn till. En ändring i modellen ger sedan en fingervisning om hur motsvarande ändring i verkligheten skulle kunna te sig. Vidare undersöktes de olika byggnadsdelarnas teoretiska besparingspotential, även detta i VIP Energy. Utgångsläget jämfördes med ett teoretiskt bästa utfall, där byggnadsdelen i fråga ersattes med en oändligt bra isolering. Resultatet av studien visade att åtgärder av tilläggsisoleringstyp är enkla att utföra i förtid eftersom de främst minskar värmeflödet genom de isolerade byggdelarna och stör hyresgästerna minimalt under arbetet. Åtgärder som påverkar husets täthet blir svårare att utgöra i ett tidigt skede eftersom otätheterna utgör friskluftsintag i den befintliga frånluftsventilationen. Byte av ventilationssystem kräver omfattande ingrepp i lägenheterna och bedömdes därför inte vara möjligt att utföra i förtid med kvarboende hyresgäster och därför bör förtätande åtgärder ej utföras innan. Den största energibesparingspotentialen finns i ytterväggar och fönster.
20

Användning och utveckling av Miljöbyggnad / Use and development of Miljöbyggnad

Jeppsson, Stina, Hasnein, Barak, Mohamadi, Mohammed January 2014 (has links)
Rapporten beskriver undersökningen och utvärderingen av certifieringssystemet Miljöbyggnad. Undersökningen har genomförts genom personliga intervjuer med tre olika företag, Karlshamnsbostäder, Ljungby kommun och Växjö Fastighetsförvaltning AB.Syftet med rapporten är även att undersöka om produktionsenergi för byggnadsmaterial bör inkluderas med i systemet Miljöbyggnad. Undersökningen genomförs genom beräkning av energianvändningen för ett isoleringsmaterial, värmeeffektbehovet och transmissionsförlusterna.

Page generated in 0.0772 seconds