• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 190
  • 69
  • 43
  • 18
  • 9
  • 5
  • 4
  • 3
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 374
  • 94
  • 85
  • 54
  • 50
  • 47
  • 41
  • 40
  • 40
  • 37
  • 37
  • 36
  • 36
  • 30
  • 29
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
261

Usinas hidrelétricas cotistas: aspectos técnicos e regulatórios sobre a qualidade do serviço prestado. / Regulated hydropower plants: technical and regulatory aspects about the quality of service.

Tenaglia, Gustavo Caravaggi 19 May 2017 (has links)
Esta Dissertação traz uma discussão sobre a necessidade de haver políticas de incentivo à existência de almoxarifado de operação em usinas hidrelétricas que renovaram suas concessões através da Lei 12.783/13 passando a pertencer ao regime de cotas de garantia física, e seus efeitos imediatos para a disponibilidade do sistema gerador e para a segurança de operação do sistema elétrico brasileiro, estabelecendo conexões do ambiente regulatório/econômico com o mundo físico/real. Com base nas teorias de confiabilidade, métodos de gestão de ativos e políticas de operação e manutenção, analisa-se a situação real do parque gerador hidrelétrico com mais de 30 anos de operação, e as consequências do aumento das taxas de falhas e redução de vida útil, explanando a necessidade de se promover uma forma de incentivo que corrija as assimetrias regulatórias estabelecidas, envolvendo as penalidades e os benefícios percebidos tanto pelo lado do agente regulado, quanto pelo lado do consumidor final. No texto deste trabalho, verifica-se uma discrepância entre os custos de O&M reais e regulatórios, induzindo duas análises possíveis: Para o caso em que as remunerações são superiores aos custos reais, a penalização proposta pelo regulador não é suficiente para induzir investimentos em almoxarifados, dado que o retorno não condiz com o custo de oportunidade do capital empregado. Já para o caso em que as remunerações são inferiores aos custos reais, as penalidades podem impor um desequilíbrio econômico-financeiro da gestão dos ativos, anulando os incentivos para manutenção da disponibilidade através da imobilização de ativos sobressalentes. Estes casos demonstram, de forma simples, a existência de uma falha no sinal dado pelo regulador para a manutenção da qualidade do serviço, medido através dos índices de disponibilidade. Ressalta-se que a degradação dos ativos pertencentes às usinas cotistas não só é prejudicial para a busca pela modicidade tarifária, mas também poderá ser crítica para a operação do sistema em um período em que as hidrelétricas existentes terão um papel fundamental o gerenciamento de carga com a entrada de fontes intermitentes no sistema elétrico brasileiro. Para isso, o trabalho está estruturado em sete capítulos: (1) introdução; (2) o modelo regulatório vigente; (3) usinas hidrelétricas e seus sistemas; (4) confiabilidade e taxa de falha; (5) estudo de caso 1 - qualidade do serviço prestado; (6) estudo de caso 2 - avaliação dos impactos sistêmicos e (7) considerações finais. / This Dissertation brings a discussion about the need of creating politics to incentive the existence of operational warehouses in Regulated Hydropower Plants, regarding the immediate effects in the availability and reliability of the Brazilian Electrical System - linking the regulatory environment to the physical world. Based in reliability theories, asset management theories and operational & maintenance polices, the work analyses the real performance of those he Regulated Hydropower Plants that are in operation for more than 30 years of operation, looking at the consequences of the growing of failure rates by going toward the end of the forecasted life-time of the main systems and equipment. By that, it aims to explain the need of promoting incentives that corrects the regulatory asymmetry involving the penalties and bonuses perceived by the regulated agent and the final consumer. Through this work, a discrepancy between the real and the regulatory O&M costs is noted, what leads to two different analysis: On the one hand, for those agents with regulated revenue greater than the real O&M costs, there is no incentive to spent their capital in spare parts due to the opportunity cost of that capital. On the other hand, the for those agent with regulated revenue lower than the real O&M costs, the penalties can easily impose an economic-financial imbalance, also nulling the incentives to immobilize assets in spare parts. Those two examples demonstrate in a simple way the failure in the sign given by the regulator to guarantee the quality of service of those Power Plants. It is divided into seven chapters: (1) introduction; (2) the current regulatory model; (3) hydropower plant and its systems; (4) reliability and failure rate; (5) study case 1 - quality of service; (6) study case 2 - evaluation of systemic impacts and (7) final considerations.
262

Produção de energia por mini e micro hidrelétricas na rede de distribuição de água. / Energy production with mini and micro hydropower plants in the water supply system network.

Sosnoski, André Sandor Kajdacsy-Balla 10 April 2015 (has links)
A geração de energia hidrelétrica enfrenta uma crescente restrição a sua expansão, diretamente relacionada a fatores ambientais e da limitação de terrenos com potencial economicamente aproveitável. A partir deste fato, é relacionada uma possível fonte de energia hidrelétrica, resultante do aproveitamento dos potenciais presentes na rede de distribuição de água das cidades, ainda sem nenhum aproveitamento. O desenvolvimento desta fonte de energia se dá com a instalação de mini e micro centrais hidrelétricas nos condutos da rede distribuidora de água. Este trabalho tem por objetivo avaliar o potencial de aproveitamento hidrelétrico por mini e micro hidrelétricas por meio de técnicas de modelagem e de otimização, para agilizar e facilitar o procedimento de identificação dos potenciais e a instalação na rede de abastecimento. O trabalho leva em conta as diversas peculiaridades das redes de distribuição de água e dos equipamentos eletro-hidráulicos, discorrendo sobre a possível complementariedade da geração de energia durante os picos de consumo. Discorre também sobre a contribuição para a rede de distribuição elétrica, na logística e nos custos de implantação além de discutir a tipologia das turbinas capazes de aproveitar o potencial energético. É avaliado, com o auxilio de modelos hidráulicos e de otimização, o posicionamento das centrais geradoras na rede e os possíveis benefícios, restrições e impedimentos ao seu uso, desenvolvendo uma metodologia para facilitar a tomada de decisão quanto ao aproveitamento para geração, ou não, em redes diversas. A construção deste procedimento e ferramenta são desenvolvidos a partir do estudo de caso do sistema distribuidor de água do Município de Piquete no estado de São Paulo, Brasil. / Hydropower energy production is facing limitations in their capacity to grow due directly to environmental and space limitations, questioning the actual economic benefits that hydropower have always had compared to other energy sources. In order to face this problems and to propose a new technology, the study focus on the potential of hydropower generation in the water supply systems (WSSs) network that are yet to be studied. Developing this new technology means the introduction of mini and micro hydropower plants in the WSS network. This study intends to develop a methodology and evaluate mini and micro hydropower potential, adopting optimization and modeling tools to accelerate and facilitate the identification procedures of potential installation points and the possibility of implementing pressure controls in the form of turbines in the network. The study considers all WSS peculiarities and restrictions, evaluating the introduction of electro hydraulic equipment and their interference and complementarity when considering energy consumption and production that would make the installation feasible. There is also a discussion about how will this technique be implemented in the network without interfering in water supply, and the logistics, costs and how energy distribution issues can be treated, including turbines type and configuration and also the activation timetables. All these features will be linked and treated with an optimization method that can provide decision making easier, locating production units and evaluating benefits and restrictions imposed by the environment. The construction of this procedure will be applied in a case study in the Piquete municipality in São Paulo, Brazil.
263

Approximations d'ordre réduit des équations de Saint-Venant pour la modélisation de vallée hydroélectrique / Reduced order approximations of the Saint-Venant equations for hydropower valley modeling

Dalmas, Violaine 10 December 2018 (has links)
L'hydroélectricité est la première des énergies renouvelables électriques. Sa production repose en partie sur des centrales au fil de l'eau dont les capacités de modulation sont encore faiblement exploitées. Les capacités d'ajustement des centrales hydrauliques sont d'autant plus essentielles aujourd'hui que la pénétration d'énergies intermittentes dans un mix énergétique décarboné est indispensable.Dans cette thèse, nous nous intéressons aux centrales au fil de l'eau turbinant le débit de cours d'eau aux marnages limités. Les enjeux de sûreté, notamment liés au multi-usage de l'eau, ainsi que la perspective de moduler les débits turbinés nous ont amenés à considérer le problème de la modélisation des écoulements dans les canaux reliant les centrales au fil de l'eau. Les équations de Saint-Venant sont les plus pertinentes pour ce type de modélisation. Nous avons proposé plusieurs approches à partir de ces dernières pour caractériser analytiquement la dynamique de l'écoulement à des variations de débits turbinés. Nous avons considéré la dynamique du système autour d'un régime fluvial stationnaire non-uniforme caractéristique des configurations hydroélectriques. La première approche est basée sur une approximation basses fréquences. La seconde approche est basée sur une méthode de réduction de modèle avec une paramétrisation selon le débit support. Une troisième approche est proposée en considérant explicitement la recherche d'une solution approximée des équations de Saint-Venant linéarisées autour d'une configuration hydroélectrique. Un critère spatio-fréquentiel est alors introduit, l'existence d'un biais en basses fréquences nous conduit à proposer un modèle d'ordre réduit dont la dynamique basses fréquences est imposée selon les résultats de la première approche. La solution exprimée sous forme de fonctions de transfert, comme pour les deux précédentes approches, met en évidence explicitement la présence de modes de résonance/anti-résonance. Finalement, nous illustrons les résultats vis à vis de simulations non-linéaires et de données réelles et proposons une régulation de niveau basée sur cette dernière approche. / New challenges arise from energy transition toward a more sustainable energy mix. Hydropower is already the main source of renewable electricity. In order to integrate a massive increase in generation of renewable intermitent energies, improving the flexibility of run-of-the-river hydropower plants becomes essential. In this thesis, we focus on run-of-the river power plants facing water level constraints. Safety issues, partly due to the multiple uses of water, and the opportunity to modulate turbined flow rates have led us to adress the problem of flow modelisation in open channels that connect run-of-the rivers facilities with each others. An accurate model is provided by the Saint-Venant equations. From these latters, we have proposed different approaches to characterize analytically the flow dynamics in response to turbined flow variations. The system dynamics have been considered around a subcritical stationary non-uniform regime typical of hydroelectric configuration. The first approach is based on a low frequency approximation. The second approach is based on a parametric model reduction technique. By seeking explicitly an approximate solution to the linearized Saint-Venant equations around an hydroelectric configuration, we have proposed a third approach. A space-frequency criterion is introduced, which shows a bias in low frequency. Results of the first approach are then used to propose a reduced order model asymptotically exact in low frequency. As for the two other approaches, the solution takes the shape of parametric transfer functions. Resonance/anti-resonance modes explicitly appear. Finally, comparisons with non-linear simulations taking into account actual real data are discussed and a water level controller is developed based on the last approach.
264

Dimensionamento de usinas hidroelétricas através de técnicas de otimização evolutiva / Sizing hydropower plants via evolutionary optimization techniques

Silva Filho, Donato da 18 December 2003 (has links)
As metodologias normalmente utilizadas para otimizar as dimensões de uma usina hidroelétrica, incluindo os métodos empregados pelo Setor Elétrico Brasileiro, baseiam-se em análises do tipo custo/benefício. Os custos provêm de gastos diretos com a construção da usina e os benefícios correspondem a receitas proporcionadas pela venda de energia. Para avaliar os benefícios, são realizadas simulações da operação da usina e a energia produzida é valorizada economicamente. Esta necessidade das simulações da operação faz com que o problema de dimensionamento não possua uma função analítica explícita para determinar os benefícios energéticos, o que dificulta a implementação de métodos tradicionais de otimização. O objetivo deste trabalho é justamente desenvolver e implementar uma metodologia de dimensionamento que permita que o processo de busca pelas dimensões ótimas seja automático. Para tanto, acoplam-se um modelo de otimização evolutiva e um modelo de simulação da operação de sistemas hidroelétricos. Adicionalmente, o modelo proposto também deve ser flexível, permitindo que as regras de operação do sistema hidroelétrico, o conjunto de vazões afluentes, a forma de valorização da energia gerada e uma série de outros fatores sejam tratados como parâmetros do modelo. Os resultados encontrados indicam que, sob o ponto de vista computacional, o modelo proposto é automático, flexível e eficiente. Além disso, as várias análises de sensibilidade realizadas atestam a consistência da metodologia proposta e permitem avaliar a forma como os diferentes parâmetros do modelo influenciam as próprias dimensões da usina sob dimensionamento. A partir destas análises, sugerem-se algumas medidas de regulamentação e planejamento para que as dimensões de novas usinas não sejam determinadas a partir de sinalizações imprecisas de parâmetros que influenciam de forma decisiva suas dimensões ótimas. / The methods normally applied to optimally size a hydropower plant, including the ones used by the Brazilian Power Industry, are based on cost/benefit analysis. The costs are due to direct expenses with the hydropower plant construction and the benefits correspond to incomes from selling energy. The benefits are evaluated throughout computing simulations of the hydropower plant operation, followed by the assignment of an economical value to the energy produced by it. The need for computing simulations turns out a non-analytical objective function for the sizing problem, what makes the use of traditional optimization tools very hard. The objective of this work is just to develop and implement a sizing method that automatically performs the search for the optimal sizes of a hydropower plant. The proposed method combines an evolutionary optimization technique and a simulation model for the operation of hydropower systems. Additionally, the proposed model is also flexible in the sense that the operation rules for the hydroelectric system simulation, the set of water inflows, the way the energy is valued and some other factors that may influence the results are treated as parameters. The results show that, from the computing point of view, the proposed method is automatic, flexible and efficient. Furthermore, the sensitivity analyses performed validate the method consistency and establish relationships among the different parameters and the way they affect the optimal features of the new hydropower plant. Based on the results of such analyses, some regulation and planning measures are suggested in order to avoid sizing hydropower plants with mistaken parameters that can substantially change its optimal features.
265

Financiamento da geração hidrelétrica de grande porte no Brasil: evolução e perspectivas / Hydropower Financing In Brazil: Evolution and Perspectives

Milene Clifford Carvalho 16 April 2013 (has links)
A indústria de energia elétrica é caracterizada por sua importância no planejamento estratégico de um país, uma vez que o crescimento e desenvolvimento socioeconômico são respaldados pela disponibilidade energética nacional. Nesse sentido, a expansão da capacidade de geração, transmissão e distribuição são essenciais para o acompanhamento da evolução econômica e para a inserção social. Com base na atual configuração da matriz energética brasileira e no plano de expansão de energia elétrica, o planejamento de investimentos em projetos de geração é importante para suportar o desenvolvimento do país e o financiamento desses projetos é fundamental para que o planejamento seja cumprido. Nesse contexto, o presente trabalho analisa a evolução das formas de financiamento adotadas nos empreendimentos de geração hidrelétrica de grande porte no Brasil, bem como busca identificar fontes alternativas de recursos adequadas às características desses projetos. Para isso, aborda-se o histórico do setor elétrico brasileiro, que alterna entre períodos de predomínio de investimentos públicos. Posteriormente, discute-se a dupla função do poder político, seja por defender os recursos naturais objetos de concessão, seja pela busca de atratividade de investimentos no setor de energia elétrica, e a atuação do BNDES como agente financiador da expansão de energia, com base no modelo Project Finance. As principais características do modelo de Project Finance são apresentadas no capítulo 4 e aborda-se seu aparecimento no Brasil e, mais especificamente, no desenvolvimento do setor elétrico brasileiro. Além disso, investiga-se como os critérios ambientais, relevantes nos empreendimentos de grande porte, interagem com a regulação e com a concessão de financiamentos. Por fim, analisa-se os financiamentos recentes das Usinas Hidrelétricas Santo Antônio, Jirau e Belo Monte, a evolução das políticas praticadas pelo BNDES e as possíveis alternativas de fontes de recursos para investimentos em infraestrutura e, portanto, empreendimentos hidrelétricos de grande porte. / The electric power industry is characterized by its importance in the strategic planning of a country, since the growth and socioeconomic development are supported by national energy availability. In this regard, the expansion of generation capacity, transmission and distribution are essential for monitoring the economic evolution and social inclusion. Based on the current configuration of the Brazilian energy matrix and on the expansion plan for electricity, planning investments in generation projects is important to support the country\'s development, and financing is the key to accomplish such projects. In this context, this paper analyzes the evolution of financing adopted in Brazilian large scale projects of hydroelectric generation as well as seeks to identify alternative funding sources appropriate to the features of these projects. Therefore, the history of the Brazilian electric sector is discussed, which present alternates periods of predominance of public and private investments. In addition, the dual role of political power is discussed, whether by defending natural resources, subject to governmental concession, whether by the pursuit of attractiveness of investments in the electric sector. Also the role of BNDES as financing agent of the expansion of generation capacity is important to be considered, as well as the main features of the Project Finance and its presence on the Brazilian electric sector. Furthermore, a study of how environmental principles, relevant to large energy projects, interact with regulation and the granting of loans is prepared. Finally, the recent funding of Santo Antonio, Jirau and Belo Monte hydroelectric plants analysis is conduced, with regards of the development of financial policies of BNDES and possible alternatives sources of funds for infrastructure investments such as large hydroelectric projects.
266

Usinas hidrelétricas cotistas: aspectos técnicos e regulatórios sobre a qualidade do serviço prestado. / Regulated hydropower plants: technical and regulatory aspects about the quality of service.

Gustavo Caravaggi Tenaglia 19 May 2017 (has links)
Esta Dissertação traz uma discussão sobre a necessidade de haver políticas de incentivo à existência de almoxarifado de operação em usinas hidrelétricas que renovaram suas concessões através da Lei 12.783/13 passando a pertencer ao regime de cotas de garantia física, e seus efeitos imediatos para a disponibilidade do sistema gerador e para a segurança de operação do sistema elétrico brasileiro, estabelecendo conexões do ambiente regulatório/econômico com o mundo físico/real. Com base nas teorias de confiabilidade, métodos de gestão de ativos e políticas de operação e manutenção, analisa-se a situação real do parque gerador hidrelétrico com mais de 30 anos de operação, e as consequências do aumento das taxas de falhas e redução de vida útil, explanando a necessidade de se promover uma forma de incentivo que corrija as assimetrias regulatórias estabelecidas, envolvendo as penalidades e os benefícios percebidos tanto pelo lado do agente regulado, quanto pelo lado do consumidor final. No texto deste trabalho, verifica-se uma discrepância entre os custos de O&M reais e regulatórios, induzindo duas análises possíveis: Para o caso em que as remunerações são superiores aos custos reais, a penalização proposta pelo regulador não é suficiente para induzir investimentos em almoxarifados, dado que o retorno não condiz com o custo de oportunidade do capital empregado. Já para o caso em que as remunerações são inferiores aos custos reais, as penalidades podem impor um desequilíbrio econômico-financeiro da gestão dos ativos, anulando os incentivos para manutenção da disponibilidade através da imobilização de ativos sobressalentes. Estes casos demonstram, de forma simples, a existência de uma falha no sinal dado pelo regulador para a manutenção da qualidade do serviço, medido através dos índices de disponibilidade. Ressalta-se que a degradação dos ativos pertencentes às usinas cotistas não só é prejudicial para a busca pela modicidade tarifária, mas também poderá ser crítica para a operação do sistema em um período em que as hidrelétricas existentes terão um papel fundamental o gerenciamento de carga com a entrada de fontes intermitentes no sistema elétrico brasileiro. Para isso, o trabalho está estruturado em sete capítulos: (1) introdução; (2) o modelo regulatório vigente; (3) usinas hidrelétricas e seus sistemas; (4) confiabilidade e taxa de falha; (5) estudo de caso 1 - qualidade do serviço prestado; (6) estudo de caso 2 - avaliação dos impactos sistêmicos e (7) considerações finais. / This Dissertation brings a discussion about the need of creating politics to incentive the existence of operational warehouses in Regulated Hydropower Plants, regarding the immediate effects in the availability and reliability of the Brazilian Electrical System - linking the regulatory environment to the physical world. Based in reliability theories, asset management theories and operational & maintenance polices, the work analyses the real performance of those he Regulated Hydropower Plants that are in operation for more than 30 years of operation, looking at the consequences of the growing of failure rates by going toward the end of the forecasted life-time of the main systems and equipment. By that, it aims to explain the need of promoting incentives that corrects the regulatory asymmetry involving the penalties and bonuses perceived by the regulated agent and the final consumer. Through this work, a discrepancy between the real and the regulatory O&M costs is noted, what leads to two different analysis: On the one hand, for those agents with regulated revenue greater than the real O&M costs, there is no incentive to spent their capital in spare parts due to the opportunity cost of that capital. On the other hand, the for those agent with regulated revenue lower than the real O&M costs, the penalties can easily impose an economic-financial imbalance, also nulling the incentives to immobilize assets in spare parts. Those two examples demonstrate in a simple way the failure in the sign given by the regulator to guarantee the quality of service of those Power Plants. It is divided into seven chapters: (1) introduction; (2) the current regulatory model; (3) hydropower plant and its systems; (4) reliability and failure rate; (5) study case 1 - quality of service; (6) study case 2 - evaluation of systemic impacts and (7) final considerations.
267

\"Aqueles que vivem nas marges, às margens da decisão: controvérsias sobre o uso dos rios e das terras ribeirinhas para geração hidrelétrica\" / Those who live at the riversides, aside from the decision making: controversies about the use of rivers and the riverside lands for hydroelectric power generation.

Francisco Del Moral Hernandez 01 December 2006 (has links)
Esta dissertação desenvolve a idéia de um processo de \"destituição da fala\" de grupos sociais, indígenas, camponeses, ribeirinhos, ameaçados e atingidos por barragens e grupos da sociedade organizada como os sindicatos que representam os trabalhadores das empresas elétricas e organizações não governamentais que discordam da maneira como vem se conduzindo o processo de expansão da oferta de eletricidade através da construção de hidrelétricas. Fazemos dois retrospectos. O primeiro, das lutas sociais por democracia nos últimos 30 anos. O segundo, um histórico da consolidação das empresas elétricas, relacionando-o com a história política brasileira e as relações entre interesses privados e ações de governo. Revela-se uma relação autoritária, pouca participação pública, centralismo decisório e fundamentalmente a prevalência dos interesses capitalistas nos projetos hidrelétricos. O viés autoritário, sendo herança histórica, molda a maneira como até hoje a discussão sobre como a oferta de eletricidade se desenvolve. Os resultados da pesquisa de campo e análise de entrevistas com dirigentes do movimento social organizado, sindicalistas e integrantes da coordenação nacional do Movimento dos Atingidos por Barragens (MAB) revelam a grande distância entre a produção de diagnósticos, reflexões, expectativas das organizações sociais, organizações não governamentais e uma efetiva incorporação desta produção na discussão sobre novos, antigos e futuros projetos hidrelétricos. Há pouco reconhecimento público e institucional das entidades e movimentos sociais que, a despeito de terem propostas e acúmulo de experiências sobre empreendimentos mal sucedidos, reivindicações sobre o passivo social e ambiental das obras já instaladas, não tomam parte dos processos de discussão e decisão. Esta ausência do processo se materializa como elemento de não-reconhecimento e comprometedor da dignidade de ação política destes agrupamentos sociais. A ampliação de espaços de discussão é tratada ao nível teórico e prático a partir da voz dos entrevistados e nos servindo dos estudos das ciências políticas sobre a constituição de esferas públicas, sobre ação comunicativa e sobre a teoria dos movimentos sociais. Dois exemplos internacionais são trazidos para reflexão: o debate público sobre energia no Quebec e o gerenciamento da utilização dos cursos d\'água e das margens dos rios na Holanda. O processo de criminalização dos movimentos sociais é identificado como um obstáculo à idéia de que se crie, na opinião pública, espaço para se discutir de maneira ampla o uso dos rios, das águas e terras ribeirinhas. Conclui-se este trabalho de dissertação apontando algumas oportunidades políticas e frentes de atuação através das quais os movimentos sociais, sindicatos, organizações não governamentais, podem ampliar o espaço de discussão. A participação nos comitês de bacias, exploração das heterogeneidades nos espaços de governo, alianças entre movimento sindical, movimentos sociais e ONGs e a importância dos ciclos de protesto diante de um cenário de criminalização dos movimentos sociais podem, concomitantemente, ampliar espaço e juntar forças para denunciar e se contrapor ao esgotamento dos recursos naturais e à expropriação autoritária e acelerada das terras dos pequenos proprietários, pescadores e moradores ribeirinhos que a instalação de uma quantidade enorme de empreendimentos hidrelétricos vem consolidando. / This Dissertation develops the idea of a process of suppression of the voice of social groups, indigenous peoples, rural workers, riverside populations, those threatened by or victims of Dams construction, and groups of the organized society such as those unions that represent the workers of the electricity companies and non government organizations that disagree with the way how the process of expansion of the electricity supply is being conducted through the construction of hydroelectric plants. We present two retrospective overviews. The first one addresses the social movements in their fight for democracy in the last 30 years. The second one addresses the history of the consolidation of the electricity companies, relating it to the Brazilian politics history and the relationship between private interests and government actions. It is revealed an authoritarian relationship, a small public participation, a centralized decision systems and, essentially, the prevailing of the capitalist interests in the hydroelectric projects. The authoritarian bias, an historic heritage, shapes the way how the discussion on electricity supply developed until the present. The results of the field research and the analysis of the interviews of leaders of the organized social movements, union leaders, and members of the national coordination of the \"Dam Affected People Movement\" - Movimento dos Atingidos por Barragens (MAB), reveal a large gap between the production of diagnostic analysis, expectances of the social organizations and non government organizations, and any substantial incorporation of this production in the discussion of new, previous and future hydroelectric projects. There is little public and institutional recognition of those organizations and social movements, which, in spite of having proposals, experiences on projects with bad outcomes, and demands on the social and environmental liability of the plants already in operation, do not take part in the discussions of the decision making process. The expansion of the discussion arenas is addressed at the theoretical and practical levels, having as base materials the interviews conducted during the field research and political sciences studies on the constitution of public spheres, on the communicative action, and on the theory of social movements. Two international examples are brought to discussion: the public debate on Energy in the Quebec Province, and the management of the use of the riverside space in the Netherlands. The process of criminalization of the social movements is identified as an obstacle to the idea of creating, in the public opinion, spaces for a comprehensive discussion on the use of rivers, of the water, as well as of the river side lands. This dissertation concludes with the identification of political opportunities and directions of action through which the social movements, unions, and non-government organizations can expand the space for discussion. The participation in river basin committees, the exploration of heterogeneous spaces of government, alliances among the unions movement, social movements and NGOs, and the importance of cycles of protest in a scenario of criminalization of social movements can, all together, expand the space and add strengths to make public and to fight against the exaustion of natural resources and the fast and authoritarian expropriation of lands of small rural owners, fishers and riverine inhabitants, which is being consolidated by the large development of hydroelectric enterprises.
268

Going with the flow or swimming against the current? : the influence of rules and norms on advocacy strategies of NGO coalitions along the Mekong River

Yasuda, Yumiko January 2014 (has links)
Nongovernmental organisations (NGOs) have come to play a major role in contemporary governance systems, and particularly in the fields of water and the environment. Adopting a new institutional theoretical perspective, this thesis examines how rules and norms affect the advocacy strategies of coalitions of NGOs in Vietnam and Cambodia, utilising a comparative case study analysis of the Xayaburi hydropower dam planned on the Mekong River in Laos. The comparison was conducted between the Rivers Coalition in Cambodia and the Vietnam Rivers Network during the planning period for the dams in 2011-2013.The main findings of the study is that rules, norms, actors, biophysical and material conditions interact with each other in creating influence over advocacy strategies. Different patterns of interactions were identified; these are 1) complementary interactions between formal rules, informal rules and norms 2) competing interactions between formal rules, informal rules and norms. Actors play important roles in both of these forms of interactions. Through identification of the barriers and opportunities NGO actors face within the Mekong region, the thesis concludes with two recommendations: 1) modifications to the formal rules which could facilitate further integration of NGOs and civil society actors into decision-making processes of transboundary water governance and 2) use of analytical framework by NGO and civil society actors in identifying windows of opportunities for advocacy strategies.
269

Regras de operação para sistemas hidroelétricos com previsão por redes neurais / not available

Sacchi, Rodrigo 08 April 2004 (has links)
Este trabalho de pesquisa está relacionado com a aplicação de técnicas de Redes Neurais Artificiais (RNA\'s) na obtenção de políticas de operação conjunta de usinas hidroelétricas (UH\'s). O comportamento ótimo das usinas hidroelétricas depende tanto da posição relativa de cada UH ao longo da cascata como da relação entre elas. O propósito principal deste trabalho é de aplicar a rede de mapa auto-organizável (SOM) de Kohonen com modelos de sistemas dinâmicos, no aprendizado destas relações, objetivando seu uso para simular a operação ótima de um sistema hidroelétrico real. Este modelo é uma versão não-supervisionada do modelo NARX sendo chamado de modelo ou rede NARX Auto-Organizável (SONARX), capaz de processar padrões espaço-temporais. Desta maneira, um algoritmo de programação não-linear, especialmente desenvolvido para a realização da operação determinística de sistemas hidrotérmicos de potência, é utilizado para otimizar a operação deste conjunto de usinas, considerando-se várias condições hidrológicas distintas e, tendo como função objetivo a minimização do custo com complementação térmica. Em seguida, os resultados desta otimização são então processados e utilizados no treinamento da rede SONARX; ela irá captar os comportamentos relativos de cada uma das UH\'s, trabalhando com afluências futuras que ela mesma irá prever. De forma geral, a partir dos resultados obtidos com um subsistema do sistema sudeste brasileiro, pode-se concluir que a rede SONARX conseguiu assimilar o comportamento ótimo da operação do sistema teste. Os testes mostraram que o previsor neural possui uma forte tendência em seguir os resultados da otimização determinística, otimizando o uso dos recursos hídricos disponíveis para geração de energia elétrica. Posteriormente, a rede neural com função de base radial (RBF) foi aplicada na interpolação das previsões feitas pela rede SONARX, uma vez que este tipo de rede é indicado para esta tarefa. Neste contexto, os centros das funções de base, da rede RBF, passam a ser definidos pela rede SONARX, mitigando o erro inerente a este tipo de modelagem baseada na técnica de MATQV. / This research work is related to the application of Artificial Neural Networks (ANN) in the obtaining of united operation policies in hydroelectric power plants (HP). The optimal behavior of the hydroelectric power plants depends as much on the relative position of each station throughout the cascade as on the relation between them. The main purpose of this work is to apply the self-organizing map network (SOM) of Kohonem with dynamic system models, in the learning of these relations, objectifying its usage to simulate the optimal operation of a real hydroelectric power system. This model is an unsupervised version of the NARX model; which has been called self-organized model or network (SONARX), capable of processing space-time patterns. This way, a nonlinear programming algorithm, especially developed to accomplish the hydrothermal power system deterministic operation, is used to optimize the operation of this group of hydropower plants, considering many distinct hydrological conditions, and aiming the minimized cost with the thermal complementation. After this, the results of this optimization are processed and used in the SONARX network training; it will captivate the relative behavior of each one of the (HP), working with future affluences that it will predict. In a general way, from the acquired results from a subsystem of the brazilian southeast system, we may conclude that the SONARX network managed to assimilate the optimal behavior of the system test operation. The tests showed that the neural predictor has a high tendency towards deterministic optimization results, optimizing the water resources use available for the electric energy generation. After all this, the radial basis function (RBF) network was applied on the interpolation of the predictions made by the SONARX network, once this kind of network is indicated to this task. On this context, the centers of the basis functions, of RBF network, are to be defined by the SONARX network, mitigating the unrelated error to this type of modeling based on MATQV technique.
270

Vibration analysis of a fast response brushless excitation system

Pålsson, Emma January 2019 (has links)
The aim of this study is to measure and analyze vibrations on a fast response brushless exciter (FRBE) at a real hydropower plant and identify vibration origins through frequency analysis. Moreover, the observed vibrations are evaluated in relation to generator vibration standards and estimated tangential eigenfrequencies of the studied FRBE. It is concluded that the pulsations in the air gap torque, originating from the rotating thyristor bridge rectifier, is the source of the strongest vibrations. Some additional vibration sources are also identified. The requirements of the generator vibration standards are mostly fulfilled and no tangential eigenfrequencies are triggered in the vibration recordings. For further studies it is recommended that alternative control strategies and optimization of the FRBE mechanical design, with respect to its ability to withstand vibrations, should be investigated.

Page generated in 0.1517 seconds