Spelling suggestions: "subject:"lagerhållningskostnader"" "subject:"investeringskostnader""
1 |
Pandemin och den militära konfliktens påverkan på en monteringsverksamhet : Materialförsörjning, produktion och leveransförmåga till kundSuljic, Admir, Åhrlin, Eric January 2022 (has links)
The pandemic (Covid-19) has since the beginning of 2020 caused major changes for many different companies. To minimize the spread of the virus several different measures have been implemented by local authorities. Additionally, a military conflict occurred between Russia and Ukraine in the early 2022, it has caused sanctions and led to many consequences including deterioration in the supply of raw materials. This study investigates a case company that assembles trucks for sewer cleaning in purpose to identify how the consequences of the pandemic and military conflict have affected its material supply, production, and delivery capacity to customers. The purpose is also to examine how the consequences can be managed to maintain an efficient business. The study is based on an abductive research approach and the data collection was mainly based on semi- and unstructured interviews. The collected data from the interviews has then been analyzed with relevant theories. During the pandemic the case company was affected by delivery delays, which further caused disruptions in production and a poor delivery capacity to customers. Similar outcomes are caused by the military conflict, the delivery from suppliers have deteriorated and continued to affect the production capacity of the case company, which is expected to decrease the delivery precision to customers. These consequences have caused the need of other methods than Just-in-time (JIT) to be applied during crisis, and a different view of tied up capital is also required. Measures to reduce the impacts of the pandemic have involved larger safety stocks, standardization, and innovation by building on support frames. The study concludes that a resilient supply chain and innovative thinking can reduce the consequences of a pandemic and a military conflict, these are some of the theoretical contributions presented by the study. Further studies are proposed for similar industries to enhance generalizability. / Sedan början av år 2020 har pandemin (Covid-19) orsakat stora förändringar för många olika företag. Lokala myndigheter har infört åtgärder i syfte att förhindra smittspridningen av viruset. Vidare utlöstes även en militär konflikt i början av år 2022 mellan Ryssland och Ukraina som orsakat sanktioner, vilket lett till försämrad tillgång av bland annat råvarumaterial. Denna studie undersöker ett fallföretag som monterar slamsugningsbilar i syfte att identifiera hur deras materialförsörjning, produktion och leveransförmåga till kund påverkats av både pandemin och den militära konflikten. Den innehåller även hur konsekvenserna kan hanteras för att upprätthålla en effektiv verksamhet. Studien utgår ifrån en abduktiv forskningsansats och där datainsamling huvudsakligen skett med semi- och ostrukturerade intervjuer. Svaren från intervjufrågorna har använts till nulägesbeskrivningen som sedan analyserats utifrån relevanta teorier. Under pandemin påverkades fallföretaget av längre leveransförseningar, som vidare orsakat störningar i produktion och därtill försämrat leveransprecisionen till kund. Studien visar liknande faktorer under den militära konflikten, där leveranspålitligheten förvärrats och fortsatt påverkat produktionskapaciteten, vilket förväntas att försämra leveransprecisionen till kund ytterligare. Samtliga konsekvenser har orsakat att andra metoder än Just-in-time (JIT) bör tillämpas under sådana kristider, samt att det även krävs en annan syn på kapitalbindning. Trots detta har fallföretaget klarat sig undan relativt bra under pandemin tack vare större säkerhetslager, ökad standardisering och genom en innovativ åtgärd att montera på stödramar. Studiens slutsats tyder på att motståndskraftiga försörjningskedjor och innovativt tänkande kan leda till lindrigare konsekvenser av både en pandemi och en militär konflikt, dessa är några av de teoretiska bidrag som presenteras. Vidare studier föreslås inom liknande branscher för att påvisa ökad generaliserbarhet.
|
2 |
Lagerlokalisering i Europa / Warehouse in EuropeEriksson, Daniel, Diaz, Magnus January 2009 (has links)
<p>Fiskeby Board tillverkar returfiberbaserad kartong som oftast används till livsmedelsprodukter. Fiskeby producerar mot kundorder. När en order är färdigproducerad så lagras den i väntan på att kunden ska avropa delar av ordern. Korta leveranstider är en av de viktigaste faktorerna för att lyckas i kartongbranschen.</p><p>På senare år har marknaden för livsmedelstillverkning flyttats från norden, söder ut, till och omkring Tyskland. Detta faktum har gjort att avståndet från Fiskebys produktionsanläggning till deras kunder har ökat vilket har lett till ökade leveranstider.</p><p>Uppgiften med examensarbetet var dels att som oberoende part, hitta ett nytt logistiskt upplägg som innebar kortare leveranstider och högre leveransservice och dels att göra en totalkostnadsanalys över företagets logistiska verksamhet för att underlätta för Fiskebys fortsatta arbete.</p><p>Det enda sättet att minska leveranstiden är att minska avståndet mellan produkterna och marknaden och därför togs beslutet att gå vidare med att hitta en strategisk lagerpunkt.</p><p>För att hitta en strategisk lagerpunkt gjordes flera olika tyngdpunktsberäkningar där varje analys tog hänsyn till en eller flera faktorer så som efterfrågan, vinstmarginal, geografisk belägenhet och kundrelation. Av alla Fiskebys kunder så analyserades bara de kunder som är belägna på kontinenten. Det sammanvägda resultatet av analyserna visade att lagret bör placeras i närheten av Frankfurt, Tyskland.</p><p>Utöver denna analys undersöktes möjligheten att lagra Fiskebys produkter i närheten av en hamn i Tyskland och en hamn i Polen. De två senare alternativen visade sig vara ekonomiskt oförsvarbara och därför utgick allt vidare arbete ifrån tyngdpunktsanalysens resultat.</p><p>För detta resultat undersöktes skillnader i kostnader, leveranstider och miljöpåverkan gentemot det nuvarande logistikupplägget.</p><p>Kostnader ökade med ca 40 % där högre transportkostnader var den främsta bidragande orsaken. Leveranstiden minskade med ca 44 % mot nuvarande system, detta beror på att avstånden till kunden minskar betydligt. Minskade leveranstider leder också till ökad leveransservice vilket förbättrar Fiskebys situation på marknaden.</p><p>Eftersom miljön påverkas olika mycket beroende på vilket transportslag som används så beräknades diverse utsläppshalter för alla transportlösningar. Det visade sig att det blir en miljöförsämring då enbart lastbilar används som transportslag, övriga lösningar visade en klar miljöförbättring.</p> / <p>Fiskeby Board AB is manufacturing packaging boards based on first class recycled fibre to be used in the food industry.</p><p>Fiskeby begins their production when they receive a customer order. When a complete order has been produced it gets transferred to a nearby warehouse. Customers then send a delivery request for a partial part of the order to be transferred. One of the most important factors to be successful in the packaging board industry is to be able to deliver the product within the shortest amount of time.</p><p>The food industry has in the past years slowly been centralized in and around Germany. Fiskeby has therefore ambitions to gain new customers in that region since they are at the same time losing customers in Scandinavia. The lead times have increased due to the fact that the distance between Fiskeby and its customers has grown.</p><p>The goal of this project is to reduce the lead times by changing the existing logistical approach. Another goal is to make a total cost analysis to simplify future logistical evaluations, which will be made by consultants.</p><p>Our work showed that the only way of reducing the lead times is to get closer to the current market. We decided to evaluate the possibility of renting a warehouse by a third party logistic company.</p><p>To find a strategic place of storage, several centre of gravity analysis were made. Every analysis used different factors as input such as customer demand, margin of profit, geographical suitability, and ability to cooperate. The result showed that the warehouse should be located around Frankfurt, Germany.</p><p>Besides this result, two other studies were made. The first study evaluated the alternative of placing the warehouse close to a Polish harbour. The second study evaluated the alternative of placing the warehouse close to a German harbour. Both of these alternatives where proved to be too costly and a decision were made to continue the project by only looking at the result from the centre of gravity approach.</p><p>A comparison between the current logistic approach and the centre of gravity approach were made. Cost, lead time, and the environmental effects were compared and results showed that the cost associated with transportation and storage will rise by approximately 40 %.</p><p>The lead time however will decrease by approximately 44 % compared with the current system, due to shorter distances to customers. This will improve delivery service and also improve the current market situation.</p><p>A change of systems will increase emissions only if Fiskeby decides to use truck as the mode of transportation. In all other cases emissions will decrease.</p>
|
3 |
Lagerlokalisering i Europa / Warehouse in EuropeEriksson, Daniel, Diaz, Magnus January 2009 (has links)
Fiskeby Board tillverkar returfiberbaserad kartong som oftast används till livsmedelsprodukter. Fiskeby producerar mot kundorder. När en order är färdigproducerad så lagras den i väntan på att kunden ska avropa delar av ordern. Korta leveranstider är en av de viktigaste faktorerna för att lyckas i kartongbranschen. På senare år har marknaden för livsmedelstillverkning flyttats från norden, söder ut, till och omkring Tyskland. Detta faktum har gjort att avståndet från Fiskebys produktionsanläggning till deras kunder har ökat vilket har lett till ökade leveranstider. Uppgiften med examensarbetet var dels att som oberoende part, hitta ett nytt logistiskt upplägg som innebar kortare leveranstider och högre leveransservice och dels att göra en totalkostnadsanalys över företagets logistiska verksamhet för att underlätta för Fiskebys fortsatta arbete. Det enda sättet att minska leveranstiden är att minska avståndet mellan produkterna och marknaden och därför togs beslutet att gå vidare med att hitta en strategisk lagerpunkt. För att hitta en strategisk lagerpunkt gjordes flera olika tyngdpunktsberäkningar där varje analys tog hänsyn till en eller flera faktorer så som efterfrågan, vinstmarginal, geografisk belägenhet och kundrelation. Av alla Fiskebys kunder så analyserades bara de kunder som är belägna på kontinenten. Det sammanvägda resultatet av analyserna visade att lagret bör placeras i närheten av Frankfurt, Tyskland. Utöver denna analys undersöktes möjligheten att lagra Fiskebys produkter i närheten av en hamn i Tyskland och en hamn i Polen. De två senare alternativen visade sig vara ekonomiskt oförsvarbara och därför utgick allt vidare arbete ifrån tyngdpunktsanalysens resultat. För detta resultat undersöktes skillnader i kostnader, leveranstider och miljöpåverkan gentemot det nuvarande logistikupplägget. Kostnader ökade med ca 40 % där högre transportkostnader var den främsta bidragande orsaken. Leveranstiden minskade med ca 44 % mot nuvarande system, detta beror på att avstånden till kunden minskar betydligt. Minskade leveranstider leder också till ökad leveransservice vilket förbättrar Fiskebys situation på marknaden. Eftersom miljön påverkas olika mycket beroende på vilket transportslag som används så beräknades diverse utsläppshalter för alla transportlösningar. Det visade sig att det blir en miljöförsämring då enbart lastbilar används som transportslag, övriga lösningar visade en klar miljöförbättring. / Fiskeby Board AB is manufacturing packaging boards based on first class recycled fibre to be used in the food industry. Fiskeby begins their production when they receive a customer order. When a complete order has been produced it gets transferred to a nearby warehouse. Customers then send a delivery request for a partial part of the order to be transferred. One of the most important factors to be successful in the packaging board industry is to be able to deliver the product within the shortest amount of time. The food industry has in the past years slowly been centralized in and around Germany. Fiskeby has therefore ambitions to gain new customers in that region since they are at the same time losing customers in Scandinavia. The lead times have increased due to the fact that the distance between Fiskeby and its customers has grown. The goal of this project is to reduce the lead times by changing the existing logistical approach. Another goal is to make a total cost analysis to simplify future logistical evaluations, which will be made by consultants. Our work showed that the only way of reducing the lead times is to get closer to the current market. We decided to evaluate the possibility of renting a warehouse by a third party logistic company. To find a strategic place of storage, several centre of gravity analysis were made. Every analysis used different factors as input such as customer demand, margin of profit, geographical suitability, and ability to cooperate. The result showed that the warehouse should be located around Frankfurt, Germany. Besides this result, two other studies were made. The first study evaluated the alternative of placing the warehouse close to a Polish harbour. The second study evaluated the alternative of placing the warehouse close to a German harbour. Both of these alternatives where proved to be too costly and a decision were made to continue the project by only looking at the result from the centre of gravity approach. A comparison between the current logistic approach and the centre of gravity approach were made. Cost, lead time, and the environmental effects were compared and results showed that the cost associated with transportation and storage will rise by approximately 40 %. The lead time however will decrease by approximately 44 % compared with the current system, due to shorter distances to customers. This will improve delivery service and also improve the current market situation. A change of systems will increase emissions only if Fiskeby decides to use truck as the mode of transportation. In all other cases emissions will decrease.
|
4 |
Undersökning av kostnader som uppstår vid tillverkning av flera produktvarianter : En studie utförd på Axis Communications / Analysis of arising costs related to the manufacturing of multiple product variants : A study performed at Axis CommunicationsPersson, Jesper, Persson, Johanna January 2017 (has links)
Dagens företag lägger ner allt mer tid och resurser på att utöka variantfloran i deras produktsortiment. Syftet är att nå ut till ett bredare segment av kunder samtidigt som företaget behåller en konkurrenskraftig position på marknaden. Vid framtagning av nya produkter ställs Axis Communications ofta inför utmaningen att ta beslut om att tillverka en eller flera varianter. I dagsläget tas beslut om att tillverka fler varianter i produktsortimentet utifrån priset på direkt material och försäljningsvolymen för varje variant. Axis Communications saknar därmed kunskap om vilka ytterligare faktorer som påverkas när beslut om variantskapande ska tas. Syftet med studien är att ta fram en beräkningsmodell som kan användas som beslutsunderlag vid analys av kostnader i att tillverka mer än en produktvariant. För att besvara syftet har studien genomfört två fallstudier utifrån två olika produkter i Axis Communications produktsortiment. Den första fallstudien analyserar nuläget av tillverkningen hos Axis Communications kontraktstillverkare där kostnader som påverkas av att flera varianter tillverkas identifieras och beräknas. Den andra fallstudien är en fiktivt fallstudie där de identifierade kostnaderna beräknas på nytt men då endast en variant tillverkas och resterande varianter tagits bort. Därefter utfördes en analys på hur de identifierade kostnaderna påverkas vid tillverkning av endast en variant. Utifrån litteraturstudier har de kostnader som påverkas i samband med att flera varianter tillverkas identifierats. Vidare har även processkartläggningar samt ett studiebesök hos en av Axis Communications kontraktstillverkare genomförts där ytterligare relevanta kostnader identifierats och bekräftats av personer med bred kunskap inom området. De kostnader som identifierats i studien och som därmed ansett påverkas mest av att variantfloran förändras är följande: Direkta särkostnader Direkt material Lagerföringskostnader Ställkostnader Fixtur- och verktygskostnader Indirekta särkostnader Kvalitetskostnader Time to Market Investeringskostnader Resurskostnader för utveckling av mekanik Resurskostnader för utvecklig av elektronik Certifieringskostnader Verktygskostnader Kostnader för test av produktion Kostnader för framtagning av prototyper Resultatet för direkt material visade att det går att utgå från ett medelvärde av priset för direkt material samt den prognostiserade försäljningsvolymen per variant för att skapa sig en första uppfattning om hur mycket variantskapande egentligen kostar. Lagerföringskostnaden visade sig också påverkas vid tillverkning av endast en variant. Lagerföringskostnaden minskade i lagret för komponenter men ökade samtidigt i färdigvarulagret eftersom att det endast är den dyrare varianten med avseende på direkt material som tillverkas då det är den variant som har samtliga funktioner jämfört med resterande varianter. Ställkostnaden eliminerades helt då ställtiderna som uppstår vid byte av varianter i tillverkningen försvann. Vidare så halverades kostnaderna för fixturer och verktyg. Kvalitetskostnaden visade sig vara svårare att kvantifiera, dock gick det att inse att desto högre volym som tillverkas av en variant desto fortare når varianten de uppsatta kvalitetsmålen vilket i sin tur bidrar till lägre kvalitetskostnader. Dessutom innebär ett lägre antal varianter i en och samma produktionslina att hanteringen blir lättare då bland annat risken för felmontering minskar. Det blir även lättare att identifiera, prioritera samt åtgärda fel som kan tänkas uppstå i produktionslinan. Det leder i sin tur till att kvalitetskostnaderna minskar. Time to Market påverkades också när endast en variant tillverkades. Även om Time to Market inte direkt kan ses som en kostnad utan snarare som ett intäktsbortfall, påvisade studien att det går fortare att få fram produkterna på marknaden om antalet varianter minskar. Slutligen studerades olika investeringskostnader som går att koppla till tillverkningen av flera varianter och resultatet visade på att det går att minska investeringskostnaderna om endast en variant tillverkas. Utifrån resultatet från de två fallstudierna utformades en beräkningsmodell åt Axis Communications som ska hjälpa företaget med att ta beslut om variantskapande. Beräkningsmodellen lyfter fram de kostnader som påverkas mest av en förändring i variantfloran tillsammans med en beskrivning av hur kostnaderna ska beräknas. Med hjälp av beräkningsmodellen kan Axis Communications beslut om variantskapande underlättas jämfört med hur de tar beslut idag. / Today’s companies spend a significant amount of time and resources on increasing the number of product variants in their product range. The aim is to reach a wider segment of customers while maintaining a competitive position in the market. When developing new products, Axis Communications is often faced with the challenge of deciding whether to focus on one or more product variants. At present, focus is directed towards developing more product variants in the product range based on the price of direct material and the sales volume for each variant. Axis Communications therefore lacks knowledge of what additional factors that are affected when decisions about creating more product variants are taken. The purpose of the study is to provide a calculation model that can be used as a basis for analysing costs in producing more than one product variant. In order to achieve this purpose, the study has carried out two case studies based on two different products in Axis Communications product range. The first case study analyses the current state of production at Axis Communications’ contracted manufacturers, where costs that are affected by the production of multiple variants are identified and calculated. The second case study is a fictitious case study where the identified costs are calculated again, but only when one product variant is manufactured and the remaining product variants are disregarded. This was followed by an analysis regarding how the identified costs are affected when only one product variant is manufactured. Based on literature studies, the costs associated with the production of several variants have been identified. Furthermore, process flow charts have been developed and a study visit to one of Axis Communications contracted manufacturers was undertaken, where additional relevant costs have been identified and confirmed by persons with broad knowledge about the manufacturing processes. The costs identified to be affected the most by the variation of product variants are as follows: Direct incremental costs Direct material Inventory carrying costs Setup costs Fixture- and tooling costs Indirect incremental costs Quality costs Time to Market Investment costs Resource costs for the development of mechanics Resource costs for the development of electronics Certification costs Tooling costs Costs for testing of production Costs for prototyping The result for direct material showed that an average of the price of direct material as well as the forecasted production volume for each product variant can be assumed to create an initial perception of how much an increase of product variants actually costs. The inventory carrying cost also proved affected by the manufacturing of only one product variant. The inventory carrying cost decreased in the inventory of components but increased at the same time in the finished goods inventory since it is only the most expensive product variant with all functions compared to the other product variants that is being stored. The setup cost was eliminated since the setup times that occurred when changing product variants in the production disappeared. Furthermore, the cost of fixtures and tools was halved. The quality cost proved to be harder to quantify, however, it was realized that the higher the volume produced by a product variant the faster the product variant reaches the set quality goals, which in turn contributes to lower quality costs. Additionally, a lower number of product variants in the same production line means that handling becomes easier, including the risk of errors in assembling the product variant. It will also be easier to identify, prioritize and correct errors that may occur in the production line. This in turn leads to a reduction of quality costs. Time to Market was also affected when only one product variant was manufactured. Although Time to Market cannot be seen directly as a cost but rather as a loss of revenue, the study showed that it is faster to launch the product on the market if the number of product variants decreases. Finally, various investment costs were studied that could be linked to the production of several product variants, and the result showed that it is possible to reduce the investment costs if only one product variant is manufactured. Based on the outcome of the two case studies, a calculation model was designed for Axis Communications to help the company decide whether to manufacture product variants or not. The calculation model explains the costs that are affected the most by a change of number of product variants together with a description of how the costs are to be calculated. Using the calculation model will enable Axis Communications to make well-informed decision on whether or not to introduce more product variants in the product range.
|
Page generated in 0.0918 seconds