• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 208
  • 19
  • 18
  • 7
  • 4
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 267
  • 267
  • 120
  • 97
  • 70
  • 66
  • 55
  • 36
  • 36
  • 34
  • 34
  • 31
  • 30
  • 29
  • 28
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
211

Estudo do sistema de gerenciamento integrado de resíduos de construção e demolição do município de São Carlos - SP / Study of the integrated management of construction and demolition wastes from São Carlos - SP

Córdoba, Rodrigo Eduardo 21 May 2010 (has links)
Com a intensificação da geração de resíduos sólidos urbanos, as autoridades, pesquisadores e sociedade têm voltado seus esforços para enfrentar as dificuldades de manejo e disposição final adequada desses resíduos. Neste sentido, é coerente afirmar que os resíduos de construção e demolição (RCD) fazem parte dessa problemática, pois geralmente representam a maioria dos resíduos sólidos gerados no meio urbano. A ausência de políticas públicas em relação à gestão e gerenciamento desses resíduos tem provocado diversos impactos como, por exemplo, o surgimento de vários depósitos clandestinos nas áreas mais afastadas do perímetro urbano e gastos por parte da administração pública com modelos de gestão corretiva. Entretanto, esse modelo corretivo tem se demonstrado obsoleto e ineficaz para minimizar os impactos negativos gerados pela deposição irregular de RCD. Diante desses fatos, foi criada a Resolução CONAMA nº 307/2002, que instituiu que os municípios devem prover políticas públicas voltadas a evitar o descarte dos RCD em locais irregulares e que contemplem a minimização dos impactos causados ao meio ambiente e saúde humana. Assim, com intuito de contribuir nesta área de conhecimento a presente pesquisa teve por finalidade estudar a situação do sistema de gerenciamento integrado de RCD do município de São Carlos-SP, após a regulamentação da Resolução CONAMA nº 307/2002. Para tanto, foi realizado um levantamento da situação atual do gerenciamento dos RCD no município, por meio de quatro etapas de estudo - contextualização dos indicadores básicos locais; caracterização quantitativa; caracterização qualitativa e por fim análise das áreas de descarte clandestino e áreas de implantação de pontos de captação para pequenos volumes de RCD. Com base nos resultados obtidos neste estudo, foi possível verificar que o município de São Carlos possui um Plano Integrado de Gerenciamento de RCD, em consonância com a Resolução CONAMA nº 307/2002. Porém pode-se constatar que o respectivo município não possui implantada uma rede de captação que contemple os pequenos volumes, assim este sofre com o aumento de áreas de descarte clandestino, as quais causam diversos impactos ao meio ambiente e saúde pública local. Entretanto, medidas adotadas neste novo sistema também demonstraram fatores positivos como a redução de descartes em aterros e geração de emprego e renda. Por fim, esta pesquisa implementou uma metodologia de caracterização dos RCD por análise de imagens, a qual se demonstrou eficiente na caracterização de amostras que apresentavam peças com grandes volumes como, por exemplo, vigas, pilares e placas de concreto. / With the increased generation of urban solid wastes, the authorities, researchers and society have turned their efforts to tackle the difficulties of handling and final disposal of such wastes. In this sense, it is consistent to say that the construction and demolition wastes (C&D) are part of this problem, because they generally represent the majority of solid waste generated in urban areas. The absence of public politics regarding the management of such waste have caused many impacts, for example, illegal discharges dumping sites in areas furthest from the urban perimeter and spending by the government with corrective models. However, this corrective model has proven obsolete and ineffective to minimize the negative impacts caused by the irregular disposal of C&D wastes. Given these facts, the resolution nº 307/2002 of the National Environmental Council (CONAMA) for the C&D wastes was created, which established that municipalities must provide public politics that aim at preventing the disposal of C&D wastes at irregular areas and reduce impacts to the environment and human health. Therefore, to contribute to this area of knowledge this research studied the situation of the integrated management system of C&D wastes from São Carlos-SP, after the implementation of resolution nº 307. For this, a survey was done of the current situation of management of C&D wastes in the city through four stages - local contextualization of basic indicators, quantitative characterization, qualitative characterization and finally analysis of areas of irregular discharge and areas of implantation of points for small volumes of C&D wastes. Based on the results of this study, we observed that the municipality of São Carlos has an Integrated Waste Management of C&D wastes, according to resolution nº 307. However, it was found that the municipality has not established a system of small volumes, so it suffers with increasing areas of irregular disposal, which causes many impacts to the environment and local public health. However, measures taken in this new system also demonstrated positive factors such as the reduction of discards in landfills and the generation of employment and income. Finally, this study implemented a methodology to characterize the C&D by image analysis, which has demonstrated effectiveness in the characterization of samples with high volume parts such as beams, pillars and slabs of concrete.
212

Proposta para implantação de sistema de gestão integrado para unidade de tratamento e armazenamento de rejeitos radioativos de baixo e médio níveis de radiação do empreendimento RMB / Proposal for implementation of the integrated management system for radioactive waste treatment and storage unit of low and medium radiation levels of the Project RMB

Salvetti, Tereza Cristina 14 December 2017 (has links)
O Reator Multipropósito Brasileiro (RMB) é um projeto que está sendo desenvolvido pela Diretoria de Pesquisa e Desenvolvimento (DPD), da Comissão Nacional de Energia Nuclear (CNEN), com o objetivo principal de suprir o país com radioisótopos para aplicação médica (saúde), indústria, agricultura e meio ambiente. Este empreendimento possui vários estágios de desenvolvimento, cada um deles com etapas que envolvem conhecimentos muito específicos para a operacionalização efetiva de suas instalações, além de detalhes legais e regulamentares que precisam ser atendidos. O Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis (IBAMA) e a Comissão Nacional de Energia Nuclear (CNEN) são, respectivamente, os responsáveis pelo licenciamento ambiental e nuclear. Nesses órgãos licenciadores pode-se encontrar diretrizes para elaborar a documentação necessária aos processos de licenciamento para Instalações Nucleares e Instalações Radiativas, porém não foi possível identificar claramente algumas diretrizes para as instalações dedicadas a tratamento e armazenamento de Rejeitos Radioativos. O Empreendimento RMB irá gerar rejeito radioativo e contará com uma instalação para tratamento, acondicionado e armazenamento, para o qual haverá também a necessidade de se gerar documentação específica dedicada ao processo de licenciamento. Diante da lacuna na diretriz de estruturação e elaboração dos documentos específicos para este tipo de instalação, foi necessário realizar um levantamento de leis, regulamentos e normas relacionados a este tipo de negócio e que serão adotadas como referência na estruturação de tais documentos. O objetivo deste trabalho foi realizar um levantamento e alinhamento das leis, regulamentos e normas aplicáveis, estruturando os requisitos em um Sistema de Gestão (SG), cujo escopo abrange o tratamento e armazenamento dos rejeitos radioativos do RMB. Este SG deverá fornecer diretrizes para a elaboração dos documentos de licenciamento e promover a gestão dos rejeitos radioativos gerados pelo RMB, bem como, deverá abordar as melhores práticas, de maneira a observar a segurança da instalação e processos envolvidos. / The Brazilian Multipurpose Reactor (RMB) is a project being developed by the Research and Development (DPD) Directorate of the National Nuclear Energy Commission (CNEN), with the main objective of supplying the country with radioisotopes for medical application (health), industry, agriculture and the environment. This project has several stages of development, each one with very specific knowledge for the effective operation of its facilities, as well as legal and regulatory details that need to be met. The Brazilian Institute of Environment and Renewable Natural Resources (IBAMA) and CNEN are respectively responsible for environmental and nuclear licensing. These regulatory agencies have guidelines to prepare the necessary documentation for the licensing processes for nuclear and radioactive facilities, but it was not possible identify clearly the guidelines for the facilities dedicated to the treatment and storage of radioactive wastes. The RMB will generate radioactive waste and will have a facility for treatment, conditioning and storage, for which it will also be necessary to generate specific documentation dedicated to its licensing process. Faced with the lacuna in the structuring guideline and elaboration of the specific documents for this type of installation, it was necessary to carry out a survey of laws, regulations and norms related to this type of business and that will be adopted as reference in the structuring of such documents. The objective of this work was to carry out a survey and alignment of the applicable laws, regulations and standards, structuring the requirements in a Management System (SG), whose scope covers the treatment and storage of the RMB radioactive waste. This SG should provide guidelines for the preparation of licensing documents and promote the management of radioactive waste generated by the RMB and should address best practices in order to observe the safety of the facility and the processes involved.
213

Resíduos de equipamentos elétricos e eletrônicos em instituições de ensino superior: estudo de caso e diretrizes para elaboração de plano de gestão integrada / Electrical and electronic equipment waste in Higher Education Institutions: a case study and guidelines for the development of an integrated management plan

Reidler, Nivea Maria Vega Longo 27 March 2012 (has links)
Introdução: no Brasil, ainda não há legislação específica, em nível nacional, sobre resíduos de equipamentos elétricos e eletrônicos (REEE). Com a regulamentação da Política Nacional de Resíduos Sólidos, as instituições de ensino superior (IES) no país se deparam com a necessidade de criar sistemas de gestão integrada que incluam logística reversa e disposição desses equipamentos ao final de sua vida útil. Objetivo: estudar a geração, fluxo e destino dos REEE de IES e propor diretrizes para a gestão institucional desses resíduos. Estudou-se o caso de duas IES, em dois cenários distintos: A) a Universidade de São Paulo (Brasil), sem influência de legislação específica sobre o tema e que não possui política de resíduos consolidada; B) A Universidade de Cádiz (Espanha), sob influência das Diretivas da União Europeia e de legislação nacional e que conta com política de resíduos e sistemas integrados de gestão de REEE. Método: análise quali/quantitativa em ambas as IES que constou de: I) Diagnóstico da geração, fluxo e destino dos REEE. Técnica utilizada: levantamento dos dados censitários dos bens que sofreram processo de baixa em um período de dez anos, no sistema de informação da Administração Patrimonial; II) Criação de nova base de dados, com inclusão de classificação dos REEE por tipo, peso médio e periculosidade; III) Pesquisa participativa com os responsáveis por setores envolvidos com a gestão interna de REEE; e IV) Observação sistemática, com registros fotográficos e de dados obtidos, em locais de destino de REEE e em nove Sistemas de Gestão Integrada de REEE (SIG-REEE) da Espanha. Resultados: o diagnóstico foi apresentado aos responsáveis por setores envolvidos com a gestão interna desses resíduos nas instituições, com objetivo de coletar sugestões para um plano de gestão de REEE que atendesse às suas necessidades e expectativas. Os resultados desta pesquisa levaram à proposta de diretrizes para a gestão institucional de REEE, orientando a execução das ações de controle de seus impactos econômicos, sociais, ambientais e de saúde de forma integrada e que seja sustentável e possa ser adaptado a quaisquer tipos de instituição, com flexibilidade para atender a diferentes necessidades e realidades. Conclusão: I) Os procedimentos adotados atualmente nas IES estudadas não atendem aos requisitos fundamentais de sustentabilidade. II) Constatou-se que fatores internos determinam os caminhos da gestão externa do REEE. III) As diretrizes propostas para gestão integrada de REEE baseiam-se em três etapas principais: a) planejamento para aquisição do EEE; b) vida útil; c) gestão de REEE. O estudo conclui que para se conseguir um sistema de gestão sustentável e efetivo, é necessário considerar todas as etapas do ciclo de vida do produto, a partir do planejamento para sua aquisição, até seu destino final. Para que o sistema de gestão de REEE em IES seja efetivo, propõe-se a integração da gestão de EEE/REEE / Introduction: in Brazil, there is no specific law at the national level for the disposal of electrical and electronic equipment waste (WEEE). With the National Solid Waste Policy regulations, Higher Education Institutions (HEI) in the country are faced with the need to create integrated management systems that include reverse logistics and disposal of such equipment at the end of its life time. Objective: to study the generation, flow, and destination of WEEE from HEI and propose guidelines for developing an institutional management system for such waste. Two HEIs in two distinct scenarios were analyzed: A) the University of São Paulo (Brazil), which operates without the influence of legislation on the subject and does not have a consolidated waste policy; and B) The University of Cádiz (Spain), which operates under European Union Directives and national legislation, featuring an integrated waste management policy on WEEE. Methods: qualitative/quantitative analyses in both institutions consisted of: i) Diagnosis of the generation, flow, and destination of WEEE based on census data on goods that have undergone a process of decline over a period of ten years in the Administração Patrimonial (Asset Management) information systems; ii) Creation of a new database, which includes the classification of WEEE by type, average weight, and hazard risk; iii) Research with the participation of the responsible parties of the sectors involved with the internal management of WEEE, and iv) Systematic observation, with photographic records and retrieved data from WEEE destinations and from nine Integrated Management Systems of WEEE (SIG-REEE) in Spain. Results: the diagnoses were presented to the responsible parties of the sectors involved with the internal management of such waste in institutions, with the objective of gathering suggestions for a WEEE management system that meets needs and expectations. The results led to the proposal of guidelines for the preparation of an institutional WEEE management plan, to orient the implementation of sustainable practices in order to better control economic, social, environmental, and health impact in an integrated manner that is sustainable and can be adapted to any type of institution, with enough flexibility to meet different needs and realities. Conclusion: I) the procedures currently in effect in HEI do not meet the core requirements of sustainability II) It was noted that internal factors determine the paths of external WEEE management. III) The guidelines proposed in this study for integrated management of WEEE were based on three main stages: a) acquisition of the EEE, b) useful life period; c) WEEE management. The study concludes that to achieve a sustainable and effective management system, it is necessary to consider all stages of the life cycle of a product, from planning to acquisition, to its final destination. The integration of EEE/WEEE management is recommended
214

Sistema de Gestão Integrado por processos de negócio: guia para implantação e manutenção / Process-based Integrated Management System: a guide for implementation and maintenance

Ignácio, Livia Rodrigues 04 October 2017 (has links)
Um Sistema de Gestão Integrado (SGI) pode ser entendido como uma abordagem que visa o aprimoramento no desempenho de uma organização por meio do ciclo PDCA, e cujos requisitos podem ser baseados em normas mundialmente conhecidas. Apesar do grande volume de pesquisas que abordam formas de se implantar o SGI, uma minoria o relaciona com a abordagem de processos de negócio, que é também um requisito normativo. Neste contexto, esta pesquisa defende que a abordagem de Gerenciamento por Processos de Negócio (Business Process Management - BPM) pode contribuir significativamente para a implantação efetiva e manutenção de um SGI, já que é uma abordagem que apoia a análise e melhoria dos processos de negócio, aspectos essenciais para a estruturação e gerenciamento de um Sistema de Gestão. Diante deste contexto, este trabalho visa propor um guia com etapas, recomendações e instrumentos de apoio para a implantação e manutenção de um SGI por Processos de Negócio, por meio de revisão da literatura (exploratória e sistemática) e avaliação de especialistas. Para esta pesquisa, considerou-se SGI como a integração das normas ISO 9.001:2015 (Sistema de Gestão da Qualidade) e ISO 14.001:2015 (Sistema de Gestão Ambiental), dada a relevância de ambas no cenário atual dos negócios. Os resultados da Revisão Bibliográfica Sistemática (RBS) mostraram que as pesquisas que abordam a integração entre SGI e BPM ainda são preliminares e que há oportunidades de aprofundamento no tema. Este trabalho visa contribuir para a compreensão, implantação e manutenção dos requisitos do SGI pelas organizações com base na abordagem de Gerenciamento por Processos de Negócio, sob o ponto de vista prático. / An Integrated Management System (IMS) can be understood as an approach that aims to improve organization\'s performance through the PDCA cycle, and whose requirements may be based on globally recognized standards. Despite the large volume of research that addresses ways of implementing an IMS, a minority relates it to the business process approach, which is also a normative requirement. In this context, this research argues that the Business Process Management (BPM) approach can contribute significantly to the effective implementation and maintenance of an IMS, since it supports the analysis and improvement of business processes, essential aspects for the structuring of a Management System. In this context, this work aims to propose a guide with steps, recommendations and support instruments for the structuring and maintenance of a Process-based IMS, through literature review (exploratory and systematic) and expert assessment. For this research, IMS was considered as the integration of ISO 9.001: 2015 (Quality Management System) and ISO 14.001: 2015 (Environmental Management System) standards, given the relevance of both in the current business scenario. The results of the systematic literature review (SLR) have shown that research that addresses the integration between IMS and BPM is still preliminary and that there are opportunities for further study. This paper aims to contribute to the understanding, implementation and maintenance of IMS requirements by organizations based on the business process management approach, in a practical view.
215

Gestão integrada de resíduos industriais: análise comparativa entre o Estado de São Paulo e Portugal / Integrated solid waste management: comparative analysis between the State of São Paulo and Portugal

Cruz, Jorge Manuel Mendes de Pinho da 06 June 2014 (has links)
Com o agravamento dos problemas ocasionados pelos resíduos, a busca de soluções e orientações se torna cada vez mais evidente. As empresas, enquanto geradoras de resíduos industriais, são obrigadas por Lei a efetuar um correto gerenciamento dos seus resíduos. Conhecer a legislação ambiental aplicável é, por conseguinte, crucial para qualquer organização. O tema que se pretende desenvolver é a Gestão Integrada de Resíduos Industriais: análise comparativa entre o Estado de São Paulo e Portugal. Este trabalho tem como objetivo geral realizar um estudo comparativo entre o Estado de São Paulo, representativo do Brasil, e Portugal, no que tange a gestão integrada de resíduos industriais, tendo como base os diplomas legais que regulam esta matéria em ambos os países, bem como dar uma visão global e sintética do funcionamento da gestão integrada de resíduos industriais em São Paulo e em Portugal. A metodologia a ser usada terá em conta a análise das políticas públicas voltadas para a gestão integrada de resíduos industriais e será realizada com base em pesquisas bibliográficas e revisão documental. O levantamento de dados e das principais exigências legais terá como forma dominante o uso de bancos de dados legais via internet, a consulta de trabalhos e estudos realizados sobre esta matéria, e revistas de informação técnica e científica. / With the worsening problems caused by waste, finding solutions and guidance becomes increasingly evident. The companies, while generating industrial waste, are required by law to make a correct management of their waste. Meet applicable environmental legislation is therefore crucial for any organization. The topic to be developed is the Integrated Management of Industrial Waste: comparative analysis of the state of São Paulo and Portugal. This work has as main objective to carry out a comparative study between the State of São Paulo, representative of Brazil and Portugal, regarding the integrated management of industrial waste, based on the legislation governing the matter in both countries, as well as give insight global and synthetic functioning of integrated management of industrial waste in São Paulo and in Portugal. The methodology to be used will take account of the analysis focused on the integrated management of industrial waste and will be based on literature searches and document review public policies. The survey data and the main legal requirements will use as the dominant form of legal data banks via internet, consulting work and studies on the subject, and magazines of technical and scientific information.
216

Base de données et cartographie juridiques, deux outils d'aide à la décision pour une gestion intégrée des espaces naturels : une proposition de modélisation du droit / Legal database and legal mapping, two decision support tools for integrated management of natural areas : a proposal of legal modeling

Benzada Jouira, Karima 30 June 2014 (has links)
A l’instar des autres disciplines, notamment celles relatives à l’informatique, le développement technologique et l’avènement de nouvelles techniques ont permis de faire évoluer une certaine manière de connaître et d’appréhender le droit. Cette recherche vise plus particulièrement le droit relatif aux espaces naturels et tente d’apporter, par l’utilisation des systèmes d’information, une aide à la décision portant sur des problèmes juridiques posés par la diversité́ des instruments de protection de la nature et des acteurs concernés par cette protection. Elle propose l’élaboration d’une méthodologie collaborative et l’expérimentation de deux outils analytiques visant à faciliter l'aide à la décision en matière de protection des espaces naturels, à savoir une base de données juridiques Jurisbase et une cartographie juridique Juriscarto. / Like other disciplines, particularly those related to computing, the development of high technologies and the emergence of new technics allowed the development of a certain knowledge and understanding concerning law. This research focuses on law related to natural areas. It aims at providing, through the use of information systems, a decision support to legal problems posed by the diversity of instruments used to protect natural areas, and the diversity of actors involved in such a protection. This research proposes the development of a collaborative methodology and the experiment of two analytical tools aiming at facilitating the decision making process in the protection of natural areas, namely a legal database Jurisbase, and legal mapping Juriscarto.
217

Estudo da gestão integrada dos resíduos sólidos urbanos na bacia Tietê-Jacaré (UGRHI-13) / Study of the integrated management of urban solid waste at the Tietê-Jacaré basin (UGRHI-13)

Lopes, Adriana Antunes 01 November 2007 (has links)
Os resíduos sólidos podem poluir e contaminar as águas superficiais e subterrâneas, pela migração de lixiviado gerado em aterros e lixões, o que pode colocar em risco a saúde pública e o ambiente. Assim, o objetivo deste estudo foi analisar a gestão dos resíduos sólidos urbanos na bacia hidrográfica Tietê-Jacaré, pertencente a 13a Unidade de Gerenciamento dos Recursos Hídricos (UGRHI-13) do Estado de São Paulo, bem como verificar a sua influência na qualidade dos recursos hídricos da região, por meio de coletas de água superficial (14 pontos) e subterrânea (20 pontos), localizados nos municípios de Araraquara, Bauru, Brotas, Jaú, Ribeirão Bonito e São Carlos. Para a realização deste trabalho foram coletadas quatro amostras de água subterrânea em quatro poços de monitoramento, um a montante e três a jusante, de cinco aterros. Também foram coletadas quatro amostras de água em dois pontos de sete córregos na área de influência de aterros e lixões. As coletas foram realizadas durante 2004 e 2005. As amostras foram submetidas a análises físico-química, microbiológica e ecotoxicológica. O nível d´água, bem como os parâmetros pH, condutividade elétrica, salinidade, oxigênio dissolvido e temperatura foram obtidos in situ. Durante o monitoramento realizado foi constatado alteração das características naturais dos recursos hídricos, indicando poluição e contaminação em alguns pontos. Com base nas visitas realizadas e nas informações obtidas, o estudo permitiu concluir que não há gestão integrada dos resíduos sólidos na bacia Tietê-Jacaré, salvo avanços em alguns municípios. Os aterros municipais estão melhorando gradativamente, a fim de atenderem às exigências dos órgãos ambientais, porém constatou-se que as medidas são emergenciais e corretivas. Falta investimento da administração pública no que se refere à prevenção dos impactos negativos. / Solid waste can pollute and contaminate superficial and groundwater, through the migration of sanitary landfills and dumps leachate, which can endangers the public health and the environment. Therefore, this work aimed to analyze the urban solid waste management at Tietê-Jacaré basin, which belongs to the São Paulo State 13th Water Resources Management Unit (UGRHI-13), and to verify its influence to the regional water resources quality by sampling superficial water (14 points) and groundwater (20 points) at Araraquara, Bauru, Brotas, Jaú, Ribeirão Bonito and São Carlos. Four groundwater samples were collected at four wells, one upstream and three downstream, at five landfills. Four water samples were also collected at two points from seven streamlets of the landfills influence area. The sampling occurred on 2004 and 2005. The samples were submitted to physic-chemical, microbiological and ecotoxicologycal analysis. Water table, pH, electrical conductivity, salinity, dissolved oxygen and temperature were achieved in situ. During the monitoring, alteration of the natural characteristics of the water resources was verified, indicating pollution and contamination at some points. Based on the surveys and the information, this study could conclude that there is not an integrated management of solid wastes at Tietê-Jacaré basin, excepting improvements at some municipalities. The municipal landfills are being improved gradually, following environmental agencies requests, but the measures are emergent and correctives. There is lack of investment from governments for negative impacts prevention.
218

Resíduos de equipamentos elétricos e eletrônicos em instituições de ensino superior: estudo de caso e diretrizes para elaboração de plano de gestão integrada / Electrical and electronic equipment waste in Higher Education Institutions: a case study and guidelines for the development of an integrated management plan

Nivea Maria Vega Longo Reidler 27 March 2012 (has links)
Introdução: no Brasil, ainda não há legislação específica, em nível nacional, sobre resíduos de equipamentos elétricos e eletrônicos (REEE). Com a regulamentação da Política Nacional de Resíduos Sólidos, as instituições de ensino superior (IES) no país se deparam com a necessidade de criar sistemas de gestão integrada que incluam logística reversa e disposição desses equipamentos ao final de sua vida útil. Objetivo: estudar a geração, fluxo e destino dos REEE de IES e propor diretrizes para a gestão institucional desses resíduos. Estudou-se o caso de duas IES, em dois cenários distintos: A) a Universidade de São Paulo (Brasil), sem influência de legislação específica sobre o tema e que não possui política de resíduos consolidada; B) A Universidade de Cádiz (Espanha), sob influência das Diretivas da União Europeia e de legislação nacional e que conta com política de resíduos e sistemas integrados de gestão de REEE. Método: análise quali/quantitativa em ambas as IES que constou de: I) Diagnóstico da geração, fluxo e destino dos REEE. Técnica utilizada: levantamento dos dados censitários dos bens que sofreram processo de baixa em um período de dez anos, no sistema de informação da Administração Patrimonial; II) Criação de nova base de dados, com inclusão de classificação dos REEE por tipo, peso médio e periculosidade; III) Pesquisa participativa com os responsáveis por setores envolvidos com a gestão interna de REEE; e IV) Observação sistemática, com registros fotográficos e de dados obtidos, em locais de destino de REEE e em nove Sistemas de Gestão Integrada de REEE (SIG-REEE) da Espanha. Resultados: o diagnóstico foi apresentado aos responsáveis por setores envolvidos com a gestão interna desses resíduos nas instituições, com objetivo de coletar sugestões para um plano de gestão de REEE que atendesse às suas necessidades e expectativas. Os resultados desta pesquisa levaram à proposta de diretrizes para a gestão institucional de REEE, orientando a execução das ações de controle de seus impactos econômicos, sociais, ambientais e de saúde de forma integrada e que seja sustentável e possa ser adaptado a quaisquer tipos de instituição, com flexibilidade para atender a diferentes necessidades e realidades. Conclusão: I) Os procedimentos adotados atualmente nas IES estudadas não atendem aos requisitos fundamentais de sustentabilidade. II) Constatou-se que fatores internos determinam os caminhos da gestão externa do REEE. III) As diretrizes propostas para gestão integrada de REEE baseiam-se em três etapas principais: a) planejamento para aquisição do EEE; b) vida útil; c) gestão de REEE. O estudo conclui que para se conseguir um sistema de gestão sustentável e efetivo, é necessário considerar todas as etapas do ciclo de vida do produto, a partir do planejamento para sua aquisição, até seu destino final. Para que o sistema de gestão de REEE em IES seja efetivo, propõe-se a integração da gestão de EEE/REEE / Introduction: in Brazil, there is no specific law at the national level for the disposal of electrical and electronic equipment waste (WEEE). With the National Solid Waste Policy regulations, Higher Education Institutions (HEI) in the country are faced with the need to create integrated management systems that include reverse logistics and disposal of such equipment at the end of its life time. Objective: to study the generation, flow, and destination of WEEE from HEI and propose guidelines for developing an institutional management system for such waste. Two HEIs in two distinct scenarios were analyzed: A) the University of São Paulo (Brazil), which operates without the influence of legislation on the subject and does not have a consolidated waste policy; and B) The University of Cádiz (Spain), which operates under European Union Directives and national legislation, featuring an integrated waste management policy on WEEE. Methods: qualitative/quantitative analyses in both institutions consisted of: i) Diagnosis of the generation, flow, and destination of WEEE based on census data on goods that have undergone a process of decline over a period of ten years in the Administração Patrimonial (Asset Management) information systems; ii) Creation of a new database, which includes the classification of WEEE by type, average weight, and hazard risk; iii) Research with the participation of the responsible parties of the sectors involved with the internal management of WEEE, and iv) Systematic observation, with photographic records and retrieved data from WEEE destinations and from nine Integrated Management Systems of WEEE (SIG-REEE) in Spain. Results: the diagnoses were presented to the responsible parties of the sectors involved with the internal management of such waste in institutions, with the objective of gathering suggestions for a WEEE management system that meets needs and expectations. The results led to the proposal of guidelines for the preparation of an institutional WEEE management plan, to orient the implementation of sustainable practices in order to better control economic, social, environmental, and health impact in an integrated manner that is sustainable and can be adapted to any type of institution, with enough flexibility to meet different needs and realities. Conclusion: I) the procedures currently in effect in HEI do not meet the core requirements of sustainability II) It was noted that internal factors determine the paths of external WEEE management. III) The guidelines proposed in this study for integrated management of WEEE were based on three main stages: a) acquisition of the EEE, b) useful life period; c) WEEE management. The study concludes that to achieve a sustainable and effective management system, it is necessary to consider all stages of the life cycle of a product, from planning to acquisition, to its final destination. The integration of EEE/WEEE management is recommended
219

Sistema de Gestão Integrado por processos de negócio: guia para implantação e manutenção / Process-based Integrated Management System: a guide for implementation and maintenance

Livia Rodrigues Ignácio 04 October 2017 (has links)
Um Sistema de Gestão Integrado (SGI) pode ser entendido como uma abordagem que visa o aprimoramento no desempenho de uma organização por meio do ciclo PDCA, e cujos requisitos podem ser baseados em normas mundialmente conhecidas. Apesar do grande volume de pesquisas que abordam formas de se implantar o SGI, uma minoria o relaciona com a abordagem de processos de negócio, que é também um requisito normativo. Neste contexto, esta pesquisa defende que a abordagem de Gerenciamento por Processos de Negócio (Business Process Management - BPM) pode contribuir significativamente para a implantação efetiva e manutenção de um SGI, já que é uma abordagem que apoia a análise e melhoria dos processos de negócio, aspectos essenciais para a estruturação e gerenciamento de um Sistema de Gestão. Diante deste contexto, este trabalho visa propor um guia com etapas, recomendações e instrumentos de apoio para a implantação e manutenção de um SGI por Processos de Negócio, por meio de revisão da literatura (exploratória e sistemática) e avaliação de especialistas. Para esta pesquisa, considerou-se SGI como a integração das normas ISO 9.001:2015 (Sistema de Gestão da Qualidade) e ISO 14.001:2015 (Sistema de Gestão Ambiental), dada a relevância de ambas no cenário atual dos negócios. Os resultados da Revisão Bibliográfica Sistemática (RBS) mostraram que as pesquisas que abordam a integração entre SGI e BPM ainda são preliminares e que há oportunidades de aprofundamento no tema. Este trabalho visa contribuir para a compreensão, implantação e manutenção dos requisitos do SGI pelas organizações com base na abordagem de Gerenciamento por Processos de Negócio, sob o ponto de vista prático. / An Integrated Management System (IMS) can be understood as an approach that aims to improve organization\'s performance through the PDCA cycle, and whose requirements may be based on globally recognized standards. Despite the large volume of research that addresses ways of implementing an IMS, a minority relates it to the business process approach, which is also a normative requirement. In this context, this research argues that the Business Process Management (BPM) approach can contribute significantly to the effective implementation and maintenance of an IMS, since it supports the analysis and improvement of business processes, essential aspects for the structuring of a Management System. In this context, this work aims to propose a guide with steps, recommendations and support instruments for the structuring and maintenance of a Process-based IMS, through literature review (exploratory and systematic) and expert assessment. For this research, IMS was considered as the integration of ISO 9.001: 2015 (Quality Management System) and ISO 14.001: 2015 (Environmental Management System) standards, given the relevance of both in the current business scenario. The results of the systematic literature review (SLR) have shown that research that addresses the integration between IMS and BPM is still preliminary and that there are opportunities for further study. This paper aims to contribute to the understanding, implementation and maintenance of IMS requirements by organizations based on the business process management approach, in a practical view.
220

Proposta para implantação de sistema de gestão integrado para unidade de tratamento e armazenamento de rejeitos radioativos de baixo e médio níveis de radiação do empreendimento RMB / Proposal for implementation of the integrated management system for radioactive waste treatment and storage unit of low and medium radiation levels of the Project RMB

Tereza Cristina Salvetti 14 December 2017 (has links)
O Reator Multipropósito Brasileiro (RMB) é um projeto que está sendo desenvolvido pela Diretoria de Pesquisa e Desenvolvimento (DPD), da Comissão Nacional de Energia Nuclear (CNEN), com o objetivo principal de suprir o país com radioisótopos para aplicação médica (saúde), indústria, agricultura e meio ambiente. Este empreendimento possui vários estágios de desenvolvimento, cada um deles com etapas que envolvem conhecimentos muito específicos para a operacionalização efetiva de suas instalações, além de detalhes legais e regulamentares que precisam ser atendidos. O Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis (IBAMA) e a Comissão Nacional de Energia Nuclear (CNEN) são, respectivamente, os responsáveis pelo licenciamento ambiental e nuclear. Nesses órgãos licenciadores pode-se encontrar diretrizes para elaborar a documentação necessária aos processos de licenciamento para Instalações Nucleares e Instalações Radiativas, porém não foi possível identificar claramente algumas diretrizes para as instalações dedicadas a tratamento e armazenamento de Rejeitos Radioativos. O Empreendimento RMB irá gerar rejeito radioativo e contará com uma instalação para tratamento, acondicionado e armazenamento, para o qual haverá também a necessidade de se gerar documentação específica dedicada ao processo de licenciamento. Diante da lacuna na diretriz de estruturação e elaboração dos documentos específicos para este tipo de instalação, foi necessário realizar um levantamento de leis, regulamentos e normas relacionados a este tipo de negócio e que serão adotadas como referência na estruturação de tais documentos. O objetivo deste trabalho foi realizar um levantamento e alinhamento das leis, regulamentos e normas aplicáveis, estruturando os requisitos em um Sistema de Gestão (SG), cujo escopo abrange o tratamento e armazenamento dos rejeitos radioativos do RMB. Este SG deverá fornecer diretrizes para a elaboração dos documentos de licenciamento e promover a gestão dos rejeitos radioativos gerados pelo RMB, bem como, deverá abordar as melhores práticas, de maneira a observar a segurança da instalação e processos envolvidos. / The Brazilian Multipurpose Reactor (RMB) is a project being developed by the Research and Development (DPD) Directorate of the National Nuclear Energy Commission (CNEN), with the main objective of supplying the country with radioisotopes for medical application (health), industry, agriculture and the environment. This project has several stages of development, each one with very specific knowledge for the effective operation of its facilities, as well as legal and regulatory details that need to be met. The Brazilian Institute of Environment and Renewable Natural Resources (IBAMA) and CNEN are respectively responsible for environmental and nuclear licensing. These regulatory agencies have guidelines to prepare the necessary documentation for the licensing processes for nuclear and radioactive facilities, but it was not possible identify clearly the guidelines for the facilities dedicated to the treatment and storage of radioactive wastes. The RMB will generate radioactive waste and will have a facility for treatment, conditioning and storage, for which it will also be necessary to generate specific documentation dedicated to its licensing process. Faced with the lacuna in the structuring guideline and elaboration of the specific documents for this type of installation, it was necessary to carry out a survey of laws, regulations and norms related to this type of business and that will be adopted as reference in the structuring of such documents. The objective of this work was to carry out a survey and alignment of the applicable laws, regulations and standards, structuring the requirements in a Management System (SG), whose scope covers the treatment and storage of the RMB radioactive waste. This SG should provide guidelines for the preparation of licensing documents and promote the management of radioactive waste generated by the RMB and should address best practices in order to observe the safety of the facility and the processes involved.

Page generated in 0.1613 seconds