• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 68
  • 16
  • 6
  • 6
  • 6
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 141
  • 141
  • 83
  • 47
  • 34
  • 32
  • 23
  • 19
  • 15
  • 14
  • 14
  • 13
  • 13
  • 10
  • 10
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
121

Řízení výstavbových projektů / Management of construction projects

Pleva, Martin January 2013 (has links)
This work describes management construction projects in the construction business. The theoretical part explains the concept of construction projects and the chapters, which are used in the management process. The practical part of the course presents the implementation of construction contracts, accompanied by textual and graphical outputs. In conclusion, the evaluation and comparison of actual and proposed during execution.
122

Komparace metod pro oceňování stavebních objektů v České republice a v Rusku / Comparison of methods for valuation of buildings in the Czech Republic and Russia

Khamzina, Anzhela Unknown Date (has links)
There is a close cooperation between Russia and the Czech Republic. Trade takes place in construction industry both with the supplies of investments as well as in other areas and activities. It is quite clear, that the experts need to understand the rules of pricing in construction industry in the respective countries. Apparently, methods of valuation of building projects in Russia and Czech Republic need to be compared. Thesis tackles the problems of life-cycle of construction projects and valuation of buildings in Russia and the Czech Republic. Problems under construction have been analyzed. Dissertation explains the questions of methodology and valuation procedures, and with this related legislation, sorting systems, normative documents. The problem of calculating of unit prices of construction work has been explained. Theoretical part is complemented practical examples of comparison of building estimation in Russian and Czech estimating system. The main result of the work is the comparison of methods for valuation of buildings in Czech Republic and Russia in construction projects. The assessments of methods for valuation of buildings in these countries and their comparison with the selected criteria have been made.
123

Impact of BIM/LEAN on the interaction of construction project design teams

Herrera Valencia, Rodrigo Fernando 14 December 2020 (has links)
[ES] Los equipos de diseño de los proyectos de construcción están compuestos por diferentes interesados; esto podría dificultar las interacciones. Las metodologías BIM y Lean tienen un impacto positivo en los proyectos de construcción. Además, hay pruebas de la aplicación conjunta de BIM y Lean; sin embargo, se desconoce la relación empírica entre las prácticas Lean y los usos de BIM en la fase de diseño. Tampoco existe una comprensión más profunda de los fenómenos sociales que se generan entre los equipos de diseño cuando se aplican las metodologías de gestión BIM-Lean. Por lo tanto, el objetivo de esta investigación es entender el impacto de las prácticas de gestión de diseño Lean (LDM) y los usos BIM en la interacción de los equipos de diseño de los proyectos de construcción. El método de investigación tiene dos fases: 1) la creación de herramientas para evaluar el nivel de aplicación de las prácticas LDM y los usos BIM, y para comprender las interacciones en un equipo de diseño; y 2) el análisis de las relaciones entre BIM, Lean y la interacción, basado en información empírica de proyectos de construcción en fase de diseño. Los resultados presentan un instrumento de evaluación de usos del BIM y un cuestionario de prácticas de LDM para medir la gestión del diseño, y un método para comprender los diferentes tipos de interacción en un equipo de diseño. Basados en los datos de 64 proyectos, un análisis chi cuadrado reveló 33 relaciones empíricas entre los usos del BIM y las prácticas LDM; además, la aplicación de los usos del BIM implica una mayor aplicación de las prácticas LDM. El proyecto que aplica la gestión BIM-Lean logra numerosas interacciones en su equipo de diseño; flujos de información transparentes, ordenados y estandarizados; un entorno de colaboración, confianza y aprendizaje; y una gestión del compromiso. Todos estos elementos de interacción no son visibles en el proyecto, en el que no se aplicó la gestión BIM-lean. / [CAT] Els equips de diseny dels projectes de construcción están compostos per diferents interesats; açó podría dificultar les interaccions. Les metodologies BIM i Lean tenen un impacte positiu en els projectes de construcció. A més, ni hi ha proves de l'aplicació conjunta de BIM i Lean; no obstant, es desconeix la relació empírica entre practiques Lean i els usos de BIM en fase de diseny. Tampoc existix una comprensió mes profunda dels fenómens socials que es generen entre els equips de diseny quan s'apliquen les metodologies de gestió BIM-Lean. Per tant, l'objectiu d'esta investigació es entendre l'impacte de les practiques de gestió de diseny Lean (LDM) i els usos BIM en l'interacció dels equips de diseny dels projectes de construcción. El métode de investigació te dos fases: 1) la creació de ferramentes per a evaluar el nivell d'aplicació de les practiques LDM i els usos BIM, i per a comprendre les interaccions en un equip de diseny; i 2) l'análisis de les relacions entre BIM, Lean i la interacció, basades en informació empírica de projectes de construcció en fase de diseny. Els resultats presenten un instrument d'evaluació d'usos del BIM i un questionari de practiques de LDM per a mesurar la gestió del diseny, i un método per a comprendre els diferents tipos d'interacció en un equip de diseny. Basades en les dades de 64 projectes, un análisis chi cuadrado va revelar 33 relacions empíricas entre els usos del BIM i les práctiques LDM; a més, l¿aplicació dels usos del BIM implica una major aplicació de les práctiques LDM. El projecte que aplica la gestió BIM-Lean obté nombroses interaccions en el seu equip de diseny; fluxes d'informació transparents, ordenats i estandarizats; un entorn de colaboració, confiança i aprenentatge; i una gestió del compromis. Tots estos elements d'interacció no son visibles en el projecte, en el que no es va aplicar la gestió BIM-lean. / [EN] Design teams of construction projects are composed of different stakeholders; this fact could make the interactions difficult. BIM and Lean methodologies have a positive impact on construction projects. Besides, there is evidence of the combined implementation of BIM and Lean; however, it is not known the empirical relationship between Lean practices and BIM uses in the design phase. Also, there is not a deeper understanding of the social phenomena that are generated among design teams when BIM-Lean management methodologies are implemented. Therefore, the objective of this research is to understand the impact of Lean design management (LDM) practices, and BIM uses in the interaction of construction project design teams. The research method has two phases: (1) the creation of tools to assess the level of implementation of LDM practices and BIM uses and to understand the interactions in a design team; and (2) the relationship analyses between BIM, Lean, and interaction, based on empirical information from construction projects in the design phase. The results present a BIM uses assessment tool and an LDM practices questionnaire to measure the design management and a method to understand the different types of interaction in a design team. Based on data from 64 projects, a chi-square analysis revealed 33 empirical relationships between BIM uses and LDM practices; also, the application of BIM uses implies a greater application of LDM practices. The project that applies BIM-Lean management achieves many interactions among its design team; transparent, orderly, and standardized information flows; a collaborative, trust, and learning environment; and commitment management. All these interaction elements are not visible in the project, where BIM-lean management was not applied. / Herrera Valencia, RF. (2020). Impact of BIM/LEAN on the interaction of construction project design teams [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/158718 / TESIS
124

Propuesta de un sistema de control focalizado para cuantificar e identificar en tiempo real los desperdicios de mano de obra y materiales en partidas incidentes de acabados húmedos en edificaciones, basados en el enfoque de valor ganado

Fernandez Paredes, Diego Alonso, Zamora Herrera, Yeffry Homar 08 January 2021 (has links)
En la actualidad, la mayoría de los proyectos de construcción cuenta con un sistema de control para evaluar el estado del proyecto en una determinada fecha de corte, en las cuales se evalúan los resultados mediante algunos reportes, entre los más conocidos los denominados RO (resultados operativos), los cuales son expuestos por lo general mensualmente, debido a que existe un prolongado proceso para desarrollar el flujo de información del proyecto. Por lo general, en los proyectos de construcción de una edificación, se realiza el flujo y procesamiento de información en un tiempo determinado que por lo general superan los quince días, en los cuales se define el estado general del avance del proyecto hasta la fecha delimitada, para posteriormente realizar un análisis detallado de los reportes, con la finalidad de disminuir la variabilidad que se traduce en los reportes como la desviación de lo planificado, este proceso de respuesta a las soluciones realizadas a la hora del análisis del estado de proyecto, también tiene un plazo de observación para verificar si se ha tomado las medidas de manera correcta, las cuales en su mayoría son mensualmente. Es decir, los sistemas de control usados actualmente en nuestro país tienen un tiempo determinado y prolongado para poder analizar sus estados y soluciones, lo cual si bien es cierto, algunas veces es efectiva, otras no. Lo que sí se puede afirmar respecto a la ejecución de estos mismo, es que se consume determinadas horas del proyecto, las cuales son invertidas solo en control y análisis, mas no en una definitiva solución. Ante esta situación, la motivación de esta propuesta de sistema de control es encontrar las principales actividades dentro de las partidas más incidentes de acabados húmedos, las cuales generan mayor desviación de lo planificado y asimismo tienen una gran influencia en el costo del desarrollo del proyecto, para poder controlar en tiempo real o final de jornal la situación o estado de estas mismas para así poder evitar desviaciones de gran magnitud respecto a lo planificado. / At present, most of the construction projects have a control system to evaluate the status of the project on a certain cut-off date, in which the results are evaluated by means of reports, among the best known the so-called RO ( operational results)), what is usually done in general, because there is a long process to develop the flow of information of the project. In general, in the projects of the construction of a building, the flow and processing of the information is carried out in a certain time that the general exceeds fifteen days, in which the general state of the progress of the project is defined until the delimited date Why not make a detailed analysis of the reports, this response process, the responses, the time of analysis of the project status, also has an observation period to verify if the measures have been taken correctly, the which are mostly monthly. That is, the control systems currently used in our country, have a time to extend to analyze their states and solutions, which although it is true, sometimes it is effective, sometimes not. What can be affirmed regarding the execution of these, are consumed during project hours, which are invested only in control and analysis, but not in a definitive solution. Purpose of making a proposal for a control system to identify and quantify in real time the waste of labor and materials in incidents of wet finishes Given this situation, the motivation of this control system proposal is to find the main activities within the most incident parts of wet finishes, which are increasingly deviating from the planned and also have a great influence on the development cost of the project, to be able to control the real or final time of the situation or their status in order to avoid large deviations from the planned one. / Tesis
125

Kommunikation och samarbete i ett byggprojekt : Hur uppfattar vi varandra? / Communication and cooperation in a construction project : How do we intrepret each other?

Edman, Robert, Lunde, Christopher January 2014 (has links)
Byggbranschen anses vara en konservativ bransch både vad gäller teknik och samarbetsformer. Det oerhörda trycket på byggbranschen och det stora antalet byggprojekt som utförs idag gör att en del komplikationer uppstår. Detta kan bl. a. bero på tidsbrist, kompetensbrist och samarbetsproblem. I vissa projekt fungerar samarbetet utmärkt mellan projektets olika parter men i allt för många projekt är samarbetet mellan parterna bristfällig. Detta kan medföra ”onödiga” ekonomiska och eller tidsmässiga konsekvenser. I samhället idag är kommunikation nyckeln till ett lyckat samarbete. Även i byggbranschen belyses kommunikation som en nyckel till ett lyckat projekt. Branschen är i ett läge där denna debatt är intressant men ännu inte riktigt kommit upp på bordet. Vårt mål med projektet är att väcka denna debatt och undersöka hur samarbetet mellan parterna egentligen fungerar, varför det fungerar/inte fungerar och hur det eventuellt kan förbättras. I examensarbetet granskas samspelet mellan de 4 aktörerna Beställare, Projektledare/Byggledare, projekterande Konsult och Entreprenör för att utreda vad som ibland skapar denna kommunikationsbrist och samarbetsproblem. Genom intervjuer och empiriska undersökningar har vi skapat oss en uppfattning om hur parterna uppfattar samarbete och kommunikation i tidigare och nuvarande projekt. Vad har de saknat? Vad tycker de fungerar? Hur skulle de vilja samarbeta och utveckla kommunikation till det bättre? Som en stöttepelare till intervjuerna har en elektronisk undersökning gjorts där 113 svar redovisats, behandlats, analyserats. De som fått tillgång till den elektroniska undersökningen är de företag där intervjuerna gjorts samt tjänstemän från ett ytterligare tiotal olika företag med varierande storlek och omsättning. Utifrån intervjuerna och den elektroniska undersökningen kan vi konstatera att den generella synen mot andra parter i ett byggprojekt är mycket god med några få reservationer. Utefter den frågeställning vi gjorde inledningsvis kan vi nu konstatera att entreprenadform har mindre betydelse för kommunikation och samarbete i ett projekt. Dock har vi kommit fram till att det existerar vissa nyckelord för att uppnå god kommunikation och ett gott samarbete i ett projekt. Nyckelorden vi har kommit fram till är: starten i ett projekt, gemensamma mål, personkemi, beslutskraft, tydlighet och kunskap. / The construction industry is considered to be a conservative industry both in technology and forms of cooperation. The immense pressure on the construction industry and the large number of construction projects that are currently being undertaken in a number of complications arise. This may be due to time constraints, skill shortages and cooperation problems. In some projects the cooperation between the project partners works very well, but in too many projects the collaboration between the parties is inadequate. This can result in "unnecessary" financial and or timing implications. In society today, communication is the key to a successful cooperation. Even in the construction industry communication are highlighted as a key to a successful project. The industry is in a position where this debate is interesting but not yet being highlighted. Our goal with this study is to bring this debate and examine how cooperation between the parties really works, why it works/does not work and how it might be improved. The thesis examines the interplay between the four actors Client, Project Manager/Construction Manager, project planning Consultant and Contractor to investigate what sometimes creates this lack of communication and cooperation problems. Through interviews and empirical studies, we have created an impression of how the parties perceive cooperation and communication in past and current projects. What have they missed? How do they work? How would they like to work together and develop communication for the better? As a mainstay of the interviews, an electronic survey carried out in which 113 responses recorded, processed, analyzed. Those who had access to the electronic survey are companies where the interviews made ​​and officers from an additional ten different companies of varying size and turnover. Based on the interviews and the electronic survey, we can conclude that the general perception to other parties on a construction project is very good with a few reservations. Along the issue we did initially, we can now conclude that the contract form is less important for communication and collaboration in a project. However, we have concluded that there are certain keywords in order to achieve good communication and good cooperation in a project. The key words we've come up with is: the start of a project, shared goals, personal chemistry, decisiveness, clarity, and knowledge.
126

Uppföljning av produktionstidplan och produktionskalkyl : En fallstudie av produktionsprocessen för byggentreprenader

Jonsson, Ida January 2020 (has links)
Två huvudsakliga mål för byggprojekt är att de ska färdigställas inom viss tidsram till en viss kostnad. För att säkerställa att framgångsrika projekt uppnås är det viktigt att projekten styrs så att de uppnår målen där uppföljning och avstämning utgör en huvudsaklig aktivitet.  Planering tillsammans med avstämning har visat sig vara en viktig framgångsnyckel för en strukturerad process. För planering av projekt kan Last planner användas som metod, aktiviteter planeras och kategoriseras enligt kan och bör för att sedan generera en plan. Kostnader styrs och följs upp under projektets gång. Målkostnadsstyrning är en metod för styrning av kostnader som genereras vid både projektering och produktion. Bristfälliga rutiner och komplexitet påverkar arbetet och försvårar styrningen av produktionen för platscheferna. Denna studie fokuserar på att kartlägga hur arbetet med uppföljning av produktionstidplan och produktionskalkyl utförs för att sedan utvärdera tänkbara förbättringsmöjligheter. Studiens syfte har varit att undersöka hur uppföljning och avstämning av produktionskalkyl samt produktionstidplan utförs i produktionsprocessen vid byggprojekt. För att realisera detta har en fallstudie gjorts på ett svenskt byggföretag.  Målet med studien har varit att ta reda på hur arbetet med uppföljning av ett projekts ekonomiska utfall kan förenklas. Detta har lett till att en undersökning för hur tidplanen skulle kunna användas vid ekonomisk styrning. Ytterligare ett mål med studien har varit att bidra till forskningen inom ekonomisk uppföljning i byggbranschen. Den metod som använts för att uppfylla studiens syfte har inneburit ett utforskande angreppssätt. Detta för att öka förståelsen inom problemområdet. Vidare har studien använt sig av abduktiv forskningsansats då den utgår från en teoretisk referensram för att sedan utföra intervjuer och observationer. Studien har vidare utförts med hjälp av kvalitativ strategi då fokus har varit att skapa djupare förståelse för problemområdet och då datainsamling kräver anpassning. Data har samlats in med hjälp av litteraturstudie, intervjuer, observationer samt kvalitativa sekundärdata. Studien visar att rutiner och arbetssätt för uppföljning av produktionskalkyl är bristfällig. I produktionsprocessen är prognoser i dagsläget det vanligaste sättet att använda sig av vid ekonomiska uppföljningar. Prognoser utförs däremot inte med sådant tätt intervall, vanligen fyra gånger per år vilket gör att kontroll på det ekonomiska läget mellan dessa tillfällen är bristfällig. Arbetssätt för uppföljning av produktionstidplan är mer utforskat jämförelsevis. Produktionstidplan och produktionskalkyl utgör underlag för styrning av produktionen och har ett starkt samband. Genom att integrera dessa två underlag med varandra skulle det bidra till att det ekonomiska utfallet kan följas upp med tätare intervall och på så sätt ge produktionsledningen indikation om projektet överskrider budget eller ej.  Den rekommendation som ges till företaget är att i första hand likrikta arbetet hos de anställda genom att se till att det finns rutiner och arbetsbeskrivningar att tillgå för arbete gällande uppföljning av kalkyl och tidplan i genomförandeprocessen. Detta skulle generera i bättre styrning av produktionen så att både tids- och kostnadsmålen kan uppnås. / Two main goals for construction projects are that they should be completed within a certain time frame at a certain cost. To ensure that successful projects are achieved, it is important that the projects are managed so that they achieve the goals where follow-up and reconciliation constitute a main activity. For project planning, Last planner can be used as a method. Activities are planned and categorized according to can and should, which will then generate a plan. Costs are controlled and followed up during the project. Target cost control and target cost design is a method who can be used for control of cost generated in both design- and production process. Planning together with reconciliation has proven to be an important key to success for a structured process. Defective routines and complexity affect the work and make it difficult to control the production for the site managers. The focus of this thesis is to map how the work with following up the schedule and the economic calculation for a project in the production process and evaluate possible improvement opportunities. The aim of this study was to investigate how the work with reconciliation of production costs and time scheduled are performed in the production process for construction projects. To realize this a case study has been done together with a Swedish construction company. Further, the aim of the survey of the working method has been to find out how the work can be simplified. This has led to an investigation into how the schedule could be used for financial management.  Another goal with this study has been to contribute to the research on the follow- up process I construction projects. To achieve the aim an exploratory researched has been used. The reason for this was to increase understanding within the problem area. Furthermore, the study has used an abductive research approach as it is based on a theoretical frame of reference and the conducts interviews and observations. The study has also been carried out with the help of qualitative strategy as the focus has been on creating a deeper understanding of the problem area and as data collection requires variation. Data have been collected using literature study, interviews, observation and qualitative secondary data. The study shows that routines and working methods for following up production calculations are defective. In the production process, forecasts are currently the most common way of using financial follow-ups. Forecasts, on the other hand, are not carried out at such a tight interval, usually four times a year, which means that control of the economic situation between these occasions is defective. Work methods for following up production schedules are more explored comparatively. Production schedule and production calculation form the basis for controlling production and have a close connection. By integrating these two bases with each other, it would contribute to the financial outcome being followed up at more frequent intervals and thus give the production management an indication of whether the project exceeds the budget or not. The recommendation for the company is to primarily align the work of the employees by ensuring that there are routines and job descriptions available for work regarding follow-up of calculations and schedules in the implementation process. This would generate in better control of production so that both time and cost targets can be achieved.
127

Эффективность финансирования инвестиционных строительных проектов в рамках реформы долевого строительства : магистерская диссертация / Efficiency of financing investment construction projects in the framework of the reform of shared-equity construction

Ершова, М. С., Ershova, M. S. January 2021 (has links)
Источниками финансирования жилищного строительства после реформы долевого строительства являются: собственные средства правообладателя (в смешанной схеме финансирования), проектное финансирование, средства жилищно-накопительных кооперативов; средства закрытых паевых инвестиционных фондов, облигационные займы. Несмотря на то, что у застройщиков остается выбор использования иных источников помимо проектного финансирования или денег дольщиков (в проектах, которые начались до 1 июля 2019 года), все рассмотренные способы либо не распространены, либо не применяются в качестве основного способа финансирования. Анализ различных методов оценки эффективности инвестиционно-строительных проектов показал, что не существует универсального показателя, дающего возможность судить об успешной реализации проекта. Наибольшее количество проблем проектного финансирования связано с банковским сектором и взаимодействием застройщиков с кредитными учреждениями. К основным трудностям, с которыми сталкиваются застройщики при реализации проектов с помощью проектного финансирования, являются: неустойчивость банковской системы в стране; доминирующее положение банков и практически полная бесправность застройщика в вопросах кредитования; невозможность осуществления деятельности застройщиками с низкорентабельными проектами из-за жестких требований кредитных учреждений; рост себестоимости строительства в связи с уплатой процентов по кредиту. В работе автором были сформулированы рекомендации по совершенствованию существующей схемы проектного финансирования строительства жилья. / The sources of financing of housing construction after the reform of shared - equity construction are: the rightholder's own funds (in a mixed financing scheme), project financing, funds of housing and savings cooperatives; funds of closed unit investment funds, bond loans. Despite the fact that developers still have the choice of using sources other than project financing or equity holders' money (in projects that began before July 1, 2019), all the methods considered are either not common or are not used as the main method of financing. The analysis of various methods of evaluating the effectiveness of investment and construction projects has shown that there is no universal indicator that makes it possible to judge the successful implementation of the project. The greatest number of problems of project financing is associated with the banking sector and the interaction of developers with credit institutions. The main difficulties faced by developers when implementing projects with the help of project financing are: the instability of the banking system in the country; the dominant position of banks and the almost complete disenfranchisement of the developer in matters of lending; the inability of developers to carry out activities with low-profit projects due to the strict requirements of credit institutions; the increase in the cost of construction in connection with the payment of interest on the loan. In the work, the author formulated recommendations for improving the existing scheme of project financing of housing construction.
128

Analys av veckostrukturer och mötesstrukturer inom byggproduktion / Analysis of weekly structures and meeting structures within construction production

Eriksson, Mark, Leesment, Samuel January 2022 (has links)
Byggbranschen består ofta av komplexa, unika och tidspressade projekt med många aktörer involverade. Detta gör att brister i kommunikationen kan förekomma och de kan ofta kosta både tid och pengar. Syftet med rapporten är att analysera möten och veckostrukturer på fyra olika projekt hos Skanska Region Hus Göteborg, hur de skiljer sig mellan de olika projekten samt förslag till förbättringsåtgärder för att effektivisera mötes- & veckostrukturen.För att kunna besvara de frågeställningar som ställdes i rapporten genomfördes tio intervjuer. Olika arbetsroller intervjuades på varje projekt för att få ett bredare perspektiv på varje projekt. De arbetsroller som intervjupersonerna hade var platschef, arbetsledare samt lagbasen för yrkesarbetarna. Tre observationer genomfördes också på morgonmöten på de olika projekten för att få en tydligare bild av vem/vilka som håller i mötet och vad som tas upp under mötets gång. En litteraturinsamling genomfördes innan intervjuerna för att stärka upp den teoretiska bakgrunden för ämnesområdet.Resultatet av undersökningen visade att det finns skillnader i hur projekten strukturerar upp veckan, hur projekten strukturerar upp möten och även hur många möten projekten håller veckovis. Återkoppling är något som används men inte på ett strukturerat vis eller särskilt ofta. De projekt som arbetade på ett mer proaktivt sätt såg att de kunde arbeta på ett mer tidseffektivt sätt. Engagemang hos deltagare ökade om mötesstrukturen inkluderade mötesdeltagarna i en högre utsträckning. Användning av en visuell tidplan sågs som ett bra komplement till informationsöverföringen i och utanför mötesforum.Studien mynnade slutligen ut i ett antal föreslagna förbättringsåtgärder som kan hjälpa till att göra vecko- och mötesstrukturerna mer effektiva och därmed också förbättra kommunikationen i stort på projekt vilket sparar både tid och pengar. Återkoppling kan struktureras in i möten samt veckoplanering för att effektivisera produktivitetsökningen för mötes- & veckostrukturering. Genom att ställa fler öppna frågor till mötesdeltagare samt låta fler deltagare leda olika delar av ett möte så skapas mer engagemang från fler mötesdeltagare. En individs arbetsvecka kan tidsdokumenteras i form av proaktivt och reaktivt arbete. Då kan individens veckostruktur analyseras för att hitta åtgärder för att minska mängden reaktiva händelser och förbättra det proaktiva arbetssättet. Arbetsveckan, arbetsmoment samt allmän information kan struktureras i ett samlat dokument för att lättare kunna planera och fördela arbetsuppgifter och därmed öka det proaktiva arbetet. / The construction industry often consists of complex, unique and time-consuming projects with many different actors involved. This means that shortcomings in communication can occur, and they can often cost both time and money. The purpose of the report is to analyze meetings and weekly structures on four different projects at Skanska Region House Gothenburg, how the projects differ and what kind of improvement measures exist.To be able to answer the questions posed in the report, ten interviews were conducted. Different work roles were interviewed on each project to get a broader perspective on each project. The work roles that the interviewees had were site manager, supervisor, and the team base for the construction workers. One observation was also made at the daily morning meetings on the various projects to get a clearer picture of who is holding the meeting and what is being discussed during the meeting. A literature collection was also conducted before the interview stage to strengthen the theoretical background for the subject area.The results of the study showed that there were differences in how the week was structured, how meetings were structured and how many meetings were held weekly. Feedback is something that is used but not in a structured way or very often. The projects that worked in a more initiative-taking way saw that they could work in a more time-efficient way. Participation among workers increased if the meeting structure included the workers to a greater extent. The use of a visual timetable was seen as a good complement to the information transfer in and outside of meeting forums.The study resulted in a few proposed improvement measures that can help make the weekly and meeting structures more effective and thus also improve communication in general on projects which saves both time and money. Feedback can be structured into meetings and weekly planning to streamline productivity growth for meeting & weekly structuring. By asking more open questions to meeting participants and letting more participants lead various parts of a meeting, more commitment is created from more meeting participants. The individuals work weeks can be time-documented in the form of initiative-taking and reactive work. Then the individual’s weekly structure can be analyzed to find measures to reduce the number of reactive events and improve the initiative-taking approach. The work week, work steps and general information can be structured in a single document to make it easier to plan and distribute tasks and thereby increase the initiative-taking work.
129

Massbalans : En kvantitativ studie med fokus på effektivisering / Mass Balance : A qualitative study targeting efficiency

Wiss, Filip, Gustafsson, Vanessa, Olsson, David January 2024 (has links)
Syfte och mål - Studien syftade till att identifiera förbättringsmöjligheter och rekommendationer för effektiv masshantering. Målet var att effektivisera masshanteringen med fokus på massbalans och därmed minska både naturresurser och klimatpåverkan för transport till och från anläggningsprojekt. Metod - Studien använde sig av kvalitativa semistrukturerade intervjuer, litteraturstudie samt multikriterieanalys. Resultat - Studiens resultat visade att tidiga utredningar i projekteringsskedet, snabbare handläggningstider, och effektiv logistik och tydliga massdispositionsplaner är centrala för effektiv masshantering inom anläggningsprojekt. Resultaten gav därmed praktiska riktlinjer för att effektivisera masshanteringen inom anläggningsbranschen och därmed förbättrad hållbarhet. Analys – Litteraturstudie och intervjuer analyserades. En multikriterieanalys genomfördes för att välja det bästa sättet att hantera massor med fokus på faktorer som tid, ekonomi och miljöpåverkan. Tidiga utredningar i projekteringsstadiet rankades högst bland sju alternativa åtgärder för effektiv masshantering enligt multikriterieanalysen. Diskussion - Betydelsen av tidiga utredningar, snabbare handläggningstider och en välplanerad logistik framhölls som viktiga åtgärder för att effektivisera masshanteringen. Diskussionen betonade också behovet av kompetenta chefer och tydliga massdispositionsplaner för att främja projektens ekonomi och hållbarhet. Trots utmaningar i multikriterieanalysen visade resultaten enighet mellan tidigare forskning och intervjuer, vilket stärkte studiens reliabilitet och validitet. Studien möjliggjorde en generalisering som kan gynna flera entreprenadföretag inom anläggningsbranschen genom att dra nytta av studiens resultat. Nyckelord – Anläggningsprojekt, effektivisering, hållbarhet, massbalans, masshantering, multikriterieanalys. / Purpose and Objectives – The study aimed to identify improvement opportunities and recommendations for efficient mass management. The goal was to make mass management more efficient with a focus on mass balance, thereby reducing both natural resources usage and climate impact associated with transportation to and from construction projects. Methodology – The study used qualitative semi-structured interviews, literature review, and a multicriteria analysis. Results – The study's findings indicated that early investigations in the design phase, faster processing times, and efficient logistics and clear mass disposal plans are crucial for effective mass management within construction projects. The results provided practical guidelines for making mass management more efficient in the construction industry and thereby improving sustainability. Analysis – Literature review and interviews were analysed. A multicriteria analysis was conducted to select the best way to handle masses, focusing on factors such as time, cost, and environmental impact. Early investigations in the design stage ranked highest among seven alternative measures for efficient mass management according to the multicriteria analysis. Discussion – The importance of early investigations, faster processing times, and carefully planned logistics was emphasized as crucial steps to improve mass management. The discussion also highlighted the need for skilled managers and clear mass disposal plans to promote project economics and sustainability. Despite facing challenges in multicriteria analysis, the results showed agreement with previous research and interviews, which strengthened the study's reliability and validity. The study enabled generalization, potentially benefiting many construction companies in the industry by using its findings. Keywords – Construction projects, efficiency, mass balance, mass management, multicriteria analysis, sustainability.
130

BIM for Steel Buillding Projects BIM-DFE

Avendaño Bernal, Jose Ignacio 15 January 2024 (has links)
Tesis por compendio / [ES] El acero es un material esencial para la industria de la construcción; en consecuencia, su consumo y producción per cápita ha aumentado considerablemente, entre otros factores debido al crecimiento de la población y las demandas de industrialización de los países en vías de desarrollo. El acero ofrece ciertas ventajas sobre otros materiales de construcción, por ejemplo, comportamientos estructurales adecuados, alto grado de prefabricación y velocidad de ejecución. En este mismo sentido, el uso del acero como material de construcción ha incrementado la complejidad de los proyectos, particularmente en cuanto a la gestión de la información, ya que se hace imperativo asegurar la información de calidad y oportuna para los diferentes actores que intervienen en el flujo de trabajo. Por otro lado, La fragmentación de las distintas fases que componen un proyecto de construcción en acero da como resultado un uso ineficiente de la información. Para hacer frente a este uso ineficiente, es necesario incluir metodologías como el modelado de información de construcción (BIM) que facilita la colaboración entre los diferentes profesionales y técnicos involucrados en el ciclo de vida de los proyectos de construcción. Generalmente BIM se ha asociado con una mayor productividad y cooperación entre los equipos. Sin embargo, los beneficios de usar BIM en el proceso de construcción en acero no se han explorado exhaustivamente, más aún, cuando BIM es aplicado no existe una homogeneidad de su aplicación a lo largo de las fases de un proyecto de construcción en acero; como resultado, sus beneficios se reducen. Por lo tanto, existe la necesidad de investigar, desarrollar y proponer una integración BIM que genere una comunicación y coordinación entre las diferentes fases de los proyectos de construcción en acero, de tal manera de asegurar que los entregables cumplan con los requisitos inicialmente establecidos del proyecto. La presente tesis doctoral propone un modelo de integración de los procesos BIM llamado BIM para el diseño, fabricación y montaje en edificios de acero (BIM-DFE) con el fin de mejorar la comunicación y desempeño en las distintas etapas de este tipo de proyectos. Estos beneficios operativos tienen como finalidad conseguir incrementos importantes de productividad para los proyectos de construcción. Si bien esta investigación está orientada a proyectos de edificación en acero, el modelo BIM-DFE propuesto se podría extrapolar en futuras investigaciones asociadas a diferentes materiales con procesos similares como el hormigón, la madera o cualquier material prefabricado para la industria de la construcción. / [CA] L'acer és un material essencial per a la indústria de la construcció; com a resultat, el seu consumi la producció per càpita han crescut considerablement, a causa del creixement de la població i l'augment de les demandes d'industrialització als països en desenvolupament, entre altres factors. L'acer ofereix certs avantatges respecte a altres materials de construcció, com ara el baix pes, comportaments estructurals adequats, un alt grau de prefabricació i un augment de la construcció velocitat. No obstant això, l'ús de l'acer com a material de construcció ha augmentat la complexitat de projectes, especialment pel que fa a la gestió de la informació, perquè és imprescindible garantir una informació de qualitat i oportuna als diferents actors implicats en el flux de treball. L'ús ineficient de la informació provoca la fragmentació durant la construcció, per fer front a aquesta fragmentació, cal incloure la modelització de la informació de l'edifici (BIM) que faciliti la col·laboració entre els diferents actors implicats en el cicle de vida de l'edifici. BIM s'ha associat amb una millora de la productivitat i la cooperació entre els equips. No obstant això, els beneficis d'utilitzar BIM en el procés de construcció d'acer no s'han explorat de manera exhaustiva, encara més quan s'utilitza BIM no presenta continuïtat al llarg de les fases d'un projecte de construcció d'acer; com a resultat, els seus beneficis es redueixen. Per tant, cal investigar, desenvolupar i proposar una integració BIM que generi una comunicació, coordinació i gestió contínua entre les fases de la construcció d'acer, i garantir els lliuraments que concloguin amb un edifici que compleixi els requisits inicialment establerts del projecte. La present tesi doctoral proposa un model d'integració BIM anomenat BIM per al disseny, fabricació i muntatge en edificis d'acer (BIM-DFE) per millorar la comunicació, la integració, els processos d'adquisició comprensibles i els processos de producció definits per les parts crítiques de la indústria siderúrgica. Aquests beneficis operatius poden donar lloc a beneficis per als projectes de construcció d'acer. Tot i que aquesta recerca està orientada a projectes de construcció d'acer, el model BIM-DFE proposat es pot extrapolar a diferents materials amb processos similars com el formigó, la fusta o qualsevol material prefabricat per a la indústria de la construcció. / [EN] Steel is an essential material for the construction industry; as a result, its consumption and production per capita have grown considerably, owing to population growth and increasing demands for industrialization in developing countries, among other factors. Steel offers certain advantages over other construction materials, such as low weight, adequate structural behaviors, a high degree of prefabrication, and increased construction speed. However, the use of steel as a construction material has increased the complexity of projects, particularly in terms of information management, because it is imperative to ensure quality and timely information for the different actors involved in the workflow. The inefficient use of information results in fragmentation during construction, to cope with such fragmentation, it is necessary to include building information modeling (BIM) that facilitate collaboration between the different actors involved in the building life cycle. BIM has been associated with improved productivity and cooperation among teams. However, the benefits of using BIM in the steel building process have not been explored comprehensively, even more when BIM does not exhibit continuity throughout the phases of a steel construction project; as a result, its benefits are curtailed. Therefore, there is a need to investigate, develop, and propose BIM integration that generate continuous communication, coordination and management between steel building phases, in order to ensure deliverables that conclude with a building that meets the initially established project requirements. The present PhD thesis proposes a BIM integration model called BIM for design, fabrication and erection in steel buildings (BIM-DFE) to improve communication, integration, comprehensible procurement processes, and production processes defined by critical stakeholders in the steel industry. These operating benefits can result in benefits for steelbuilding projects. Although this research is oriented to steel-building projects, the proposed BIM-DFE model can be extrapolated to different materials with similar processes such as concrete, wood or any prefabricated material for the construction industry / Avendaño Bernal, JI. (2023). BIM for Steel Buillding Projects BIM-DFE [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/202062 / Compendio

Page generated in 0.2529 seconds