• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 7
  • 1
  • 1
  • 1
  • Tagged with
  • 10
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Specificering av produktionstransformatorer : Rekommenderade avsteg från IEC 60076 för att vid upphandling beskriva en robust enhet / Specifying generator transformers

Eriksson, Markus January 2013 (has links)
As break downs of production transformers are costly and often result in long outages it is essential for reliability of operation that the transformers are manufactured to be robust. The aim of this M.Sc. thesis is to investigate if deviations should be made from the standard IEC 60076 – Power Transformers in order to describe a robust large power transformer for procurement. The investigation has been conducted in three stages. In the first stage a definition of the term robust was developed in consultation with the client Vattenfall Vattenkraft. In the second stage six parameters, called key parameters, which significantly affect transformer robustness were identified. The identification was based on an analysis of transformer construction, a description of occurring faults and an analysis of statistics. In the third and final stage the standard was evaluated regarding requirements on the six key parameters. The evaluation was primarily conducted by means of interviewing persons with relevant knowledge of the evaluated aspects. The identified key parameters are: Temperature, regarding mainly hot spot temperature rises; Type and properties of the insulation; Quality and performance of the manufacturing facility; Ability to withstand external short circuit; Loss evaluation, since the magnitude of the losses dictates the forces developed during transients, and finally impurities within the insulation. It has been found that, in order to describe a robust transformer, deviations from the standard should be made in the specification for procurement. A total of 22 recommended deviations have been presented including the following: The hot spot temperature at the core surface should be specified and verified by calculation and test. The rated voltage for insulation sizing should be chosen higher than the standard suggests. The ability to withstand external short circuit should be validated by calculation. The loss evaluation should be specified, a value of 11,000 euro/kW for no load losses is recommended. The transformer tank lid should be welded in place in order to ensure a tight seal over time. The investigation was limited to the internal parts of large production power transformers with a rated apparent power of at least 20 MVA and a rated voltage of 40 – 400 kV. OLTCs and transformer bushings are not covered.
2

Ramverk för temperaturstyrning i Matlab : Programmering av DAQ , datalogger,temperaturskåp och spänningsaggregat

Pavlov, Anton, Särnholm, Jonathan January 2016 (has links)
Examensarbetet utfördes på Calmon. Ett Ramverket för instrumenten:DA/AD - Modul, datalogger, klimatkammare och nätaggregat skapades medhjälp av programmet Matlab. Arbetet utfördes med hjälp av programmeringi syfte att kunna genomföra mätningar på föremål i klimatkammaren.Kommandon för styrning av instrumenten implementerades. För att vägledaanvändaren utvecklades en specifikation och ett exempelprogram.
3

Om bearbetning : En undersökning av äganderätt och ersättning vid identitetsförändrad egendom

Forsberg, Fabian January 2021 (has links)
No description available.
4

Aktivitetsbaserade insatser i ätstörningsvård och deras effekter på patienterna : En systematisk litteraturstudie / Occupational based interventions in the treatment of eating disorders and their effects on the patients : A systematic review

Frilén, Rebecca, Nilsson, Ronja January 2023 (has links)
Ätstörningar är en sjukdom som drabbar många och resulterar i stort lidande samt en påverkan i vardagen. Behandlingen som ges är bara delvis effektiv då många aldrig blir friska, en stor risk för återfall och även dödsfall finns. Syftet med studien var att undersöka vilken effekt arbetsterapeutiska och icke-arbetsterapeutiska interventioner baserade på aktivitet hade på patienter med ätstörningar. En systematisk litteraturstudie användes för att besvara syftet och åtta artiklar inkluderades i studien. Resultatet visade på en bredd av interventioner där majoriteten kretsade kring att träna på aktiviteter kopplat till att äta och laga mat. Aktivitetsbaserade interventioner kan ha god effekt på person med ätstörningar och arbetsterapeutiska interventioner kan bland annat bidra med ökad motivation. Resultatet och tidigare forskning tyder på att en kombination av olika professioner och interventioner kan vara fördelaktig i ätstörningsvården.  Mer forskning behövs i ämnet och då framför allt kontrollerade studier med specifika arbetsterapeutiska interventioner.
5

Kan man genom ett originärt fång förvärva äganderätten till en byggnad? / Is it possible to acquire ownership of a building by an original acquisition?

Frödevik, Camilla January 2004 (has links)
<p>För de originära fången ockupation och specifikation finns det varken några lagregler eller någon utförlig beskrivning i den juridiska litteraturen. Därför har jag i denna uppsats analyserat dels vilka krav som kan antas gälla för äganderättsförvärv genom ockupation respektive specifikation, dels om man genom dessa originära fång kan förvärva äganderätten till en övergiven byggnad som är lös respektive fast egendom. </p><p>För äganderättsförvärv genom ockupation kan det anses finnas två krav; dels måste egendomen vara herrelös och dels måste egendomen tas i besittning. Byggnad som är lös egendom samt byggnad som är fast egendom kan enligt min mening bli herrelösa och de kan tas i besittning. Trots detta kommer ockupanten inte att kunna bli dess ägare. Anledningen till detta är att äganderätt medför inte endast rättigheter utan också skyldigheter. Fastighetsskattens erläggande är en sådan skyldighet och den kan endast erläggas av den som hos skattemyndigheten står som ägare. Uppfylls inte skyldigheterna, kommer man inte i åtnjutande av rättigheten, det vill säga äganderätten. </p><p>För äganderättsförvärv genom specifikation krävs det att det finns en värdeskillnad mellan bearbetningen av råmaterialet och råmaterialets värde, men det finns inget krav på att bearbetaren skall ha befunnit sig i god tro. Äganderättsförvärv genom specifikation torde kunna komma ifråga oavsett vilken slags egendom det är fråga om. Detta medför att byggnad på ofri grund och byggnad som är fast egendom kan äganderättsförvärvas genom specifikation.</p>
6

Kan man genom ett originärt fång förvärva äganderätten till en byggnad? / Is it possible to acquire ownership of a building by an original acquisition?

Frödevik, Camilla January 2004 (has links)
För de originära fången ockupation och specifikation finns det varken några lagregler eller någon utförlig beskrivning i den juridiska litteraturen. Därför har jag i denna uppsats analyserat dels vilka krav som kan antas gälla för äganderättsförvärv genom ockupation respektive specifikation, dels om man genom dessa originära fång kan förvärva äganderätten till en övergiven byggnad som är lös respektive fast egendom. För äganderättsförvärv genom ockupation kan det anses finnas två krav; dels måste egendomen vara herrelös och dels måste egendomen tas i besittning. Byggnad som är lös egendom samt byggnad som är fast egendom kan enligt min mening bli herrelösa och de kan tas i besittning. Trots detta kommer ockupanten inte att kunna bli dess ägare. Anledningen till detta är att äganderätt medför inte endast rättigheter utan också skyldigheter. Fastighetsskattens erläggande är en sådan skyldighet och den kan endast erläggas av den som hos skattemyndigheten står som ägare. Uppfylls inte skyldigheterna, kommer man inte i åtnjutande av rättigheten, det vill säga äganderätten. För äganderättsförvärv genom specifikation krävs det att det finns en värdeskillnad mellan bearbetningen av råmaterialet och råmaterialets värde, men det finns inget krav på att bearbetaren skall ha befunnit sig i god tro. Äganderättsförvärv genom specifikation torde kunna komma ifråga oavsett vilken slags egendom det är fråga om. Detta medför att byggnad på ofri grund och byggnad som är fast egendom kan äganderättsförvärvas genom specifikation.
7

Einbindung von Bahnübergängen auf ETCS-Strecken

Kirschbauer, Fabian 11 November 2016 (has links) (PDF)
Ziel dieser Arbeit ist eine möglichst umfassende Aufbereitung der aktuellen Situation für die Zwecke der Lehre an der Professur für Verkehrssicherungstechnik der Technischen Universität Dresden. Die Studienarbeit stellt dazu eine Momentaufnahme der Situation zur Einbindung von Bahnübergängen auf ETCS-Strecken dar. Ausgehend von den Festlegungen der System Requirements Specification für ERTMS/ETCS werden nationale Lösungen zuerst dar- und anschließend gegenübergestellt. Des Weiteren wird eine Umsetzung auf drei Laboranlagen des Integrierten Eisenbahnlabors der Technischen Universität Dresden nach technischen, didaktischen und praktischen Aspekten geprüft. Abschliessend wird ein Planungsbeispiel für ETCS L1 LS und ETCS L2 im Bereich der DB AG erarbeitet. / The intention of this paper is a most comprehensive preparation of the current status for the purposes of the teaching at the Chair of Railway Signalling Transport Safety Technology of the Technical University of Dresden. This student research project shows the current situation concerning the embedding of Level Crossings on railway lines equipped with ETCS. Based on the description of the regulations of the System Requirements Specification of ERTMS/ETCS national solutions are first presented and then set in contrast to each other. Furthermore an implementation on three potentially suitable laboratory assets of the Integrated Railway Laboratory of Technical University of Dresden considering technical, didactical and practical aspects is investigated. At last the planning of an example of a Level Crossing once in combination with ETCS L1 LS and once in combination with ETCS L2 is developed.
8

Framtagning av teknisk specifikation för upphandling av kontrollanläggningar för Uddevalla Energi EInät AB

Glans, Jesper January 2013 (has links)
No description available.
9

A Method for Porting Software Using Formal Specifications

Öberg, Fredrik, Fredriksson, Magnus January 2021 (has links)
Formal specifications are mathematically based techniques with which a system can be analyzed, and its functionalities be described. Case studies have shown that using formal specifications can help reduce bugs and other inconsistencies when implementing a complex system; they are more likely found during the software design phase rather than later. During the process of porting code, testing has been used to verify that the port has the same functionalities as the original. However, testing alone has been deemed necessary but not sufficient to accomplish this. This thesis questions if formal specifications could be used during the process of porting code to create an accurate model of the system, and thereby provide higher degrees of certainty that the final product conforms to the original. A step-by-step methodology is presented to answer this question. The methodology ascertains the behavior of a port target through testing and a formal specification model based on these tests is created. This model is then used to create the port. The result indicates that the methodology used has some potential since it provided a high level of certainty that the ported code adhered to the original. Since the methodology puts a high emphasis on the specification and has several layers of verification, it is likely that it is suitable for projects with several modules and interdependencies. When using it for porting a trivial or non-complex system, the overhead of the methodology may prove high in comparison to the value gained. It was also found that one must take into consideration the implicit functionalities a language provides. Strict reliance on a model could thereby lead to a less flexible process where creativity and consideration of the specifics of the target language may have produced a different result. / Formella specifikationer är matematiska tekniker med vilka ett system kan analyseras och dess funktioner beskrivas. Fallstudier har visat att användning av formella specifikationer vid mjukvaruutveckling kan bidra till att reducera antalet fel och därmed minska omkostnaderna. Vid portering av kod har tester använts för att verifiera att porteringen har samma funktionaliteter som originalet. Tester anses dock vara otillräckliga - om än nödvändiga - för att fullständigt beskriva ett system. Denna avhandling ställer frågan om formella specifikationer kan användas i en porteringsprocess och därmed ge en högre grad av tillförlitlighet i att porteringen överensstämmer med originalet. En steg-för-steg-metodik presenteras för att besvara denna fråga. Metodiken använder sig av tester för att beskriva det system som skall porteras och en modell baserad på formella specifikationer skapas genom dessa tester. Denna modell används därefter för att skapa porteringen. Resultatet indikerar att metoden har viss potential eftersom den upplevdes öka förståelsen för referensarbetet och därmed också tryggheten i att den portade koden överensstämde med originalet. Eftersom metodiken lägger stor vikt vid specifikationen och består av flera lager av verifiering är det troligt att den är mer lämplig för system som består av flertalet moduler med inbördes beroende. Vid användning för att portera ett trivialt system kan metodens om-kostnader visa sig vara för höga i förhållande till det värde som erhålls. Det visade sig även att en porteringsprocess måste ta hänsyn till de implicita funktioner ett språk tillhandahåller. En strikt anpassning till en modell kan därmed leda till en mindre flexibel process och därmed leda till ett icke tillfredsställande resultat, där kreativitet och hänsyn till målspråket skulle kunna ha gett ett annat.
10

Einbindung von Bahnübergängen auf ETCS-Strecken

Kirschbauer, Fabian 11 November 2016 (has links)
Ziel dieser Arbeit ist eine möglichst umfassende Aufbereitung der aktuellen Situation für die Zwecke der Lehre an der Professur für Verkehrssicherungstechnik der Technischen Universität Dresden. Die Studienarbeit stellt dazu eine Momentaufnahme der Situation zur Einbindung von Bahnübergängen auf ETCS-Strecken dar. Ausgehend von den Festlegungen der System Requirements Specification für ERTMS/ETCS werden nationale Lösungen zuerst dar- und anschließend gegenübergestellt. Des Weiteren wird eine Umsetzung auf drei Laboranlagen des Integrierten Eisenbahnlabors der Technischen Universität Dresden nach technischen, didaktischen und praktischen Aspekten geprüft. Abschliessend wird ein Planungsbeispiel für ETCS L1 LS und ETCS L2 im Bereich der DB AG erarbeitet.:Inhaltsverzeichnis 1 Einleitung 13 1.1 Motivation 13 1.2 Zielstellung 13 1.3 Vorgehen 14 2 Grundlagen der System Requirements Specification 16 2.1 Verwendung der System Requirements Specification 16 2.2 Prinzipien und Prozeduren in Verbindung mit Bahnübergängen 16 2.2.1 Prinzipien 16 2.2.2 Prozeduren 18 2.3 Möglichkeiten der Einbindung von Bahnübergängen auf ETCS-Strecken 23 2.3.1 Verwendbare Pakete 23 2.3.2 Temporary Speed Restriction 24 2.3.3 Level Crossing Information 29 3 Länderspezifische Lösungen der Einbindung von Bahnübergängen auf ETCS-Strecken 31 3.1 Vorgehen 31 3.2 Deutschland – Deutsche Bahn AG 31 3.2.1 ETCS-Planungen 31 3.2.2 Grundlegendes zur Bahnübergangsicherung 32 3.2.3 Bahnübergänge auf ETCS L1 LS-Strecken 37 3.2.4 Bahnübergänge auf ETCS L2-Strecken 41 3.3 Systemführerschaft ETCS Schweiz 50 3.3.1 Grundlegendes zu ETCS in der Schweiz 50 3.3.2 Grundlegendes zur Bahnübergangssicherung 50 3.3.3 Bahnübergänge auf ETCS L1 LS-Strecken 57 3.3.4 Bahnübergänge auf ETCS L2-Strecken 63 3.4 Ungarn – Magyar Államvasutak Zrt. 66 3.4.1 Grundlegendes zur Bahnübergangssicherung 67 3.4.2 Bahnübergänge auf ETCS L1-Strecken 69 3.4.3 Bahnübergänge auf ETCS L2-Strecken 74 3.5 Dänemark – Banedanmark 76 3.5.1 Grundlegendes zur Bahnübergangssicherung 76 3.5.2 Bahnübergänge auf ETCS L2-Strecken 77 4 Vergleich der unterschiedlichen Lösungen 82 4.1 Vorgehen 82 4.2 Sicherungsarten 82 4.3 Einschaltarten 83 4.4 Überwachungsarten 85 4.5 Prozedur des Passierens eines gestörten BÜ 87 4.6 Sicherungsmöglichkeiten 89 4.7 Resümee des Vergleichs 91 5 Untersuchung der Umsetzbarkeit auf einer Laboranlage des Integrierten Eisenbahnlabors 93 5.1 Anlass und Vorgehen 93 5.2 Eignungsprüfung des Eisenbahnbetriebslabors 93 5.2.1 Beschreibung des Eisenbahnbetriebslabors 93 5.2.2 Technische Aspekte 96 5.2.3 Didaktische Aspekte 97 5.2.4 Praktische Aspekte 100 5.3 Eignungsprüfung des Sicherungstechnischen Labors – ETCS-Versuchsstand 104 5.3.1 Beschreibung des ETCS-Versuchsstands 104 5.3.2 Technische Aspekte 107 5.3.3 Didaktische Aspekte 109 5.3.4 Praktische Aspekte 111 5.4 Eignungsprüfung des Sicherungstechnischen Labors – BUES 2000-Anlage 112 5.4.1 Beschreibung der BUES 2000-Anlage 112 5.4.2 Technische Aspekte 114 5.4.3 Didaktische Aspekte 115 5.4.4 Praktische Aspekte 116 5.5 Empfehlungen zur Implementierung 117 5.5.1 Vorgehen 117 5.5.2 Empfehlung im Hinblick auf technische Aspekte 117 5.5.3 Empfehlung im Hinblick auf didaktische Aspekte 118 5.5.4 Empfehlung im Hinblick auf praktische Aspekte 118 5.5.5 Zusammenfassung der Empfehlungen 119 6 Anwendung der Planungsregeln 121 6.1 Vorgehen bei der Entwicklung des Planungsbeispiels 121 6.2 Grundlegende Bahnübergangsplanung 122 6.3 Planung der Ausrüstung mit ETCS L1 LS 133 6.4 Planung der Ausrüstung mit ETCS L2 138 7 Zusammenfassung und Ausblick 147 7.1 Zusammenfassung 147 7.2 Ausblick 148 Abkürzungsverzeichnis 150 Verzeichnis terminologischer Besonderheiten 155 Abbildungsverzeichnis 156 Tabellenverzeichnis 158 Literaturverzeichnis 160 Erklärung 163 Anhang A: Besprechungsprotokolle 164 Anhang B: BÜ Klardorf – Berechnung der technischen Sicherung 187 Anhang C: BÜ Hallalit der ETCS-Strecke Berlin – Rostock 190 / The intention of this paper is a most comprehensive preparation of the current status for the purposes of the teaching at the Chair of Railway Signalling Transport Safety Technology of the Technical University of Dresden. This student research project shows the current situation concerning the embedding of Level Crossings on railway lines equipped with ETCS. Based on the description of the regulations of the System Requirements Specification of ERTMS/ETCS national solutions are first presented and then set in contrast to each other. Furthermore an implementation on three potentially suitable laboratory assets of the Integrated Railway Laboratory of Technical University of Dresden considering technical, didactical and practical aspects is investigated. At last the planning of an example of a Level Crossing once in combination with ETCS L1 LS and once in combination with ETCS L2 is developed.:Inhaltsverzeichnis 1 Einleitung 13 1.1 Motivation 13 1.2 Zielstellung 13 1.3 Vorgehen 14 2 Grundlagen der System Requirements Specification 16 2.1 Verwendung der System Requirements Specification 16 2.2 Prinzipien und Prozeduren in Verbindung mit Bahnübergängen 16 2.2.1 Prinzipien 16 2.2.2 Prozeduren 18 2.3 Möglichkeiten der Einbindung von Bahnübergängen auf ETCS-Strecken 23 2.3.1 Verwendbare Pakete 23 2.3.2 Temporary Speed Restriction 24 2.3.3 Level Crossing Information 29 3 Länderspezifische Lösungen der Einbindung von Bahnübergängen auf ETCS-Strecken 31 3.1 Vorgehen 31 3.2 Deutschland – Deutsche Bahn AG 31 3.2.1 ETCS-Planungen 31 3.2.2 Grundlegendes zur Bahnübergangsicherung 32 3.2.3 Bahnübergänge auf ETCS L1 LS-Strecken 37 3.2.4 Bahnübergänge auf ETCS L2-Strecken 41 3.3 Systemführerschaft ETCS Schweiz 50 3.3.1 Grundlegendes zu ETCS in der Schweiz 50 3.3.2 Grundlegendes zur Bahnübergangssicherung 50 3.3.3 Bahnübergänge auf ETCS L1 LS-Strecken 57 3.3.4 Bahnübergänge auf ETCS L2-Strecken 63 3.4 Ungarn – Magyar Államvasutak Zrt. 66 3.4.1 Grundlegendes zur Bahnübergangssicherung 67 3.4.2 Bahnübergänge auf ETCS L1-Strecken 69 3.4.3 Bahnübergänge auf ETCS L2-Strecken 74 3.5 Dänemark – Banedanmark 76 3.5.1 Grundlegendes zur Bahnübergangssicherung 76 3.5.2 Bahnübergänge auf ETCS L2-Strecken 77 4 Vergleich der unterschiedlichen Lösungen 82 4.1 Vorgehen 82 4.2 Sicherungsarten 82 4.3 Einschaltarten 83 4.4 Überwachungsarten 85 4.5 Prozedur des Passierens eines gestörten BÜ 87 4.6 Sicherungsmöglichkeiten 89 4.7 Resümee des Vergleichs 91 5 Untersuchung der Umsetzbarkeit auf einer Laboranlage des Integrierten Eisenbahnlabors 93 5.1 Anlass und Vorgehen 93 5.2 Eignungsprüfung des Eisenbahnbetriebslabors 93 5.2.1 Beschreibung des Eisenbahnbetriebslabors 93 5.2.2 Technische Aspekte 96 5.2.3 Didaktische Aspekte 97 5.2.4 Praktische Aspekte 100 5.3 Eignungsprüfung des Sicherungstechnischen Labors – ETCS-Versuchsstand 104 5.3.1 Beschreibung des ETCS-Versuchsstands 104 5.3.2 Technische Aspekte 107 5.3.3 Didaktische Aspekte 109 5.3.4 Praktische Aspekte 111 5.4 Eignungsprüfung des Sicherungstechnischen Labors – BUES 2000-Anlage 112 5.4.1 Beschreibung der BUES 2000-Anlage 112 5.4.2 Technische Aspekte 114 5.4.3 Didaktische Aspekte 115 5.4.4 Praktische Aspekte 116 5.5 Empfehlungen zur Implementierung 117 5.5.1 Vorgehen 117 5.5.2 Empfehlung im Hinblick auf technische Aspekte 117 5.5.3 Empfehlung im Hinblick auf didaktische Aspekte 118 5.5.4 Empfehlung im Hinblick auf praktische Aspekte 118 5.5.5 Zusammenfassung der Empfehlungen 119 6 Anwendung der Planungsregeln 121 6.1 Vorgehen bei der Entwicklung des Planungsbeispiels 121 6.2 Grundlegende Bahnübergangsplanung 122 6.3 Planung der Ausrüstung mit ETCS L1 LS 133 6.4 Planung der Ausrüstung mit ETCS L2 138 7 Zusammenfassung und Ausblick 147 7.1 Zusammenfassung 147 7.2 Ausblick 148 Abkürzungsverzeichnis 150 Verzeichnis terminologischer Besonderheiten 155 Abbildungsverzeichnis 156 Tabellenverzeichnis 158 Literaturverzeichnis 160 Erklärung 163 Anhang A: Besprechungsprotokolle 164 Anhang B: BÜ Klardorf – Berechnung der technischen Sicherung 187 Anhang C: BÜ Hallalit der ETCS-Strecke Berlin – Rostock 190

Page generated in 0.0982 seconds