• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 83
  • 49
  • 47
  • 15
  • 15
  • 9
  • 8
  • 5
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 292
  • 292
  • 209
  • 193
  • 111
  • 90
  • 83
  • 58
  • 54
  • 52
  • 47
  • 40
  • 34
  • 28
  • 28
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
211

A gestão do processo de projeto em empresas incorporadoras e construtoras. / The design management process into real estate developers companies.

Flávia Rodrigues de Souza 24 November 2015 (has links)
Nos últimos anos, a discussão sobre a implementação do conceito de modelagem da informação da construção tem permanecido nas pautas das empresas do setor da construção civil em todo o mundo; no entanto, no cenário brasileiro, o descompasso entre a estratégia setorial e as iniciativas individuais de algumas empresas tem chamado a atenção. Partindo do princípio de que o conceito de modelagem da informação da construção, em função do seu caráter de inovação tecnológica, carrega consigo a necessidade de mudanças, a reflexão e adaptações sobre os diversos processos que permeiam a produção dos empreendimentos de construção torna-se fundamental. Nesse contexto, o objetivo desta tese é propor um conjunto de Diretrizes para Gestão do Processo de Projeto em Empresas Incorporadoras e Construtoras. As Diretrizes estão pautadas na necessidade de definir o projeto como um processo estratégico, inserindo a sua gestão como elemento fundamental para a facilitação e integração do fluxo de informações no âmbito do empreendimento. Para a concretização do objetivo da tese, realizaram-se Estudos de Caso em empresas Incorporadoras e Construtoras brasileiras com o objetivo de diagnosticar as práticas vigentes de gestão do processo de projeto. Em paralelo, conduziu-se a reflexão sobre as responsabilidades do gestor do processo de projeto no âmbito da modelagem por meio de Grupos de Foco envolvendo gestores do processo de projeto e especialistas em tecnologia da informação aplicada à construção. Além disso, a metodologia de pesquisa contempla um Estudo de Caso com foco para a implementação do Conceito de Modelagem da Informação no contexto setorial do Reino Unido. Como resultado das Diretrizes, apresenta-se o Modelo para Gestão do Processo de Projeto no Contexto da Modelagem, seguido pelo Plano de Reestruração para o Departamento de Projetos, o qual visa à proposição de um modelo estruturado para condução das mudanças necessárias nas áreas responsáveis pelo processo de projeto das empresas Incorporadoras e Construtoras. / The discussion about BIM (Building information Modelling) implementation has remained on the agendas of construction companies worldwide in recent years; however, in the Brazilian context, the gap between the industry strategy and few companies which have decided to implement BIM autonomously has been the main aspect that draw attention. Assuming BIM as a technological innovation, which carries with it changes, it is fundamental to analyse and adapt the design and construction processes. In this context, the thesis aims propose a set of Guidelines to Manage the Design Process of Brazilian Real Estate Development Companies. The Guidelines has taken the Design Management as a strategic process which must facilitate and integrate information flow among the Construction Project agents. In order to achieve the objective of Thesis, Case Studies have carried out in order to diagnose the design management current practices in the Brazilian Real Estate Development Companies. Aiming to discuss the Design managers\' responsibilities in contexts where BIM is applied, Focus Groups were organized and Design Managers, BIM specialists and also Academics have participated in the discussions sections. In addition, the research methodology have included a Case Study focusing on the BIM implementation in United Kingdom construction industry. As results and Guidelines, the Design Management Modeling in BIM context, followed by the Restructuring Planning are proposed. The Restructuring Planning was defined specifically for Real Estate Development Companies and aims to propose structured way, comprehending processes which should be re-designed and a set of steps for driving the necessary changes in order to use Design Management Guide in BIM context are proposed.
212

Modelo para planejamento e controle logístico de obras de sistemas pré-fabricados do tipo engineer-to-order com o uso de BIM 4D

Bortolini, Rafaela January 2015 (has links)
O planejamento e controle logístico cumpre um importante papel no processo de montagem de sistemas construtivos pré-fabricados, e pode ter um impacto substancial nas metas do empreendimento em termos de prazo, custo, qualidade e segurança. A falta de planejamento logístico na construção pode causar congestionamento em postos de trabalho e resultar em baixa produtividade. Building Information Modeling (BIM) tem sido apontado como uma grande oportunidade para a melhoria do desempenho da logística de canteiros, principalmente pelo uso de modelos 4D para analisar planos de construção, assim como reduzir conflitos espaciais em canteiros de obras. Entretanto, modelos 4D têm sido frequentemente utilizados simplesmente para representar a sequencia de execução definida em uma rede CPM, sem considerar atividades que não agregam valor, tais como estoques e transporte. Visando a preencher esta lacuna, esta pesquisa propõe um modelo para o planejamento e controle logístico para sistemas construtivos pré-fabricados do tipo engineer-to-order, utilizando BIM 4D. Pesquisa construtiva foi a abordagem metodológica adotada nesta pesquisa. Quatro estudos empíricos foram realizados em diferentes canteiros de obras de uma empresa de estrutura metálica, nos quais processos logísticos foram planejados e controlados. O estudo também propôs diretrizes para integrar o planejamento logístico ao planejamento e controle da produção e para o uso de gestão visual para apoiar o controle logístico. O modelo proposto sugere que o desenvolvimento e uso de modelos 4D para controle e planejamento logístico deve ter uma ampla participação de diferentes intervenientes. / Logistics planning and control plays a key role in the process of assembling prefabricated building systems, and can have a major impact in project goals in terms of schedule, cost, quality and safety. The lack of construction logistics planning may cause congestion in workspaces and result in low productivity. Building Information Modeling (BIM) has been pointed out as a major opportunity for the improving the performance of site logistics, especially by using 4D models to analyze construction plans as well as to reduce spatial conflicts in construction sites. However, 4D models have been often used simply for representing the installation sequence defined in a CPM network, without considering non value-adding activities, such as inventories and transportation. In order to fill this gap, this research work proposes a logistics planning and control model for engineer-to-order prefabricated building systems using BIM 4D. Constructive research was the methodological approach adopted in this investigation. Four empirical studies were carried in different construction sites of a steel fabricator company, in which logistic processes were planned and controlled. This study also proposes guidelines for integrating logistics planning and control with production planning and control, and for the use of visual management to support logistics control. The proposed model suggests that the development and use of 4D models for logistics planning and control should have a broad participation of different stakeholders.
213

Ferramenta informatizada de apoio à criação de documentos de diretrizes para contratação de empreendimentos em BIM. / Computerized tool to support the creation of BIM project procurement guidelines.

Diego Rastrelli de Gusmão de Faria 13 July 2018 (has links)
Building Information Modeling (BIM), ou, no Brasil, Modelagem da Informação da Construção, auxilia em alguns dos principais desafios apresentados no cenário atual do mercado da construção civil nacional, como a redução de riscos e aumento da produtividade. Contudo, para que o BIM propicie esses benefícios, é necessário que existam padronizações e especificações de como sua utilização deve ser conduzida, quais são os usos esperados do modelo BIM, como as informações serão trocadas e quais informações os elementos do modelo devem conter. Para esta finalidade, são desenvolvidas diretrizes de contratação de empreendimentos em BIM, fundamentais para garantir o alinhamento entre contratante e contratadas em tudo o que tange à utilização do BIM no projeto. Utilizando-se a metodologia da pesquisa construtiva, foi realizada a análise bibliográfica de diretrizes de contratação BIM e a proposição de uma ferramenta de apoio à criação de diretrizes de contratação de empreendimentos em BIM para o mercado da construção civil nacional. A ferramenta proposta tem como principal objetivo facilitar a geração de diretrizes de contratação, usando como base referências difundidas para aplicação de processos BIM, mas também permitindo sua customização para melhor se adequar à realidade de cada contratante. Espera-se que a ferramenta apoie as empresas contratantes a vencer a barreira criada pela dificuldade de produzir sua própria diretriz, deixando mais claras as especificações para contratação, apoiando a implementação do BIM. Esta ferramenta foi avaliada em um caso teste, em duas rodadas, para avaliar sua aplicabilidade e aferir os resultados obtidos, tornando-a base para o desenvolvimento de outros documentos similares e para futuras pesquisas na área. A avaliação comprovou que a ferramenta foi capaz de operar dentre os limites de desempenho esperados, facilitando o processo de geração e consulta de uma diretriz, permitindo customização pelo usuário e alimentada por bases de conhecimento consolidadas. tratação em BIM, Normas BIM. / Building Information Modeling (BIM) may assist with some of the main challenges presented in the current state of the national civil construction industry, such as reducing risks and increasing productivity. However, for BIM to provide these benefits, the existence of standards and specifications is necessary, indicating what workflows should be followed, what are the expected uses, how the information will be exchanged and what properties should be included in the model. Therefore, contracting guidelines for BIM projects are developed, to ensure alignment between owner and providers in all matters related to the use of BIM in the project. Using the Constructive Research methodology, this research performed an analysis of BIM publications in countries with proven experience on successful project procurement and the proposition of a tool to support the creation of guidelines for the contracting of projects in BIM in the national civil construction market. The main objective of the proposed tool is to facilitate the generation of contracting guidelines, using well-known references on the application of BIM processes as basis, but also allowing their customization to better suit the reality of each contractor. It is expected that the tool supports contractors to overcome the barrier created by the difficulty of producing their own guideline, clarifying the specifications for contracting and supporting the implementation of BIM. This tool was evaluated in a test case, in two rounds, to assess its applicability and to gauge the obtained results, making it the basis for the development of other similar documents and for future research in the area. The evaluation proved that the tool was able to operate within the expected performance limits, facilitating the process of generation and consultation of a guideline, allowing customization by the user and fed by consolidated knowledge bases.
214

A introdução da modelagem da informação da construção em um banco público brasileiro. / The introduction of Building Information Modeling in a brazilian public bank.

Fernanda Andrade Ferrari 08 June 2016 (has links)
Em decorrência de sua atuação expressiva no mercado de financiamento de empreendimentos de habitação e infraestrutura, a Caixa Econômica Federal (Caixa) é um banco de grande relevância para o setor da construção civil brasileira. A Caixa mantém um setor técnico no qual são desempenhadas, dentre demais responsabilidades, as atividades de análise de documentação técnica e verificação da execução orçamentária e financeira das obras. Atualmente, esses procedimentos são realizados essencialmente de forma manual, configurando um processo moroso e suscetível à ocorrência de imprecisões. Nesse sentido, o presente trabalho tem como objetivo analisar a introdução da Modelagem da Informação da Construção, notadamente, no processo de verificação da documentação técnica de obras, realizado pelos profissionais desse banco público. Primeiramente, realizou-se um diagnóstico, por meio de uma survey, no setor técnico da Caixa que apontou aspectos relevantes à gestão de mudanças de origem tecnológica nesse ambiente. Em continuidade ao estudo de caso, investigou-se as motivações, os benefícios almejados e as possíveis barreiras para a implantação dessa inovação no processo de análise técnica desenvolvido pela instituição. Para verificar a adequabilidade e a aceitação das propostas preliminares de ferramentas e diretrizes de modelagem foi conduzido um workshop no qual participaram profissionais voluntários do mercado da construção civil. Com base neste estudo, apresentado neste trabalho na forma de três artigos científicos publicados, verificou-se que a Caixa pode ser considerada um importante vetor de difusão de práticas associadas à Modelagem da Informação da Construção na indústria da construção civil brasileira e que a proposição de novas ferramentas e diretrizes poderia ser efetivamente adequada para incrementar a prática projetual. Além disso, observou-se que a transformação interna necessária para a implementação de mudanças nos processos técnicos da Caixa é viável desde que seja propiciado um ambiente favorável, em que os gestores incentivem, planejem e deem suporte às possíveis mudanças. Finalmente, a contribuição pretendida com esta pesquisa é fomentar outras iniciativas e colaborar para a disseminação da Modelagem da Informação da Construção nos setores de projeto e construção civil brasileiros. / Due to its outstanding performance in housing and infrastructure construction financing market, Caixa Econômica Federal (Caixa) is a bank of great importance in the Brazilian Construction and Design industry. Caixa maintains a technical department that, among other activities, perform technical feasibility analyses, and verify the budgetary and financial development of construction projects. Currently, the project analysis process is manual, time-consuming and error-prone. In this sense, the present study aims to analyse the introduction of Building Information Modelling in the technical feasibility analyses process, carried out by engineers and architects. Firstly, a survey was conducted to perform an intraorganizational assessment of Caixa\'s technical department, in order to identify aspects relevant to change management. Secondly, in this study case, the motivations, the desired benefits and potential barriers to the implementation of this innovation were investigated. In addition, a workshop was conducted with construction and design professionals to verify the suitability and acceptance of the preliminary proposals of tools and modelling guidelines. Based on this study presented in three published scientific papers, Caixa can be considered an important diffusion vector of Building Information Modelling practices in the Brazilian construction and design industry. In addition, the proposition of new tools and modelling guidelines could effectively be appropriate to enhance its design practices. Furthermore, the intraorganizational change required for implementing innovations in the Caixa technical department proved to be feasible if provided with a favourable environment in which managers stimulate, plan and support possible changes. Finally, the intended contribution of this research is to encourage other initiatives and contribute to spreading additional practices related to Building Information Modelling in the Brazilian construction and design industry.
215

O Projeto da produção de formas para estrutura de concreto armado incorporando BIM / The Formwork Design for reinforced concrete structures incorporating BIM

Neiva Neto, Romeu da Silva, 1988- 08 January 2014 (has links)
Orientador: Regina Coeli Ruschel / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-25T11:41:04Z (GMT). No. of bitstreams: 1 NeivaNeto_RomeudaSilva_M.pdf: 25903368 bytes, checksum: 7606709c0fa33a6f6699ae620c3c1fb9 (MD5) Previous issue date: 2014 / Resumo: Os sistemas de formas para concreto armado existentes no mercado brasileiro compõem até 30% do custo das obras de estruturas de concreto armado no país. Porém, construtoras geralmente não dão a devida atenção a essa disciplina, pois são poucos os casos em que o projeto para esse fim é desenvolvido e quando o é, geralmente carece de detalhamento e precisão. Isso resulta em desperdícios, falta de planejamento e atrasos nos cronogramas gerais das obras. Desta forma, o objetivo deste trabalho foi incorporar os preceitos da Modelagem da Informação da Construção (BIM) no Projeto Construtivo de Formas de Madeira (PCFM). Restringiu-se a estruturas de concreto armado para edifícios de múltiplos pavimentos. O método adotado foi o da pesquisa construtiva, pois desejava-se desenvolver de forma inovadora, projetos de forma, resolvendo problemas do mundo real por meio de uma teorização digital aplicada. O delineamento da pesquisa compreendeu a descrição da problemática (conhecimento prático e teórico), a formulação da solução digital para o projeto de formas, a implementação da solução e a consideração de sua aplicabilidade. A solução para o projeto de formas abarcou incrementalmente diferentes níveis de abstração do projeto: do componente (modelagem paramétrica), da quantificação (detalhamento e custo) e do planejamento (simulação 4D). A contribuição resultante foi a virtualização do projeto de formas em BIM gerando impacto benéfico: no processo construtivo e na adoção deste novo paradigma no contexto brasileiro / Abstract: The Formwork systems that exist in the Brazilian construction industry contributes to 30 % of the cost of works of reinforced concrete structures in the country. However, builders generally do not give due attention to this subject because there are few cases in which the formwork design is developed for this purpose and when it is, often lacks detail and accuracy. This results in waste, lack of planning and delays in general schedules of projects. Thus, the aim of this research was to incorporate the concepts of the Building Information Modeling (BIM) in Formwork Construction Design (FCD). The research was restricted to reinforced concrete structures for multiple floors buildings. The scientific method used was the constructive research as it was desired to develop in an innovative way, for workshop drawings, solving real-world problems by means of a digital applied theory. The scope of the research consisted of the research problem (practical and theoretical knowledge), the formulation of the digital solution for the formwork design, solution implementation and consideration of its applicability. The solution for the formwork design encompassed incrementally different levels of design abstractions: the component (parametric modeling), quantity take-off (and cost breakdown) and site planning (4D simulation). The resulting contribution was the virtual construction for the formwork design systems incorporating BIM. That brought beneficial impacts to the construction process and to the adoption of this new paradigm in the Brazilian context / Mestrado / Arquitetura e Construção / Mestre em Engenharia Civil
216

[en] EMPIRICAL STUDY TO PROPOSE GUIDELINES FOR THE IMPLEMENTATION OF BIM IN SMALL AND MEDIUM-SIZED ENTERPRISES IN BRAZIL / [pt] ESTUDO EMPÍRICO PARA PROPOSTA DE DIRETRIZES PARA IMPLANTAÇÃO DO BIM EM PEQUENAS E MÉDIAS EMPRESAS NO BRASIL

JOAO FELIPE LEMGRUBER COELHO 18 September 2017 (has links)
[pt] Embora o uso de tecnologias de informação na construção seja de extrema relevância para o aumento da produtividade em busca do desenvolvimento sustentável, não se encontra na literatura orientações claras para sua implantação. O propósito deste trabalho é identificar barreiras e benefícios para propor diretrizes de implantação do Building Information Modeling (BIM) no Brasil. O protocolo adotado para a pesquisa é qualitativo e quantitativo, contendo as etapas de revisão sistemática da literatura, estudo empírico, proposição de diretrizes, validação e conclusão. Há evidências na literatura de barreiras em tecnologias, envolvendo limitações de softwares e falta de interoperabilidade, frequentemente citadas. Além disso, identificou-se falta de colaboração e diferentes expectativas entre disciplinas em fluxos de trabalho. Sobretudo, a falta de conhecimento, a resistência à mudança e a descontinuidade das equipes afetam a implantação de BIM. Após comparar o que foi observado no estudo empírico com o identificado na literatura, analisando as barreiras e benefícios, propõem-se diretrizes envolvendo processo, tecnologia e pessoas para guiar a implantação de BIM. Finalmente, é utilizada uma pesquisa do tipo survey para validação do proposto. / [en] Although the use of information technologies in construction is highly relevant for increasing productivity seeking sustainable development, the literature lacks clear guidelines for its implementation. The purpose of this study is to identify barriers and benefits to propose a set of guidelines for implementation of Building Information Modeling (BIM) in Brazil. The study protocol is qualitative and quantitative, containing the stages of systematic literature review, empirical studies, guidelines proposal, validation and conclusion. Evidence in the literature points to barriers in technologies, involving frequently cited software limitations and lack of interoperability. Lack of collaboration and different expectations between disciplines involved in the work flow were also identified. Above all, lack of knowledge, resistance to change, and team turnover affects the implementation of BIM. After comparing the observations from empirical studies and the literature, analyzing barriers and benefits, guidelines are proposed that involve process, technology, and people to guide the implementation of BIM. Finally a survey is used to validate the findings.
217

Integrate Building Information Modeling (BIM) and Sustainable Design at the Conceptual Stage of Building Projects

Jalaei, Farzad January 2015 (has links)
Lately the construction industry has become more interested in designing and constructing environmentally friendly buildings (e.g. sustainable buildings) that can provide both high performance and monetary savings. Analyzing various parameters during sustainable design such as Life Cycle Assessment (LCA) and energy consumption, lighting simulation, green building rating system criteria and associated cost of building components at the conceptual design stage is very useful for designers needing to make decisions related to the selection of optimum design alternatives. Building Information Modeling (BIM) offers designers the ability to assess different design options and to select vital energy strategies and systems at the conceptual stage of proposed buildings. This thesis describes a methodology to implement sustainable design for proposed buildings at their conceptual stage. The proposed methodology is to be implemented through the design and development of a model that simplifies the process of designing sustainable buildings, evaluating their Environmental Impacts (EI), assessing their operational and embodied energy and listing their potential accumulated certification points in an integrated environment. Therefore, a Decision Support System (DSS) is developed by using Multiple Criteria Decision Making (MCDM) techniques to help design team decides and selects the best type of sustainable building components and design families for proposed projects based on three main criteria (i.e. Environmental, Economical factor «cost efficiency » and Social wellbeing) in an attempt to identify the influence of design variations on the sustainable performance of the whole building. The DSS outcomes are incorporated in an integrated model capable of guiding users when performing sustainable design for building projects. The proposed methodology contains five modules: 1) Database Management System (DBMS), 2) Energy and lighting analysis, 3) Life Cycle Assessment (LCA), 4) LEED and 5) Life Cycle Cost (LCC). To improve the workability of the proposed model, a use case of abovementioned modules are going to be created as plug-ins in BIM tool. The successful implementation of such a methodology represents a significant advancement in the ability to attain sustainable design of a building during the early stages, to evaluate its EI, and to list its potentially earned certification points and associated soft costs.
218

Mätetal inom Virtuell Design och Konstruktion / Measurement figures for Virtual Design and Construction.

Nilsson Ebers, Rasmus January 2019 (has links)
Bakgrunden till studien grundar sig i att mätetal är en viktig del i projekt där VDC, Virtual Design andConstruction, används som metod för projektledning. Det skiljer sig hur företag väljer att arbeta medmätetal och vilka resurser som finns tillgängliga. Denna studie genomförs på uppdrag av Tyréns somär i uppstarten med att använda denna metod i utvalda projekt. De vill med denna studie ta fram enmetod för att visa projektorganisationen och beställaren hur de arbetar med VDC. Studien är därfören inledande studie för att undersöka ett lämpligt sätt att arbeta med mätetal och genomförs genomatt svara på frågeställningarna: • Vilka mätetal, med avseende på BIM, är relevanta att mäta för att uppnå kundens ochprojektets mål? • Hur presenteras dessa mätetal gentemot projektdeltagarna på ett pedagogiskt sätt? Studien har genomförts på Tyréns kontor i Stockholm tillsammans med personal från Tyréns egen BIMavdelning.Materialet i denna studie har tagits fram genom en intervju med avdelningschef JakobBerggren och genom två workshoppar där deltagarna har fått möjlighet till att diskutera ett lämpligttillvägagångssätt gemensamt. Detta material har tillsammans med tidigare studier analyserats för attslutligen presentera två mätetal och hur dessa kan presenteras. Utifrån studiens resultat framkom att tydliga BIM-relaterade mål saknas i dagsläget, vilket är enförutsättning för att mätetal ska kunna vara till nytta för projektet. Trots detta, ansåg deltagarna istudien att, antalet kollisioner i en BIM-modell samt tiden som sparas tack vare automatiska processeranses som lämpliga mätetal att påbörja ett arbete med. Utgångspunkten för dessa mätetal bör dåhandla om att bygga upp en historik av mätetal för att sedan kunna sätta lämpliga mål samt få kundoch projektledning att förstå nyttan med BIM. Genom att förstå nyttan med BIM är förhoppningen attBIM-relaterade mål ska utformas tidigt i projekt. Mätetalen bör presenteras på projektets projektsida där Tyréns använder Microsofts programSharePoint. Presentationen sker lämpligast i form av en dashboard och den visuella utformningen ärav stor vikt för att ge projektdeltagarna en tydlig och konkret bild av mätetalen utan att vilseleda.Slutligen presenteras ett lämpligt förslag på utformningen av denna dashboard med hänsyn tilllämpliga riktlinjer som framkommit under studien. / The background of this study is that the measurement figures are an important part of projects which use VDC, Virtual Design and Construction, as a method for the project. How companies choose to work with the measurement figures and which resources they have available differ. This study is carried out on behalf of Tyréns, which is a company that is at the beginning of using this method in selected projects. Together with this study, they want to bring forth a method to show the project organization and the client how they work with VDC. This study is, therefore, an initial study to examine a suitable way to work with measurement figures and is accomplished by answering the questions: • Which measurement figures are relevant to measure, concerning to BIM, to achieve the customer's and the project's goals? • How can these measurements be presented to the project participants in an educational way? The study has been conducted at Tyrén's office in Stockholm together with staff from Tyrén's own BIM department. The material in this study has been produced through an interview with Jakob Berggren, who is the Head of the Department, and through two workshops where participants were allowed to discuss an appropriate approach in common. This material has been analyzed together with previous studies to finally present two measurement figures and how these can be presented. Based on the results of the study, it was found that clear BIM-related goals are currently lacking, which is essential for measuring figures to be useful in the project. Despite this, the participants in the study considered that the number of collisions in a BIM model and the time saved thanks to automatic processes are considered as appropriate metrics, to begin with. The initial work should then be to build up a history of these two metrics to set appropriate goals and get the customer and project management to understand the benefits of BIM. By understanding the benefits of BIM, the expectation is that BIM-related goals will be formulated earlier in projects. Furthermore, the metrics should be presented, according to the participants of the study, on the project's project page which is SharePoint, developed by Microsoft. The presentation of the metrics is most suitable in the form of a dashboard. The visual design is of great importance to give the project participants a clear and concrete picture of the metrics without being misled. Finally, an appropriate proposal for the design of this dashboard is presented at the end of the report and taking into account the appropriate guidelines that emerged during the study.
219

Analýza únikových tras v 3D modelu budovy / Analysis of escape routes in 3D building model

Marešová, Kristýna January 2016 (has links)
The primary object of the master thesis is creating escape route analysis in 3D model of a building. Analysis is created using mainly open source tools like PostgreSQL with PostGIS and pgRouting extensions.
220

Model rodinného domu v programu Revit / The model of a family house in Revit

Soukup, Štěpán January 2020 (has links)
This diploma thesis focuses on processing and data collecting for the use of creating functional 3D informating model that we call BIM (Building Information Modelling) which is getting more and more attention throughout building industry and it is used by all of the participants in the industry from designers and architects to those who are dealing with building installations. This process is slowly getting into legislations of many countries including Czechia. The thesis is divided into two parts where one of them is describing the Building Information Modeling in general and the other part is describing the work which is behind the colleting good data which is needed when making the 3D documentation in Revit software which is wildly used for designing building constructions. Practical part of the land surveyor´s work is devided here into two parts where one of them is dedicated to collecting data by laser scanning process, GNSS and measuring by total station and levelling machine. Second part focuses on the description of the data processing in order to make 3D model. The example of the output production data is the BIM 3D model of the family house in selected level of detail and besides that we also have the visualization of both interior and exterior and 2D simplified building documentations.

Page generated in 0.1407 seconds