• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 34
  • 4
  • Tagged with
  • 38
  • 15
  • 12
  • 11
  • 10
  • 8
  • 8
  • 7
  • 6
  • 6
  • 5
  • 5
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Ta bort tidstjuvarna! : Om tidsbesparande effektiviseringsåtgärder inom det kommunala bostadsföretaget Gavlegårdarnas byggprojekt

Eliassen, Hanna January 2012 (has links)
Abstract The development of the construction industry is slower compared to other industries. This implies that there must be improvements in this field. One step to increased effectiveness in construction projects is making the construction process more efficient, therefore resulting in a positive result for both the actual construction project and for the overall branch. The purpose of this study is to identify areas for improvement within the municipal housing company Gavlegårdarna completed construction project, who will then contribute to increased efficiency in their upcoming projects. The work has been performed with the help of two case studies examine construction projects "Fullriggaren" and "The three nursing homes." Opinions about what could have improved the efficiency of these construction projects further have been collected with the help of an interview study among some of the project participants involved in both projects. There have been many studies addressing the topic of how the construction process can be streamlined and similar studies that have been previously conducted. From some of these studies the efficiency factors have taken a theoretical basis in this study. These factors are considered important in efforts to achieve an efficient construction process. Among these factors are: carrying it out right from the beginning, clear objectives, good communication and effective meetings, providing interaction and teamwork and good management of repetitions and experience interchange. The results of this study show that Gavlegårdarnas construction process is fragmented in all of these factors. The shortcomings that emerged are: not to getting tenants in time, unclear responsibilities, unclear objectives, time-consuming discussions at meetings, etc. The outcome of this study also supports previous studies conducted in the area. The study concludes with all of the resulting criticized fragmentations and a proposal of measures that show how Gavlegårdarna can counteract these deficiencies occurring in their future projects.   Keywords: project participants, construction process, efficiency, communication, partnering / Sammanfattning Utvecklingen av byggbranschen går långsammare jämfört med övrig industri. Detta medför att det måste göras förbättringar inom detta område. Ett steg i en ökad effektivisering är att i byggprojekten göra själva byggprocessen mer effektiv, då detta får ett positivt genomslag för både det aktuella byggprojektet och för branschen i stort. Syftet med denna studie är att hitta de förbättringsområden inom det kommunala bostadsbolaget Gavlegårdarnas genomförda byggprojekt, som sedan ska bidra till en ökad effektivisering i deras kommande byggprojekt. Arbetet har utförts genom att med hjälp av två fallstudier undersöka byggprojekten ”Fullriggaren” och ”De tre gruppbostäderna”. Med hjälp av en intervjustudie bland av några av de medverkande aktörerna i de båda projekten har synpunkter samlats in om vad som skulle kunna ha effektiviserat dessa byggprojekt ytterligare. Det har genomförts mängder av studier som behandlar ämnet om hur byggprocessen kan effektiviseras och liknande studier som denna har genomförts tidigare. Ur några av dessa studier har effektiviseringsfaktorer hämtats som teoretiskt underlag i denna studie. Dessa faktorer anses som viktiga i arbetet att uppnå en effektiv byggprocess. Dessa faktorer är: att göra rätt från början, tydliga mål, bra kommunikation och effektiva möten, att skapa samverkan och team och bra hantering av omtag och erfarenhetsöverföring. Resultatet av denna studie visar att Gavlegårdarna visat brister inom samtliga av dessa faktorer. De brister som uppstått handlar t.ex. om att inte få in hyresgäster i tid, otydlig ansvarsfördelning, otydliga mål, tidskrävande diskussioner på möten etc. Därmed visar sig denna studies resultat även stödja de tidigare genomförda studierna inom området. Studien avslutas med att samtliga av de uppkomna bristerna konkretiseras och att förslag ges på hur Gavlegårdarna kan motverka att dessa brister uppstår i deras kommande projekt.    Nyckelord: Byggherre, byggentreprenör, Byggprocess, byggprojekt, effektivisering, kommunikation, partnering
22

Praktisk tillämpning av Lean Production : En möjlig väg till minskat slöseri / Lean production in practice : A possible way todecrease waste of resources?

Lindblad, Caroline January 2014 (has links)
Utländsk arbetskraft konkurrerar allt mer om arbetstillfällen i form av lägre löner och produktionskostnader. Detta gäller inte minst inom bygg- och anläggningsbranschen. Ett sätt att effektivt minska kostnader är att undersöka hur eventuellt slöseri kan undvikas. En filosofi som fokuserar på detta är Lean Production som allt fler företag i bygg- och anläggnings-branschen försöker arbeta enligt. Svensk Markentreprenad AB är ett ungt, växande företag som strävar efter att arbeta effektivare. De vill arbeta strukturerat och är nyfikna på Lean Production, då begreppet blivit allt vanligare. Därför studerades pro-blem hos företaget som skulle kunna förbättras med implementering av Lean i verksamheten samt de förutsättningar som fanns för detta. Genom en studie om Lean Production samt en mikro-etnografisk fältstudie hos årets (2012) Leanpris-vinnare Ytterbygg AB för dokumentation av hur de tillämpat Lean i företaget, samt hur de minskat sitt slöseri, drogs slutsatser kring hur Svensk Markentreprenad kan införa Lean Production på ett håll-bart sätt i sin verksamhet. Det visade sig att Ytterbygg AB var en god förebild då de arbetade ak-tivt med att reducera slöserier som även sågs hos Svensk markentrepre-nad. Genom att implementera Lean på rätt sätt i företaget finns goda för-utsättningar att lyckas strukturera verksamheten och bli effektivare. Det viktigaste är att ta till vara på och inspirera människor till kreativitet. Lean-filosofin bygger på enkla idéer med stort värde.
23

Bristande kommunikation kostar! / Fault in communication costs!

Gawriye, Georgina, Nilkam, Kotchakorn January 2018 (has links)
Ett framstående samt återkommande problem i Sveriges byggindustri är då kommunikation brister mellan aktörerna, vilket kostar. Byggprocessens alla skeden tillsammans med ett stort antal aktörer är de två största anledningarna till missförstånd och försummad information. Ett projekt som utförs i partnering går ut på öppenhet och gemenskap. Syftet med denna studie är att undersöka de kommunikationsbrister som kan uppkomma under ett partneringsamarbete mellan beställare och byggentreprenör. Målet blir då att utveckla förbättringsåtgärder som gynnar det framtida samarbetet mellan de två aktörerna och effektiviserar projektering samt produktion av ett projekt. Metoder som använts är litteraturstudier tillsammans med semistrukturerade intervjuer och workshop. Det deltog totalt åtta personer i intervjuerna från företagen som vi kallar för aktör B, som är beställaren, och aktör E, som är byggentreprenadföretaget, då dessa vill förbli censurerade i denna rapport. Resultatet av studien fastställer fem byggstenar för partnering: Teambuilding och relationer, gemensamma mål, konflikthanteringssystem, upphandling och kontrakt och sist men inte minst uppföljning och ständiga förbättringar. Resultatet påvisar att kommunikationsbrister uppstår när dessa inte är väldefinierade mellan aktörerna. Partnering hade fler fördelar än nackdelar enligt respondenterna, det vill säga så länge det utfördes på rätt sätt. För att förhindra att dessa kommunikationsproblem uppstår har den teoretiska referensramen tillsammans med empirin givit oss möjligheten att bidra med ett par förbättringsförslag: Definiera byggstenarna i tidigt skede med hjälp av en extern specialist, använda sig av en objektiv moderator under de mest väsentliga mötena samt uppföljning genom sammanställning av utvärderingar från representanter av varje led.
24

Third party logistics at a large hospital construction project / Bygglogistik vid Framtidens Universitetssjukhus

Österman, Hanna January 2017 (has links)
Byggbranschen är en viktig näringsgren med stor direkt och indirekt påverkan på tillväxten och problem inom byggsektorn riskerar därför att fortplanta sig som negativa effekter på samhällsekonomin. Sedan länge brottas byggsektorn med en mycket svag produktivitetsutveckling. En direkt delorsak till detta är att en stor andel av arbetstiden på en byggarbetsplats läggs på annat än direkt värdeskapande arbete, såsom att vänta på eller att leta efter material. Detta beror i sin tur delvis på att leveransprecisionen är låg och logistiken är eftersatt inom byggbranschen. Därmed ligger det inom räckhåll att förbättra produktiviteten med bättre rutiner kring materialförsörjning och logistik. Denna studie har fokuserat på hur resursutnyttjandet i byggbranschen skulle kunna öka med hjälp av strukturerade arbetssätt inom bygglogistik och anlitande av tredjepartslogistiker. Specifikt har studien analyserat det logistikupplägg med en tredjepartslogistiker som använts vid den omfattande ombyggnation av Universitetssjukhuset i Linköping (US), som benämns Framtidens US (FUS). FUS omfattar ny- och ombyggnation i direkt anslutning till pågående sjukvårdsverksamhet och akuta vårdflöden får inte hindras. För att störa vården minimalt anlitades tredjepartslogistikern Bygglogistik för att samordna alla materialtransporter. Den föreliggande studien samlar upp de lärdomar som drogs av logistikupplägget under projektets första etapp (FUS1), analyserar hur dessa lärdomar omsattes under planeringen inför den andra etappen (FUS2) samt studerar följsamhet till de uppsatta logistikriktlinjerna och attityder till upplägget i såväl FUS1 som FUS2. Resultaten visar att logistikupplägget bidragit med stora värden i och med att inga akuta ambulanstransporter hindrats, mer tid har kunnat läggas på direkt byggande och projekten har fått bättre ekonomi. Men resultaten visar också att implementeringen inte varit smärtfri och att somliga fortfarande är skeptiska till värdet av upplägget. Dessutom finns en diskrepans mellan den operativa logistiktjänst byggherren upplever sig ha fått levererad och den mer utvecklande kunskapstjänst som byggherren trodde sig ha upphandlat.
25

Miljöbedömning av två flerbostadshus : En jämförande studie mellan stomme av betong och stomme av KL-trä / Life cycle assessment of two multi-family houses : A comparative study between frame of concrete and frame of CLT

Karlsson, Jenny January 2017 (has links)
Antropogena utsläpp av klimatpåverkande gaser är enligt IPCC med 95 % sannolikhet anledningen till de klimatförändringar vi nu står inför. För att klimatförändringarna inte ska bli för omfattande finns det nu ett mål att försöka hålla den globala medeltemperaturökningen under 2 °C. Detta mål kräver bidrag ifrån flera sektorer och ett gemensamt ansvar för att lyckas, eftersom klimatpåverkan är ett globalt problem. Inom byggindustrin fanns tidigare en uppskattning att större delen av en byggnads miljöpåverkan uppkommer under driftskedet, till följd av energianvändning för uppvärmning.  Tack vare nya standarder på klimatskal för byggnader bidrar numera byggprocessen till den större miljöpåverkande delen i en byggnads livscykel. För att ytterligare minska byggsektorns miljöpåverkan behöver miljövänligare byggnadsmaterial användas. En byggmetod som på senare tid blivit intressant är konstruktion med korslimmat trä, så kallat KL-trä. KL-trä är ett byggmaterial av trä med god bärighet och styvhet, vilket gör att det lämpar sig som bärande och stabiliserande material i byggnader. Det vanligaste bärande och stabiliserande materialet i byggnader idag är betong, men KL-trä har visat sig vara ett konkurrerande alternativ. När miljöbedömningar genomförts över byggnaders livscykler har det visat sig att byggnader med en högre andel biobaserade material resulterar i lägre miljöpåverkan jämfört med byggnader med lägre andel biobaserat material. Syftet med arbetet är att undersöka skillnaden i miljöpåverkan och energianvändning mellan två flerbostadshus genom att göra en miljöbedömning. Flerbostadshusen kallas i studien för Klippan och Klippan-KL. Byggnaderna är likvärdiga utifrån funktion och användningsyta men konstruerade med betong respektive KL-trä som bärande och stabiliserande material. Miljöbedömningen redovisas i form av klimatpåverkan, försurnings- och övergödningspotential samt energianvändning.  Resultatet från miljöbedömningen visar skillnad i miljöpåverkan beroende på om man väljer byggnation med KL-trä eller betong. Miljöbedömningen visar också skillnad i energianvändning mellan de två flerbostadshusen, om deras klimatskal utformas enligt studien. Baserat på de undersökningar som gjordes i studien så är den samlade bedömningen att flerbostadshuset som undersöktes ska utformas med KL-trä och inte betong, för att minska på miljöpåverkan från byggprocessen. / Anthropogenic emissions of greenhouse gases are according to IPCC with 95 % probability the reason to the climate changes we now are facing. For climate change to not be too extensive, there is now a goal to try to keep the global average temperature increase below 2 ° C. This goal requires contributions from several sectors and a shared responsibility for success, since climate change is a global problem. In the construction industry, there was earlier an estimate that most of a building's environmental impact arises during the operational process, due to energy use for heating. Thanks to new standards on building envelope, the construction process now contributes to the major environmental impact of a building's life cycle. To further reduce the environmental impact from the construction sector, environmentally friendly building materials need to be used.  A building method which has recently become interesting is the construction with cross laminated timber, so-called CLT. CLT is a building material made of wood with good bearing and stiffness, which makes it suitable as the load-bearing and stabilizing material in buildings. The most common load-bearing and stabilizing material in buildings today is concrete, but CLT has proven to be a competing alternative. When environmental assessments have been carried out over building life cycles, buildings with a higher proportion of bio based materials have resulted in lower environmental impact compared to buildings with a lower proportion of bio based materials. The purpose of the study is to investigate the difference in environmental impact and energy use between two multi-family houses by making an environmental assessment. The multi-family houses in the study are called Klippan and Klippan-KL. The buildings are equal in function and usable space but are constructed with concrete or CLT, as load-bearing and stabilizing material. The environmental assessment is presented in terms of climate impact, acidification and eutrophication potential and energy usage. The result of the environmental assessment shows a difference in environmental impact, depending on whether a building is chosen with CLT or concrete. The environmental assessment also shows a difference in energy usage between the two multi-family houses, if their building envelope is designed according to the study. Based on the studies conducted, the overall assessment is that the multi-family house surveyed should be designed with CLT and not concrete, in order to reduce environmental impact from the construction process.
26

Implementering av BIM-Manual – En riktlinje hur BIM-manualen tillämpas i verkligheten

Alic, Sanel, Anehov, Erik January 2020 (has links)
Ett byggprojekt innehåller fyra skeden, förstudie, projektering, produktion och förvaltning. Projekteringsskedet är hela designprocessen där ritningar och beskrivningar skapas för att sedan kunna bygga och förvalta den tänkta byggnaden. Projekteringsstadiet består av flera olika aktörer och teknik discipliner där samordning och koordinering krävs. Ett verktyg som tillämpas i hela byggprocessen men framförallt i projekteringen är BIM, vilket är en arbetsprocess som effektiviserar informationshantering genom att under byggprojektets gång samla information till en 3D-modell. BIM i projekteringsstadiet består av flera olika teknik discipliner som behöver samordnas och koordineras till gemensamma mål för att inte missförstånd ska ske och att viktig information ska förloras.Denna studie utreder BIM-manualer och dess innehåll samt undersöka om projektörer och arkitekter följer de krav och riktlinjer som formulerats i BIM-manualen. Studien utreder även om de krav och riktlinjer som utformats i BIM-manualer öppnar upp för nytänkande och innovation för projektörerna och arkitekterna, eller om det eventuellt begränsar projektörerna och arkitekterna innovation samt nytänkande. Rapporten grundas på en kvalitativ metod, där information erhålls från semistrukturerade intervjuer, och en litteraturstudie där data och information har hämtats från litteraturer i form av böcker, forskningsrapporter, utredningsrapporter, examensarbeten, dokument och webbsidor. Studien avgränsar sig till projekteringsskedet, där åtta personer har intervjuats och fyra företag har studerats. Personal som har intervjuats är fem BIM-samordnare, en Section Manager inom BIM, en avdelningschef som ansvarar för BIM och slutligen en VVS-projektör.Baserat på resultatet i studien kan man konstatera att BIM-manualer inte följs strikt i verkligheten utan mer översiktligt. Detta beror bland annat på att krav och riktlinjer kan uppdateras under projektets gång. Utifrån studien kan man även konstatera att en BIM-manual innehåller projektspecifika krav och riktlinjer för de planerade BIM-modellerna i syfte för att skapa den organisation och de arbetsprocesser som ett BIM-projekt eftersträvar. Några exempel på krav och riktlinjer som kan formuleras i en BIM-manual är leveransformat på filer, programvaror och specifika krav och redovisningsteknik. Man kan även dra slutsatsen att krav och riktlinjer som definierats i BIM-manualen underlättar samordning och koordinering under projektets gång men att de inte följs rigoröst. En annan slutsats som kan faställas utifrån studien är att BIM-manualen öppnar upp för kreativitet och innovation för projektörerna och arkitekterna eftersom inga tekniska lösningar är definierade i manualen. Avslutningsvis kan man även konstatera att det som kan förbättras med arbetet kring BIM-manualer är att den tydligare kan förklaras till alla involverade aktörer.Efter att ha studerat hur BIM-manualer efterlevs i projekteringsskedet så kan även en liknande studie göras för att se hur BIM-manualen följs i förvaltningsskedet. / A construction project contains four stages, feasibility study, design, production and management. The planning stage is the entire design process where drawings and descriptions are created in order to be able to build and manage the intended building. The design stage consists of several different actors and technology disciplines where coordination and coordination are required. A tool that is used throughout the construction process but above all in the design is BIM, which is a work process that streamlines information management by gathering information into a 3D model during the construction project. BIM at the design stage consists of several different technology disciplines that need to be coordinated and coordinated to common goals so that misunderstandings do not occur and that important information is lost.This study investigates BIM manuals and their contents and analyzes whether projectors and architects follow the requirements and guidelines formulated in the BIM manual. The study also investigates whether the requirements and guidelines formulated in BIM manuals open up new thinking and innovation for the projectors and architects, or whether it may limit the projectors and architects innovation. The report is based on a qualitative method, where information is obtained from semi-structured interviews, and a literature study there data and information has been obtained from literature in the form of books, research reports, investigative reports, degree projects, documents and web pages. The study is limited to the design stage, where eight people have been interviewed and four companies have been studied. Staff interviewed are five BIM coordinators, a Section Manager within BIM, a department manager in charge of BIM and finally a plumbing projector.Based on the results of the study, it can be concluded that BIM manuals are not strictly followed in reality but more comprehensively. This is partly due to the fact that requirements and guidelines can be updated during the course of the project. Based on the study, it can be concluded that a BIM manual contains project-specific requirements and guidelines for the planned BIM models in order to create the organization and work processes that a BIM project seeks. Some examples of requirements and guidelines that can be formulated in a BIM manual are delivery formats for files, software and specific requirements and accounting technology. It can also be concluded that the requirements and guidelines defined in the BIM manual facilitate coordination during the course of the project, but that they are not rigorously followed. Another conclusion that can be determined from the study is that the BIM manual opens up for creativity and innovation for the projectors and architects as no technical solutions are defined in the manual. Finally, it can also be noted that what can be improved with the work on BIM manuals is that it can be more clearly explained to all the actors involved.After studying how BIM manuals are complied with in the design phase, a similar study can also be done to see how the BIM manual is followed in the management phase.
27

Effektivisering av byggprocessen med hjälp av lean : En fallstudie på ett företag med prefabricerat byggande

Alhajjaj, Eman, Sanchez, Marvin January 2022 (has links)
The increasing housing shortage occurring in society has for a long time created a great need to build housing quickly and cost-effectively. This has led to more and more industrialization of its building process, where housing is manufactured in modular form in the factory. With industrial processes, companies can give freedom to workers to take responsibility for the process in which they participate, and thus contribute with improvements and standardization in the process. One concept that is very suitable for this is The Toyota Production system (TPS), also called Lean production. Today, there are studies where Lean has been combined with the building process. The purpose of this study is to investigate and study whether the building process for prefabricated houses can be streamlined using the Lean method and, if so, how. As an efficiency improvement is sought in this study, questions about the basic principles of Lean will be involved. A qualitative data collection is done, which is based on an interview study. The questions for these interviews have been formulated with the help of literature contained within the subject. The interview questions are structured by being open where the respondent is given the opportunity to speak freely and in detail about the topic. Two companies were selected for this study. One company is a Stockholm stationed company that deals with prefabricated construction. These do not use the Lean working method as standard in their work. The other company is a company that also deals with prefabricated construction on a larger scale and that they use the Lean working method throughout their organization. The theory behind the study is the actual implementation of Lean in an existing building process that does not use the working method. By introducing Lean's basic principles into a company that does not use it today, this study will describe what elements can be applied from Lean's perspective. Finally, improvement measures, based on Lean's principles, are being introduced to improve and streamline the construction process of prefabricated construction at the particular company where the study was conducted. The aim of the study is to describe and analyze the construction process for industrial companies, the obstacles that arise in the process and how can Lean streamline the construction process from the 14 principles. Key-word: Efficiency, Lean, Prefabricated, Modular house, Construction, Construction process, Elimination, The Toyota Way, Lean principle / Den ökande bostadsbristen som sker i samhället har under en lång tid skapat ett stort behov av att bygga bostäder snabbt och kostnadseffektivt. Detta har lett till att mer och mer har industrialiserat sin byggprocess där bostäder tillverkas i modulform i fabrik (Wasana, Gunatilake, & Fasna (2019). Med industriella processer kan företagen ge frihet till arbetare att få ansvar för den process de medverkar i, och därmed bidra med förbättringar och standardiseringar i processen. Ett koncept som lämpar sig väldigt väl för detta är The Toyota Production system (TPS), också kallat Lean production. Lean är utvecklad och anpassad för bilindustrin. Idag finns det studier där Lean har kombinerats ihop med byggprocessen. Syftet med denna studie är att utreda och studera om byggprocessen för prefabricerade hus kan effektiviseras med hjälp av arbetsmetoden Lean och isåfall hur. Eftersom att en effektivisering söks i denna studie kommer frågor kring grundprinciperna för Lean involveras. En kvalitativ datainsamling görs som är baserad i form av en intervjustudie. Frågorna till dessa intervjuer har formulerats med hjälp av litteratur som är kopplat till ämnet. Intervjufrågorna är strukturerade genom att vara öppna frågor där respondenten får chans att tala fritt och detaljerat om ämnet. För denna studien valdes två företag. Ena företaget är ett Stockolms stationerat företag som sysslar med prefabricerat byggande. Dessa använder sig inte av arbetsmetoden Lean som standard i sitt arbete. Andra företaget är ett företag som också sysslar med prefabricerat byggande i större skala samt att de använder sig av arbetsmetoden Lean i hela sin organisation. Teorin bakom studien är själva implementeringen av Lean i en befintlig byggprocess som ej använder sig av arbetsmetoden. Genom att införa Leans grundprinciper i ett företag som idag inte använder sig av detta ska denna studie beskriva vilka moment som finns att tillämpa sett ur Leans perspektiv.  Avslutningsvis framförs förbättringsåtgärder, baserat på Leans principer, för att förbättra och effektivisera byggprocessen av prefabricerat byggande på just företaget där studien är gjord. Studiens mål är att beskriva och analysera hur byggprocessen för industriella företag ser ut, vilka hinder som uppstår i processen samt hur Lean kan effektivisera byggprocessen ur de 14 grundprinciper.  Nyckelord:  Effektivisering, Lean, Prefabricerade, Modulhus, Konstruktion, Byggprocess, Eliminering, The Toyota Way, Lean principer.
28

Från Polishus till Bostäder : En Fallstudie / From Police House to Residence Building : A Case Study

Wällersten, Alice January 2022 (has links)
Hållbart byggande är någonting som börjar bli mer aktuellt inom fastighets- och byggbranschen. Att ta tillvara på redan existerande byggnadsmaterial, ta tillvara på kulturvärden och anpassa sig efter det hus man har framför sig är någonting som börjar bli mer och mer självklart för alla parter. 2016 gick startskottet för projektet Brf NEO i Davidshall i Malmö där Riksbyggen utlovande att en hållbar byggprocess skulle genomföras på polishuset vid Davidshallstorget. Polishuset som hade 80 år på nacken skulle gå från att vara just ett polishus till att bli nya bostäder. Det är just den byggprocessen denna uppsats valt att fokusera på.  Syftet med denna uppsats har varit att undersöka byggprocessen av det gamla polishuset vid Davidshallstorget i Malmö ur ett hållbarhetsperspektiv. Fokus har legat på byggprocessen samt återvinning och återbruk av byggnadsmaterial och byggtekniker. Om byggnadsmaterial eller byggtekniker inte bevarats syftar uppsatsen till att belysa varför de inte bevarats. Uppsatsen är en fallstudie där projektet Brf NEO i regi av företaget Riksbyggen har studerats. Metoden som valts för att genomföra arbetet har varit en kvalitativ metod med tre semistrukturerade intervjuer med nyckelpersoner som varit delaktiga i projektet samt insamling av material från företagens egna hemsidor för att få en helhetsbild. Informationen i uppsatsen grundar sig i de semistrukturerade intervjuerna som genomförts med tre respondenter. Sekundär information har inhämtats från företagens egna hemsidor men även andra källor såsom Boverket och annan relevant litteratur.  Resultatet av denna uppsats visar på en väl genomförd byggprocess med ett genomgående hållbarhetstänk. Uppsatsen pekar ut vad som gör byggprocessen hållbar och djupdyker i bevarandet av byggnadsmaterial och byggtekniker. / Building sustainably is something that is becoming increasingly more common within the real estate and construction industry. To take advantage of already existing materials, cultural values and adapt to the building in front of you is becoming increasingly obvious for all parties. In 2016 the company Riksbyggen launched their new project - Brf NEO. Brf NEO is located in Malmo, Sweden. Riksbyggen promised to conduct a sustainable renovation process on the old police station building standing in Davidshallstorget. The old police station building has served as a police station for 80 years but would now be transformed into a residence building. The renovation process of the old police station is what this essay will focus on. This essay aims to examine the building process of the old police house located at Davidshallstorg in Malmö from a sustainable point of view. The focal point is the building process and the recycling and reuse of building materials and construction techniques. This essay is a case study focusing on the project Brf NEO conducted by Riksbyggen. The method chosen for this essay is a qualitative method with three semi-structured interviews with key-parties. The information in this essay is based upon these three interviews together with secondary information from the companies’ websites, websites such as Boverket and other relevant literature.  The result of this essay shows a well-performed building process with sustainability constantly at the centre. The essay pinpoints what makes this building process sustainable and thoroughly examines the preservation of building materials and construction techniques.
29

Digitala hjälpmedel för granskning och prövning av bygglovshandlingar

Pålstam, Anton January 2019 (has links)
Politiskt sett har Sverige en ambition att ligga i framkant inom digitalisering, samtidigt ligger grannländerna Norge och Danmark före inom området. Målen med digitaliseringen är att underlätta kommunikation med intressenter samt att öka både kvalitet och effektivitet i det kommunala arbetet. Det saknas dock gemensam styrning för hur digitaliseringen skall ske inom kommunerna, något som resulterar i olika val för olika kommuner. De gemensamma kraven som skall uppfyllas för att få bygglov grundar sig bland annat i BBR 3:1 och 3:2 samt detaljplan och områdesbestämmelser. Det har tidigare gjorts studier med fokus på digitala detaljplaner och möjligheten att pröva BIM-modeller mot dessa krav. I de tidigare studierna undersöktes IFC som filformat för BIM-baserade bygglovshandlingar. I Luleå kommun, som använder den vanliga ansökningstjänsten Mittbygge.se, kommer bygglovshandlingar in i många olika filformat och med varierande kvalitet. Detta kan vara en konsekvens av att det juridiskt saknas tydliga riktlinjer för vad bygglovshandlingar skall innehålla och hur de skall vara utformade. Syftet med det här examensarbetet var att kartlägga, utvärdera och jämföra de programvaror som Sveriges kommuner använder för att granska och pröva bygglovshandlingar. För att uppfylla syftet undersöktes dagens förutsättningar att digitalt granska och pröva bygglovshandlingar mot utformningskraven för tillgänglighet i BBR 3:1. Genom tolkning och konkretisering av lagtext förenklades de BBR-krav som prövas i bygglovsskedet. En utvärderingsmodell skapades för programvarorna baserat på den konkretiserade lagtexten samt de analoga verktyg som normalt används. Mallen användes för att beskriva och jämföra programvarors tillämpbarhet för granskning och prövning. Dessutom utvärderades programvarornas interoperabilitet med BIM. Bland Sveriges kommuner förekommer minst 5 olika programvaror för ändamålet granskning och prövning, 2 av dessa saknar minst en nödvändig funktion för att pröva en bygglovshandling mot BBR 3:1. De programvaror som enligt utvärderingsmodellen stod ut som bäst lämpade för sitt ändamål var DWG TrueView samt Bluebeam revu. De programvarorna hade samtliga funktioner som eftersöks enligt analysmnodellen samtidigt som de kan hantera bygglovshandlingar på flera olika BIM-nivåer. Med programvaran Solibri Model Checker är det möjligt att i viss mån pröva BIM-modeller automatiskt mot lagkrav. Mjukvaran är dock beroende av avancerade BIM-modeller snarare än bygglovshandlingar, något som skulle göra bygglovsansökan orimligt svårt för medborgare. Dessutom finns det svårigheter med att automatisera bygglovshantering då vissa bedömningar behöver göras utifrån mjuka värderingar. Digitaliseringen inom bygglov har kommit igång i majoriteten av Sveriges kommuner. I vissa kommuner har medborgarna och företagen inte hunnit anpassa sig till kommunernas digitala bygglovshantering ännu. I andra kommuner har man precis börjat ta emot digitala bygglovshandlingar. / Politically speaking, Sweden has an ambition to be at the forefront of digitization, meanwhile neighboring countries such as Norway and Denmark are ahead in the field. The goals of the digitization are to facilitate communication with interested parties and to increase both quality and efficiency in municipal work. However, there is no common guidance for how the digitalization should be done within the municipalities, which results in different municipalities making different choices. The common requirements that must be met for obtaining a building permit include BBR 3:1 and 3:2, as well as detailed plans and area regulations. Previous studies have focused on digital detailed plans and the possibility of testing BIM models against these requirements. The studies investigated the IFC file formats suitability for BIM-based building permit documents. In Luleå municipality, which uses the common application service Mittbygge.se, building permit documents are submitted in many different file formats and with varying quality. This can be a consequence of the fact that legally, there is a lack of clear guidelines for what building permit documents must contain and how they should be designed. The purpose of this thesis was to map, evaluate and compare the software that Sweden's municipalities use to review and test building permits. To fulfill the purpose, different software for viewing and testing digital building permits were examined in the context of design requirements for accessibility in BBR 3:1. Through interpretation and concretisation of legal text, the requirements that are examined in the building permit stage were simplified. An evaluation model was then created for the software based on the simplified laws and the analog tools commonly used. The template was used to evaluate and compare the software that the municipalities use. In addition, the software's interoperability with BIM were evaluated. Among Sweden's municipalities, at least 5 different software are being used for viewing and testing building permits, 2 of them lack at least one necessary function for testing a building permit act against BBR 3:1. According to the evaluation model, DWG TrueView and Bluebeam revu stood out as best suited for this purpose. These software have all the functions needed for viewing and testing building permits according to the evaluation model. Also, the software are compatible with building permits on various BIM-levels. With the Solibri Model Checker software, it is possible to test BIM models against legal requirements automatically to a certain extent. However, the software is dependent on advanced BIM models rather than regular building permit documents, something that would make the building permit application unreasonably difficult for citizens. Additionally, some of the requirements are based on soft values which makes them difficult to automate. The majority of Sweden’s municipalities have started their digitization process in regards to building permits. In some municipalities, the citizens and the companies have not yet been able to adapt to the municipality's digital building permit management. In other municipalities, they have just begun to receive digital building permits documents recently.
30

Byggdelsklassificering av installationer : En fallstudie i hur BSAB-systemet kan utvecklas / Classification of HVAC components in the construction industry : A case study on how the BSAB system can be developed

Lindell, Oscar, Ström, David January 2014 (has links)
Building Information Modelling (BIM) medför ett helt nytt sätt att arbeta där objektsbaserade 3D-modeller är den huvudsakliga informationskällan. Modellerna kan bära på stora mängder information i jämförelse med den traditionella pappersritningen som är begränsad till text, symboler och en 2D-visualisering av byggnaden. Att arbeta med BIM ställer helt nya krav på hur information ska struktureras för att säkerställa att den tolkas på samma sätt av alla aktörer i ett projekt och all den programvara som används för att hantera informationen. Den här rapporten behandlar installationer specifikt och klassifikationen av byggdelar som är grunden för att identifiera objekt i en modell. Vi har utrett BSAB 96 som är ett väletablerat system för klassifikation av byggdelar men i sin nuvarande utformning täcker det inte behovet för att kunna användas i BIM. Detta är en nyckelfaktor för att kunna koppla rätt information till BIM-objekten så att en obruten informationskedja kan erhållas. Vi förklarar teorin bakom klassifikationssystem, BSAB 96 i synnerhet, och hur de appliceras på BIM. De problemområden och utvecklingsbehov som finns ringas in och i en fallstudie föreslås två konkreta förslag på utvidgning av byggdelstabellen för installationer i BSAB 96; ett för praktisk tillämpning idag och ett baserat på en fullt integrerad datoriserad process. / Building Information Modelling (BIM) represents a completely new way of working where object-based 3D models are the main source of information. The models can carry large amounts of information in comparison with the traditional paper drawing which is limited to text, symbols, and a 2D visualization of the building. Working with BIM creates new requirements on how information should be structured to ensure that it is interpreted in the same manner by all participants in a project and all the software that is being used to handle it. This report deals with HVAC especially and the classification of construction elements which is the basis for identifying objects in the model. We have investigated BSAB 96 which is a well-established system for classification of construction elements but in its current state it does not cover the needs for use in BIM. This is a key factor to be able to connect the right information to BIM objects. We explain the theory behind classification systems, BSAB 96 in particular, and how they are applied to BIM.  The problem areas and development needs are highlighted and in a case study two concrete suggestions are proposed for expanding the classification table for HVAC construction elements in BSAB 96; one for practical used today and one based on a fully integrated computerized process.

Page generated in 0.4346 seconds