• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 59
  • 5
  • Tagged with
  • 64
  • 28
  • 26
  • 22
  • 19
  • 18
  • 13
  • 10
  • 9
  • 9
  • 7
  • 7
  • 7
  • 7
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Implementering av Virtuellt Byggande i byggprocessen : Fallstudie av NCC Construction Sverige AB

Mellgren, Oskar January 2012 (has links)
Virtual Design and Construction (VDC) is the definition for using BIM in the construction process to simulate and analyse the building. Resulting use of the technology will according to proponents lead to fewer construction errors, a better understanding between stakeholders for the construction project, less communication problems and a smoother construction process. Although BIM has according to researchers a big potential, few companies have succeeded in broad and continues implementation. The study aims to identify the factors affecting the implementation. More precisely identify what factors influencing the decision to adopt VDC and potential barriers in the diffusion process. The empirical findings are based on a case study of NCC Construction Sweden. Data has been gathered thru interviews, field trips and internal documents. The results of the study indicates that four factors influence the decision to adopt VDC; the perceived benefits, associated effort to use the technology, social influences and supporting conditions. Experience from the technology, knowledge about it and how to use will have a positive impact on the decision do adopt. The process of implementing VDC into the organisation is affected by the complex nature of the technology. The technology needs to adapt to the projects context. The barriers identified in the diffusion process can be categorised into three levels; Individual level includes knowledge about the technology and how to use it. Organisational level includes lack of resources, process owner, design of the building process and economy. Interorganizational level includes institutions, standards and knowledge transfer.
12

BIM i projekterings- och produktionsprocessen / BIM in the projection- & production process

Karlsson, Philip, Le, Hung January 2021 (has links)
Dagens tillgänglighet för mjukvara, teknik samt digitalisering har haft ett stort inflytande på byggbranschen. Det finns många olika verktyg för olika aktörer att förmedla information och ett av verktygen som finns tillgängligt är BIM (byggnads informations modellering). BIM möjliggör samordning och organisering av information. Det är inte alltid som aktören använder de nyare verktygen som finns tillgängliga vid framställning av bygghandlingar. En del aktörer i branschen har gått från traditionella arbetsmetoder till CAD (Computer aided design), vilket är en del i digitaliseringen av byggbranschen. BIM har mer funktioner i jämförelse med CAD. Användningen av digitala arbetsmetoder har ökat de senaste åren, ökningen har främst skett bland de större företagen. I studien undersöker vi närmre hur medelstora företag tillämpar digitala arbetsmetoder som BIM.Studiens syfte är att undersöka hur BIM integreras i projekterings- & produktionsprocessen. Byggbranschens sätt för hur olika aktörer samarbetar och hanterar information har förändrats av dagens teknik och digitalisering. Syftet är att få en bild av hur informationsflödet hanteras i ett byggprojekt och vilka effekter BIM har. Undersökningen är till för att ta reda på vilka hinder som finns vid implementering av BIM och vilka åtgärder som kan vidtas för att främja implementeringen. Studien är avgränsad till att undersöka små och medelstora företag.Metoden för studien utgörs av en kvantitativ enkätundersökningen och en litteraturstudie. Enkätundersökningen används för att få en bild utav BIM-användningen, i vilken utsträckning BIM används och vad BIM används till. Enkäterna är till för att få information om vilka hinder som finns för implementering av BIM, samt vilka förbättringar som kan göras inom branschen.Resultatet visar att BIM är mindre vanligt i produktionen, där det saknas kompetens bland medelstora entreprenadföretag. Svårighet att se nyttan jämfört med kostnaden är också ett problem som finns bland flera medelstora entreprenadföretag. Beställarens avsaknad på krav av BIM och organisatoriska svårigheter är faktorer som hindrar. Enkätstudien visar att BIM förekommer mer i projekteringen än i produktionen, 86% svarade att BIM används för projektering, 44,2 % svarade att BIM används för mängdavtagning som är en del i produktionsplaneringen och 16,3 % svarade att BIM används för tidsplanering i produktionen.Studien slutsats är att digitaliseringen har olika påverkan på projekterings- och produktionsprocessen. I projekteringen möjliggör digitaliseringen visualiseringar och bättre kollisionskontroller, vilket gör det möjligt att leverera bättre ritningsunderlag. Det finns en mängd olika faktorer som påverkar möjligheten för implementering, där de främsta faktorer är kunskapsbrist i kombination med saknad efterfråga från beställare och nyttan jämfört med kostnaden. Det är svårt att dra en slutsats om metoder som funkar bäst för implementering av BIM i projekt, då det oftast är en kombination av flera faktorer som motverkar implementeringen. Varje organisation är unikt och har sina anledningar eller hinder för att inte implementera BIM i projekt. / The use of digital workflows has increased in recent years, the increase being mainly among the larger companies. The study will investigate how medium-sized companies, has started to implement digital workflows such as BIM (Building Information Modeling)The purpose of the study is to investigate how BIM is integrated into the design- & production process. The construction industry's way of collaborating and managing information has changed with today's technology. The purpose is to get a picture of how the information flow is handled in a construction project and what effects BIM has.The method for the study consists of a quantitative survey and a literature study. The survey is designed to identify obstacles in the process of implementing BIM and what measures can be taken to promote implementation. The study is limited to examining medium-sized companies.The result shows that BIM is less common in production stage, where there is a lack of knowledge within the small- and medium-sized contracting companies. There’s difficulty seeing the benefits compared to the cost, which is a problem among several medium-sized contracting companies. The client's lack of requirements for BIM and organizational difficulties are factors that hinder. The survey shows that BIM is more common in the design process than in the production process, 86% responded that BIM is used for design, 44,2 % answered that BIM is used for quantity calculation (a process in production planning) and 16,3 % answered that BIM is used for scheduling in the production.The conclusion of the study is that digitalization has different effects on the design and production process. There are several different factors that affect the possibility of implementation, where the main factors are the lack of knowledge combined with demands from the customer and seeing benefit compared to the cost. It is difficult to draw a conclusion to what methods, works best for implementing BIM in projects, as it’s usually a combination of several factors.
13

Effektivisera byggprocessen genom att engagera samtliga aktörer i samordningsarbetet / Improve the process of building by involve every participant in the work of coordinating

Strömberg, Eric, Holm, Marcus January 2018 (has links)
Idag byggs det enormt mycket i Sverige, över hela landet men speciellt i städerna. Det byggs bostadsområden, affärsområden, industriområden, infrastruktur och annat för att skapa morgondagens samhälle. Det är under stor tidspress och konkurrens som byggnadsprojekt utförs. På grund av den tidspress byggbolagen ställs inför krävs ett enormt samarbete mellan alla inblandade parter. Trots att aktörer inom branschen påstår att samordningen mellan alla parter är enormt viktigt så brister det i över hälften av alla projekt. Detta examensarbete undersöker varför samordningen brister, vad det får för konsekvenser samt redovisar hur viktigt samordningsansvaret är och att det bör prioriteras under hela byggprocessen. Intervjuer och frågeformulär har gett en klar bild på hur samordningen ser ut idag, varför den brister, vad som krävs för att förbättra den samt vad en bristfällig samordning leder till för konsekvenser. Vidare har jämförelsestudien och granskning av ÄTA-arbeten gett en redogörelse för de ekonomiska konsekvenser som uppstår på grund av en bristfällig samordning. Vidare redovisar rapporten hur man kan effektivisera byggprocessen genom att ge utrymme för samordningen, i projektering samt under produktion. / Sweden is expanding and a lot of constructions are under process across the country, but especially in the cities. There are residential areas, business areas, industrial areas, infrastructure being built and are resulting in a future society. It is under great pressure and competition building projects are being carried out. Due to the time constraints that the construction companies face, enormous cooperation is needed between all parties involved. Although industry actors claim that coordination between all parties is enormously important, it is not covered enough in over half of all projects. This thesis examines explores why coordination fails, what the consequences are and explains how important the coordination is and that it should be prioritized throughout the construction process. Interviews and questionnaires have given a clear picture of how coordination looks today, why it is lacking, what it takes to improve it, and what the consequences of defective coordination are. Furthermore, the comparative study and review of ÄTA has provided an understanding of the financial consequences that arise due to defective coordination. The thesis examines also describe how to improve the construction process by providing enough space for coordination, in both projection and production.
14

<em>Granskning av kvalitets- och miljöledningssystemet hos Skanska Hus Sydost Linköping </em> : <em>“Vårt sätt att arbeta”</em>

Pettersson, Sara January 2010 (has links)
<p>För att effektivisera och uppnå de krav som ställs på företaget har Skanskas Sverige AB, i likhet med många andra företag, lagt upp ett kvalitets- och miljöledningssystem som Skanska kallar ”Vårt sätt att arbeta”. Det råder idag osäkerhet om i hur stor utsträckning systemet tillämpas och förenklar arbetet. Samt om det finns en gemensam bild av systemet bland de anställda.</p><p>I denna uppsats kommer endast produktionsförberedelsefasen och produktionsstyrningsfasen behandlas. Uppsatsen består av en kortfattad beskrivning av ”Vårt sätt att arbeta”, byggprocessen och ISO. Den utredande delen av rapporten innehåller data från intervjuer och enkäter.</p><p>Skanska har utvecklat ett mycket bra system för att hjälpa sina anställda i sitt arbete. Utifrån svaren i intervjuerna kan man tydligt se att det finns en gemensam bild av ”Vårt sätt att arbeta” och att det används och uppskattas i stor utsträckning. Men det finns alltid saker som kan förbättrs för att göra systemet ännu mer funktionellt. Det efterfrågas till exempel någon slags uppdelning i systemet.</p>
15

SOCIAL HÅLLBARHET : En undersökning för möjligheten att inkludera och beakta sociala värden under byggprocessen för husbyggnadsprojekt / SOCIAL SUSTAINABILITY : A survey for the opportunity to include and take into account the social values ​​during the construction process for building projects

Rydén, Line January 2017 (has links)
Syftet med detta examensarbete är att ge en fördjupad bild över hur man kan öka kontinuiteten i arbete med sociala aspekter under byggprocessen för husbyggnadsprojekt samt vilka konsekvenser på social hållbarhet det skulle ge. Vidare undersöks möjligheten för att inkludera och beakta sociala aspekter under byggprocessen för husbyggnadsprojekt. Arbetet innehåller även förslag till hur en sådan modell skulle kunna utformas. Ämnet valdes på grund av personligt intresse samt att få studier tidigare genomförts inom området. Det angreppssätt som valts för att undersöka det identifierade problemet är en iterativ metod med intervjuer, fokusgrupp och litteraturgenomgång om vartannat för att utveckla ett framväxande förslag av en modell som kan tillämpas. De empiriska resultaten visar tillsammans med teorin att positiva och negativa sociala konsekvenser inte beaktas utifrån ett processomfattande perspektiv i byggprocessen utan mer stötvis under byggprocessens gång. Det framtagna modellförslaget efterliknar därför metoden för sociala konsekvensbeskrivningar under planprocessen men har anpassats efter byggprocessen. Syftet med modellförslaget är att öka delaktigheten såväl internt som externt, öka flexibiliteten inom sociala frågor samt generera kontinuitet i frågor som berör social hållbarhet i projekten. För att modellförslaget ska skapa incitament för ett ökat beaktande av sociala värden i byggprocessen krävs att den utvecklas till en mer användbar och verklighetsförankarrad produkt. Här skulle förslagsvis ett pilotprojekt vara relevant. Förutom ett verktyg för identifiering av sociala konsekvenser krävs även en förändring av arbetsprocesser. Likt utvecklingen inom den miljömässiga hållbarheten bör den sociala hållbarheten bli en självklar komponent inom samhällsplanering. / The aim of this master´s thesis is to provide an in-depth view of how to increase the continuity of the work of social aspects during the construction process and the impact on social sustainability. Moreover, it will include and take in to account the social aspects of the construction process for house building projects. The thesis also provides suggestions of how such a model can be designed. The topic was chosen partly due to personal interest but also because a lack of empirical studies within the field. The approach selected to investigate the identified problem is an iterative method with interviews, workshops and literature reviews, this in order to develop an emerging draft of a model that could be applied. The empirical results along with the theoretical shows that the positive and negative aspects of social sustainability are not taken into account in the extensive perspective in the building process. The model proposed mimics the method for social impact assessment of the planning process but has been adapted for the building process. The purpose with the proposed model is to increase the participation both internally and externally, increase the flexibility and continuity in building projects and contribute to a greater inclusion and consideration of social issues within the projects. In order for the proposed model to create incentives to increase a greater consideration of social values in the building process, the model need to develop into a more useful and reality-based product. One relevant example could be a pilot-project. Beside a tool for identifying social impact, a change in the working process is also required. Like the development within the environmental sustainability, the social sustainability must become an integral component within urban planning.
16

Implementering av BIM : Datorstöd i anbudsskedet hos byggföretag / Implementing BIM : Computer-aided tender stage at construction companies

Kransvik, Fredric, Mikkelsen, Henrik January 2018 (has links)
Idag sitter flera aktörer inom byggbranschen kvar i gamla mönster och arbetssätt på grund av tidsbrist, rädsla och främst kunskapsbrist om ny teknologi. Building Information Modeling (BIM) är ett datoriserat verktyg för byggsektorn som skapar en digital 3D-modell av ett byggnadsverk där all information i byggnadsverkets livscykel kan samlas i modellen. Detta öppnar upp fler möjligheter än vad arbete med traditionella 2D-ritningar gör och BIM kommer spela en stor roll i byggbranschen i framtiden.  Syftet med denna rapporten är att undersöka hur en implementering och eventuell övergång till BIM skulle kunna gå till hos ett byggentreprenadföretag, samt hur BIM påverkar de olika processerna i anbudsskedet hos företaget.  För att samla in relevant kunskap om ämnet har litteraturstudier utförts under hela arbetets gång. För datainsamling har kvalitativa semi-strukturerade intervjuer genomförts på byggentreprenadföretaget Wästbygg och mjukvaruåterförsäljaren Cadcraft. Observationer har även verkställts på Wästbygg för att få kännedom om företagets arbetssätt i dagsläget.  Att implementera ett nytt arbetssätt med BIM skulle bevisligen kräva engagemang och tålamod från företagets sida. Nationella standarder finns inte för BIM i dagsläget och detta bedöms som en svårighetsfaktor. Vitalt är därför att företaget beslutar en tydlig strategi och målbild på förhand, samt fördelar ansvarsroller kring BIM-implementeringen till en eller två anställda. Att påbörja implementeringen i anbudsskedet är ett förnuftigt beslut – anbudsskedet befinner sig tidigt i byggprocessen och lyckas man framgångsrikt realisera BIM här är möjligheterna bättre för en vidareutveckling av företagets BIM-arbete. Framgångsrikt nyttjande av BIM innebär en semi-automatiserad mängdavtagning och kalkylering, ett förenklat informationsutbyte i anbudsskedet, samt en enkel och snygg visualisering både för personal och kund. Detta bidrar till en smidig och mer precis anbudprocess som kommer stärka företagets konkurrenskraft på marknaden. / Many construction businesses are stuck in old work patterns and procedures due to lack of time, nervousness and foremost lack of knowledge of new technology. Building Information Modeling (BIM) is a computer-aided instrument for the building sector which creates a digital 3D-model of a construction where all the information in the lifecycle of the construction is stored in the model. This entails additional opportunities compared to traditional 2D-drawings and BIM is due to play a huge part in the construction businesses in the future.  The purpose of this study is to examine how an implementation of BIM would be realized at a construction company, and furthermore how BIM affects the different processes within the tender stage of the company.  To gather appropriate knowledge surrounding the subject a literature study has been ongoing during the entirety of the study. For the purpose of data gathering, qualitative semi-structured interviews has been performed on the construction company Wästbygg and the retail company Cadcraft. Observations has also been performed on Wästbygg to get acquaintance with their current work procedures.  To implement a new work procedure with BIM would prove to require engagement and patience from the company. National standards do not currently exist, and this makes the progression more challenging. It is therefore vital for the company to decide a well-defined strategy and goals, and furthermore hand out responsibility to one or two employees on the BIM-implementation. To commence the implementation in the tender stage is a wise decision, the tender stage acts early in the construction process and if a realization of BIM is successful here, the opportunities for further expansion with BIM in the company is more probable. Successful practise with BIM would contribute to a semi-automated quantity take-off and calculation, a simplified information exchange in the tender stage, and a comfortable and appealing visualization for both staff and customer. This contributes to a straightforward and more precise tender stage which will strengthen the company’s competitiveness.
17

Från normhus till passivhus Utökade krav på organisation och framställning för hus 1 i Kallebäck / From standard house to passive house Extended demands on the organization and the development of ”hus 1” in Kallebäck.

Larsson, Lars January 2008 (has links)
Från standardhus till passivhus - Utökade krav på organisationoch framställning för hus 1 i KallebäckPassivhus är ett energismart byggnadssätt ur miljösynpunkt. Detfinns delade meningar huruvida passivhus är det framtidabyggnadssättet då dess ekonomiska vinning ifrågasätts. Den aktuellarapporten innehåller en analys över vad det innebär att bygga ettpassivhus kontra om det skulle ha byggts enligt standardnormerna.Det hus som används som referens är AF Byggs hus 1 i Kallebäck,vilket byggs idag enligt standardnormerna. Rapporten visar vilkaåtgärder gällande installationer och konstruktion som är nödvändigaför att byggnaden skall klassas som ett passivhus. Vidare finns detäven en analys över vilka förväntningar som väntas ställas påorganisationen under byggprocessen.Vad som framgår av rapporten är att det krävs ganska storaförändringar gällande både konstruktion och installationslösningarför att man skall nå passivhus nivå. En av de stora utmaningar somhittats är att passivhus konceptet bygger på att man inte får ha någotuppvärmningssystem. Vidare har det även framkommit att det ställshögre krav på organisationen. / Uppsatsnivå: C
18

Förnödenhetshantering på byggarbetsplats : Effektiviseringspotential med leverantörsbaserade logistiktjänster

Topalli, Galdim January 2019 (has links)
Det finns en utmaning med att ha effektiva processer vid hantering av förbrukningsvaror, verktyg och säkerhetsutrustning. Denna utmaning är välkänd inom byggbranschen. Detta problem har gett upphov till att leverantörer uppfunnit tjänster som ska förbättra logistiken till att göra det effektivare och ge bättre arbetsmiljö inom byggprocessen. Den tidigare forskning som gjorts kring ämnet har belyst att det finns problem i hela processen kring dessa såsom inköp, leverans, användning och påfyllnad. Genom att undersöka var utmaningarna ligger inom området så ger det möjlighet till förståelse för hur förbättringar kan effektivisera arbetet. Detta kan medföra att byggprocessen verkligen blir effektivare samt får en bättre arbetsmiljö för alla involverade. Syftet med denna studie är att kunna visa hur logistiktjänster kan bidra till ökad effektivitet och utöver detta förbättra arbetsmiljön i byggprocessen. Detta genom att undersöka hur byggprocessen ser ut vid traditionell förnödenhetshantering, därefter undersöka vilka förbättringar leverantörer menar på att deras tjänster erbjuder för att sedan validera detta i projekt där leverantörsbaserade logistiktjänster används. Författaren har valt att utföra studien med kvalitativ metod. Den litteratur som används har varit nödvändig för att identifiera de olika problemkategorierna som studien kommit att utgå efter. Dessutom så har intervjuer hållits med leverantörer och semistrukturerade intervjuer vid platsbesök på PH Bygg AB och YLAB utförts för att undersöka de olika problemområden utan logistiktjänster och effekterna vid användning av logistiktjänster. Analysen och diskussionen av resultatet har använts för att undersöka och bekräfta de effektiviseringsmöjligheter som finns vid användning av leverantörsbaserade logistiktjänster. Det som har framkommit av studien är att användningen av de logistiska tjänster som leverantörer erbjuder byggsektorn ger upphov till att byggprojekten får effektivare byggprocesser. Detta genom att olika processer antingen elimineras eller förflyttas till leverantörer och detta leder till att det blir mindre delmoment för byggentreprenören. Därutöver så har dessa tjänster gett upphov till att de respondenter som använder dessa tjänster upplever att arbetsmiljön har förbättrats markant. Detta eftersom mer tid kan läggas till aktiva moment och mindre arbetsbelastning underlättar för alla. Vidare så har författaren dragit slutsatsen att användningen av dessa tjänster ger möjligheten för byggentreprenörer till en konkurrenskraftig fördel i deras förnödenhetshantering. / The challenge of managing necessities is something that is well known in the construction industry. This has given rise to suppliers inventing different logistical services that will improve the efficiency and working environment in the construction process. The earlier research shows problems concerning purchasing, delivery, usage and replenishment regarding necessity management. The purpose of this study is to show how supplier-based logistic services can contribute to increased efficiency and in addition to this improve the working environment in the construction process. The author has chosen to carry out the study through qualitative methodology. The literature used has been necessary in order to identify the different problem categories. In addition, interviews have been held with suppliers and semi-structured interviews at site visits to PH Bygg AB and YLAB were conducted to investigate the various problem areas without logistics services and the effects of using logistics services. The analysis and discussion of the results has been used to investigate and confirm the efficiency opportunities that exist when using supplier-based logistics services. The conclusion of the study is that the use of supplier-based services gives rise to a more efficient construction process. This is possible because different processes are either eliminated or transferred to suppliers, and this leads to shorter processes for the construction contractor. In addition, this has given rise to the fact that the respondents who use these services feel that the working environment has improved.
19

Granskning av kvalitets- och miljöledningssystemet hos Skanska Hus Sydost Linköping : “Vårt sätt att arbeta”

Pettersson, Sara January 2010 (has links)
För att effektivisera och uppnå de krav som ställs på företaget har Skanskas Sverige AB, i likhet med många andra företag, lagt upp ett kvalitets- och miljöledningssystem som Skanska kallar ”Vårt sätt att arbeta”. Det råder idag osäkerhet om i hur stor utsträckning systemet tillämpas och förenklar arbetet. Samt om det finns en gemensam bild av systemet bland de anställda. I denna uppsats kommer endast produktionsförberedelsefasen och produktionsstyrningsfasen behandlas. Uppsatsen består av en kortfattad beskrivning av ”Vårt sätt att arbeta”, byggprocessen och ISO. Den utredande delen av rapporten innehåller data från intervjuer och enkäter. Skanska har utvecklat ett mycket bra system för att hjälpa sina anställda i sitt arbete. Utifrån svaren i intervjuerna kan man tydligt se att det finns en gemensam bild av ”Vårt sätt att arbeta” och att det används och uppskattas i stor utsträckning. Men det finns alltid saker som kan förbättrs för att göra systemet ännu mer funktionellt. Det efterfrågas till exempel någon slags uppdelning i systemet.
20

Kostnadsanalys av lågenergihus : Kostnadsjämförelse mellan traditionella hus, minienergi - och passivhus

Shabani, Yasmino Jasse January 2011 (has links)
Sverige har som mål att år 2020 reducera energianvändningen för bostadssektorn med 20 procent och med 50 procent till år 2050. För att målen ska uppnås fordras fler energisnåla nybyggnationer och energieffektivisering på ombyggnationer. Av alla nybyggnationer som har produceras i Sverige är mindre än 1 procent energisnåla nybyggnationer. Studier visar att en av orsakerna till den låga marknadsutvecklingen för lågenergihus beror på att lågenergihus är generellt mellan 2 till 10 procent dyrare än traditionellt byggda hus. Andra orsaker är att många byggherrar inte känner till fördelarna att bygga energieffektivt. Det har även visat sig att byggherrar har för lite kunskaper om energieffektivisering och saknar förmågan att tänka långsiktigt vilket har bidragit att många byggherrar inriktar sig på kortsiktiga ekonomiska resultat istället för hela byggnadens livscykel. Syftet med den här rapporten var att beräkna merkostnaden och livscykelvinsten för nyproduktion av minienergihus och passivhus. Resultat av beräkningar visar att lågenergihus förbrukar mellan 30 - 60 procent mindre energi och att produktionskostnaden är mellan 2,5 – 8,7 procent mer än traditionella hus. Energibesparingen i lågenergihus bidrar till lägre driftkostnader som under byggnadens ekonomiska livslängd på 50 år genererar en livscykelvinst på 57 000 kr för minienergihus och cirka 136 000 kr för passivhus. / Sweden aims to reduce energy use in year 2020 for the residential sector by 20 percent and 50 percent by year 2050. In order to achieve these goals it requires more production of energy-efficient buildings and improving energy-efficiency in renovations. Of all the new constructions are less than 1 percent low-energy house in Sweden One of the reasons for the low market of low-energy houses, is according to studies that these type of houses are generally between 2 to 10 percent more expensive than traditionally built houses. Other reasons are that many developers are not aware of the benefits of building energy-efficient. It is been discovered that many developers have insufficient knowledge of energy efficiency and lack of ability to think in long term, which has contributed many developers to focus on short-term financial results rather than the entire building lifecycle. The purpose of this report was to estimate the additional cost and life cycle profits for construction of Mini energy house and Passive house. Results from calculations shows that the production of low -energy houses costs between 2.5 to 8.7 percent more than conventional buildings. Energy conservation contributes to lower operating costs. During the low -energy houses economic life of 50 years it generates a life cycle profit of 57.000 SEK for Mini energy houses and approximately 136.000 SEK for Passive houses.

Page generated in 0.3329 seconds