• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 51
  • 5
  • Tagged with
  • 56
  • 31
  • 26
  • 17
  • 16
  • 14
  • 14
  • 11
  • 10
  • 10
  • 10
  • 10
  • 9
  • 9
  • 8
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

Analys av veckostrukturer och mötesstrukturer inom byggproduktion / Analysis of weekly structures and meeting structures within construction production

Eriksson, Mark, Leesment, Samuel January 2022 (has links)
Byggbranschen består ofta av komplexa, unika och tidspressade projekt med många aktörer involverade. Detta gör att brister i kommunikationen kan förekomma och de kan ofta kosta både tid och pengar. Syftet med rapporten är att analysera möten och veckostrukturer på fyra olika projekt hos Skanska Region Hus Göteborg, hur de skiljer sig mellan de olika projekten samt förslag till förbättringsåtgärder för att effektivisera mötes- & veckostrukturen.För att kunna besvara de frågeställningar som ställdes i rapporten genomfördes tio intervjuer. Olika arbetsroller intervjuades på varje projekt för att få ett bredare perspektiv på varje projekt. De arbetsroller som intervjupersonerna hade var platschef, arbetsledare samt lagbasen för yrkesarbetarna. Tre observationer genomfördes också på morgonmöten på de olika projekten för att få en tydligare bild av vem/vilka som håller i mötet och vad som tas upp under mötets gång. En litteraturinsamling genomfördes innan intervjuerna för att stärka upp den teoretiska bakgrunden för ämnesområdet.Resultatet av undersökningen visade att det finns skillnader i hur projekten strukturerar upp veckan, hur projekten strukturerar upp möten och även hur många möten projekten håller veckovis. Återkoppling är något som används men inte på ett strukturerat vis eller särskilt ofta. De projekt som arbetade på ett mer proaktivt sätt såg att de kunde arbeta på ett mer tidseffektivt sätt. Engagemang hos deltagare ökade om mötesstrukturen inkluderade mötesdeltagarna i en högre utsträckning. Användning av en visuell tidplan sågs som ett bra komplement till informationsöverföringen i och utanför mötesforum.Studien mynnade slutligen ut i ett antal föreslagna förbättringsåtgärder som kan hjälpa till att göra vecko- och mötesstrukturerna mer effektiva och därmed också förbättra kommunikationen i stort på projekt vilket sparar både tid och pengar. Återkoppling kan struktureras in i möten samt veckoplanering för att effektivisera produktivitetsökningen för mötes- & veckostrukturering. Genom att ställa fler öppna frågor till mötesdeltagare samt låta fler deltagare leda olika delar av ett möte så skapas mer engagemang från fler mötesdeltagare. En individs arbetsvecka kan tidsdokumenteras i form av proaktivt och reaktivt arbete. Då kan individens veckostruktur analyseras för att hitta åtgärder för att minska mängden reaktiva händelser och förbättra det proaktiva arbetssättet. Arbetsveckan, arbetsmoment samt allmän information kan struktureras i ett samlat dokument för att lättare kunna planera och fördela arbetsuppgifter och därmed öka det proaktiva arbetet. / The construction industry often consists of complex, unique and time-consuming projects with many different actors involved. This means that shortcomings in communication can occur, and they can often cost both time and money. The purpose of the report is to analyze meetings and weekly structures on four different projects at Skanska Region House Gothenburg, how the projects differ and what kind of improvement measures exist.To be able to answer the questions posed in the report, ten interviews were conducted. Different work roles were interviewed on each project to get a broader perspective on each project. The work roles that the interviewees had were site manager, supervisor, and the team base for the construction workers. One observation was also made at the daily morning meetings on the various projects to get a clearer picture of who is holding the meeting and what is being discussed during the meeting. A literature collection was also conducted before the interview stage to strengthen the theoretical background for the subject area.The results of the study showed that there were differences in how the week was structured, how meetings were structured and how many meetings were held weekly. Feedback is something that is used but not in a structured way or very often. The projects that worked in a more initiative-taking way saw that they could work in a more time-efficient way. Participation among workers increased if the meeting structure included the workers to a greater extent. The use of a visual timetable was seen as a good complement to the information transfer in and outside of meeting forums.The study resulted in a few proposed improvement measures that can help make the weekly and meeting structures more effective and thus also improve communication in general on projects which saves both time and money. Feedback can be structured into meetings and weekly planning to streamline productivity growth for meeting & weekly structuring. By asking more open questions to meeting participants and letting more participants lead various parts of a meeting, more commitment is created from more meeting participants. The individuals work weeks can be time-documented in the form of initiative-taking and reactive work. Then the individual’s weekly structure can be analyzed to find measures to reduce the number of reactive events and improve the initiative-taking approach. The work week, work steps and general information can be structured in a single document to make it easier to plan and distribute tasks and thereby increase the initiative-taking work.
52

Hur ledningens arbetssätt påverkar säkerheten på byggarbetsplatsen / How management approach affect safety on construction sites

Oguz, Nathaline, Hanzek, Fredrik January 2015 (has links)
No description available.
53

Jämställdhetsintegrering som en del av kvalitetsledning : Så kan Götakvarteren bli Skanskas mest jämställda projekt / Gender mainstreaming as a part of quality management : Götakvarteren - Skanska’s most gender equal project

Andersson, Sofia January 2019 (has links)
Bakgrund: Under flera årtionden har företag arbetat med kvalitetsledning i syfte till att förbättra och utveckla sina verksamheter. Metoder och verktyg har fungerat som stöd för att möta företagets värderingar och möta de interna och externa kundernas behov med minskad mängd resurser. Nyligen utförda projekt har kunnat bekräfta att jämställdhetsintegrering fungerar som en effektiv metod vid förbättrings- och utvecklingsarbete. Metoden påstås ha positiv inverkan på företags prestanda genom bland annat förbättrad arbetsmiljö, förhöjd kreativ och innovativ förmåga hos medarbetare samt ökad förmåga att attrahera välutbildad personal. Förutom detta anses jämställdhetsintegrering även bidra till social hållbarhet och uppfylla FN:s globala mål snabbare, vilket i sin tur leder till hållbar utveckling. Syfte: Syftet med den här studien har varit att undersöka hur jämställdhetsintegrering och kvalitetsledning samverkar, samt hur jämställdhetsintegrering kan bidra till förbättring av byggprojekt. Metod: Studien har genomförts enligt fördjupad fallstudie på Skanska Fastigheter Göteborg. För att förstå fallföretagets problem och nuvarande situation utfördes kvalitativ metod med kvantitativ inslag. Studiens kvalitativ data syftade till att skapa grundlig förståelse av ämnesområdet och fallföretagets, medan inslag av kvalitativ data motsvarade statistik från fallföretaget och byggbranschen. Som analysmetod av studiens primära datainsamling utfördes en Tematisk analys och Voice Of The Customer Table (VOCT). Resultat: I studiens teoretiska referensram identifierades flera likheter mellan kvalitetsledning och jämställdhetsintegrering, där jämställdhetsintegrering ansågs betraktas som en metod för ständiga förbättringar. Efter undersökning av Skanskas nuvarande arbetssätt framgick det att det inte finns någon koppling mellan företagets kvalitetsarbete och jämställdhetsarbete. Det medför att jämställdhetsintegrering i projektet Götakvarteren kan innebära större förändring då nya tankegångar och arbetssätt måste upprättas. Däremot indikerade analysen av medarbetarnas behov att jämställda byggprojekt är fördelaktigt för företagets hållbara utveckling. Efter analysen kunde även åtgärder och rekommendationer tas fram på hur projektet Götakvarteren kan bli mer framgångsrikt och jämställt. Slutsats: Det finns en tydlig koppling mellan jämställdhetsintegrering och kvalitetsledning, där jämställdhetsintegrering kan argumenteras för att vara en kvalitetsmetod. Just som Skanskas nuvarande kvalitetsarbete bör jämställdhetsarbetet vara integrerat i den dagliga verksamheten och accepteras som en metod för ständiga förbättringar. Utifrån Skanskas nuvarande situation togs åtgärder fram på hur jämställdhetsintegrering kan bidra till kvalitetsarbete och skapa framgångsrika och jämställda byggprojekt. / Background: Over decades, companies have been integrating quality management to constantly improve and develop their businesses. Techniques and tools have been used as support to meet the company’s values, and to increase external and internal customer satisfaction with a reduce amount of resources. Recent projects have demonstrated that gender mainstreaming works as an effective approach for business improvement and development. The method is claimed to have a positive impact on the company’s business performance, for instance by improved working environment, increased creative and innovative capacity of employees and an increased ability to attract well-trained staff. In addition, it is considered that gender mainstreaming contributes to social sustainability and the achievement of the UN’s global goals faster, which in turn leads to sustainable development. Purpose: The purpose of this study has been to investigate how gender mainstreaming and quality management interact, and how gender mainstreaming can contribute to the improvement of construction projects. Methodology: The study has been carried out as an in-depth case study at Skanska Commercial Development Nordic in Gothenburg. In order to understand the business case, its problem and current situation, a qualitative methodology with quantitative data was made. The qualitative data was used to obtain a deeper understanding of the case, and the quantitative data consisted of statistics from the company and the construction industry. As method of analysis, a Thematic analysis and Voice Of The Customer Table (VOCT) was done to understand the needs of the employees at Skanska. Result: In the study’s theoretical framework, several similarities between gender mainstreaming and quality management were identified, in which gender mainstreaming could be seen as a technique within quality management. From the study of Skanska’s way of working, it emerged that there is no link between their work with quality and gender equality. That entails gender mainstreaming in the project Götakvarteren will involve major changes as new ideas and methods must be established. On the other hand, the analysis indicated that the employees need of an equal construction project would be beneficial for the company’s sustainable development. Based on the needs of the employees, recommendations have been given for how Götakvarteren could become profitable by becoming Skanska’s most equal project. Conclusion: There is a distinct link between gender mainstreaming and quality management, in which gender mainstreaming can be argued to be a technique within quality management. Just as Skanska’s current quality management system, the work with gender equality should be integrated in the daily activities and accepted as a method for continuous improvement. After identifying the company’s challenges, opportunities and needs, actions have been developed for how gender mainstreaming can contribute to successful and equal construction projects.
54

Green Building : Ett företags energieffektiviseringsarbete i ett byggprojekt samt de krav som ställs för att få byggnaden Green Building klassad.

Andersson, Alexandra January 2009 (has links)
<p>The examination has been performed at Bjerking AB, which is an architectural and engineering company. Bjerking AB has the ambition to be a member of Green Building.</p><p>The Green Building program developed in year 2005 by The European Commission, the program is an environmental system with the aim to improving energy efficiency within the sectors of non-residential buildings. The minimum requirements to participate the program are following: in new-built buildings the calculated energy consumption must be 25 % lower than the requirements in the BBR (Building regulations) and in refurbishment the reduction must be 25 % lower than before the optimization.</p><p>The aim of this study has been to examine and review the company Bjerking AB's energy efficiency work in the project of building the school/kindergarten S:ta Maria Alsike, where the goal is to get this building Green Building classed. A description of requirements to become a member of the Green Building has also accomplished in the thesis.</p><p>The methods performed in this study are literature review, searches on the Internet, studies on the project database for facts/values, calculation of energy consumption and interviews of members of the Green Building. </p><p>The following issues have been dealt with in the report;</p><p>-          Did the building in the project manage the requirement to achieve an   energy consumption that is 25% lower than the requirements in BBR?</p><p>-          What technical measures/system was selected in the building?</p><p>-          What kind of cooperation was the project based on?</p><p>-          What is required for consultancy companies and real estate owners to become members of the Green Building?</p><p>The study of the project and calculation of estimated energy consumption in the building, give the result 47 kWh/m<sup>2</sup>, year. This is 60 % lower than the requirements of BBR. The Green Building requirement is that the building's energy consumption should be at least 25% less than the requirements in BBR. The building fulfills this requirement by a significant margin. It can therefore be concluded that the technical solutions carried out in the building are energy efficient. The project consisted of the cooperation shape “partnering ", which can be assumed to be a good form of cooperation in order to achieve an energy efficient building. The consultancy company Bjerking AB and the landlord Knivsta Pastorat has the potential to become members of Green Building, as Green Building Endorser respective Green Building Partner.</p><p><strong>Keywords:</strong> energy efficiency, requirements of BBR, technical systems, cooperation, consultancy companies, real estate owners, estimated energy consumption, partnering, Green Building Partner, Green Building Endorser.</p> / Utbildningsprogram: Civilingenjör i samhällsteknik, 180 p (270 hp).
55

Utvärdering av miljöarbetet vid nybyggnad av butik : miljöledning och avfallshantering

Othén, Anna, Persson, Sofie January 2010 (has links)
According to recent statistics the construction industry is responsible for the largest waste discharges of both dangerous and non-dangerous waste, when disregarding the "non-dangerous" amount of granite waste produced by the mining industry and the waste produced by the pulp and paper industry. Preventive work within waste management is an ongoing practice so to be able to reduce negative environmental effects. One of the most common actions for the companies to take is to separate the different kinds of waste from one another at the construction site. Although by working with the problem in earlier stages of the process a large amount of the waste could already have been reduced. Companies in the construction business that are actively working to decrease environmental impact in their operations often use an EMS (Environmental Management System). By using environmental management as method the company can manage their environmental work so that actions can be taken where they are needed the most. It may though be difficult to adapt the tool for a project-oriented organization such as a construction project. Which effect the environmental work will have does not depend on the fact that the company uses EMS, it depends on how they use it. ICA Real-estate Sweden AB is about to have a new "ICA Kvantum" store built in Avesta, the company has chosen to use an EMS in their environmental work in order to reduce their environmental impact. ICA Real-estate’s environmental review showed that a considerable environmental aspect was waste management in new constructions and rebuilding’s and as a result they have a new environmental goal for the year 2010. The goal was that they would conduct a pilot project within waste management which is currently realized through the construction of the ICA Kvantum store in Avesta. In order to specify how the environmental work should be done in the project and which environmental demands that have been demanded ICA Real-estates has established an environmental program that the entrepreneurs have received and will abide by. Based on the notion from ICA Real-estate concerning the fact that the contractor’s should have high-quality environmental work the company ByggPartner i Dalarna AB was granted the entire contract for the new ICA Kvantum store. ByggPartner also have their own agenda and goals for waste management in the project and are working towards fulfilling them through coordination and planning. The results presented from the investigation that have been done in this report shows that both companies has got many good factors in their environmental work but compared to contemporary research in the area there are still things that could be improved so that the environmental work will be even more successful. / Enligt statistik bidrar byggsektorn med mest farligt och icke-farligt avfall i Sverige, bortsett från ”ofarligt” gråberg från gruvindustrin och avfall från massa- och pappersindustrin. Det arbetas förebyggande med avfallshantering inom sektorn för att minska den negativa miljöpåverkan avfall utgör. Den vanligaste åtgärden företag utför är att källsortera på byggarbetsplatsen men en stor mängd av avfallet kan reduceras genom att arbeta med problemet i byggprocessens tidigare skeden. Majoriteten av företag inom byggbranschen som arbetar med att minska miljöbelastningen använder ett miljöledningssystem. Miljöledning är en metod där företagets miljöarbete styrs så åtgärder utförs där de är mest behövliga. En svårighet som finns inom branschen är att anpassa verktyget till projektorienterade organisationer som ett byggprojekt. Vilket resultat miljöarbetet får beror på hur företaget använder miljöledningssystemet inte att de använder verktyget. ICA Fastigheter Sverige AB skall låta uppföra en ICA Kvantumbutik i Avesta. Företaget använder ett miljöledningssystem i arbetet med minskning av verksamhetens miljöbelastning. ICA Fastigheters miljöutredning visade att en betydande miljöaspekt är avfallshantering vid nyproduktion och ombyggnader, därför sattes ett miljömål upp för 2010. Målet är att bedriva ett pilotprojekt inom avfallshantering vilket nu realiseras genom uppförandet av en ICA Kvantumbutik i Avesta. För att specificera hur miljöarbetet skall gå till i projektet och vilka miljökrav som ställs har ICA Fastigheter upprättat ett miljöprogram som entreprenören skall följa. Baserat på att entreprenören skall ha ett bra miljöarbete inom företaget erhöll ByggPartner i Dalarna AB totalentreprenaden för ICA Kvantumbutiken. ByggPartner har satt upp egna mål angående avfallshanteringen i projektet. Genom samordning och planering arbetar företaget för att uppnå dessa mål samt ICA Fastigheters krav. Resultatet av företagens miljöarbete som beskrivs i rapporten visar att båda företagen har flera bra faktorer i sitt miljöarbete. Jämfört mot forskning inom området finns det delar inom miljöarbetet hos ICA Fastigheter och ByggPartner som har förbättringspotential.
56

Green Building : Ett företags energieffektiviseringsarbete i ett byggprojekt samt de krav som ställs för att få byggnaden Green Building klassad.

Andersson, Alexandra January 2009 (has links)
The examination has been performed at Bjerking AB, which is an architectural and engineering company. Bjerking AB has the ambition to be a member of Green Building. The Green Building program developed in year 2005 by The European Commission, the program is an environmental system with the aim to improving energy efficiency within the sectors of non-residential buildings. The minimum requirements to participate the program are following: in new-built buildings the calculated energy consumption must be 25 % lower than the requirements in the BBR (Building regulations) and in refurbishment the reduction must be 25 % lower than before the optimization. The aim of this study has been to examine and review the company Bjerking AB's energy efficiency work in the project of building the school/kindergarten S:ta Maria Alsike, where the goal is to get this building Green Building classed. A description of requirements to become a member of the Green Building has also accomplished in the thesis. The methods performed in this study are literature review, searches on the Internet, studies on the project database for facts/values, calculation of energy consumption and interviews of members of the Green Building.  The following issues have been dealt with in the report; -          Did the building in the project manage the requirement to achieve an   energy consumption that is 25% lower than the requirements in BBR? -          What technical measures/system was selected in the building? -          What kind of cooperation was the project based on? -          What is required for consultancy companies and real estate owners to become members of the Green Building? The study of the project and calculation of estimated energy consumption in the building, give the result 47 kWh/m2, year. This is 60 % lower than the requirements of BBR. The Green Building requirement is that the building's energy consumption should be at least 25% less than the requirements in BBR. The building fulfills this requirement by a significant margin. It can therefore be concluded that the technical solutions carried out in the building are energy efficient. The project consisted of the cooperation shape “partnering ", which can be assumed to be a good form of cooperation in order to achieve an energy efficient building. The consultancy company Bjerking AB and the landlord Knivsta Pastorat has the potential to become members of Green Building, as Green Building Endorser respective Green Building Partner. Keywords: energy efficiency, requirements of BBR, technical systems, cooperation, consultancy companies, real estate owners, estimated energy consumption, partnering, Green Building Partner, Green Building Endorser. / Utbildningsprogram: Civilingenjör i samhällsteknik, 180 p (270 hp).

Page generated in 0.033 seconds