• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 135
  • 11
  • Tagged with
  • 146
  • 60
  • 60
  • 50
  • 33
  • 29
  • 28
  • 23
  • 20
  • 19
  • 19
  • 18
  • 18
  • 18
  • 17
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

Modellering av dagvattennät utgående från markhöjder / Modeling of storm water network based on ground level

Ahlin, Erik January 2012 (has links)
Enligt Svenskt Vatten ska dagvattensystem vara dimensionerade för att klara ett regnmed en återkomsttid på 10 år. För att utvärdera om ett system är rätt dimensionerat kanen dagvattenmodell upprättas. Det är då viktigt att veta vilka nivåer ledningarna har mendenna information är bristfällig hos många kommuner. Ledningarna borde dock följatopografin i generella drag och borde därför kunna uppskattas därifrån.Syftet med denna studie var därför att utveckla en metod för hur vattenledningarnasnivåer kunde ansättas på ett enkelt sätt utifrån marknivån och hur stor betydelse detskulle ha vid dagvattenmodellering. Ett ytterligare syfte var att även bedöma Lidingöstads dagvattensystem, där information om ledningarnas nivåer saknades, utifrån dennametod. För att metoden skulle vara användbar var det också viktigt att den var enkel attapplicera även för stora dagvattensystem.Delar av Sundbybergs dagvattennät i Stockholms län användes för att utvecklametoden. Där var ledningarnas nivåer kända och en analys av detta resulterade i enmetod där brunnarnas djup, som styr ledningarnas nivåer, ansattes på 2 m djup. Ettundantag var tvunget att göras vid de fall då ledningarna fick bakfall. Där ansattes ettdjup så att ledningen låg horisontellt.Vid utvärdering av hur stor påverkan ansättningen av djupet hade togs hänsyn tillosäkerheten av avrinningskoefficienten genom att använda tre olika scenarier;oförändrad, 30 % lägre samt 30 % högre avrinningskoefficient. För varje brunn vägdesrisken för översvämning ihop från resultatet av dessa tre scenarier och sammanställdesmed att varje brunns trycknivå fick status över mark, under mark eller osäker. Dettagjordes för både modell med kända och med ansatta nivåer. Statusen för varje brunnjämfördes sedan dem emellan för att utvärdera hur bra metoden för att ansättabrunnarnas djup var.Resultatet av studien visar att metoden i stora drag gav samma resultat vad gäller riskenför översvämning jämfört med om nivåerna hade varit kända. Avvikelser uppstodfrämst vid diken men även för enstaka instängda områden och utlopp. För Lidingösdagvattennät hamnade trycknivån för 18 % av brunnarna över marknivån vid ett 10-årsregn och ytterligare 16 % var osäkra. / According to The Swedish Water and Wastewater Association (SWWA), a storm waternetwork must be able to handle a rainfall with a return period of 10 years. In order toevaluate whether a drain system is adequately dimensioned, a storm water model can beestablished. This requires knowledge about the levels at which the conduits are situated,and this information is insufficient in many areas. However, the pipes could largely beassumed to follow the topography and the pipes levels can be estimated from it.Therefore, the aim of this study was to develop a method for how the level of stormwater conduits could be assessed from the ground level, and the significance thismethod had for storm water modeling. A further aim was also to, according to thismethod; assess the storm water systems of the Lidingö community, which lackedinformation on the pipe levels. Furthermore, for the method to be useful it wasimportant to make it easily applicable even to large storm water networks.The method was developed using parts of the storm water network in Sundbyberg,Stockholm. The levels of the conduits were known beforehand, and an analysis of themresulted in a method where the depth of the manhole, which controls the levels of theconduits, was estimated to 2 m. An exception had to be made when the conduits were inreverse slope, in which cases horizontal slope was assumed.When evaluating the impact from the depth assessment on the runoff, the uncertaintyfrom the imperviousness was taken into account by using three different scenarios;unchanged, 30% lower and 30% higher imperviousness. The risk of flooding for eachone of the manholes was weighted from the results of these three scenarios. Thisresulted in a pressure level for each manhole, either above ground, below ground orinconclusive. This was done for the model with both known levels for the conduits, andwith the assessed levels. In order to evaluate how well the method for applying thedepth worked, the status of each manhole was compared between the two models.The conclusion from this study was that the method developed here, more or less gavethe same results as when the levels of the conduits were previously known.Discrepancies arose mainly in ditches, but also for a few landlocked areas and outlets.For the Lidingö storm water network, 18 % of the wells ended up with a pressure levelabove ground when applied to a rain with a 10 year return period. Another 16 % of thewells were inconclusive.
52

Myllrande våtmarker och vektorburen smitta : Våtmarker och dagvattenhantering i planeringen

Ljungberg, Niklas January 2015 (has links)
En åtgärd som allt mer förespråkas runt om i världen för att uppnå en hållbar utveckling är att planera för öppen dagvattenhantering genom att bland annat återställa våtmarker och uppföra dammar och diken. Att dessa åtgärder även innebär fler potentiella habitat och större populationer av myggor, som kan vara vektorer för smittor, är dock ett problem som sällan diskuteras i planprocessen. Planprocessen förutsätts vara en rationell process som tar hänsyn till alla ståndpunkter och leder till den bästa lösningen. I detta arbete framkommer dock indikationer på att planprocessen kring öppen dagvattenhantering snarare går att betrakta som ett utslag av makt där handlingsutrymmet över problemformuleringen varit avgörande. Planprocessen förefaller att genom subtila maktordningar stärka vissa aktörers inflytande på andras bekostnad. Detta har medfört att ett biologiskt och tekniskt synsätt tycks dominera föreställningen om vad öppen dagvattenhantering innebär, vilket lett till att de medicinska synpunkterna inte kommit till uttryck utan exkluderats från planprocessen.
53

Banviksbrottet - Parkeringshus i kombination med radhus : En hållbar lösning till parkeringsbrist? / Banviksbrottet – Multistory car park in combination with terraced houses : A sustainable solution to parking shortage?

Rydholm, Marcus, Lowenfalk, Rasmus January 2015 (has links)
Denna rapport innehåller ett utformningsförslag med illustrationer, beskrivande textoch ritningar på hur parkeringsbristen kan lösas i stadsdelen Gamlestan i Lysekilkommun med hjälp av ett parkeringshus i kombination med radhus ovanpå. Hänsyntas till val av byggmaterial, möjlig konstruktionslösning, PBL, BBR, brandsäkerhet,dagvattenhantering, och ekonomi. / This report contains a design proposal of how to solve the lack of parking spaces inthe district Gamlestan in Lysekil kommun with a multistory car park in combinationwith terraced houses on top. The proposal is presented through illustrations,describing text and blueprints. Choice of building materials, possible constructionsolution, PBL, BBR, fire safety, stormwater management and economy is taken inconsideration.
54

Tillskottsvatten i spillvattennnät : Underlag för framtida åtgärder i Fengersfors

Nilsson, Martin, Andersson, Erik January 2015 (has links)
Examensarbetet har genomförts som den avslutande delen på högskoleingenjörsutbildningen i byggteknik vid Karlstads Universitet. Arbetet omfattar 22,5 högskolepoäng och har utförts på uppdrag av Säffle-Åmål kommuns VA-enhet. Vatten från avlopp innehåller förhöjda nivåer av kväve och fosfor som reningsverken tvingas hantera. Vid dålig rening släpps dessa ämnen ut i sjöar och andra vattendrag, vilket kan leda till övergödning. I det dalsländska samhället Fengersfors används två mindre biodammar för rening av avloppsvatten. Biodammarna uppfyller inte myndigheternas reningskrav, vilket har föranlett kommunen att uppgradera anläggningen. Vid utbyggnad av reningsanläggningen krävs det att dagens volymer av tillskottsvatten reduceras. Detta för att en dimensionering skall vara möjlig i proportion till samhällets storlek. Tillskottsvatten är övrigt vatten som når reningsverken utöver bad-, disk-, klosett- och tvättvatten. Exempel på tillskottsvatten kan vara vatten från nederbörd och grundvatten via inläckage, felkopplingar och överläckage. Man eftersträvar att minimera andelen tillskottsvatten i avloppsvattnet. Detta för att undvika kostnadskrävande reningsprocesser. Syftet med studien är att undersöka hur flödet av tillskottsvatten kan minskas till de biodammar som idag renar Fengersfors spillvatten. Studien skall besvara följande fråga: Vilka källor till tillskottsvatten finns i Fengersfors idag och vilka åtgärder bör kommunen prioritera för att uppnå sitt mål om att minska andelen tillskottsvatten i spillvattennätet? Att kartlägga källor och volymer av tillskottsvatten i avloppsledningsnätet är ett tidskrävande arbete. För att komma till rätta med problemet utan kostnadskrävande dupliceringsåtgärder är det viktigt att först skapa en bild över området. I denna studie görs detta genom fyra undersökningsmoment: fältinventering av bostadsbebyggelse, fältinventering av ytavledning, undersökning av grundvattennivåer och spårfärgning av osäkra kopplingar. Momenten är lätta att utföra och behöver inte utföras av personer med särskild kompetens. Undersökningsmomenten sammanställs i två översiktskartor, Fengersfors Norra och Fengersfors Södra. Kartorna används därefter för enklare beräkningar över vilka områden som bidrar med stora volymer tillskottsvatten. Flertalet fastigheter i Fengersfors har sina takytor anslutna till spillvattennätet. Enklare åtgärder, som omkoppling till utkastare med tät vattenavledare, kan reducera volymen nederbördsvatten som når biodammarna. Dikningsunderhållet är eftersatt i hela Fengersfors, vilket medfört att trummor och brunnar satts igen. Ett fungerande dikessystem är nödvändigt för transport av dag- och dräneringsvatten till recipient. Under spårfärgningsarbetet hittades delar av dagvattenledningar som inte fanns med i ledningskartan. Kartor kan nu uppdateras och bli en viktig pusselbit för framtida åtgärder. Resultaten visar också att cirka 60 procent av det vatten som når reningsanläggningen i Fengersfors består av dränerat grundvatten, vilket gör reningen ineffektiv och en utbyggnad svår att dimensionera. Studien ger en fingervisning över vilka områden som behöver åtgärdas eller utredas vidare av kommunen. / This work has been carried out as the final part of the Bachelor program in structural engineering at the University of Karlstad. The work comprises 22,5 credits and is performed on behalf of the Water and Sewage Department in Säffle-Åmål Municipality. Wastewater contains elevated levels of nitrogen and phosphorus which the treatment plants are forced to deal with. If the purification in the plant are substandard these substances is emitted in lakes and streams, which can lead to eutrophication. The small village of Fengersfors, in the province of Dalsland, uses two small stabilization pounds to cleanse their wastewater. These stabilization pounds do not meet the authorities’ treatment requirements, which have led the municipality to upgrade the facility. Before expanding the treatment plant, today’s volumes of extraneous water must be reduced to be able to dimension the new pounds, in proportion to the size of Fengersfors. Extraneous water is clean water that reaches the treatment plants in addition to water from baths, showers, washing machines and toilets. Examples of additional water can be storm water and groundwater. It is desired to minimize the percentage of extraneous water in wastewater systems to avoid costly purification processes. The purpose of this study is to reduce the flow of extraneous water which transports to the stabilization pounds. What sources to extraneous water is there in Fengersfors and which actions should the municipality take to achieve their goal of reduced flow of extraneous water to the stabilization pounds? To identify seepage of extraneous water in wastewater systems is a time consuming job. To address the problem, without being forced to duplicate the system, it is important to first build an image of the area. In this study this is done by four examinations: field inventory of residential areas, field inventory of transfer schemes, investigation of groundwater levels and dye tracing of bad connections. These steps are easy to preform, requires no large financial means and need not to be performed by individuals with special skills. The survey is completed in two overview maps, Fengersfors Norra and Fengersfors Södra. These are then used for basic calculations to point out areas which are contributing large volumes of groundwater, trough foundation drainage, to the treatment plant. Several properties in Fengersfors have their roof surfaces connected to the wastewater system. Simple measures, such as switching to drain spouts with dense water deflector, can reduce the volume of rainwater that reaches the stabilization pounds. General for the area is that ditches have been neglected for a long time, resulting in drums and wells clogged. A functioning ditch system is necessary for transport of storm and drainage water to the recipient. During the dye tracing process parts of previously unknown storm water systems were found. Sewer system maps can now be updated and become an important part of future actions. The study provides an indication of which areas need to be addressed or further investigated by the municipality.
55

Projektering av markarbete, parkeringsplatser, cykelställ m.m / Designing of landscaping, parking, bike racks, etc.

Gröndahl, Alexander, Wernersson, Gustav January 2014 (has links)
Arbetet tar upp lösningsförslag och val av lösning för en unik parkeringsplats på ett företag i Emmaboda. Lösningarna omfattar lokalt omhändertagande av dagvatten, val av beläggningstyper och trafiksäkerhet. Arbetet kommer att användas av Xylem till förfrågningsunderlaget för kommande anläggning av parkeringen.
56

Dagvattenhantering : Vid Sunlight i Nyköpings kommun

Serra Berglund, Catharina January 2018 (has links)
Today stormwater is a growing problem and it is a hot topic for discussions. Due to the urbanization with growing cities and hard surfaces of asphalt and concrete, rainwater flows off the streets and takes contaminants into stormwater wells. From stormwater pipes, water is led to lakes and the sea. The Water Authorities had as a goal that the stormwater would be of satisfactorily ecological and chemical status until year 2015, or in exceptional case a little later. It is then even more important to purify the water, which can be done through vegetation and infiltration in soils and in openwater systems. Openwater systems have better capacity to receive larger flows of water than stormwater pipes. Increased rainwater flows will happen more often with the warmer climate and the increased rainfall that comes with climate change. It is a common problem that urban stormwater pipelines are overloaded and stormwater wells and streets overflow. This report evaluates an industrial area that is planned to be converted into residential areas, for which open-stormwater systems that can be used. Today the stormwater flows from the soil sealed areas from the industrial area down to the recipient without cleaning. An efficient alternative is to use stormwater systems that have vegetation and infiltration for stormwater, so the stormwater can be purified and retarded before it reaches the stormwater pipeline. / Idag är dagvatten ett växande problem och är ett hett ämne att diskutera. På grund av urbaniseringen med växande städer och hårdgjorda ytor, rinner regnvatten av från gator och tar med sig eventuella föroreningar ner i dagvattenbrunnar. Från dagvattenledningarna leds vattnet ut till sjöar och hav. Vattenmyndigheten hade som mål att ytvattnet skulle vara av god ekologisk och kemisk status till år 2015, med undantagsfall något senare. Därav ännu viktigare att rena dagvattnet, vilket kan göras genom vegetation och infiltrering i mark och i öppna dagvattensystem. Öppna dagvattensystem har bättre kapacitet att ta emot större flöden av vatten än ordinära dagvattenledningar. Ökade dagvattenflöden kommer att ske oftare med det varmare klimatet och den ökade nederbörd som kommer med klimatförändringarna. Det är ett vanligt problem att dagvattenledningarna i städer blir överbelastade och dagvattenbrunnar och gator svämmar över. I denna rapport utvärderas ett industriområde som planeras att byggas om till bostadsområde, för vilka öppna dagvattensystem som kan användas. I dagsläget rinner dagvattnet från de hårdgjorda ytorna från industriområdet ner till recipienten utan rening. Ett bra alternativ är att använda dagvattensystem som har vegetation och infiltrering för dagvatten, då kan dagvattnet både renas och fördröjas innan det når dagvattenledningen.
57

Dagvattenmodellering i Kärrgruvan med klimatanpassning för ett hållbart dagvattensystem

Bengtsson, Jesper January 2018 (has links)
För att avleda vattenmassor som bildas från nederbörd har dagvattensystem konstruerats i vårt samhälle. Dessa system är byggda efter rådande förhållandena vilket betyder att ledningarna kan bli underdimensionerade om regneventen blir större i framtiden vilket de uppskattas göra på grund av klimatförändringar. Problem kan även uppstå då ledningsnätet byggs ut och ledningar i slutet av ledningsnätet utsätts för större flöden än ledningen är dimensionerad efter. Kommuner har ofta dålig vetskap om förhållandena som råder i ledningsnätet vilket betyder att verktyg behövs för att undersöka ledningsnätet. Dessa verktyg kan vara modeller som SWMM eller Mike Urban som kan modellera flödet i dagvattennät. I programmen SWMM och Mike Urban kan brunnar, ledningar, avrinningsområden och regn konstrueras. Som grund till programmen används kartor över ledningsnätet samt flödesmätningar och regnmätningar som används för att validera modellerna. Det som skiljer modellerna är beräkningssätten vilket betyder att modellerna kan få olika resultat för samma område. Syftet med projektet är att använda SWMM och Mike Urban för att undersöka och kilmatanpassa dagvattennätet i Kärrgruvan som är lokaliserat i norra Norberg. Detta område har några kända problem som kan användas för att validera modellerna. Modellernas fördelar och nackdelar, förmåga att klimatanpassas samt användning för konsulter ska utredas. Examensarbete gjordes i samarbete med ÅF, Atkins och Norra Västmalands kommunalteknikförbund. Projektet visade att programmet Mike Urbans resultat var mer jämna och logiska än SWMMs där resultaten kunde fluktuera oerhört när systemet utsattes för förändringar. Kalibreringen som utfördes i detta projekt skulle kunna förbättras vilket antagligen är en bidragande effekt till att resultaten i SWMM blev sämre än Mike Urbans resultat. Hade kalibreringen förbättrats hade antagligen Horton’s infiltrationsmodell som SWMM bygger på kunna ha anpassats bättre efter området och gett mer realistiska resultat. Båda modellerna återspeglade de rådande förhållandena väl, men SWMM hanterade implementeringen av förändring sämre än Mike Urban. Detta är på grund av att infiltrationen i Mike Urban var konstant medan SWMM byggde på Hortons infiltrationsmodell som försämrar infiltrationen allt eftersom. Hade kalibreringen varit bättre hade antagligen resultaten blivit mer lika i SWMM och Mike Urban.
58

Hållbar dagvattenhantering - En fallstudie i Nyköping

Carlsson, Sara January 2017 (has links)
In urban areas stormwater have become a problem due to limited infiltration. Impermeable surfaces such as asphalt covers and buildings cause changes in the flow of water and content of contaminating products, which normally are not processed by sewage treatment works. Instead, the stormwater often drained off to an adjacent watercourse which end in a lake or the sea, in order to limit inundation of streets and cellars in houses. Using vegetated recipients, such as wetlands, tree plantations, grass and herbcovered surfaces is anefficient and economical way to manage stormwaterinflow, which also improves the infiltration and the biodiversity in the area. Green ceilings reduce the formation of stormwater, especially designed ditches are efficient storage at extreme rainfalls and slow down the drainage   In this study, a few different natural retaining and equalisation methods are evaluated and  proposed for the design of an industrial area in Nyköping municipality which is planned to be a residential area. Challenges for the introduction of various natural water systems are that they need land space and relate to the existing buildings and at the same time get a sufficient drainage. Much of the report is based on the requirement in the area of Södermanland county, but also presents expected precipitation rates for the entire country that are essential for optimal water treatment / Dagvattenproblematiken har uppkommit främst genom urbaniseringen där markens naturliga infiltration har begränsats. De hårdgjorda ytor av både asfalt och byggnader har bidragit med både förändringar i flöde och föroreningshalter, som för det mesta inte kan tas om hand i avloppsreningsverken utan leds direkt ut till närmaste vattendrag eller till havet för att minska risken för översvämningar på både gator och källare. Genom att utnyttja det naturliga ekosystemet som exempelvis våtmarker och diken, är det ett billigt, effektivt sätt för att omhänderta dagvattnet samt att det gynnar bildningen av grundvatten samt den biologiska mångfalden. Gröna tak minskar uppkomsten av dagvatten vid källan, svackdiken leder dagvattnet och tillåter en långsam infiltration samt flera olika lösningar på magasinering vid extrem nederbörd.   I denna studie utvärderas ett fåtal olika naturliga fördröjnings- och utjämningsmetoder för att sedan ge ett förslag på utformning av ett industriområde i Nyköpings kommun som ska planläggas för att bli ett bostadsområde. Utmaningar vid införandet av olika naturliga dagvattensystem är behovet av markyta då man måste förhålla sig till de befintliga byggnaderna och samtidigt få en tillräcklig dränering. Mycket i rapporten utgår från Södermanlands län men tar även upp förväntade nederbördsmängder för hela landet som är väsentligt för ett optimalt dagvattenarbete.
59

Optimering av kortaste vägen vid hantering och avledning av skadligt dagvatten : Lösning med A-stjärna algoritm samt en guide med ekonomiska styrmedel för beslutsfattande aktörer

Abdollahian, Josef, Kanwar, Anna January 2017 (has links)
Jordens befolkning växer och allt fler flyttar in till urbana områden. Detta medför att städer växer, nya byggnader tillkommer och infrastrukturer expanderar. Denna snabba tillväxtfas står i direkt anslutning till ökade översvämningar till följd av de förändringar som görs i naturen. De redan överbelastade dagvattensystemen har i många fall svårt att hantera de befintliga kraven. Till följd av detta uppstår översvämningar vid större regnintensitet och utgör stora omkostnader för samhället. Dagvattenhanteringen brister då det inom kommunens organisationer är otydliga ansvarsfördelningar. För att kunna planera för hållbara städer även i framtiden är det viktigt att hitta en genomförbar lösning gällande både ansvarsfördelningen samt hur dagvattnet ska hanteras på bästa sätt för att uppnå kostnadsfördelar. I denna studie tas det fram en guide för kommunen över hur ansvaret bör fördelas mellan kommun och exploatör i dagvattenfrågan. Guiden bygger på simuleringar och teorier inom optimeringslära för att kunna föreslå rimliga lösningar. Genom dessa simuleringar av dagvattensystemet har mängden vatten som inte ryms i dagvattensystemet kvantifierats. Vidare för att hitta en rimlig alternativ avrinningsväg för det överflödiga dagvattnet har olika algoritmer för kortaste vägen problemet undersökts. Resultaten visar att en klassisk algoritm med en heuristisk funktion som appliceras på kortaste vägen problemet inte kan identifiera den mest lämpliga avrinningsvägen. Detta då den heuristiska funktionen i algoritmen förhindrar att en naturligare avrinningsväg uppströms väljs även om denna skulle ge en mer optimal lösning. / The earth's population is growing and increasingly more people move into urban areas. This means that as cities grow, new buildings are being built and infrastructures are expanding. This rapid growth is directly related to increased floods as a result of man-made changes in nature. The already overloaded storm water systems for rain-, melt-, rinsing and other surplus water cannot often handle the existing demand. Therefore, floods arise at greater rain intensity and pose significant costs to society. Due to an unclear division of responsibility within the municipality's organizations there is a failure to handle the existing storm water problem. In order to be able to plan for sustainable cities in the future, it is important to find a viable solution regarding the responsibility issue and how to best handle the storm water to achieve cost advantage. This study presents a guide for municipalities on how to allocate the responsibility between the municipality and the exploiter. The guide is based on simulations and theories in optimization to propose effective solutions for harmful surplus storm water. Through simulations of the storm water system, the amount of surplus water that does not fit the storm water system capacity has been quantified. In addition, to find a reasonable alternative run-off path for the surplus water, different methods of the shortest path problem have been investigated. The results show that a classical shortest path algorithm with a heuristic function is not the most appropriate alternative. This because the heuristic function in the algorithm prevents the selection of a more natural pathway upstream even though it could be a more optimal solution.
60

Dagvattenutredning för Rännilslunden, Östertälje : Utredning av flödesbelastning, föroreningsbelastning och framtagande av åtgärdsförslag / Stormwater investigation at Rännilslunden in Östertälje : Investigating the stormwater runoff and pollutant load owing to build specific measures of stormwater management for improving chemical and ecological status of the stream

Razzak, Md Abdur January 2020 (has links)
I dialog med Telge Nät har det framkommit området Rännilslunden i Östertälje kunde fungera som en fallstudie för denna utredning eftersom det finns behov av att utveckla dagvattenhanteringen med fokus på förbättring av dagvattenkvalitet. Detta arbete har utförts med syftet att utreda föroreningsstatus och flödesbelastning för området och utarbeta ett ekonomiskt rimligt och hållbart åtgärdsförslag till förbättring av befintlig dagvattenkvalitet för att uppnå god kemisk och ekologisk status. Beräkning av fördröjningsmagasin och flödesbelastning baseras på Svenskt vattens publikationer (P110, P90, P104 och P105). Föroreningsbelastning, reningseffekt och utformning av föreslagen reningsanläggning utfördes med hjälp av den Excelbaserade dagvatten- och recipientmodellering webprogrammet StormTac version 20.2.2.   Resultatet av beräkningen visade att utredningsområdets tillkortakommanden beträffande kapacitet inte var det största problemet. Ett fördröjningsmagasin med volymen 509 m3 räcker till för att lösa kapacitetsproblemen, men för att förbättra dagvattenkvaliteten behövs längre uppehållstider, vilket resulterar i ett betydligt större magasin (1800 m3). Modelleringen gjord i StormTac visade att befintligt dagvattensystem överskrider föreslagna riktvärden för Igelstaviken. Med avseende att förbättra renheten på dagvattnet från området har tre åtgärdsförslag tagits fram, vilket kompletterats med en kostnadsberäkning. Föroreningsreduktion och utformning av anläggningen samt reningseffekten modellerades i StormTac. Åtgärdsförslagen inkluderar anläggning av en damm med omhändertagande av 20,15 och 10 millimeter nederbörd med en rening av vatten på 90%, 86% respektive 76%. Dessa åtgärdsförslag uppnådde målen för rening enligt rådande miljökvalitetsnorm och Södertälje kommuns VA-policy. Åtgärdsförslagen skilde sig marginellt gällande reducering av föroreningshalter och kostnadseffektivitet.   En nedströmslösning i form av en fördröjning/reningsdamm dimensionerad för att kunna hantera 20 millimeter nederbörd kan vara optimal för Rännilslunden om den utformas med en reglervolym för fördröjning av flödet från ett 30-årsregn och maximalt regndjup om 30 millimeter. Denna fördröjning/reningsdamm bidrar till ett dagvatten som uppfyller miljökvalitetsnormerna.   Den planerade dammens reningseffekt för näringsämnen ligger kring 50% för fosfor och 25% för kväve, upp till 50–70% för tungmetaller (lägre värdet för kvicksilver) och cirka 60 % för suspenderat material (StormTac databas v.20.2.2). Denna typ av lösning förbättrar dagvattnets kvalitet avsevärt ur ett kemiskt och ekologiskt perspektiv. Fördröjning/reningsdamm är en bra lösning, både ur hållbarhetsperspektiv och kostnadseffektivitet, men också ur en estetisk synvinkel. En fördröjnings-/reningsdamm reducerar effektivt flödet, föroreningshalter samt föroreningsmängder, vilket gör att miljökvalitetsnormerna uppfylls i Södertälje kommun, men bidrar också till det estetiska och ekologiska värdet.

Page generated in 0.1756 seconds