Spelling suggestions: "subject:"[een] PROJECT DEVELOPMENT"" "subject:"[enn] PROJECT DEVELOPMENT""
21 |
Utveckling av ergonomiskt armstöd för dentala operatörsstolar : Ett produktutvecklingsprojekt på uppdrag av Support Design AB / Development of ergonomic arm rest for dental operator chairs : A product development project commissioned by Support Design ABBerg, Elin January 2017 (has links)
This report treats a product development project conducted in the course Degree Project for the Degree of Bachelor of Science in Innovation and Design Engineering, MSGC12, at Karlstads University. The course is a part of the faculty of heath, sciences and engineering. The report is written by the student Elin Berg, the supervisor of the project is Kristina Gullander and the examnier is Leo de Vin. The assignment is provided by Support Design, a Swedish company in Sunne that manufactures and distributes ergnomic chairs. The chairs are mainly sold to clients working in the dental and medical markets, but also office workers. Customers often sit on the chairs for long workdays, and several users sometimes perform precision work that requires relief for the arms and shoulders. Today, Support Design does not manufacture its own armrests but buys these from the US and China. The aim of the project is to develop an ergonomic armrest for dental operator chairs where the target group is dentists, dental hygienists and dentist assistants. The armrest should have functions that relieve, provide support and are flexible in order for the user to change the working position. The purpose of the project is to expand the Support Designs business by introducing its own armrest production. Eventually, this would give the company competitive advantages, facilitate logistics and result in better margins. The work process follows the methods that are part of a product development process. The phases of the project are project start, project planning, research, product specification, concept generation, concept selection, sub-report, design, final prototype, opposition, presentation, and exhibition. The research is the most important phase in identifying the user's needs, thus developing ergonomic armrests that fulfill the necessary functions.
|
22 |
Komercializace bytových domů / Commercialization of residential buildingsKarásek, Jiří January 2015 (has links)
This thesis deals with the issue of commercialization of residential buildings. The theoretical part introduces the idea of the business cycle and its relation to economic crises. The theoretical part of this thesis also deals with the area of development and related financing and marketing development projects, which is applied subsequently to the practical part for the particular developer's residential project. In addition to the application of this theoretical knowledge is the analysis of a questionnaire survey among residential developers, which is the basis for analyzing the possibility of effective commercialization of residential development projects in the post-crisis period at different stages of the business cycle.
|
23 |
Infrastruktur vid nyexploatering : Förslag till byggherren / Infrastructure in Relations to New Building : Proposals to the DeveloperEnström, Martin, Gyllberg, Johan January 2015 (has links)
Vid projektutveckling utav bostäder i expansiva storstadsområden uppstår stora kostnader vid markförvärv, infrastruktur- och bostadsproduktion. Då byggherren, privat eller kommunal, äger huvudmannaskapet för exploateringsområdet kan infrastrukturen utföras med olika tillvägagångssätt. I Liljeholmen, Stockholm, där JM är en stor markägare, produceras infrastruktur parallellt med bostadsproduktion. I Norra Djurgårdsstaden, Stockholm, har stadens Exploateringskontor istället färdigställt infrastrukturen innan bostadsproduktionen inletts. Rapporten utreder hur dessa två tillvägagångssätt påverkar projektutvecklingens ekonomi, infrastruktur- och bostadsproduktion, logistik, arbetsmiljö, miljö och försäljning. I rapporten omfattar infrastruktur anläggningar som samhället dagligen använder sig av i ett exploateringsområde exempelvis gator, el, tele, fjärrvärme, vatten och avlopp. Rapporten innehåller ej ekonomiska bedömningar i form av kalkyler eftersom detta inte hade varit genomförbart under den korta tidsperioden för arbetet. I början av undersökningen genomfördes en litteraturstudie för att skapa bred och översiktlig kunskap kring ämnet. Därefter utformades frågemallar som användes under elva personliga intervjuer med sakkunniga från JM, Stockholm stads Exploateringskontor, Forsen Projekt och WSP. Dessutom utfördes en enkätundersökning där syftet var att förstå hur färdigställande av infrastruktur påverkar nyinflyttade bostadsrättsinnehavares självskattade nöjdhet. Resultatet av undersökningen påvisade för majoriteten av delarna att ett storskaligt färdigställande av infrastruktur i ett tidigt skede är det mest fördelaktiga. Detta medför större möjligheter till en kostnadseffektiv infrastruktur- och bostadsproduktion samt bättre förutsättningar för en god arbetsmiljö och logistik. Dessutom möjliggörs bostadsbyggande i en snabbare takt vid en högkonjunktur. Nackdelen med ett tidigt färdigställande är den framtunga och stora investeringen. Denna medför kapitalkostnader och ekonomisk risk, vilket hanteras mer fördelaktigt med det parallella tillvägagångssättet då infrastrukturen produceras i etapper efter behov. För JM som markägare i ett område med cirka tio kvarter föreslås att infrastruktur färdigställs som en kombination av de två tillvägagångssätten. Detta innebär att infrastrukturen, exklusive finplanering, färdigställs för tre kvartersmarksområden samt dess omgärdande allmänna platsmark och ledningssystem. Detta sker innan bostadsproduktionen inleds. I och med det här möjliggörs en mer kostnadseffektiv infrastruktur- och bostadsproduktion på grund av enklare samordning, framkomlighet och logistik på arbetsplatsområdet. Dessutom skapas längre tid till effektiva saneringsmetoder, vilket leder till en kostnads- och miljöbesparing. Då investeringen för en del av infrastrukturen är mindre jämfört med ett färdigställande av all infrastruktur inom området minskas kapitalkostnaderna och den ekonomiska risken. Finplaneringsarbeten utförs i samband med att bostäderna färdigställs, precis innan kunder flyttar in. Detta minimerar risken för skador och slitage på grund av byggtrafik under produktionstiden. Dessutom ökar kundernas nöjdhet då färdigställd finplanering medför en mer attraktiv miljö för boende och kommersiell verksamhet. / Housing developments in urban areas entail considerable expenses in the acquisition of land, the infrastructure development and the production of housing. If the developer, public or private, owns the site the infrastructure can be organized differently. JM, a big landowner and developer, on a site in Liljeholmen, Stockholm developed the infrastructure parallel with the production of housing. In contrast, Stockholm’s Exploateringskontor on their site in Norra Djurgårdsstaden, completed the infrastructure provision before starting to build the housing. This study analyzes how these two approaches affect the economy of the project developments, infrastructure and housing production, logistics, work environment, external environment and sales. In this study infrastructure covers the facilities that the community uses on daily basis, such as roads, electricity, tele communications, heating, water and sewage. The study does not contain economical calculations because of the short time period. A review of the literature was made at the beginning of the studies to create a broad and general knowledge of the subject. Subsequently question templates were designed and used during eleven personal interviews with experts from JM, Stockholm’s Exploateringskontor, Forsen Projekt and WSP. Furthermore, a survey was made to understand how the completion of infrastructure affects the community’s self-rated satisfaction of the environment of occupancy. The result of the study show that a large-scale completion of infrastructure at an early stage of the development is the most advantageous. The large-scale completion increases the potential for a cost-effective infrastructure and housing production and it also creates better conditions for a good working environment and logistics. It also allows a faster housing production during a boom. However, the large investment at an early stage of the development is a disadvantage when it comes to large-scale completion. The large investment causes capital costs and financial risk. The result is that the parallel approach is more advantageous because the infrastructure is produced in stages after demand with a lower financial risk. JM, as a housing developer for ten blocks in a development area, is recommended to complete the infrastructure as a combination of the two approaches. This means that infrastructure, excluding detailed planning, should be completed for three blocks of the development area along with the surrounding roads and pipeline systems. This takes place before the housing production begins. This enables a more cost-effective infrastructure and housing production because of easier coordination, availability and logistics at the workplace area. It also creates more time for effective soil remediation methods, leading to lower cost and environmental savings. The partial investment in infrastructure is less compared to a completion of all infrastructure in the site area. This reduces the capital costs and financial risk. The detailed planning work is finished with the completion of the housing projects, just before the customers move in. This minimizes the risk of wear and damage due to construction traffic during the construction period. It also increases customer satisfaction when the detailed planning work is completed, making habitation attractive.
|
24 |
WIND POWER PROJECT DEVELOPMENT: A MULTI-CRITERIA DECISION ANALYSIS FRAMEWORK FOR SUBCONTRACTORS’ EVALUATIONChetouani, Yassine January 2022 (has links)
The Swedish Wind Energy Association (SWEA, 2019) reported the wind power project's total investment cost between 2017 and 2021 was over SEK 72 billion. They predicted that at project completion, the total production will be approximately 22.4 TWh per year. Due to project size, complexity, and long-term contracts commitments, almost all wind power project developers outsource some or most of their project activities to different subcontractors, after which they perform monitoring activities of the project process. Therefore, the pre-qualification stage and subcontractors’ evaluation become essential parts of every project. Most corporates and authorities are usually awarding projects to subcontractors with offers based on the most competitive price advantage. This approach results in high risks that can affect the delivery time, the overall cost, and the quality of wind power projects.This research paper aims to use a multi-criteria analysis to identify and select the most adequate subcontractor. To achieve the research purpose, a sample of five subcontractors nominated by a windpower developer were evaluated in a selection phase under nine criteria: (1) management capability, (2) product or service quality, (3) planning and capabilities, (4) quality assessment,(5) environmental management, (6) health and safety measures, (7) financial strength, (8) contract insurances and guaranties, and (9) cost. After the evaluation and the ranking of companies, a result of the most adequate subcontractor for the project offer was presented. At the end of this study, a comparison analysis was followed at the final stage which compared the method with a similar procurement approach used by one corporate where it showed that this paper’s method can uncover critical aspects with subcontracts which can alter the selection process.
|
25 |
Implementation and integration of a collaborative robot in a production lineBafounis Kottas, Emmanouil January 2019 (has links)
Scope of this thesis is the integration and implementation of a collaborative robot in the production line. In the first chapter, the project is described, and its objectives, purpose, boundaries and requirements are defined. Moreover, the project management tools and techniques are presented. All the steps and procedures followed before the initiation of the project are analysed. In the second chapter, the basic theoretical background necessary for a better understanding of the content of this thesis is presented. The history and development of collaborative robots, as well as the industrial evolutions are mentioned. The different types of collaborative robots and their importance in Industry 4.0 and current production are analysed. The third chapter deals with the detailed description of the project. All the devices and equipment are presented thoroughly. The programming logic and working flow is explained. In the last chapter according to the initial objectives, boundaries and requirements the success of the project is assessed. An analysis of how the installation of automate corrugate loader affected the production process is performed. Future changes, improvements and technical suggestions are discussed. The ultimate goal of this thesis project is that the content in the thesis report will be used as a guide for future installations of same or similar type of robots. The aim is to avoid many of the mistakes made, due to rush decisions, lack of experience and communication between team members. The leaning curve obtained during the implementation of the project, can lead to more effective projects in the future. / Fokus för denna avhandling är integrering och implementering av en interaktiv robot i en produktionslina. I det första kapitlet beskrivs projektet, och dess mål, syfte, gränser samt krav definieras. Dessutom presenteras verktyg och tekniker för projektledning. Alla de steg och procedurer som använts/följts innan projektet påbörjades har analyserats. I det andra kapitlet presenteras den grundläggande teoretiska bakgrunden för att ge en bättre förståelse av innehållet i denna avhandling. Historien och utvecklingen av interaktiva robotar, liksom de industriella evolutionerna nämns. De olika typerna av interaktiva robotar och deras betydelse i Industri 4.0 och nuvarande produktion analyseras. Det tredje kapitlet innehåller en detaljerad beskrivning av projektet. Alla enheter och utrustning presenteras noggrant. Programmeringslogiken och arbetsflödet förklaras. I det sista kapitlet utvärderas projektets framgång utfrån de ursprungliga målen, gränserna och kraven. En analys utförs av hur installationen av den automatiska laddaren för veckmaskinen påverkar produktionsprocessen. Framtida ändringar, förbättringar och tekniska förslag diskuteras. Det slutliga målet för detta exjobbsarbete är att innehållet i avhandlingen ska användas som en vägledning för framtida installationer av samma eller liknande typ av robotar. Syftet är att undvika många av de misstag som gjorts, på grund av brådska beslut, brist på erfarenhet och kommunikation mellan lagmedlemmar. Lärandekurvan som uppnåtts under genomförandet av projektet kan leda till effektivare projekt i framtiden.
|
26 |
Systém pro správu IT projektů / IT Projects Management SystemDobiáš, Richard Unknown Date (has links)
This MSc Thesis focuses on software development management. It describes the importance of project management in IT fields and mentions its significant standards. Thesis devotes some chapters to software project life cycle models. Another part of this thesis compares instruments supporting project management and analyzes system requirements of IT project management. A part of thesis implements the designed system concerning its real use in the future. Due to the web application form, the implementation phase focuses on keeping today's standards of accessible quality website, good usability. Conclusion of this thesis evaluates reached outcomes and mentions possible solution enhancement.
|
27 |
Socially Engaged Art: Managing Nontraditional Curatorial PracticeHaidet, Roza 19 September 2013 (has links)
No description available.
|
28 |
Insuring the future : Improving the Insurance process by Identifying Risks in Battery Energy Storage Projects / Försäkrar framtiden : Förbättring av försäkrings processen genom Identifiering av risker i batteri energi lagrings projektKabir, Sabina, Sharan, Viveka Vishi January 2024 (has links)
This master thesis investigates the risks associated with Battery Energy Storage (BESS) projects to improve the insurance process for BESS projects in Sweden, aligning with the global shift towards renewable energy as mandated by the Paris Agreement. The primary objective of this report is to develop guidelines for small enterprises entering the BESS market, focusing on risk identification and stakeholder objectives to improve the insurance process. Some risks identified were a lack of knowledge and experience, unsatisfactory suppliers, and policy and regulatory uncertainties. Utilizing a system engineering approach, the study investigates the interactions and communication between stakeholders, including project developers, insurance brokers, and insurers. The research is conducted through interviews with these stakeholders and a comprehensive literature review. The findings highlight challenges in communication during the insurance process and identify key factors that project developers should consider to ensure smoother interactions, such as providing more detailed information about the requirements to receive insurance. The study reveals the unique challenges posed by the novelty of BESS technology in Sweden. It suggests that a standardized and improved insurance process for BESS projects can accelerate the adoption of renewable energy technologies. The study is delimited to the Swedish context, acknowledging that insurance market mechanisms and BESS technology implementations vary across different countries. The theoretical contributions include an analysis of insurance for BESS projects and an overview of the current insurance products available in the Swedish market. The practical contributions include a guideline for new BESS project developers with considerations they can take to ensure a smoother insurance process for their projects. / Denna masteruppsats undersöker de risker som är förknippade med projekt för batterienergilagringssystem (BESS) för att förbättra försäkrings processen för BESS-projekt i Sverige, i linje med den globala övergången till förnybar energi enligt Parisavtalet. Huvudmålet med denna rapport är att utveckla riktlinjer för småföretag som går in på BESS-marknaden, med fokus på riskidentifiering och intressenternas mål för att förbättra försäkrings processen. Några identifierade risker var bristande kunskap och erfarenhet, otillfredsställande leverantörer och osäkerheter i policy och regelverk. Genom att använda Systems Engineering undersöker denna studie interaktionerna och kommunikationen mellan intressenter, inklusive projektutvecklare, försäkringsmäklare och försäkringsbolag. Forskningen genomförs genom intervjuer med dessa intressenter och en omfattande litteraturstudie. Resultaten belyser utmaningar i kommunikationen under försäkrings processen och identifierar viktiga faktorer som projektutvecklare bör beakta för att säkerställa smidigare interaktioner, såsom att tillhandahålla mer detaljerad information om kraven för att få försäkring. Studien avslöjar de unika utmaningar som den nya BESS-tekniken medför i Sverige. Den föreslår att en standardiserad och förbättrad försäkrings process för BESS-projekt kan påskynda införandet av förnybar energiteknik. Studien är begränsad till den svenska kontexten och erkänner att försäkringsmarknadens mekanismer och BESS-teknikens tillämpningar varierar mellan olika länder. De teoretiska bidragen inkluderar en analys av försäkringar för BESS-projekt och en översikt över de nuvarande försäkringsprodukterna som finns tillgängliga på den svenska marknaden. De praktiska bidragen inkluderar riktlinjer för nya BESS-projektutvecklare med överväganden dekan ta för att säkerställa en smidigare försäkrings process för sina projekt.
|
29 |
Softwarová podpora projektového řízení / Software Support for Project ManagementCzibor, František January 2009 (has links)
This thesis deals with project management and how software can support it. In first part the problems and characteristics of project management is stressed as well as theoretical basics with focus on software development projects. Comparison of the available tools as project management aid is also touched. Objective of this thesis is to create such a project management aid tool by detailed analysis, design and implementation. The system has been implemented in programming language C#, the database layer is Microsoft SQL. End the end of the thesis the summary of the achieved results and possible future extensions of the project management tool can be found.
|
30 |
Развитие е-коммерции как инструмента маркетинга для удовлетворения потребностей китайского рынка : магистерская диссертация / Development of e-commerce as a marketing instrument for meeting the needs of the сhinese marketШуюань, Ч., Shuyuan, Z. January 2020 (has links)
Электронная коммерция вносит новые качественные элементы в современный бизнес, которые способствуют: росту конкуренции; персонализации взаимодействия; экономии затрат. Современные предприятия должны иметь возможность изучать и использовать инструменты электронной коммерции для маркетинга. В этом исследовании будет изучена теория электронной коммерции, чтобы понять ее природу и особенности развития; исследовать инструменты э-коммерции как связь потребителей и маркетологов и модель электронной коммерции Xiaomi; исследовать факторы, влияющие на поведение китайской онлайн-покупателя; разработка проекта по созданию привлекательного бренда смартфонов xiaomi через интернет-магазин в Китае. / E-commerce brings new quality elements to modern business, which contribute to: increased competition; personalization of interaction; cost saving. Modern businesses should be able to learn and use e-commerce tools for marketing. In this study, the theory of electronic commerce will be studied to understand its nature and features of development; explore e-commerce tools like consumer-marketer communication and Xiaomi's e-commerce model; explore the factors that influence the behavior of a Chinese online shopper; development of a project to create an attractive brand of Xiaomi smartphones through an online store in China.
|
Page generated in 0.059 seconds