51 |
Improving Cooperation between Systems Engineers and Project Managers in Engineering Projects - Towards the alignment of Systems Engineering and Project Management standards and guides / Amélioration de la coopération entre les ingénieurs Système et les managers dans les projets d'Ingénierie - Vers un processus intégré obtenu par l'alignement des standards et guides de l'Ingénierie Système et de la Gestion de ProjetXue, Rui 15 February 2016 (has links)
L’ingénierie système et le management de projet sont deux disciplines essentielles dans l'industrie, et représentent deux facteurs essentiels pour la réussite des projets. Cependant, depuis de nombreuses années, s’est établie une barrière culturelle entre les praticiens de l'ingénierie des systèmes et ceux de la gestion de projet. Alors que l'ingénierie des systèmes s’intéresse aux éléments techniques, le management de projet a la responsabilité globale du projet ; de ce fait, certains considèrent que leurs activités sont indépendantes plutôt que de les considérer comme des parties d’un tout. Par conséquent, le travail coûte souvent plus, prend plus de temps, et fournit une solution non optimale pour le client. Alors comment faire pour supprimer les barrières entre les différentes équipes, les pratiques et les connaissances, afin de prendre les décisions dans le projet sur la base des vues intégrées de ces parties prenantes ? La réponse à cette question est essentielle pour assurer le succès du projet et améliorer la performance en entreprise. Cette thèse se place à l'intersection de plusieurs disciplines, notamment l’ingénierie système et le management de projet. Elle promeut le développement collaboratif de systèmes multi-technologies et la prise de décision partagée entre les parties prenantes. Notre premier objectif porte sur l'harmonisation des descriptions des processus du management de projet et d'ingénierie des systèmes sur la base des normes et guides de bonnes pratiques internationaux. Notre proposition est d'élaborer un cadre de processus fondamentaux et alignés pour supporter le management des processus d’ingénierie système qui peut être adapté à des entreprises de profils différents (PME, ETI ou grands groupes). Pour cela, nous comparons les cinq normes et guides d'ingénierie des systèmes (ANSI/EIA 632, ISO/IEC 15288, IEEE 1220, INCOSE Handbook et Sebok) et les trois normes et guides de gestion de projets (PMBoK, ISO 21500, ISO/IEC 29110) afin d'évaluer la cohérence de ces documents de référence en ce qui concerne les processus qu'ils décrivent et qui sont impliqués dans l'ensemble du projet. Au-delà de l'intégration des pratiques par l'utilisation de ce cadre, nous offrons aussi aux ingénieurs systèmes et managers un ensemble d'indicateurs qu'ils peuvent partager afin de faciliter la coopération entre eux et leur permettre une prise de décision collaboration dans le suivi et le pilotage des projets. Les indicateurs sont évalués à la fois par les ingénieurs systèmes et les managers et leur importance est décidée collaborativement à l’aide d’une méthode multicritère d’aide à la décision (AHP). Ensuite, sur la base des valeurs des indicateurs, les méthodes du chemin critique (CPM) et de gestion adaptative de la valeur acquise (EVM) sont utilisées pour évaluer l’avancement du projet et du développement du système. Quatre indices sont ainsi définis pour supporter le processus de prise de décision tout au long du projet afin de permettre la prise de décisions collaborative et de rendre celle-ci plus rationnelle. / In a highly competitive economic context, companies need to improve their performance in entire life cycle of a product. It is often found that company organization leads to segregation between systems engineering and project management, with the result that decision-making is sometimes misguided and may compromise project execution, whereas, although they each have specific visions and targets, these disciplines are nonetheless intended to serve a common objective, which is to satisfy the customer. So it is an important issue to facilitate their adoption and their joint deployment within the company, in order to improve decision-making in engineering projects. The proposal of the thesis involves bringing systems engineering and project management closer together in order to help both systems engineers and project managers assess the project progress. Based on this assessment, they can adjust the project policy dynamically through the project life cycle. In this thesis, we first harmonize the standards and guides from systems engineering and project management domains and define an integrated process groups organized into 3 groups of processes. Then we identify a set of key indicators related to these process groups, indicators are then valuated and give the evaluation of the indicator based on the analytic hierarchy process method to integrate the views of systems engineers and project managers in an additional way. On the basis of these indicators, we use the critical path method and earned value management method to assess the project progress values and define two project indexes to assess and insight the project progress easier.
|
52 |
Manager le projet par la synthèse : les collaborations entre ingénieurs et architectes / Managing Design Through Synthesis : Collaboration Between Architects And EngineersMarie, Jean-Baptiste 12 March 2018 (has links)
Que ce soit dans ses objectifs, son organisation, ses outils ou ses techniques, le projet en architecture subit des transformations profondes. Certaines découlent des politiques publiques, liées notamment à l’environnement, d’autres d’une maîtrise croissante du rapport qualité-coût, d’autres encore des innovations constructives et de l’essor du numérique, d’autres enfin de l’évolution du cadre des marchés publics, à l’exemple de la conception-réalisation. Dans ce contexte, on observe des pratiques de pilotage et de gestion des projets plus complexes dans lesquelles l’architecte n’est plus le seul à détenir la compétence de synthèse. Cette dernière, au contraire, prend des formes plus partagées dans lesquelles l’ingénieur occupe une place croissante. Pourtant, celle-ci reste peu décrite et mal connue, ou limitée dans sa définition à la synthèse d’exécution définie par la loi n° 85-704 du 12 juillet 1985, dite loi MOP (maîtrise d'ouvrage publique). Caractériser les conditions d’exercice de la synthèse et ses impacts sur les processus de projet est l’enjeu de cette thèse. Nous nous intéressons ici à un aspect, certes circonscrit, mais décisif pour la réussite du projet, à savoir les modalités de collaboration entre ingénieurs et architectes : formes de pensées et d’organisation, outils de représentation, divergences et convergences de leurs actions. L’analyse porte sur le partage de la dimension architecturale et constructive dans huit situations de synthèse issues de trois cas d'étude : la Maison Hermès à Tokyo, la station d'assainissement Seine-Aval à Achères, la Fondation Louis Vuitton à Paris.Par une observation sur le terrain et par des entretiens menés auprès d'ingénieurs et d'architectes, ce travail met en avant deux types de résultats : 1) une caractérisation des situations de synthèse qui précise le rôle des représentations, dont trois types sont identifiés : les représentations spécifiques, les représentations échangées et les représentations partagées ; 2) une évaluation des incidences de la synthèse sur le pilotage et le management des projets. Ces résultats mettent en lumière de nouvelles modalités de collaboration entre ingénieurs et architectes et de gestion de projet qui, sans être totalement représentatifs des projets menés en loi MOP, sont susceptibles de les rendre plus efficients. / Whether in its objectives, its organisation, its tools, or its techniques, the architectural project is undergoing profound transformations. Some arise from public policies, notably relating to the environment, others from increasing control over project cost management, yet others from innovations in construction and developments in digital technology, and others, finally, from changes in the framework of public contracts, such as design-build. As a result of these factors, more complex project management practices are emerging, in which the coordinating role is no longer confined to architects alone. Instead, it now takes more collaborative forms, with engineers playing an increasingly more important role. Nonetheless, there has been little description of this synthesising activity and it is poorly understood, or limited in its definition to the execution summary defined by act No. 85-704 of 12 July 1985, the so-called public project ownership (MOP) act. The aim of this thesis is to explain what is meant by project synthesis. We are interested here in a circumscribed aspect of the architectural and construction project – but one decisive to its success – which is the forms of collaboration between engineers and architects: modalities of thinking and organising, representational tools, differences and similarities in their activities. The theoretical and practical implications of this hypothesis will be explored through an analysis of the sharing of the architectural and constructional dimensions of eight examples of synthesis, drawn from three case studies: Maison Hermès in Tokyo, the Seine-Aval sewage plant in Achères, the Louis Vuitton Foundation in Paris. Through observation on the ground and interviews with engineers and architects, this analysis highlights two kinds of result: 1) a description of situations of synthesis, which details the role of representations, identifying three types: specific representations, exchanged representations, and shared representations; 2) assessment of the impacts of synthesis on the conduct and management of projects. These results demonstrate new forms of collaboration between engineers and architects and of project management which, though not entirely representative of projects conducted under the MOP act, offer methodological contributions that could help make them more effective.
|
53 |
Généralisations du problème d'ordonnancement de projet à ressources limitéesKadri, Roubila Lilia 24 April 2018 (has links)
Un problème d'ordonnancement de projet à ressources limitées (POPRL) consiste en l'ordonnancement d'un ensemble de tâches, nécessitant un ou plusieurs types de ressources, renouvelables ou non renouvelables, en quantités limitées. La résolution d'un POPRL a pour but la détermination des dates d'exécution des tâches en tenant compte des contraintes de préséance et de disponibilité des ressources et ayant comme objectif la minimisation de la durée totale du projet. Le POPRL est un problème d'optimisation combinatoire de complexité NP-dur (Blazewicz et al. 1983). Une revue de littérature du (POPRL) est présentée au chapitre 2. Plus de 125 articles scientifiques sont analysés. Les contributions relatives à ce problème portent sur les méthodes exactes de résolution, la détermination de bornes inférieures sur la durée du projet et les méthodes heuristiques (approchées) de résolution. L'aspect pratique de ce problème dans des contextes industriels divers a conduit à de nombreuses généralisations du problème classique. On constate que malgré les efforts déployés pour définir des POPRL plus généraux, les contraintes de transfert des ressources continuent à être ignorées, nous constatons aussi que l'optimisation du problème en considérant les coûts a été très peu traitée dans la littérature. Ce qui forcent les gestionnaires dans la plus part des cas à se baser uniquement sur leur expérience pour réaliser ou ajuster manuellement les ordonnancements produits par des heuristiques conçues pour résoudre des versions simplifiées du problème. Cette thèse tente de combler partiellement ces lacunes. Le chapitre 3 traite le problème d'ordonnancement de projet à ressources limitées POPRLTT avec des temps de transfert des ressources. Un temps de transfert est le temps nécessaire pour transférer une ressource du lieu d'execution d'une activité vers un autre. Ainsi, le temps de transfert d'une ressource dépend des lieux des activités à exécuter, ainsi que des caractéristiques des ressources à transférer. L'objectif dans un POPRLTT est la détermination des dates d'exécution des tâches en tenant compte des contraintes de préséance et de disponibilité des ressources et les temps de transfert des ressources. L'objectif est de minimiser la durée totale du projet. Nous proposons un nouvel algorithme génétique basé sur un opérateur de croisement de deux positions. L'étude expérimentale menée sur un grand nombre de problèmes test prouve que l'algorithme proposé est meilleur que les deux méthodes déjà existantes dans la littérature. Une généralisation du problème d'ordonnancement de projet à ressources limitées et des temps de transfert des ressources au contexte multi mode (POPRL=PMETT) est présentée au chapitre 4. Dans ce problème, nous supposons que la préemption est non autorisée, et les ressources utilisées sont renouvelables et non renouvelables, chaque activité a plusieurs modes d'exécution, et les relations de préséance sont de type dit début-fin sans décalage. L'objectif est de choisir un temps de début (ou de fin) et un mode d'exécution pour chaque tâche du projet, pour que la durée du projet soit minimisée tout en respectant les contraintes de préséance, de disponibilité de ressources et les temps de transfert. Au meilleur de notre connaissance, cette version du problème n'a jamais été abordée auparavant. Nous proposons une formulation mathématique de ce problème, ensuite nous présentons un algorithme génétique, que nous avons conçu pour résoudre les instances de grandes tailles. Pour tester les méthodes proposées nous développons des nouveaux ensembles de problèmes-tests pour le POPRL=PMETT, qui pourront être utilisés dans l'avenir pour mener des recherches dans ce domaine. Dans le chapitre 5, nous définissons une nouvelle généralisation du problème d'ordonnancement de projet à ressources limitées en considérant l'objectif de minimiser le coût total d'exécution du projet. Celui-ci est composé de deux éléments principaux: le coût direct des ressources à utiliser et les frais généraux qui ne dépendent pas de la quantité de ressources allouées, mais qui sont proportionnels à la durée du projet. Ce problème, que nous appelons Problème général d'allocation et de nivellement des ressources d'un projet (PGANRP) est très commun en pratique, mais très peu de recherche est consacrée à ce problème. Dans un PGANRP, nous devons simultanément déterminer les quantités des ressources à allouer au projet au cours de son exécution et réduire la variabilité de l'utilisation des ressources au minimum tout en essayant de terminer le projet à une date de fin acceptable. Les quantités des ressources à allouer au projet devraient permettre l'accomplissement du projet à cette date et devient une limite sur la disponibilité de ces ressources durant toute l'exécution du projet. Nous proposons, une formulation mathématique du problème et deux approches de recherche dans le voisinage pour les instances de grandes tailles. / The resource-constrained project scheduling problem (RCPSP) consists of scheduling a set of activities or tasks using one or more resource types available in limited quantity. In the standard version of this problem, pre-emption is not allowed, precedence relations are of the no-lag, finish-to-start type, and the used resources are renewable meaning that the same resources quantity are available each time period. Solving this NP-hard optimization problem requires the determination of tasks execution date such that the project duration is minimized without using more than the available resource quantities. In the first chapter of this thesis, the research problem and research objectives are presented while chapter 2 reviews the literature and contributions to the RCPSP and some of its extended versions. More than 125 published papers are reviewed. These contributions are divided into 4 groups of contributions. Those proposing optimal solution methods, those developing lower bounds on the project duration, those proposing heuristic and approximate solution methods, and those extending the standard version of the problem in order to make it closer to the real-life problem. This literature review revealed that very few contributions explicitly take into consideration the time required to transfer resources between execution sites of the project. Only three such contributions are published and none of these three publication deal with the case where tasks have more than one execution mode. This review also revealed that the large majority of the published research deals with the problem where the objective is to minimize the duration of the project. However, in almost all real-life situations, the objective is to minimise the total cost of the project. That is why this thesis is dedicated to solve these neglected extensions of the RCPSP. Chapter 3 deals with the resource-constrained project scheduling problem with transfer times (RCPSPTT). Thus the goal in this case is to determine execution dates that allows for resources to be transferred between execution sites while respecting the precedence relations between these tasks as well as resources availability. A new genetic algorithm (GA) is developed to solve the RCPSPTT. This algorithm uses a new and efficient crossover operator. The chapter also study the performance of the proposed genetic algorithm and shows that it produces better results than the two previously published solution heuristics. It is to notice that the proposed GA considers renewable resource types and assume that tasks have only one execution mode. Chapter 4 deals with the multi-mode resource-constrained project scheduling problem with transfer times (MRCPSPTT). Thus, it extends the problem studied in the previous chapter to the multi-mode case under the assumptions of no pre-emption while using renewable and non-renewable resources. This problem has never been the subject of any published research before. An integer linear mathematical formulation of the problem is given as well as new genetic algorithm is developed to solve it. An extensive empirical analysis is then presented and shows that the proposed GA is able to produce the optimal solution for 529 test instances with 10, 20 and 30 activities. Chapter 5 introduces the generalized resource allocation and leveling problem (GRALP). This problem can be stated as follows. Given a set of project tasks to execute, their possible execution modes and precedence relations, an upper bound on the amount of resources that can be made available to the project, a project due date, the cost of resource utilization and the overhead cost; determine the execution date and mode for each task and the amount of resources to allocate to the project. The objective is to minimize the total project execution cost while respecting precedence constraints, project due date and not using more than the amount of resources that we decided to allocate to the project. Again we notice that this problem has never been the subject of any published research work. Chapter 5 presents an integer linear formulation of the problem, a neighborhood search solution heuristic, a genetic algorithm to solve it and an empirical experiment to evaluate the proposed heuristics showing the superiority of the proposed GA. Finally, the conclusions of the thesis and some propositions for future research are given.
|
54 |
La pérennisation de programmes de financement basé sur les résultats : étude de cas au MaliSeppey, Mathieu 08 1900 (has links)
Le financement basé sur les résultats (FBR) est un type de financement de plus en plus utilisé dans les systèmes de santé en Afrique. Au Mali, un projet pilote de FBR a été implanté afin d’améliorer l’offre et la qualité des soins, en ciblant des services payés à la performance. Aucune étude n’a encore été publiée pour comprendre le processus de pérennisation d’un tel programme en Afrique ou pour évaluer la pérennité de ses résultats; ceci étant le but de la recherche.
La pérennisation a été analysée à travers ses différents déterminants, phases, niveaux et contextes. Ces composantes ont été explorées par différents événements critiques permettant d’obtenir une notion partagée par les parties prenantes de la pérennité du projet. Six centres de santé communautaire et deux centres de référence ont été choisis comme sites. Quarante-neuf entretiens ont été conduits avec les différentes parties prenantes (prestataires de soins, direction, gestionnaires, membres du projet) à divers niveaux administratifs (aires de santé, district, régional et national). Une analyse thématique a été effectuée à l’aide du logiciel © QDA Miner.
Les résultats montrent que le niveau de pérennité du projet est faible pour plusieurs raisons. Concernant les déterminants de pérennité, l’investissement de ressources s’est arrêté à la fin du projet, peu de partage culturel se déroulait autour du FBR, peu de nouvelles tâches ont perduré et le projet n’était pas totalement adapté/approprié pour/par tous les acteurs. Peu d’événements critiques permettent de retracer les différentes phases de pérennisation, cependant, un manque de planification au niveau de la pérennité du projet est constaté. Des questions peuvent donc être posées quant à l’approche par projet et les gains potentiels qui pourraient être effectués grâce à une meilleure compréhension et opérationnalisation du concept de pérennité. / Performance-based financing (PBF) is emerging as a new alternative to finance health systems in many African countries. In Mali, a pilot project was conducted to improve demand and supply of health services through financing performance. No study has explored the sustainability process of such a project in Africa. This study’s objectives were to understand the sustainability process of the project and to assess its level of sustainability.
The process of sustainability was examined through its different determinants, stages and contexts. These were explored in interviews to discern, via critical events, stakeholders’ ideas regarding sustainability in terms of this project. Forty-nine stakeholders were interviewed in six community health centres and two referral health centres, including health practitioners, administrators (at district, regional, national levels), and those involved in implementing and conceptualizing the program (government and NGOs). A theme analysis was done with the software © QDA Miner.
The results show a weak level of sustainability of the project due to many factors. Concerning determinants of sustainability, investments stopped at the end of the project, insufficient cultural artefacts were shared around PBF, few new tasks lasted after the project and the latter was not fully adapted/owned for/by the stakeholders. Few critical events were associated to stages of sustainability; however, a lack of planning could be seen linked to sustainability. Therefore, questions can be asked regarding the project approach and the potential gains that could be made through a better comprehension and operationalisation of the sustainability concept.
|
55 |
Success of corporate Wiki Systems : an end-user perspectiveBhatti, Zeeshan Ahmed 30 September 2011 (has links)
L'utilisation croissante des sites en web 2.0 sur internet a favorisé l'utilisation des outils du Web 2.0 par de nombreuses organisations à travers le monde. L’un des outils les plus largement utilisés aujourd’hui dans les organisations est la technologie Wiki, et ce tout particulièrement dans la gestion de projet. Parce qu’un nombre croissant d’organisations déploie des systèmes Wiki et que le Web 2.0 fait encore l’objet d’un véritable battage médiatique, il est important de travailler sur ces technologies collaboratives et de mesurer leur succès en termes d’utilisation dans l’environnement de l’organisation. Cette étude traite de l’utilisation de la technologie Wiki dans les entreprises et du besoin de développer cette technologie. Il s’agit également de déterminer comment mesurer le succès des systèmes wiki internes du point de vue des « end-users ». La littérature sur les systèmes Wiki publics et d’entreprise est également présentée. Cette étude propose un modèle théorique de recherche sur le succès des wikis internes des entreprises, fondé sur la précédente théorie sur le succès des systèmes d’information. Enfin, le modèle proposé est testée empiriquement et les déterminants importants du succès des wikis interne des entreprises sont présentés / With the ever increasing use of Web 2.0 sites on the internet, the use of Web 2.0 based tools has been employed by the organizations across the globe. One of the most widely used Web 2.0 tool in organizations is the wiki technology particularly in project management. Since growing number of organisations are deploying wiki systems as Web 2.0 still remains a hype, it is important to investigate into these collaborative technologies and measure the success in corporate environment usage. In this study, we discuss the use of Wiki technology in the enterprise setting, the need for wiki deployment and how can we measure the success of corporate wiki systems from end-user’s perspective. The literature on corporate and public wiki systems is also presented. The paper presents a theoretical research model of enterprise wiki systems’ success based on the previous IS success theory. Finally, the research model of corporate Wiki success is empirically tested and the important determinants of corporate Wiki systems are presented
|
56 |
La coordination des parties prenantes dans les projets de coopération décentralisée Nord-Sud : un enjeu majeur : le cas des autorités locales françaises et palestiniennes dans le secteur de l’eau et de l’assainissement / Stakeholders' coordination in projects of decentralised cooperation between the North and the South : a major issue : case of French and Palestinian local authorities in the water and sanitation sectorFouchet, Charline 12 December 2016 (has links)
La coopération décentralisée, brique de l’Aide publique au développement et action extérieure des collectivités territoriales, existe légalement depuis 1992. L’intérêt pour la thématique "eau et assainissement" ainsi que pour les pays de la Méditerranée, nous a amené à mener notre recherche dans les Territoires palestiniens, territoires souffrant du manque d’eau. Ces actions de coopération nécessitent une coordination des parties prenantes sur le territoire partenaire. C’est cette coordination que questionne cette recherche. Pour cela les enjeux de la coopération décentralisée ont été comparés entre la littérature et le terrain, ce qui nous a permis de nous intéresser plus particulièrement à l’enjeu du transfert de connaissances. En effet, les actions de formation ont une part de plus en plus importante dans les projets de coopération décentralisée, du fait notamment des difficultés financières des collectivités territoriales. La littérature du transfert inter-organisationnel a aussi été mobilisée lors de cette recherche. Nous sommes ensuite revenus sur les différentes pratiques managériales liées à la gestion de projet, au suivi de projet, à la mise en place de consultations publiques, etc. Nous avons pu voir que la communication publique était peu existante et que d’autres difficultés existaient comme la gestion du turn-over. Nous avons souhaité comprendre quels pouvaient être les impacts liés à cela, ainsi que les solutions envisageables. Lorsque nous nous sommes intéressés aux difficultés, la coordination des parties prenantes est apparue comme primordiale à améliorer / Decentralized cooperation projects, an aspect of the development aid and external action of local authorities, has legally existed since 1992. Simultaneous interest in water and sanitation issues and in Mediterranean countries motivated us to focus our research in the Palestinian Territories, many of which suffer of a lack of water. These cooperative actions require a coordination of the stakeholders on the partner territory. This research questions the efficacy of these coordinated efforts applied to the water and sanitation field. Herein, issues of decentralized cooperation have been compared between the literature and a field study, which allowed us to focus more particularly on the issue of knowledge transfer. Indeed, training accounted for an increasingly important share of decentralized cooperation projects, due in particular to financial difficulties of local authorities. This is why we focused on knowledge transfer’s literature, inter-organizational transfer actually as it does not meet the same difficulties as private organizations (with holding information, power games, an unstable relationship, etc.) but conversely it is rarely assessed and thus warrants investigation. We also followed up on the different management practices related to project management : project monitoring, implementation of public consultations, etc. We found that public communication is scarce and found others difficulties such as frequent management turnovers. We wished to understand the impact of frequent turnover and solutions to the problems they may create
|
57 |
Dynamique du contrôle dans un projet de déploiement de pratiques : Un cas de pratiques environnementales et de maitrise des risques dans un réseau d'agences / Dynamic of control in a project of practices deployment : the case of sustainable and risks management practices in a network agenciesDhuyvetter, William 31 May 2013 (has links)
Le but de cette recherche est de décrire et de comprendre le contrôle du transfert de Bonnes Pratiques entre différentes agences réparties sur le territoire. Cette étude émerge de l’observation d’un problème terrain : à partir d’un jeu de pratiques environnementales et de maitrises des risques dites « idéales » et sélectionnées pour avoir déjà prouvées leur efficacité dans d’autres unités organisationnelles, les membres du Comité de Pilotage transforment ces pratiques, tout au long des réunions du projet, de façon à permettre leur implémentation. Mais ces pratiques dépassent la simple application de prescriptions règlementaires et sont souvent des innovations pour l’entreprise. Ces innovations engagent le Comité de pilotage dans un véritable processus de conception. La finalité du projet est d’autonomiser les opérateurs dans l’usage de ces pratiques qui doivent pouvoir appréhender le terrain, adapter leur réponse tout en se conformant à l’idéal porté par la pratique. Notre hypothèse de travail est que l’action du Comité est mue par une logique de contrôle. Dans ce travail, nous cherchons à caractériser la façon dont le Comité de pilotage de ce projet contrôle le déploiement de ces Bonnes Pratiques et à rendre compte de sa dynamique. Pour répondre à cette question, cette étude conduite au sein de la filiale régionale d’un groupe s’inscrit dans une approche qualitative. Notre méthode d’analyse s’appuie sur le recours à la théorie ancrée en se fondant sur les éléments empiriques du terrain. Pour caractériser le processus de contrôle, nous avons voulu échapper aux catégories usuelles des mécanismes de contrôle de la théorie (Ouchi, 1979 ; Simons, 2004) en expliquant comment l’acteur collectif Comité de pilotage, par des actions sur le processus de conception des pratiques, par des actions d’information et de formation des agents et par des actions sur la rédaction de fiches de procédures, cherchait à s’assurer que chaque membre du Comité de pilotage et les agents impliqués dans ce processus de conception se comportent dans le sens des objectifs fixés par la Direction générale. Ainsi, parmi nos contributions, le niveau de granularité plus fin dans l’analyse du contrôle nous a permis d’apporter une relecture des travaux traditionnels en contrôle. Pour rendre compte de la dynamique du contrôle, nous procédons également à une opérationnalisation du modèle de la réplication de Winter et Szulanski (2001). En complément, nos résultats illustrent la dynamique du contrôle fondée sur l’analyse de la convergence des projets par Midler (1993). / The purpose of this study is to describe and understand how the transfer of the Good Practices among the different agencies spread out in the territory is controlled. This research emerges from a problem observed in practice : based on a set of environmental and risk-management practices which were said to be « ideal » and which had proved to be efficient, the members of the Piloting Committee transform these practices throughout their project meetings so that they may be implemented. Those practices however, go beyond statutory requirements, and often turn out to be innovations for companies. Those innovations engage the Piloting Committee in a true conception process. The project aims at making the users/operators autonomous. They are to be able to apprehend the situation and adapt their response, all the while complying with the fundamental ideal of the Practice. Our working hypothesis is that the action of the Piloting Committee is driven by logic of control. In this work, we are seeking to characterize the way the Piloting Committee of this project controls the way in which the Good Practices are implemented and to report their dynamics. To investigate these research questions, a qualitative study was designed and conducted. We use grounded theory methodology. This intervention-research led in a subsidiary company. To characterize the control process, we chose to avoid the usual categories of mechanical control of the theory (Ouchi, 1979; Simons, 2004). Instead, we chose to explain how the collective actor Piloting Committee, by setting up information and training campaigns for all the Piloting Committee members and at the actors involved in the conception process, sought to ensure that each and every one was indeed acting consistently and in compliance with the targets set by the General Management. We are procceeding to the operationalization of the replication of Winter and Szulanski model (2001). Our results show Midler’s work (1993).
|
58 |
Performance evaluation and decision support in industrial system management : a benefit-cost-value-risk based methodology / Evaluation de la performance et aide à la décision pour la Gestion de systèmes industriels : méthodologie basée sur Bénéfice-coût-valeur-risqueLi, Fan 01 June 2017 (has links)
La mesure et la gestion de la performance représente de sérieux défis aux praticiens et chercheurs en génie industriel et sciences de gestion pour une prise de décision efficace sur base d’informations intégrées, dynamiques et pertinentes concernant la satisfaction simultanée d’objectifs émanant de diverses parties-prenantes. Bien que nombreuses méthodologies et outils aient déjà été proposés, des progrès en la matière sont encore possibles pour aider les gestionnaires et les ingénieurs à prendre de meilleures décisions et ce, de manière plus systématique.En considérant que la performance d’un système, projet ou processus industriel peut-être globalement évaluée en suivant quatre dimensions (bénéfice, coût, valeur et risque), cette thèse propose un cadre original et complet ainsi qu’une méthodologie opérationnelle afin d’appliquer des méthodes et outils d’intervention appropriés dans l’évaluation de la performance et l’aide à la décision au sein de projets industriels.A l’aide de plusieurs exemples inspirés de cas industriels, ces travaux soulignent que la méthodologie proposée peut être le support de : l’évaluation de plusieurs scénarios de décision pour sélectionner la solution la plus appropriée, l’évaluation de la performance à toutes phases d’un projet industriel et le pilotage d’un projet en cours avec plusieurs points d’évaluation durant le cycle de vie. / Performance measurement and management represents serious challenges to practitioners and researchers in industrial engineering and management sciences for efficient decision making with integrated, dynamic and relevant performance information regarding simultaneous accomplishment of multiple stakeholder objectives. Although many methodologies and approaches have already been proposed, there is still room for new advances to go further in assisting managers and engineers to make better decisions in a more systematic manner.Assuming that the performance of an industrial system, project or process can be comprehensively evaluated by four main dimensions (benefit, cost, value and risk), the thesis proposes an original and complete framework as well as an operational methodology to apply relevant supporting methods and tools for the sake of performance evaluation and decision support in industrial projects.Using several examples based on industrial cases, the work emphasises that the proposed methodology can provide the support for: opportunity assessment of several decision alternatives to select the most appropriate one, performance evaluation at any phase of an industrial project and monitoring of an ongoing industrial project requiring performance evaluation at several phases along its life history.
|
59 |
Innovation par la responsabilité sociétale dans la gestion de projet d’ingénierie : cas de l’ingénierie pharmaceutique / Innovation by social responsibility in engineering and project management : Case of pharmaceutical engineeringTahiri, Azedine 19 February 2013 (has links)
L’intégration d’une démarche orientée vers le développement durable (DD) dans les organisations implique au-delà des motivations, des méthodes structurées et structurantes. Ces méthodes que l’on pourrait nommer outils de mise en œuvre du DD sont orientées vers un objectif commun, une performance globale (PG). À ce jour très peu de méthodes sont proposées aux sociétés d’ingénierie pour atteindre cette PG. Sans doute est-ce dû aux spécificités typologiques de ce type d’organisation de maîtrise d’œuvre (MOE) qui est partagée entre deux univers que sont la maîtrise d’ouvrage (MOU) et un ensemble de parties prenantes complexes (PP). C’est dans ce contexte que nous abordons notre sujet de recherche : comment la réponse à des attentes de la société peut-être un élément de la stratégie économique de l’entreprise ? C’est pourquoi notre idée est de proposer des méthodologies applicables au métier de l’ingénierie afin que ces entreprises puissent intégrer une démarche volontaire dans leur organisation pour le DD par la RSE. Dans le cadre d’une recherche-intervention nous avons donc posé les bases de réflexions au développement de processus d’intégration de la RSE non pas à l’échelle de l’organisation mais à l’échelle du métier. Par le développement d’un outil d’intégration d’une démarche de RSE construit sur la base de la norme ISO 26000 et de la norme expérimentale Afnor X30-029 nous avons pu faire évoluer dans le contexte de l’ingénierie pharmaceutique, les bonnes pratiques d’ingénierie en créant un modèle d’ingénierie responsable donc durable. / The integration of a sustainable development gait (SD) in the organizations implies, beyond the incentives, structured and structuring methods. These methods that we could name tools of implementation of SD are oriented toward a common objective: the global performance. Today very few methods are proposed to the societies of engineering in order to reach this global performance. It is probably due to the typological specificities of this type of organization. In point of fact, these engineering enterprises are quite atypical because they are shared between two universes which are the client (for instance pharmaceutical industry) and a significant number of complex subcontractors (SC). In this context, we approach our topic of research: the enterprise must prove that it is “economically viable, socially responsible and environmental healthy” (Quairel-Lanoizelee 2004), even beyond its own frontiers. But the answer to society’s expectations is also an element of the enterprise’s economic strategy. That is why, our idea is to suggest methodologies that are applicable to the engineering profession, and therefore could be adapted to all types of engineering enterprises, so that it can integrate a voluntary gait for SD by The Social Responsibility (SR). The International Organization for Standardization (ISO) is developing an international standard in order to provide guidelines for adopting and disseminating social responsibility: ISO 26000, which was published in 2010. In our research we have considered that the SR will play a double role, as reformer of the classical practices of project management as well as a tool that could bring SD strategy inside and outside the engineering organization. The general idea is to conceive a new approach of the enterprise’s management philosophy, disinterested from the unique profit notion. This brings us to think about another dimension of the enterprise’s performance. This project lead us to asking the following question: is it possible to manage an engineering project by including the SR approach in classical methodology of project management?By a methodology of action-research and specifically intervention-research (I-R), we are going to build our investigation about an international engineering company, which has as pharmaceutical engineering activity. The objective is to analyze, and to understand the specificities of engineering enterprise’s model in order to known if it is possible to change this model by developing a new project management approach based on the SR and strategy innovation. The innovating methodology that we developed must allow us to integrate a gait of SR within the best practice of engineering project. In conclusion, the integration tool of a gait of SR which is today on the stage of prototype, built on ISO 26000 norms and on the experimental norm Afnor X30-029 basis, allowed us to develop the pharmaceutical engineering’s profession, by moving from the standard engineering best practice to the social responsible engineering best practice, for a sustainable development goal.
|
60 |
Relations entre des dynamiques territoriales et la construction de compétences : les territoires ne sont plus ce qu'ils étaient !Leclercq, Françoise 01 July 2007 (has links) (PDF)
Les nouvelles dynamiques de développement local questionnent les politiques publiques, dédiées à la construction des compétences d'un système productif territorial. A partir d'une patiente investigation, qui nous amène à construire la scénarisation d'une aventure territoriale d'une vingtaine d'années, nous avons recherché comment les acteurs d'un territoire, qu'on pourrait qualifier de " territoire menacé de perdre ", s'engagent collectivement dans une stratégie plus ou moins explicite de ''trajectoire pour gagner'' exprimée en terme de ''développement durable''. Pour ce faire, trois clefs de lecture de l'historiographie d'une performance locale (territoire, compétence, espace industriel) sont conjuguées avec l'analyse des systèmes d'acteurs (encastrements de leurs trajectoires dans différents projets) et leurs modes d'appropriation de dispositifs qui ne relèvent pas du local. L'étude de la construction du Génie Naval de Saint-Nazaire, autour de l'organisation des réseaux et des dispositifs qui l'aident à se structurer, nous fait suivre le cheminement de ce système productif, notamment, au bénéfice des PME. Mais, on ne peut comprendre la construction d'un système productif local, si on ne l'inscrit pas dans une dynamique territoriale plus large. Entre le local et le mondial, il y a l'intermédiation d'autres échelles territoriales. Entre la Métallurgie et les autres secteurs d'activités, il y a de nombreuses passerelles et de nombreux " passeurs " dans un territoire qui apprend des démarches partenariales, basées sur des projets collectifs. Ces projets développent progressivement une culture collective territoriale et des formes d'intervention qui opérationnalisent progressivement le contenu de la gouvernance territoriale industrielle. Pour se développer, les territoires ont besoin de la dimension d'un projet partagé, appuyé sur les réalités du vécu des hommes et de leurs activités. Le local n'est pas un terrain passif et peut inspirer les dispositifs nationaux et européens. Nos résultats apportent des clefs d'une lecture de la trajectoire industrielle d'un territoire.
|