• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 221
  • 13
  • 7
  • Tagged with
  • 242
  • 242
  • 188
  • 179
  • 50
  • 43
  • 37
  • 37
  • 36
  • 27
  • 27
  • 26
  • 24
  • 24
  • 24
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
231

A importância da simetria de informações para o sucesso dos projetos de tecnologia da informação, por meio das ações de cooperação

Oliveira, Henrique Pontes Gonçalves de 24 February 2017 (has links)
Submitted by Henrique Pontes (henrique.pontes@uol.com.br) on 2017-03-21T00:46:25Z No. of bitstreams: 1 Dissertação - Henrique Pontes.pdf: 3935453 bytes, checksum: 7700a20560f29b2b18636236872fa621 (MD5) / Approved for entry into archive by Pamela Beltran Tonsa (pamela.tonsa@fgv.br) on 2017-03-21T15:06:29Z (GMT) No. of bitstreams: 1 Dissertação - Henrique Pontes.pdf: 3935453 bytes, checksum: 7700a20560f29b2b18636236872fa621 (MD5) / Made available in DSpace on 2017-03-21T15:50:23Z (GMT). No. of bitstreams: 1 Dissertação - Henrique Pontes.pdf: 3935453 bytes, checksum: 7700a20560f29b2b18636236872fa621 (MD5) Previous issue date: 2017-02-24 / With the advancement of technological solutions and a business environment increasingly agile and competitive, the Information Technology area has, growingly, assumed an essential part in organizations. As a result, the number of IT demands has increased significantly, making the usage of project management practices a fundamental component in meeting these demands. In Information Technology projects the generation and flow of information, as well the interaction between the areas associated with the projects, is significantly high, requiring adequate communication procedures, which are the most sensitive and extremely associated to the success or failure of the project. This research explored, through a multiple case study, the influence of information symmetry, that is, the adequate distribution of project information among its stakeholders through cooperation actions in the projects’ success. After an extensive review of the literature on IT projects, project management, information symmetry and cooperation, three propositions were developed in order to answer the research question. The first proposes that the symmetry of information in IT projects facilitates cooperation actions; the second, that cooperation actions influence the success of IT projects, and the third, that efficient communication and symmetry of information, referring to IT projects, through cooperation actions, are essential factors for the success of the project. The research data collection stage was carried out in two large multinational companies, in the retail sector, in the food and garments segments and, in each of them, qualitatively analyzed a strategic project for the company. In the two analyzed projects, it was verified that did not obtain satisfactory results, although their products were delivered. The main factors pointed out were problems in the communication process, mainly the information symmetry. It was still verified that the inefficiency in the communication directly harms the cooperation actions and proved that the inadequate distribution of information is a preponderant factor for the generation of conflicts and, consequently, the failure of the project. However, it was pointed out by all interviewees, in both projects, that information symmetry influences cooperation actions between teams and, it is essential to achieve the success of IT projects. / Com o avanço das soluções tecnológicas e um contexto de negócios cada vez mais ágil e competitivo, a área de Tecnologia da Informação vem assumindo um papel essencial nas organizações. Com isso, a quantidade de demandas junto à área de TI aumentou significativamente, tornando a utilização de práticas de gerenciamento de projetos um componente fundamental no atendimento dessas demandas. Em projetos de Tecnologia da Informação a geração e o fluxo de informação, bem como a interação entre as áreas associadas aos projetos, é significativamente elevada, exigindo procedimentos adequados de comunicação, mais sensíveis e extremamente associados ao sucesso ou fracasso do projeto. Este trabalho pesquisou, a partir de um estudo de caso múltiplo, a influência da simetria da informação, ou seja, a adequada distribuição das informações do projeto entre seus envolvidos por meio das ações de cooperação no sucesso dos projetos. Após extensa revisão bibliográfica sobre projetos de TI, gerenciamento de projetos, simetria de informação e cooperação, três proposições foram elaboradas a fim de responder à questão de pesquisa. A primeira propõe que a simetria das informações em projetos de TI facilita as ações de cooperação; a segunda, que as ações de cooperação influenciam no sucesso de projetos de TI, e a terceira, que a comunicação eficiente e a simetria de informações referentes aos projetos de TI, por meio das ações de cooperação, são fatores essenciais para o sucesso do projeto. A etapa de coleta de dados da pesquisa foi realizada em duas empresas multinacionais de grande porte, no ramo do varejo, nos segmentos de alimentação e vestuário e, em cada uma delas, analisados qualitativamente um projeto estratégico para a empresa. Nos dois projetos analisados, foi constatado que não obtiveram resultados satisfatórios, apesar de seus produtos terem sido entregues. Os principais causadores da insatisfação foram problemas no processo de comunicação, principalmente a simetria da informação. Foi verificado ainda que a ineficiência na comunicação prejudica diretamente as ações de cooperação e comprovado que a inadequada distribuição de informações é fator preponderante para a geração de conflitos e, consequentemente, o fracasso do projeto. Por outro lado, todos os entrevistados apontaram, nos dois projetos, que a simetria de informação influencia as ações de cooperação entre as equipes e, é essencial para atingir o sucesso dos projetos de TI.
232

[en] A SOFTWARE PRODUCT LINE BASED ON AGENTS FOR PROJECT MANAGEMENT SYSTEMS / [pt] UMA LINHA DE PRODUTO DE SISTEMAS BASEADOS EM AGENTES PARA GERENCIAMENTO DE PROJETOS DE SOFTWARE

ROBERTA CLAUDINO BARRETO PESSANHA GOMES 27 July 2010 (has links)
[pt] O gerenciamento de projetos de software enfrenta diversos desafios que devem ser superados ao longo do desenvolvimento para garantir seu sucesso. Diversas ferramentas e abordagens foram propostas na literatura para auxiliar gerentes de projeto com tais questões. Assim, propõe-se utilizar duas tendências promissoras da engenharia de software pouco exploradas nesse contexto, que consiste em desenvolver uma linha de produto de sistemas de gerenciamento de projetos baseados em agentes. O uso de linhas de produto de software permite derivar sistemas customizados segundo o tamanho do projeto. Entre os benefícios do uso de agentes tem-se a reconfiguração dinâmica do sistema a partir da exploração de suas características, como raciocínio e adaptação. / [en] Software project management faces several challenges that must be overcome throughout the development to guarantee its success. Many tools and approaches have been proposed in the literature to help project managers with these issues. Thus, it is proposed to use two promising software engineering trends barely exploited in this context, which consists of the development of a software product line of project management systems based on agents. The use of software product lines allows the derivation of customized systems based on the project size. Among the benefits of using agents it is included the system dynamic reconfiguration from the exploitation of their characteristics, such as reasoning and adaptation.
233

[en] EFFECTIVE RESOURCE ALLOCATION FOR PLANNING AND CONTROL PROJECT PORTFOLIOS UNDER UNCERTAINTY: A ROBUST OPTIMIZATION APPROACH / [pt] ALOCAÇÃO EFETIVA DE RECURSOS PARA PLANEJAMENTO E CONTROLE DE PORTFOLIOS DE PROJETOS SOB INCERTEZA: UMA ABORDAGEM DE OTIMIZAÇÃO ROBUSTA

CARLOS RAONI DE ALENCAR MENDES 18 January 2018 (has links)
[pt] O planejamento e controle de portfolios de projeto é uma tarefa desafiadora. Eles estão sujeitos a múltiplos riscos, restrições de recursos, relações de precedências e penalidades por atrasos de projetos. É fundamental desenvolver estratégias efetivas de alocação dos recursos disponíveis de forma a garantir que estes projetos sejam concluídos dentro dos limites de tempo e custo. Um fator crucial que deve ser levado em consideração ao tomar estas decisões é o gerenciamento das incertezas associadas a execução dos projetos. Neste contexto, este trabalho propõe uma metodologia baseada em otimização robusta para planejamento e controle de portfolios de projeto sob incerteza. Este método combina modelos e algoritmos desenvolvidos para diferentes problemas de alocação de recursos para os quais foi aplicada a mesma abordagem de otimização robusta. Nela, a incerteza é modelada como um adversário capaz de materializar a combinação de riscos de pior caso que maximiza o impacto no(s) projeto(s) para qualquer plano de alocação de recursos. Nos problemas estudados o tomador de decisão tem então que determinar a alocação ótima de recursos que minimiza um objetivo particular assumindo que a combinação de riscos de pior caso irá se materializar. A abordagem também provê um mecanismo para controle do grau de conservadorismo das soluções robustas. Para cada problema modelado, uma estratégia de solução é desenvolvida através de um esquema de reformulação que parte de uma formulação Min-Max compacta e termina em um algoritmo de geração de cortes. Diversos experimentos computacionais foram executados, provendo importantes conclusões que direcionaram o desenvolvimento da metodologia de controle e planejamento de portfolios. A importância de se desenvolver planos de alocação de recursos de forma integrada no contexto de tomada de decisão em portfolios de projetos e a falta de efetividade do método tradicional de análise de caminhos críticos no contexto de cenários de pior caso para as durações das atividades, são importantes exemplos das conclusões obtidas pelos experimentos. A aplicação da metodologia foi demonstrada em um caso de estudo que contempla um portfolio para construção de duas refinarias. O referido exemplo demonstrou o potencial do uso prático dos métodos propostos neste trabalho. / [en] Planning and controlling complex project portfolios is a challenging task. These portfolios are subject to a number of potential risk sources coupled with resource constraints, intricate precedence relationships, and penalties for project delays. For this reason, it is fundamental that optimal strategies for the allocation of the available resources are constantly adopted by the decision makers to ensure that their projects are completed within limits of time and cost. Moreover, the uncertainty that affects these projects has to be taken into account for effective resource allocation decisions. Within this context, this work proposes a robust optimization-based methodology for planning and controlling project portfolios under uncertainty. The method combines models and algorithms for multiple resource allocation problems under the same robust optimization framework. In this approach, the uncertainty environment is modeled as an adversary that selects the worst-case combination of risks for any decision maker s actions. Subsequently, the main goal of the decision maker is to determine optimal resource allocation plans for minimizing a particular objective subject to the assumption that the adversary s worst-combination of risks will materialize. The approach also provides a way to control the degree of conservatism of the solutions. For each studied problem, a solution strategy is developed through a reformulation scheme from a compact min-max formulation to a cut-generation algorithm. Several computational experiments are conducted, providing key insights that drive the design of the referred portfolio planning and control methodology. The ineffectiveness of traditional critical path analysis under worst-case realizations of uncertain activities durations and the importance of taking integrated resource allocation decisions in the context of project portfolios, are examples of the key findings of the experiments. The application of the methodology is demonstrated in a case study of a portfolio aimed at the construction of two refineries. This example presents the capabilities of the developed techniques in a practical context.
234

Ferramenta para configuração de modelos híbridos de gerenciamento de projetos / A tool for configuring hybrid project management models

Michael Jordan Bianchi 14 July 2017 (has links)
As organizações desenvolveram recentemente novas práticas de gerenciamento de projetos, ditas ágeis e que convivem com as práticas anteriores, ditas direcionadas ao plano (Plan-driven). Ao invés de optar entre uma ou outra, vem ganhando força a ideia de combiná-las. Entretanto, a singularidade dos projetos torna difícil identificar a combinação de práticas mais apropriadas a cada caso. A presente pesquisa propõe uma ferramenta de configuração que relaciona as características e contexto de um projeto com práticas gerenciais, fundamentada em uma matriz morfológica e cujo propósito é apoiar a escolha de práticas e configuração de um modelo de gestão específico para o projeto. O estudo restringiu-se ao planejamento e controle do escopo e tempo em gerenciamento de projetos. A pesquisa iniciou com uma revisão bibliográfica sistemática para identificar ferramentas similares e modelos híbridos disponíveis na área de gerenciamento de projetos. Em seguida, compreendeu uma fase de proposição teórica da ferramenta e seu teste por meio de um estudo de caso em uma empresa de desenvolvimento de softwares, envolvendo desenvolvedores e gestores de projetos com experiência em gerenciamento ágil. A aplicação da ferramenta resultou em propostas diferentes para situações de projetos distintas. Uma análise das justificativas dos profissionais para as suas escolhas, mostrou que as experiências dos profissionais da organização, bem como suas preferências pessoais, influenciam as escolhas e não apenas o contexto do projeto. Há, portanto, indícios de que é viável optar por uma personalização para cada projeto, mas é importante investigar a experiência prévia e preferências dos profissionais de forma a aprimorar a ferramenta. A ferramenta proposta pode servir como referência para as empresas que desejam adequar modelos de gestão para seus diferentes tipos de projetos, combinando as práticas das diferentes abordagens de gerenciamento. O estudo também agrega ao desenvolvimento do tema de gestão hibrida na área de gerenciamento de projetos, trazendo uma inovação em relação as propostas encontradas na literatura. / Organizations have recently developed new project management practices, called agile and coexisting with previous practices, called Plan-driven. Instead of choosing between one and the other, the idea of combining them is gaining strength. However, the uniqueness of the projects makes it difficult to identify the most appropriate combination of practices to each case. The present research proposes a configuration tool that relates the characteristics and context of a project with management practices, based on a morphological matrix, and whose purpose is to support the choice of practices and configuration of a specific management model for the project. The study was limited to the planning and control of the scope and time in project management. The research began with a systematic literature review to identify similar tools and hybrid models available in the project management area. Then, it comprised a theoretical proposition phase of the tool and its test through the case study method in a software development company, involving developers and project managers with experience in agile management. The application of the tool resulted in different proposals for different project situations. An analysis of the professionals\' justifications for their choices showed that the experiences of the organization\'s professionals, as well as their personal preferences, influence the choices and not just the context of the project. There are, therefore, indications that it is feasible to choose a customization for each project, but it is important to investigate the previous experience and preferences of the professionals in order to improve the tool. The proposed tool can serve as a reference for companies that want to adapt management models to their different types of projects, combining the practices of the different management approaches. The study also adds to the development of hybrid management topic in the project management area, bringing an innovation in relation to the proposals found in the literature.
235

Fatores críticos de insucesso na implantação de projetos: um survey entre profissionais em uma empresa integrada de energia no Brasil

Barretto, Cyro Rodrigues 18 June 2015 (has links)
Submitted by Marcia Silva (marcia@latec.uff.br) on 2015-10-28T14:31:51Z No. of bitstreams: 1 Dissert Cyro Rodrigues Barretto.pdf: 5057628 bytes, checksum: 9cd414387fb221841d38efd245edcf97 (MD5) / Made available in DSpace on 2015-10-28T14:31:51Z (GMT). No. of bitstreams: 1 Dissert Cyro Rodrigues Barretto.pdf: 5057628 bytes, checksum: 9cd414387fb221841d38efd245edcf97 (MD5) Previous issue date: 2015-06-18 / Esta dissertação constitui o resultado de um estudo sobre fatores críticos de insucesso no gerenciamento e implantação de projetos em uma empresa integrada de energia no Brasil. O estudo procurou trazer uma contribuição adicional aos estudos que vem sendo realizados sobre o tema, buscando mapear e analisar os fatores críticos de insucesso (FCI), que podem ser identificados antes da fase inicial de implantação de projetos, na perspectiva do ambiente interno tanto das equipes executoras, quanto dos patrocinadores e clientes/usuários de projetos neste segmento organizacional. A pesquisa foi realizada por meio de uma revisão da literatura mais recente, buscando artigos científicos mais relevantes, com foco no estado da arte relacionado à temática escolhida. Foram identificados oito grupos temáticos mais frequentes entre os autores estudados. A revisão da literatura apontou a existência de condições desfavoráveis que estando presentes no ambiente do projeto, podem trazer impactos na realização de diversos requisitos relacionados ao escopo, como prazo, custo, qualidade, aspectos de meio ambiente, segurança, saúde ocupacional e responsabilidade social, entre outros. Foram identificados oito grupos temáticos de FCI mais frequentes entre os autores pesquisados. A partir deste agrupamento, foi construído um questionário estruturado, que foi validado com especialistas com grande experiência no gerenciamento de projetos. O questionário validado foi utilizado em um survey entre profissionais de gerenciamento de projetos de duas Comunidades de Práticas da empresa estudada, oriundos de diferentes circunstâncias históricas, bem como distintas realidades profissionais, culturais, socioeconômicas, políticas e ambientais. Foram obtidos 397 questionários válidos, sendo que os resultados do survey foram submetidos à estatística descritiva, que identificou um conjunto de 10 FCI encontrados com maior frequência pelos especialistas que participaram do survey. Os resultados encontrados mostraram-se importantes para a construção de conhecimento não somente para a comunidade acadêmica, como também para os profissionais de gerenciamento de projeto. Percebeu-se que quanto mais precocemente os FCI forem identificados, maiores poderão ser as chances de serem tratados, seja por meio da eliminação ou mitigação dos seus impactos, com vistas a se obter uma taxa de sucesso que possa atender aos requisitos mais prioritários definidos pelos atores envolvidos. / This dissertation is the result of a study on critical factors of failure in the management and implementation of projects in an integrated energy company in Brazil. The study sought to bring an additional contribution to the studies that have been conducted on the subject, seeking to map and analyze the critical factors of failure (CFF), which can be identified before the initial phase of project implementation from the perspective of both the internal context executing teams, the sponsors and clients / projects of users in this organizational segment. The survey was conducted through a review of the latest literature, searching for the most relevant scientific articles, focusing on the state of the art related to the chosen theme. Eight most frequent thematic groups among the study authors were identified. The literature review showed the existence of unfavorable conditions that are present in the project environment, that can pose impacts in making various requirements related to the scope, such as time, cost, quality, environmental aspects, safety, occupational health and social responsibility, among others. Eight thematic groups CFF frequently among the surveyed authors were identified. From this group, a structured questionnaire was built, which was validated by experts with extensive experience in project management. The validated questionnaire was used in a survey among project management professionals from two communities of practice within the studied company, from different historical circumstances and different professional, cultural, socialeconomic, political and environmental realities. 397 valid questionnaires were obtained, and the survey results were submitted to descriptive statistics, which identified a set of 10 CFF found more often by the experts who participated in the survey. The results proved to be important for the construction of knowledge not only for the academic community, but also for project management professionals. It was noticed that the earlier the CFF are identified, the greater will be the chances of being treated, either by eliminating or mitigating their impacts, in order to obtain a success rate able to meet the highest priority needs defined by the actors involved
236

Prazo de entrega em gerenciamento de projetos: um estudo a partir dos depósitos de patentes / Delivery time in project management: a study from patent deposits

Ruas, Osmar Borges 16 October 2017 (has links)
Submitted by Nadir Basilio (nadirsb@uninove.br) on 2018-04-03T18:34:14Z No. of bitstreams: 1 Osmar Borges Ruas.pdf: 4968457 bytes, checksum: f034d06ab41189910725d292527fd096 (MD5) / Made available in DSpace on 2018-04-03T18:34:14Z (GMT). No. of bitstreams: 1 Osmar Borges Ruas.pdf: 4968457 bytes, checksum: f034d06ab41189910725d292527fd096 (MD5) Previous issue date: 2017-10-16 / The delivery time is the time unit that determines the time needed to complete the project, which in external or internal conditions in organizations can cause deviations to the project deliveries. As a consequence, they can cause financial loss, excessive expenses, increased risks, communication failures, loss of quality among other problems. In some studies, alternatives are used to avoid or solve these problems in carrying out project management. As an alternative, this study uses about 100 million patents registrations deposited in the European Patent Office (EPO) Espacenet for potential solutions to deadline issues. The objective of this research is to identify the solutions for the delivery time of project management in the EPO base using the extraction of patents with the tool Patent2NET. With open source tooling, it allows for content analysis and bibliographic organization with mind maps. This research uses the qualitative method, with exploratory-descriptive character, with the analysis of secondary data. The correlation, similarity and frequencies of the words will be analyzed. Thus, contributions are offered to improve the understanding of these solutions found in four semantic classes, as well as the presentation of the techniques for constructing search expressions and the patents that can help in the solution of problems of the deadline and, therefore, to promote improvements in project management practices. / O prazo de entrega é a unidade temporal que determina o tempo necessário para concluir o projeto, que em condições externas ou internas em organizações podem causar desvios às entregas do projeto. Como consequência, podem trazer prejuízo financeiro, gastos excessivos, aumento de riscos, falhas de comunicação, perda de qualidade dentre outros problemas. Em alguns estudos, utilizam-se alternativas para evitar ou resolver esses problemas na realização do gerenciamento dos projetos. Como alternativa, este estudo utiliza cerca de 100 milhões de registros de patentes depositados no Espacenet da European Patent Office (EPO) para obter as potenciais soluções para problemas de prazo de entrega. O objetivo desta pesquisa é identificar as soluções de prazo de entrega em gerenciamento de projetos na base EPO utilizando a extração das patentes com a ferramenta Patent2NET. Com o manuseio de ferramentas open source são realizadas análises de conteúdo e a organização bibliográfica com mapas metais. Esta pesquisa utiliza o método qualitativo, com caráter exploratório-descritivo, com a análise de dados secundários. Serão analisados o correlacionamento, a similitude e as frequências das palavras. Dessa forma, são oferecidas contribuições para melhorar o entendimento dessas soluções encontradas em quatro classes semânticas, bem como a apresentação das técnicas para construção de expressões de busca e as patentes que podem ajudar na solução de problemas de prazo de entrega e, assim, promover melhorias nas práticas de gerenciamento de projetos.
237

Análise da cultura organizacional no gerenciamento de projetos / The analysis of organizational culture in project management

Carvalho, Liza Fachin de 31 July 2015 (has links)
O gerenciamento de projetos de forma sistematizada vem se tornando essencial para todo tipo de organização, pois os mercados a cada dia tornam-se cada vez mais competitivos, os recursos mais escassos e os clientes muito mais exigentes. É possível observar isso com o número crescente de empresas que se associam ao Project Management Institute (PMI) - referência nas melhores práticas em gerenciamento de projetos - que desde o final de 2013 possui mais de 400.000 empresas associadas em todo o planeta. Tal tendência é natural, visto que as empresas necessitam se destacar nos negócios em um mercado cada vez mais dinâmico a fim de garantir a sua sobrevivência. De acordo com Gu et al. (2013), uma questão-chave na investigação de gerenciamento de projetos gira em torno de porquê alguns projetos são bem sucedidos, enquanto outros não. Esta questão levou os pesquisadores a explorar determinantes potenciais que possam levar ao sucesso ou fracasso de um projeto. Por exemplo, o Standish Group International (2009) encontrou uma taxa global de fracasso do projeto em torno de 72% nos EUA. É certo que a cultura organizacional exerce forte influência no sucesso dos projetos, mas seria possível diagnosticá-la para com isso melhor conduzir as equipes de projeto? Deste modo, o objetivo do presente estudo foi analisar a relação entre a cultura organizacional e o gerenciamento de projetos, utilizando-se para tanto dos modelos como o Competing Values Framework (CVF) e o Organizational Culture Assessment Instrument (OCAI). O emprego dos modelos se justifica por serem os mais utilizados na literatura em gestão organizacional, embora não tenham sido encontrados estudos empíricos que os utilize no contexto brasileiro em gerenciamento de projetos. O método utilizado para obtenção do perfil cultural dominante para o sucesso em gerenciamento de projetos foi survey, na qual o modelo OCAI foi adaptado e destinado para gerentes e membros de equipe de projetos. Observou-se através da análise dos dados, que a cultura de clã foi a que apresentou forte influência para o sucesso no gerenciamento de projetos de acordo com a percepção dos respondentes da survey. É importante ressaltar que não há um perfil de cultura melhor que o outro, portanto, a cultura de gerenciamento de projetos obtida é apenas o diagnóstico de uma cultura organizacional que poderá permitir a obtenção de um desempenho superior, ou seja, sucesso no atendimento de escopo, qualidade, custo e prazo. Discute-se para estudos futuros a importância de se empregar respondentes de diferentes estados do Brasil e ainda de outros países, buscando estabelecer que não existam influências de outros fatores culturais regionais na percepção dos respondentes. / Project management in a systematic manner has become essential for any type of organization, because the markets every day become increasingly competitive, scarce resources and more demanding customers. You can see this with the growing number of companies that are associated with the Project Management Institute (PMI) - reference the best practices in project management - which since late 2013 has more than 400,000 affiliates around the world. This tendency is natural, since companies need to stand out in business in an increasingly dynamic market in order to ensure their survival. According to Gu et al. (2013), a key issue in project management research centers on why some projects are successful while others do not. This question led the researchers to explore potential determinants that can lead to success or failure of a project. For example, the Standish Group International (2009) found an overall rate of failure of the project around 72% in the US. Admittedly, the organizational culture has a strong influence on the success of the projects, but it would be possible to diagnose it for it better lead project teams? Thus, the aim of this study is to analyze the relationship between organizational culture and project management, using for both models like the Competing Values Framework (CVF) and the Organizational Culture Assessment Instrument (OCAI). The use of models is justified because they are the most used in the literature on organizational management, although we did not find empirical studies that use them in the Brazilian context in project management. The method used to obtain the dominant cultural profile for success in project management was the survey, in which the OCAI model was adapted and designed for managers and project team members. It was observed by analyzing the data, the clan culture showed the strong influence for success in project management according to the perception of the survey respondents. Importantly, there is a better culture profile than the other, so the obtained project management culture is only the diagnosis of an organizational culture that may allow obtaining superior performance, ie success in scope of service, quality, cost and schedule. It is argued for further study the importance of employing respondents from different states of Brazil and even from other countries, seeking to establish that there are no influences from other regional cultural factors in the perception of respondents.
238

Análise da cultura organizacional no gerenciamento de projetos / The analysis of organizational culture in project management

Liza Fachin de Carvalho 31 July 2015 (has links)
O gerenciamento de projetos de forma sistematizada vem se tornando essencial para todo tipo de organização, pois os mercados a cada dia tornam-se cada vez mais competitivos, os recursos mais escassos e os clientes muito mais exigentes. É possível observar isso com o número crescente de empresas que se associam ao Project Management Institute (PMI) - referência nas melhores práticas em gerenciamento de projetos - que desde o final de 2013 possui mais de 400.000 empresas associadas em todo o planeta. Tal tendência é natural, visto que as empresas necessitam se destacar nos negócios em um mercado cada vez mais dinâmico a fim de garantir a sua sobrevivência. De acordo com Gu et al. (2013), uma questão-chave na investigação de gerenciamento de projetos gira em torno de porquê alguns projetos são bem sucedidos, enquanto outros não. Esta questão levou os pesquisadores a explorar determinantes potenciais que possam levar ao sucesso ou fracasso de um projeto. Por exemplo, o Standish Group International (2009) encontrou uma taxa global de fracasso do projeto em torno de 72% nos EUA. É certo que a cultura organizacional exerce forte influência no sucesso dos projetos, mas seria possível diagnosticá-la para com isso melhor conduzir as equipes de projeto? Deste modo, o objetivo do presente estudo foi analisar a relação entre a cultura organizacional e o gerenciamento de projetos, utilizando-se para tanto dos modelos como o Competing Values Framework (CVF) e o Organizational Culture Assessment Instrument (OCAI). O emprego dos modelos se justifica por serem os mais utilizados na literatura em gestão organizacional, embora não tenham sido encontrados estudos empíricos que os utilize no contexto brasileiro em gerenciamento de projetos. O método utilizado para obtenção do perfil cultural dominante para o sucesso em gerenciamento de projetos foi survey, na qual o modelo OCAI foi adaptado e destinado para gerentes e membros de equipe de projetos. Observou-se através da análise dos dados, que a cultura de clã foi a que apresentou forte influência para o sucesso no gerenciamento de projetos de acordo com a percepção dos respondentes da survey. É importante ressaltar que não há um perfil de cultura melhor que o outro, portanto, a cultura de gerenciamento de projetos obtida é apenas o diagnóstico de uma cultura organizacional que poderá permitir a obtenção de um desempenho superior, ou seja, sucesso no atendimento de escopo, qualidade, custo e prazo. Discute-se para estudos futuros a importância de se empregar respondentes de diferentes estados do Brasil e ainda de outros países, buscando estabelecer que não existam influências de outros fatores culturais regionais na percepção dos respondentes. / Project management in a systematic manner has become essential for any type of organization, because the markets every day become increasingly competitive, scarce resources and more demanding customers. You can see this with the growing number of companies that are associated with the Project Management Institute (PMI) - reference the best practices in project management - which since late 2013 has more than 400,000 affiliates around the world. This tendency is natural, since companies need to stand out in business in an increasingly dynamic market in order to ensure their survival. According to Gu et al. (2013), a key issue in project management research centers on why some projects are successful while others do not. This question led the researchers to explore potential determinants that can lead to success or failure of a project. For example, the Standish Group International (2009) found an overall rate of failure of the project around 72% in the US. Admittedly, the organizational culture has a strong influence on the success of the projects, but it would be possible to diagnose it for it better lead project teams? Thus, the aim of this study is to analyze the relationship between organizational culture and project management, using for both models like the Competing Values Framework (CVF) and the Organizational Culture Assessment Instrument (OCAI). The use of models is justified because they are the most used in the literature on organizational management, although we did not find empirical studies that use them in the Brazilian context in project management. The method used to obtain the dominant cultural profile for success in project management was the survey, in which the OCAI model was adapted and designed for managers and project team members. It was observed by analyzing the data, the clan culture showed the strong influence for success in project management according to the perception of the survey respondents. Importantly, there is a better culture profile than the other, so the obtained project management culture is only the diagnosis of an organizational culture that may allow obtaining superior performance, ie success in scope of service, quality, cost and schedule. It is argued for further study the importance of employing respondents from different states of Brazil and even from other countries, seeking to establish that there are no influences from other regional cultural factors in the perception of respondents.
239

Práticas operacionais e objetivo de desempenho como influenciadores do comportamento da equipe de projetos

Quaglia, João Luís Corradini 25 June 2014 (has links)
Submitted by João Luís Corradini Quaglia (joaoluiscq@gmail.com) on 2014-08-22T17:13:22Z No. of bitstreams: 1 Dissertação_João Luís Corradini Quaglia_final.pdf: 1105096 bytes, checksum: c1efb596b83ac47821901bd42fe12021 (MD5) / Approved for entry into archive by PAMELA BELTRAN TONSA (pamela.tonsa@fgv.br) on 2014-08-22T17:19:13Z (GMT) No. of bitstreams: 1 Dissertação_João Luís Corradini Quaglia_final.pdf: 1105096 bytes, checksum: c1efb596b83ac47821901bd42fe12021 (MD5) / Made available in DSpace on 2014-08-22T17:48:42Z (GMT). No. of bitstreams: 1 Dissertação_João Luís Corradini Quaglia_final.pdf: 1105096 bytes, checksum: c1efb596b83ac47821901bd42fe12021 (MD5) Previous issue date: 2014-06-25 / Práticas em gestão de projetos (GP), apesar de amplamente difundidas, utilizadas e pesquisadas, não garantem o desempenho (sucesso) do projeto em suas entregas em tempo e custos conforme planejamento. Observa-se que, apesar do uso extensivo de práticas de GP, falhas em relação ao atendimento do cronograma e orçamento são amplamente relatadas. Portanto, este trabalho tem como objetivo principal analisar a influência das práticas de gestão de projetos e do objetivo de desempenho no Comportamento de Cidadania Organizacional (OCB) da equipe de projetos. As dimensões que compuseram o OCB foram: Ajuda, Iniciativa e Compliance. Para testar a relação entre os fatores de práticas de GP (incipientes ou avançados) e objetivo de desempenho (normal ou desafiador) no comportamento da equipe foi utilizada a metodologia do experimento baseado em cenários (SBRP experiment). A amostra contou com 216 alunos de graduação e pós-graduação em administração. O estudo mostrou que a utilização de práticas em gestão de projetos não influenciou o Comportamento de Cidadania Organizacional da equipe de projetos. Entretanto, o objetivo de desempenho nas dimensões de tempo e custos influenciou o Comportamento Cidadão da equipe de projetos. Além desses resultados, a pesquisa mostrou que características pessoais, como experiência em liderar projetos, influenciou a propensão em aumento do comportamento cidadão mediante uma remuneração adicional. Como contribuição adicional este estudo mostra que existem diferenças de resultados nos diferentes grupos de respondentes (alunos de graduação e pós-graduação em administração), conforme encontrado em outros estudos. A utilização do experimento também foi um diferencial metodológico, em virtude de sua ainda baixa utilização em gestão de operações. Finalmente, este estudo também identificou as principais práticas utilizadas na gestão de projetos. / Practices in project management (PM), although widely disseminated, utilized and researched, do not guaranteee the project performance (success) in their deliveries on time and costs as planned. It is observed that, despite the extensive use of PM practices, failures to meet the schedule and budget are widely reported. Thus, this thesis aims to analyze the influence of PM practices and performance targets on the project team's Organizational Citizenship Behavior (OCB). The dimensions that composed OCB were: Help, Initiative and Compliance. To test the relationship between the factors of PM practices (incipient or advanced) and performance targets (ordinary or challenging) in team behavior, the scenario-based role-playing experiment (SBRP experiment) was used, as research methodology. The sample consisted of 216 undergraduate and post graduate students in business administration. The research showed that the use of practices in project management did not influence the project team’s Organizational Citizenship Behavior (OCB). However, performance targets in time and costs influenced the project team’s OCB. In addition to these results, the research showed that personal characteristics, such as experience as project manager, influenced the propensity for increasing OCB based on additional payment. As an additional contribution this study shows that there are differences in the results for different groups of respondents (undergraduate and post graduate students in business administration), as found in other studies. The use of the SBRP experiment was also a methodological advantage, seeing that is has not been widely used in operations management. Finally, this study also identified key practices in project management.
240

Avaliação de equipes de desenvolvimento de software por meio de métricas orientadas a objeto

Madureira, Jamille Silva 12 April 2017 (has links)
Managing a software project is an increasingly complex task as the demands on the final product increase. Competitive environment in software industry and customer needs require software developers to increasingly concern themselves with user satisfaction as a measure of quality of the final product. Therefore, e ective management is required from project design up to software maintenance. The development team is one of the most relevant resources for the success of projects, but it is also where the greatest problems are found. Using metrics is a way to help the project team to achieve its goals and objectives. The goal of this work was to use software metrics to evaluate teams and and their members in order to analyze current performance of developers. To reach this objective, literature review and case study were applied as research instruments. The literature review allowed to discover reference values for the applied metrics in order to establish criteria that served as a basis to evaluate the software involved in the research. After obtaining this knowledge, the case study was applied to two local public companies and undergraduate students from two universities. In total, thirteen softwares were evaluated, four of which were developed in companies and nine by students. A tool was selected to collect software metrics automatically and to provide the result in a format ready to be manipulated. As a result, it was verified that the evaluation of software quality by means of metrics contributes to project management, because it indicates its failures and where it should be improved. Evidence has also been discovered that using collected software metrics is useful in evaluating development team members. By means of the case study, it was discovered that team composition is important to the success of the project, and that training and experience of the members directly a ect quality of software. When analyzing the software through metrics, it was observed that the best performance was achieved by developers with more advanced training and more near experience time. In this sense, software metrics can contribute to follow both the development of the project and the decisions that cause changes in the team. / Gerenciar um projeto de software é uma tarefa cada vez mais complexa à medida que as exigências sobre o produto final aumentam. O ambiente competitivo no mercado de software e as necessidades dos clientes exigem que os desenvolvedores de software tenham preocupação cada vez maior na satisfação do usuário como uma medida da qualidade do produto final. Assim, é preciso um gerenciamento eficaz desde a concepção do projeto até a manutenção do software. A equipe de desenvolvimento é um dos recursos mais relevantes para o êxito dos projetos, mas também é onde frequentemente são encontrados os maiores problemas. O uso de métricas é uma forma de ajudar a equipe do projeto a atingir os seus objetivos e metas. O objetivo deste trabalho foi utilizar métricas de software para avaliar equipes e seus membros, analisando o desempenho atual dos desenvolvedores. Para atingir esse objetivo, nesse trabalho foram aplicados como instrumentos de pesquisa a revisão da literatura e o estudo de caso. A revisão da literatura propiciou descobrir valores referência para as métricas aplicadas, com a finalidade de estabelecer critérios que serviram de base para avaliar os softwares envolvidos na pesquisa. Após obter esses conhecimentos, foi aplicado o estudo de caso em duas empresas públicas locais e em exercícios com alunos de graduação de duas universidades. No total, foram avaliados treze softwares, sendo quatro desenvolvidos nas empresas e nove pelos estudantes. Para a aplicação das métricas, foi selecionada uma ferramenta que as coletasse automaticamente e fornecesse o resultado em um formato pronto para ser manipulado. Como resultado, foi constatado que a avaliação da qualidade do software por meio de métricas contribui na gestão de projetos, pois indica suas falhas e onde deve ser melhorado. Também foram descobertas evidências de que o uso de métricas é útil na avaliação dos membros das equipes de desenvolvimento. Por meio do estudo de caso, descobriu-se que a composição da equipe é importante para o sucesso do projeto, pois a formação e experiência dos membros afetam diretamente a qualidade do software. Ao analisar os softwares por meio de métricas, foi observado que o melhor desempenho foi alcançado por desenvolvedores com capacitação em andamento e tempo mais próximo de experiência . Neste sentido, as métricas de software podem contribuir para acompanhar tanto o desenvolvimento do projeto quanto nas decisões que causam mudanças na equipe.

Page generated in 0.0972 seconds