• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 221
  • 13
  • 7
  • Tagged with
  • 242
  • 242
  • 188
  • 179
  • 50
  • 43
  • 37
  • 37
  • 36
  • 27
  • 27
  • 26
  • 24
  • 24
  • 24
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
201

Diretrizes para o gerenciamento do processo de desenvolvimento de projetos de arquitetura, engenharia e construção de obras públicas: o Caso da Universidade Federal de Viçosa / Guidelines for the process management of the development project process of architectural design, engineering and construction of public constructions: the Federal University of Viçosa`s case

Marques, Nayara Rodrigues 18 February 2013 (has links)
Made available in DSpace on 2015-03-26T13:28:16Z (GMT). No. of bitstreams: 1 texto completo.pdf: 5149553 bytes, checksum: ca9e4618f4e73e9bc80bbd0655e979a7 (MD5) Previous issue date: 2013-02-18 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / For a long time the public sector seemed to be alienated to the concerns of the market in search for efficiency and quality in the design and building product. So much so that a great share of the research on project management in the construction sector is concentrated on the private sector. On the other hand, Federal Government initiative, concerns about the built environment performance, and the influence of public opinion highlights the need for adapting management and administrative standards to the competitive and demanding scenarios. The launch of REUNI (2007) greatly increased the volume of works at UFV, by proposing the implementation of new constructions in Federal Institutions of College Education - IFES - throughout the national territory. It showed existing management problems, which confirms the need to give attention to this issue, in particular within the IFES. In this sense, this research examined the design process management of architecture, engineering and construction - AEC - at UFV from the acceptance of a proposal to the opening phase of the bidding process. The goal was to propose guidelines that lead this process according to the organizational culture and existing institutional strategies. The resources used were bibliographical research, non-structured interviews with those involved in the development of projects in the AEC institution, document analysis, process mapping analysis, and also field research. The methodology used in the data gathering and processing has a qualitative approach, analyzing implicit aspects in the project development and in the interaction among ones involved. From the assessment of the data it was possible to perform an interpretation of the current organizational structure and a mapping of the Institution s AEC design process. The structure studied is in a transition period, and has sought to better organize functions and responsibilities, control and standardization of documents, and also the knowledge related to project management. However, one must implement the operationalization of the transition structure, which should be performed by an agency responsible for managing the entire lifecycle of the project. Therefore, the creation of a unit responsible for hiring and developing architecture, engineering and construction projects in the institution is proposed. This unit needs to be aided by a sector that should capture, transfer, and store information, associated with the adoption of a computerized system. In addition, flowcharts of the development steps of the design process were made, and templates to be produced in each project delivery were identified and provided. It is concluded that the implementation of these guidelines should occur by means of a plan that involves changes in the organizational culture, in the programming stages of implementation, and in the training and qualification of those involved in the process. It is expected that the institution, especially if it is a public one, is receptive to the proposed changes and the implementation must be done gradually. Otherwise, flowcharts and templates offered will not be part of a coordinated process, but only documents to no avail. / Por muito tempo, o setor público pareceu alheio às apreensões do mercado na busca por eficiência e qualidade no projeto e no produto edificação. Uma evidência é que grande parte das pesquisas desenvolvidas em gerenciamento de projetos na área de construção civil é voltada para o setor privado. Por outro lado, iniciativas do Governo Federal, preocupações com o desempenho do ambiente construído e a influência da opinião pública evidenciam a necessidade de adequar os padrões gerenciaisadministrativos ao cenário competitivo e exigente. O lançamento do REUNI (2007), que propôs a implementação de novas construções nas Instituições Federais de Ensino Superior (IFES), em todo o território nacional, aumentou consideravelmente o volume de obras na UFV. O que evidenciou problemas gerenciais já existentes, confirmando a necessidade de se dar atenção a esse tema, em especial, dentro das IFES. Nesse sentido, esta pesquisa analisou a gestão do processo de projeto de arquitetura, engenharia e construção (AEC) na UFV, desde a acolhida de uma proposta, até a fase de abertura do processo licitatório. O objetivo foi propor diretrizes que norteiem esse processo, de acordo com a cultura organizacional e estratégias institucionais existentes. Os meios utilizados foram consulta bibliográfica, entrevistas não estruturadas com os envolvidos no desenvolvimento de projetos de AEC na instituição, análise de documentos, mapeamento dos processos e pesquisa de campo. A metodologia empregada na coleta e tratamento dos dados possui abordagem qualitativa, analisando aspectos implícitos no desenvolvimento do projeto e na interação entre os seus envolvidos. A partir da apreciação dos dados foi possível realizar uma leitura da estrutura organizacional vigente e um mapeamento do processo de projeto de AEC na Instituição. A estrutura estudada encontra-se em um momento de transição, e tem procurado uma melhor organização de funções e responsabilidades, controle e padronização dos documentos, além da busca de conhecimentos relacionados ao gerenciamento de projetos. Entretanto, é preciso realizar a operacionalização da estrutura ainda em transformação, que deve ser realizada por um órgão responsável por gerenciar todo o ciclo de vida do projeto. Propõe-se, portanto, a criação de uma unidade responsável por desenvolver e contratar projetos de arquitetura, engenharia e construção na Instituição. Essa precisa estar auxiliada por um setor que deve captar, transferir e armazenar informações, aliado à adoção de um sistema informatizado. Além disso, foram realizados fluxogramas das etapas de desenvolvimento do processo de projeto, sendo identificados e fornecidos os templates que devem ser produzidos a cada entrega do projeto. Conclui-se que a implantação dessas diretrizes deve ocorrer por meio de um planejamento que envolva mudanças na cultura organizacional, programação das etapas de implantação, além de treinamentos e capacitação dos envolvidos no processo. Espera-se que a Instituição seja receptiva às mudanças propostas e a implementação deve ser realizada de forma gradativa. Especialmente em Instituições públicas, faz-se necessário realizar um trabalho de preparação para essa implantação, sem o qual, os fluxogramas e templates propostos não farão parte de um processo coordenado, sendo apenas documentos sem proveito.
202

Proposta de modelo para o gerenciamento da execução de projetos de arquitetura, engenharia e construção na Universidade Federal de Viçosa / Propose of model for managing the execution of projects in the Architecture, Engineering and Construction at Federal University of Viçosa

Martins, Willian Dias 14 March 2013 (has links)
Made available in DSpace on 2015-03-26T13:28:20Z (GMT). No. of bitstreams: 1 texto completo.pdf: 6597016 bytes, checksum: b0de937ef25396a0f919e8646d1ef943 (MD5) Previous issue date: 2013-03-14 / In human history, projects have been conducted since antiquity. But it was in the 1970s that the practice of Project Management (PM) as a resource aimed at implementing changes associated with organizational strategies, strengthened and established itself as a mode of action for individuals and companies seeking excellence in their endeavors and survival in the market. In Brazil and in the case of PM for the civil construction projects , the practice is most commonly found in the private sector , not observed even in the public sector as an adherence to the real need for implementing management standards . In that sense considering the recent expectations of society regarding the effectiveness of the different spheres of government in setting and achieving goals outreach, is also expected that the Brazilian public sector seeks a realignment on its way to capture, understand and direct efforts and public resources to better meet the demands required by the public sector by society. Under such a scenario, this research sought to explore this opportunity, specifically studying the field of architecture, engineering and construction of a federal university located in the Zona da Mata of Minas Gerais State. The decision to carry out the work with a Public University held reading of reality seen from the implementation of the Program REUNI of Federal Government in 2007 , part of which consisted in the allocation of large infrastructure investments in federal institutions of higher education , and scope for expansion and restructuring of institutions that have joined . As a research methodology, data collected through: literature, previous studies at UFV, semi-structured interviews with those involved in the development of projects in the AEC Institution, document analysis and process mapping. From the data obtained, we carried out a qualitative analysis to determine which aspects and points of reorientation in the area AEC at university. As proposition of this study were developed flowcharts related to processes that span all stages of physical execution of civil projects and also called templates , which serve to provide alignment and standardization , as a form of management. / Na história humana, projetos vêm sendo realizados desde a antiguidade. Mas foi nos anos de 1970 que a prática do Gerenciamento de Projetos (GP), como recurso visando à implantação de mudanças associadas às estratégias organizacionais, fortaleceu e se firmou como um modo de agir para pessoas e empresas em busca de excelência em seus empreendimentos e sobrevivência no mercado. No Brasil e no caso do GP destinado a projetos de construção civil, comumente a prática é mais constatada na iniciativa privada, não se observando ainda no setor público uma aderência quanto à real necessidade de execução de padrões de gerenciamento. Nesse sentido considerando-se a recente expectativa da sociedade quanto a efetividade das diferentes esferas de governos no estabelecimento e cumprimento de metas de alcance social, é esperado também que o setor público brasileiro busque um realinhamento quanto à sua forma de captar, entender e direcionar esforços e recursos públicos para melhor responder as demandas requeridas do setor público pela sociedade. Sob tal cenário, com esta pesquisa procurou- se explorar tal oportunidade, especificamente estudando a área de arquitetura, engenharia e construção de uma universidade federal localizada na Zona da Mata mineira. A opção por realizar o trabalho com uma universidade pública federal decorreu de leitura da realidade observada a partir da implementação do Programa REUNI pelo Governo Federal em 2007, uma parte do qual consistiu na destinação de grandes investimentos em infraestrutura nas instituições federais de ensino superior, tendo por escopo a expansão e a reestruturação das instituições que aderiram ao Programa. Como metodologia de pesquisa, foram utilizados dados coletados por meio de: bibliografia, estudos anteriores da UFV, entrevistas semiestruturadas com os envolvidos no desenvolvimento de projetos de AEC na Instituição, análise de documentos e mapeamento de processos. A partir dos dados obtidos, realizou-se uma análise qualitativa para determinar aspectos e pontos susceptíveis de reorientação na área de AEC na universidade. Como proposição deste estudo, foram desenvolvidos fluxogramas relacionados aos processos que se estendem por todas as fases da execução física de empreendimentos civis e, também, os chamados templates, que servem para dar alinhamento e padronização, como uma forma de gestão da organização.
203

Modelo de estrutura para o trabalho com projetos no âmbito do sistema de gestão de convênios e contratos de repasse - SICONV : um estudo nas Secretarias do Estado de Santa Catarina

Gerent, Camila Prado 02 October 2014 (has links)
Made available in DSpace on 2016-12-01T19:18:39Z (GMT). No. of bitstreams: 1 120340.pdf: 768292 bytes, checksum: 22073dc2df3d9c5adbe3886dec539071 (MD5) Previous issue date: 2014-10-02 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / The System Management Transfer Contracts and Agreements SICONV was created by the Federal Government in 2008 to make possible the online management of the volunteer transfer of resources for the others federative bodies. This kind of transfer became very important for the states and cities budgets. However the use of project management techniques is still recent, making necessary the development of models to structure the project management in the Public Administration. The aim of this dissertation was develop, from the premises that sustain this project, a model of structure for the work with projects from SICONV in the Santa Catarina s State s Offices. This dissertation was characterized as a descriptive research with a qualitative approach. The gathering of data was made from semi structured interviews with project managers of the State s Offices that happened between January and March 2014 and also bibliographic and documental consultation. The diagnostic method used was the subject analyses. The main considerations of the diagnostic was: the lack of structure of the project management, the need of training, the deficiency of planning of the contracts and agreements, the need of control and patronization, the opportunity to improve the monitoring of new opportunities and space to develop the articulation. As a structure model for the projects, contracts and agreements management was proposed the implementation of a project management office in the State s Offices, detailing the basic functions, main competences, stages and implementation steps. Was also suggested the implementation of a project management office in the State level, in order to help the other State s Offices and its project management offices and to promote the project management. / O Sistema de Gestão de Convênios e Contratos de Repasse SICONV foi criado pelo Governo Federal em 2008 para viabilizar o gerenciamento online das transferências voluntárias para os demais entes federativos. Essa forma de transferência tornou-se cada vez mais importante nos orçamentos dos estados e municípios brasileiros. Entretanto a utilização de técnicas de gerenciamento de projetos na gestão pública é ainda recente, tornando latente a necessidade do desenvolvimento de modelos para estruturação da gestão de projetos na Administração Pública. O objetivo desta dissertação foi desenvolver, a partir das premissas sobre as quais se sustenta o projeto apresentado, um modelo de estrutura para o trabalho com projetos no âmbito do SICONV para as Secretárias de Estado de Santa Catarina. O trabalho se caracterizou como uma pesquisa descritiva com abordagem qualitativa. A coleta dos dados foi realizada a partir de entrevistas semiestruturadas com os gestores de projetos e convênios das Secretarias Estaduais realizadas entre janeiro e março, além de consulta bibliográfica e documental. Como metodologia de diagnóstico foi utilizada a análise de conteúdo. Entre as principais considerações do diagnóstico estão: a falta de estrutura para o gerenciamento de projetos, a necessidade de capacitação, a deficiência de planejamento dos convênios e contratos, a carência de controle e padronização, a possibilidade de melhoria do monitoramento de oportunidades e abertura para o avanço na área de articulação. Como modelo para a estruturação da gestão de projetos, convênios e contratos nos órgãos estaduais foi proposta a implementação de escritórios de projetos junto às Secretarias Estaduais Catarinenses, detalhando as funções básicas, principais atribuições, fases e etapas de implantação. Além disso, foi sugerida a implementação de um escritório de projetos a nível estadual, para auxiliar as demais secretarias e seus escritórios de projetos e fomentar o gerenciamento de projetos.
204

Um ambiente para simulação da gestão de projetos de software

Leite, Danilo Rangel Arruda 31 August 2013 (has links)
Made available in DSpace on 2015-05-14T12:36:45Z (GMT). No. of bitstreams: 1 arquivototal.pdf: 2102956 bytes, checksum: a67efcefab23e707c9f27fc24882dafb (MD5) Previous issue date: 2013-08-31 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Inadequate implementation of management techniques in software projects often leads to failure and possible cancellation of a project. One possible cause is the lack of a better understanding of its key practices. The use of simulators in training can have a high power motivation may present benefits compared to other traditional forms of learning. This paper aims to design and development of an educational game for teaching project management software in undergraduate courses in computing. As validation of the proposal, the game was submitted to a group of undergraduate course in computer science, having complied with the initial expectation of aid in teaching-learning of the discipline. / A aplicação inadequada de técnicas de gerenciamento em projetos de software muitas vezes acarreta no fracasso e possível cancelamento de um projeto. Uma das possíveis causas é a falta de um melhor entendimento das suas práticas essenciais. A utilização de simuladores em treinamento pode ter um alto poder de motivação podendo apresentar benefícios se comparado a outras formas tradicionais de aprendizado. Este trabalho tem por objetivo a elaboração e desenvolvimento de um jogo educacional para o ensino de gerenciamento de projetos de software em cursos de graduação na área de computação. Como validação da proposta, o jogo foi submetido a um grupo de alunos de graduação no curso de ciência da computação, tendo cumprido com a expectativa inicial de auxiliar no ensino-aprendizado da disciplina.
205

Proposta de um método probabilístico de estimativa de custos de construção. / Purpose of a probabilistic method of construction cost estimate.

Fabrízio César Reis Fonseca 19 December 2013 (has links)
Projetos de construção são caracterizados pela escala, complexidade e seus riscos. Não é incomum encontrar planejamento e definição de escopo incompletos o que leva a aumento de custos e prazos. O objetivo desse trabalho é descrever um método de avaliação de riscos de forma a aumentar a previsibilidade da estimativa de custos do empreendimento. Para isso foram utilizados conceitos de gerenciamento de projetos, de simulação e de analise de riscos descritos na literatura para a constituição de um método de análise de riscos em estimativa de custos. A aplicação do método proposto em comparação com o método tradicional traz vantagens no que diz respeito à abrangência da análise. Enquanto pelo método tradicional a análise do empreendimento se faz por meio de suas tarefas, o método proposto analisa de forma distinta o planejamento do empreendimento nas suas três dimensões fundamentais: escopo, prazo e custo. / Construction projects are characterized by their scale, complexity, and their common risks. Its not uncommon to find incomplete project planning and scope definition which often leads to cost and schedule overruns. The objective of this work is to describe a method of risk assessment in order to increase the accuracy of the project cost estimate. To meet this objective, its been utilized project management, simulation and risk analysis concepts to build a cost estimate risk analysis method. The method proposed in this work has advantages in terms of the analysis broadness in comparison with the traditional method. By using the traditional method, the project analysis is oriented by work on the other hand by using the proposed method, the project is analyzed distinctively in its three fundamental dimensions: scope, cost and schedule.
206

Desenvolvimento de veículos comerciais no Brasil: um estudo sobre parâmetros de sucesso em gerenciamento de projetos de produtos / Commercial vehicles development in Brazil: a study about success parameters in products projects management

Paschoal Federico Neto 20 September 2016 (has links)
Esta dissertação tem como objetivo pesquisar a importância de parâmetros de sucesso no processo de gerenciamento do desenvolvimento de veículos comerciais em empresas estabelecidas no Brasil, quarto maior mercado mundial. O referencial teórico tem como base os cinco critérios de avaliação de resultados de projetos descritos no Modelo Diamante de Shenhar e Dvir e os dez fatores críticos de sucesso (FCS) que formam o Modelo de Processo de Implantação de Projetos (PIP) de Pinto e Slevin. Para isto, foi feito um estudo de caso em uma grande montadora tradicional, por meio de um questionário dirigido a participantes de gerenciamento de projetos de produtos. A pesquisa revelou resultados interessantes tais como: (i) o perfil do participante de projetos de veículos comerciais, principalmente engenheiros com grande experiência profissional; (ii) as características principais dos produtos desenvolvidos, como inovação, tecnologia, complexidade e prazo restrito; (iii) a comparação de priorização dos critérios de sucesso segundo as opiniões dos entrevistados e segundo o que pensam ser o que sua empresa adota e (iv) a priorização dos FCS segundo suas próprias opiniões. Nestes dois últimos resultados, obtiveram-se achados que, por um lado, confirmam o referencial teórico e, por outro lado, mostram algumas diferenças como (i) o paradoxo de alguns altos executivos considerarem que a empresa adota critérios diferentes da sua própria priorização e (ii) a relação de importância dos FCS com o perfi do entrevistado e suas principais necessidades próprias para o desenvolvimento de projetos. Por fim, esta pesquisa traz colaborações para a academia, para as empresas e para a sociedade por meio da proposta do Mestrado Profissional em Empreendedorismo da Faculdade de Economia, Administração e Contabilidade da Universidade de São Paulo (FEA-USP), que busca temas de pesquisa baseado no universo profissional, embasa os conceitos teóricos com a metodologia acadêmica e aplica a pesquisa novamente no campo profissional. Isto aproxima a Universidade ao mundo empresarial e colabora com uma melhora sustentável de produtividade da sociedade brasileira / This dissertation aims to research the importance of success parameters in the management process of commercial vehicles\' development in companies established in Brazil, world\'s fourth largest market. The theoretical framework was based on five criteria of project evaluation results, described in the Diamond Model designed by Shenhar and Dvir, and in ten critical success factors (CSF) that integrate the Projects Implementation Process (PIP) modeled by Pinto and Slevin. For this purpose, a case study in a large traditional automaker was done through a questionnaire addressed to participants of product management projects. This research showed interesting results such as: (i) the profile of commercial vehicles projects\' participants, which are mainly engineers with large professional experience; (ii) the developed products main characteristics, as innovation, technology, complexity and limited term; (iii) the comparison of success criteria prioritization according to the their own opinions and what they think their company adopts and (iv) the prioritization of CSF according to their own opinions. In the latter two results, research has gathered interesting findings that, on one hand, confirm the theoretical framework and, on the other hand, show some differences as (i) the paradox of some senior executives who consider that the company adopts different criteria than their own prioritization and (ii) the importance of CSF relationship with the respondents\' profiles and their own main needs for development projects. Finally, this research brings contributions to academy, to business and to society through the proposal of the Professional Master\'s Degree in Entrepreneurship of the School of Economics, Business and Accounting of the University of São Paulo (FEA-USP), which seeks to research themes based on the professional world, underlies theoretical concepts with academic methodology and applies research findings again into the professional field. This brings the University closer to the business world and collaborates with a sustainable improvement of Brazilian society\'s productivity.
207

Avaliação de fatores críticos de sucesso no gerenciamento de projetos colaborativos universidade-empresa / Evaluation of critical success factors in the management of university-enterprise collaborative projects

Eduardo Vicente Albertin 07 November 2008 (has links)
Cresce o número de projetos de pesquisas tecnológicas entre universidades e empresas e, como resultado, pesquisadores procuram identificar fatores que são fundamentais para o sucesso desse tipo de projeto, denominados Fatores Críticos de Sucesso (FCSs). Existem estudos consolidados na literatura por meio de pesquisa do tipo levantamento, porém, poucos empregaram métodos de pesquisa em profundidade. Optou-se, então, por verificá-los empregando-se a observação participante como estratégia de pesquisa. Empreendeu-se uma análise empírica para identificar FCSs em projetos entre o Grupo de Engenharia Integrada e Integração (EI2), da Universidade de São Paulo, e uma empresa desenvolvedora de software. O autor desse estudo atuou como participante-observador e nele foram verificadas as presenças e avaliadas as influências dos potenciais FCSs sobre os resultados dos projetos. Os resultados foram avaliados a partir da percepção da equipe e dos coordenadores dos projetos (entrevistas) e do participante-observador (diário de campo), complementando-os com a análise de documentos. As principais conclusões foram: os fatores relacionados às práticas de gestão foram mais críticos para o sucesso dos projetos do que os relacionados ao contexto da parceria U-E; a necessidade de desenvolverem-se escalas e métricas mais sofisticadas para avaliar este tipo de colaboração, frente às encontradas nos estudos clássicos; e a necessidade de desenvolvimento de pesquisas para melhorar a definição da visão e dos objetivos de projetos. Portanto, o trabalho indica que nem todos os FCSs identificados na literatura são realmente críticos e aponta vários aspectos para o aprofundamento das pesquisas na área. / The number of technologic research projects involving universities and enterprises is growing rapidly, and as a result researchers are increasingly seeking to identify essential factors that are critical to their success, known as Critical Success Factors (CSFs). There are well established survey-type studies on this matter in the literature, but few of them employed in-depth investigation methods. Therefore, in order to contribute to the knowledge on CSFs this study makes use of participant observation as a research method. To this end an empirical analysis was carried out to identify CSFs in projects between the Integrated Engineering and Integration Group from São Paulo University and a software enterprise. The author of this study, acting as a participant observer, verified the presence of potential CSFs and evaluated their influence on the outcomes of the projects. The research results derived from interviews with the project coordinators and team and field notes, which were complemented by the analysis of documents. The main conclusions were: the factors related to management practices were more critical to success than those related to the context of university-enterprise partnership; there is a need for the development of more sophisticated scales and metrics to evaluate this type of collaboration as compared to the ones found in the seminal studies; and it is important to carry out further investigation to better define the vision and objectives of projects. Therefore, this study suggests that not all CSFs found in the literature may be considered as truly critical and points to several aspects that can lead to in-depth research in this field.
208

Avaliação de modelos e proposta de método para representação da visão do produto na gestão ágil de projetos / Evaluation of models and proposal of method for representing the product vision in agile project management

João Luís Guilherme Benassi 15 June 2009 (has links)
A visão do produto sempre foi identificada como fator fundamental para o sucesso de projetos de desenvolvimento. O surgimento da abordagem denominada gerenciamento ágil de projetos, veio recuperar a importância do tema. Os autores da área propõem práticas e modelos para a criação e representação da visão do produto, e sugerem que defini-la seria uma forma de simplificar a etapa de iniciação. Ao analisá-los, percebe-se, porém, que são melhor adaptados ao desenvolvimento de software, não diferem significativamente da prática de GP tradicional e que os autores não consideraram o uso dos modelos de representação de produtos, presentes na literatura de gestão de desenvolvimento de produto, para concebê-los. O presente trabalho apresenta uma compilação dos modelos de representação existentes e, como objetivo principal, propõe um método para apoiar a criação e registro da visão do produto no gerenciamento ágil de projetos. Foram analisadas as áreas de gestão de projetos, planejamento estratégico, gerenciamento ágil de projetos, gestão de desenvolvimento de produtos e metodologia de projeto, de forma a considerar a contribuição da literatura de desenvolvimento de produtos. O pesquisador propôs um método, (procedimento) inicial, por meio da síntese da literatura, avaliou-o e aprimorou-o por meio de tentativas sucessivas de uso em exemplos teóricos. Uma vez estabelecido, procedeu-se a uma primeira verificação em caso de aplicação em laboratório, configurando-se como pesquisa de campo do tipo participante observador. Por fim, apresenta-se o resultado da aplicação do método, relatando sua viabilidade quando comparada a forma tradicional de declaração da visão. Essa demonstração indica que o método proposto conseguiu unir potencialidades dos modelos de representação pesquisados e que ainda abrange aspectos positivos como simplificação e desburocratização do processo. Apontam-se também necessidades de melhoria e temas para pesquisas futuras. / The product vision has always been considered as critical factor to product development projects. The emergence of the approach known as agile project management came to recover the importance of this subject. The authors from this field propose practices and models for creating an represent the product vision and suggest that this description would be a way to simplify the initiation phase. The analysis of the agile vision methods demonstrates that they are better suited to software development, do not differ significantly from the traditional practice of PM and the authors did not consider the use of models for representation of products, presented at the product develop management literature. The text presents a compilation of existing models of representation and, as main objective, it proposes a method to support the creation and registration of the product vision in the agile project management. We analyzed project management, strategic planning, agile project management, product development and design methodology fields in order to consider the contribution of literature from the product development. The proposed method (procedure) was developed by the literature synthesis and was improved by successive attempts, using theoretical examples and action research practices. The method was evaluated from a case study perspective, a first check, using an application in a laboratory case and the participant as observer research method. Finally, the document brings results from the method application, reporting its when compared to traditional way of the vision statement. The results indicates that the proposed method has potential of uniting models representation search and still covers the positive aspects as simplifying the process and diminished bureaucracy. It also highlights needs for improvement and issues for future research.
209

MMPE-SI/TI (Gov) - Modelo de maturidade para planejamento estratégico de SI/TI direcionado às organizações governamentais brasileiras baseado em melhores práticas

Teixeira Filho, José Gilson de Almeida 31 January 2010 (has links)
Made available in DSpace on 2014-06-12T15:51:50Z (GMT). No. of bitstreams: 3 arquivo2809_1.pdf: 9969504 bytes, checksum: 2b17e62ec44c1f3bb4254a9a40680855 (MD5) arquivo2809_2.pdf: 1438597 bytes, checksum: 20290557fffcd7927d50b7a0c3efc1ee (MD5) license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5) Previous issue date: 2010 / O número de organizações, pequenas, médias ou grandes, públicas ou privadas que desenvolvem um processo de planejamento estratégico de SI/TI (Sistemas de Informação/Tecnologia da Informação) vem aumentando gradativamente no Brasil. À medida que cresce a procura por novas metodologias, modelos e processos que auxiliem essas organizações a compreenderem os benefícios da utilização destes mecanismos para melhoria dos seus negócios, torna-se necessário avaliar o nível de maturidade dos seus processos organizacionais, principalmente aqueles relacionados a SI/TI. Tendo em vista o dinamismo e a complexidade dos negócios, cada dia mais, as organizações estão buscando utilizar SI/TI mais robustos que facilitem o planejamento, controle e execução dos seus projetos para permitir transformar as estratégias em ações que possam aumentar as possibilidades de sucesso desses projetos. Esta tese propõe um modelo para avaliar o nível de maturidade do planejamento estratégico de SI/TI de organizações governamentais brasileiras, denominado MMPE-SI/TI (Gov). Ele foi definido em conformidade com os principais modelos e normas nacionais e internacionais utilizados para definição e avaliação de processos e é formado por um modelo de referência (MR), um método de avaliação (MA) e um banco de melhores práticas (BMP) definido para auxiliar no desenvolvimento do plano de melhorias da organização. A definição do modelo envolveu várias etapas, entre elas: revisão sistemática, realização de estudos de caso exploratórios, organização de um conjunto de melhores práticas, avaliação com especialistas da área de SI/TI, análise e interpretação dos dados e recomendação de melhorias. O modelo MMPE-SI/TI (Gov) possui 5 níveis de maturidade, 6 níveis de capacidade, 16 processos e 124 melhores práticas para planejamento estratégico de SI/TI direcionadas às organizações governamentais brasileiras
210

Avaliando o planejamento estratégico de SI / TI organizações públicas do governo do estado de Pernambuco utilizando o MMPE SI / TI (GOV)

ARAUJO, Verlaynne Kelley da Hora Rocha 28 August 2013 (has links)
Submitted by Fabio Sobreira Campos da Costa (fabio.sobreira@ufpe.br) on 2016-07-26T13:40:41Z No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) DissertacaoVerlaynneAraujoCIn.pdf: 5234774 bytes, checksum: a53ffab0c9cb8150ad47d3085bb4ffbd (MD5) / Made available in DSpace on 2016-07-26T13:40:41Z (GMT). No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) DissertacaoVerlaynneAraujoCIn.pdf: 5234774 bytes, checksum: a53ffab0c9cb8150ad47d3085bb4ffbd (MD5) Previous issue date: 2013-08-28 / A elaboração de um planejamento estratégico de Sistema de Informação e Tecnologia da Informação (PE SI/TI) é essencial para que seja possível identificar e alocar de forma correta os recursos da área de TI de acordo com as prioridades institucionais e com os resultados esperados. Devendo ser portanto, uma atividade sistemática entendida, apoiada e aprovada pela alta direção. O Governo Federal identificou, através de um levantamento, que vários documentos apresentados como sendo PE SI/TI, eram apenas, cartas de intenção internas à área de TI e/ou projetos do que poderia vir a ser um plano. Tal cenário sugere que parte das organizações governamentais ou não possuem, ou desconhecem a maturidade dos processos de PE SI/TI que elaboram. Assim sendo, foi criado o Modelo de Maturidade de Planejamento Estratégico de SI/TI - MMPE SI/TI (Gov). O modelo permite que as organizações governamentais descubram o quão maduro estão seus processos de PE SI/TI, saibam como elas se encontram com relação às outras, e ainda pode ser utilizado como instrumento para avaliar a eficiência do uso de SI/TI para o alcance dos objetivos do negócio. Para isso, possui um Modelo de Referência (MR), um Método de Avaliação (MA) e um Banco de Melhores Práticas (BMP). Apesar das validações realizadas por especialistas, o modelo não foi utilizado em organizações. Nesse sentido, este trabalho realiza avaliações do PE SI/TI em organizações públicas do governo de Pernambuco, utilizando o MA do MMEP SI/TI (Gov) a fim de identificar as oportunidades de melhoria para o MA e MR deste modelo. Acredita-se que, semelhantemente ao cenário encontrado no Governo Federal, as Organizações Públicas do Estado de Pernambuco desconhecem a maturidade dos processos de seus PE SI/TI e que ganhos podem ser obtidos a partir da realização dessas avaliações. Nesse contexto, este trabalho apresenta: (i) um levantamento de alto nível sobre a maturidade dos planejamentos estratégicos de TI em organizações públicas do Governo do Estado de Pernambuco segundo o MMPE SI/TI(Gov), (ii) os resultados obtidos em duas avaliações realizadas seguindo o MA e (iii) um levantamento das oportunidades de melhoria no MA e MR do MMPE SI/TI (Gov). Para atingi-lo, utiliza-se uma abordagem de natureza hipotéticodedutiva, métodos e procedimentos qualitativos, realizando revisão bibliográfica e estudo de caso descritivo, único e incorporado. / The preparation of an Information System and Information Technology Strategic Planning (IS/IT SP) is essential for identifying and correctly allocating resources of IT in accordance to institutional priorities and expected results. Therefore, such activity should be systematically understood, supported and approved by CEO. The Federal Government has identified through a study that several documents submitted as IS/IT SP were only letters of intent to the internal IT department and/or projects that could become a plan. Such scenario suggests that part of the governmental organizations either doesn't have a IS/IT SP or are unaware of the maturity of IS/IT SP process they prepare. Thus, it was created the IS/IT Maturity Model of Strategic Planning - IS/IT MMSP (Gov). The model allows the government organizations to find out how mature your IS/IT SP process is, to know how it is with respect to others and it can even be used as a tool to evaluate the efficiency of the use of SI/IT to achieve the business objectives. For this, it has a Reference Model (RM), an Assessment Method (AM) and a Best Practices Database (BPD). Despite the validation performed by experts, the model was not used in organizations. In this sense, this work carries out a IS/IT SP assessment in public governmental organizations in the state of Pernambuco, using the AM of IS/IT MMSP (Gov) to identify opportunities for improvement of the AM and RM of this model. It is believed that, similar to the scenario found in the Federal Government, the public organizations of the state of Pernambuco are unaware of the maturity of their IS/IT SP process and that some gains can be obtained from these evaluations. In this context, this paper presents: (i) a high level survey about the maturity of IT strategic planning in public governmental organizations of the state of Pernambuco concerned to IS/IT MMSP (Gov), (ii) the results of two evaluations following the AM and (iii) a survey about the improvement opportunities for the AM and RM of SI/IT MMSP (Gov). To reach the objectives, it was used an approach of hypothetical-deductive nature, qualitative methods and procedures as well as the conduction of literature review and descriptive case study, single and incorporated.

Page generated in 0.1214 seconds