• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 192
  • 13
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 208
  • 208
  • 100
  • 63
  • 51
  • 39
  • 39
  • 38
  • 37
  • 34
  • 34
  • 30
  • 27
  • 25
  • 24
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
161

Modelo de controladoria para as empresas do ramo de construção civil, subsetor edificações sob a ótica da gestão econômica / The model for controllership in construction companies, specifically the buildings sub-sector

Garcia, Editinete André da Rocha 28 January 2003 (has links)
Este estudo, desenvolvido a partir da premissa de que o modelo de gestão econômica - Gecon é o modelo de atuação empresarial mais apropriado para desenvolvimento e implantação de uma Controladoria voltada à otimização do resultado econômico da organização, objetiva identificar através da utilização do conhecimento da teoria geral de sistemas, o modelo de Controladoria para as empresas de construção civil, subsetor edificações. Para tanto, é apresentada a fundamentação teórica necessária para o suporte ao modelo. São discutidos aspectos tais como; o modelo Gecon, a eficácia empresarial, o resultado como medida de eficácia e a Controladoria considerada sob dois vértices: ramo de conhecimento e área de responsabilidade. Através do estudo da empresa de construção civil, subsetor edificações, são apresentados aspectos em relação a sua evolução e antecedentes histórico, caracterizando e identificando suas particularidades, bem como, suas principais transações. O modelo proposto considera a Controladoria como uma área de responsabilidade, com missão definida e composta por todos os subsistemas do sistema empresa, que interagem para consecução de seus objetivos. Neste aspecto, é responsável por desenvolver ações visando a otimização do resultado econômico da organização, a minimização de riscos e incertezas e salvaguarda patrimonial. O estudo apresenta, portanto, a visão de cada subsistema que compõe a Controladoria de forma que a empresa, ao identificar a necessidade de implantação desta área, identifique suas características primordiais. / This study was undertaken according to the premise that the economic management model – GECON is the most appropriate business practice model for development and implementation of Controllership geared towards optimization of economic results in an organization. The research seeks to identify, by using knowledge of the General Systems Theory, the model for Controllership in construction companies, specifically the buildings sub-sector. For that purpose, the necessary theoretical background is presented in support of the model. Aspects such as the GECON model, business effectiveness, results as a measure of effectiveness and Controllership are seen from two angles: knowledge and responsibility area. By studying the construction company, buildings sub-sector, aspects related to evolution and historical background of these companies are explored, characterizing and identifying their peculiarities, as well as their main transactions. The model considers Controllership as an area of responsibility, with a clearly-defined mission, composed of all the subsystems of the business system, which interact in order to attain their objectives. In this regard, it is responsible for developing actions seeking optimization of the organization’s economic results, minimization of risks and uncertainties and preservation of assets. The study therefore presents the view of each subsystem comprising Controllership in order that the company may identify its basic characteristics and the need for its implementation.
162

Sistemática para seleção de fornecedores na indústria da construção civil

Denicol, Juliano January 2014 (has links)
Atualmente, o ambiente industrial é caracterizado pela intensa globalização, competição entre cadeias de suprimentos, manutenção das competências centrais e terceirização dos demais serviços. Desta forma, a gestão das relações entre os agentes independentes da cadeia de suprimentos e do processo de aquisição são fatores potenciais para o aumento da competitividade empresarial. No contexto da construção civil, a seleção adequada dos parceiros de negócios é um elemento fundamental para o sucesso dos projetos, uma vez que uma grande proporção das atividades podem ser sub-contratadas e possuem relação de precedência entre si. Os suprimentos representam um percentual significativo dos custos das construções, 60%, dado que demonstra o potencial de lucratividade passível de ser atingida ao estruturar o processo de seleção de fornecedores na construção civil. Seleções baseadas no preço prejudicam os sub-empreiteiros e fornecedores mais responsáveis na concorrência, contribuindo para a queda do nível de desempenho e redução da eficiência global do projeto, uma vez que as ineficiências são somadas ao longo da cadeia. Através da estruturação do processo de seleção de fornecedores, é possível mitigar os riscos de suprimentos oriundos de falhas destes contratados ao longo da relação. O objetivo deste trabalho foi desenvolver uma sistemática para seleção de fornecedores críticos, considerando diversos critérios além do preço, entre qualitativos e quantitativos. A abordagem visa também, a eliminação da subjetividade do processo e a extração do melhor fornecedor de forma objetiva. Para tanto, foram definidas dimensões competitivas para avaliar os fornecedores e posteriormente foram utilizados dois métodos quantitativos, Teoria dos Conjuntos Difusos (TCD) e Análise de Componentes Principais (ACP), para selecionar o melhor fornecedor dentre as alternativas, com base na avaliação de múltiplos agentes. / Currently, the industrial environment is characterized by intense globalization, competition between supply chains, maintenance of core competencies and outsourcing of other services. Thus, the management of relationships between independent agents of the supply chain and the procurement process are potential factors for increasing enterprise competitiveness. In the construction context, the proper selection of business partners is a key element for the success of projects, since a large proportion of the activities can be sub-contracted and have precedence relationship between them. Supplies represent a significant percentage of the cost of buildings, 60%, information that demonstrates the potential of profitability that can be achieved by structuring the process of supplier selection in the construction industry. Selection based on price take off from competition the sub-contractors and suppliers more responsible, contributing to the decline in the level of performance and reduction in the overall project efficiency, since inefficiencies are summed through the chain. By structuring the supplier selection process, it is possible to mitigate the supply risk arising from failures of these suppliers during the relationship. The objective of this study was to develop a systematic for selection of critical suppliers, considering several criteria other than price, among qualitative and quantitative. The approach also aims at eliminating the subjectivity of the process and the extraction of the best supplier in an objective way. In order to that, competitive dimensions were set to evaluate vendors and subsequently two quantitative methods, Fuzzy Sets Theory (FST) and Principal Component Analysis (PCA) were used to select the best supplier among the alternatives based on multiple agents evaluation.
163

Aplicação de conceitos BIM à instrumentação de estruturas

Ferreira, Bruno Filipe Vieira January 2011 (has links)
Tese de mestrado integrado. Engenharia Civil. Faculdade de Engenharia. Universidade do Porto. 2011
164

Desenvolvimento de um sistema de gestão para acompanhamento ambiental de obras em pequenas e médias empresas de construção

Silva, Telma Paula Oliveira January 2013 (has links)
Estágio realizado na Tri-Plano, Engenharia e Construção, Lda. - e orientado pelo Eng. António Esteves da Silva / Tese de mestrado integrado. Engenharia do Ambiente. Faculdade de Engenharia. Universidade do Porto. 2013
165

Verificação dos parâmetros de controle de agregados reciclados de resíduos de construção e demolição para utilização em concreto / Parameters control verification of recycled aggregates from construction and demolition waste to concrete use

Lovato, Patrícia Silveira January 2007 (has links)
A construção civil consome grande quantidade de recursos naturais, energia e gera 50% do total de resíduos produzidos no mundo. A reciclagem dos resíduos de construção e demolição é uma prática de grande importância para o ambiente, uma vez que ela constitui uma alternativa para reduzir o impacto ambiental causado pelo setor. Nos diversos estudos já desenvolvidos quanto à utilização dos resíduos de construção e demolição em concreto não se observa um consenso com relação ao desempenho destes concretos. Uma das causas dessa diversidade de resultados é a grande variabilidade na composição dos agregados reciclados. Controlando a variabilidade se tornará mais fácil garantir que os concretos produzidos com esses agregados tenham bom desempenho e durabilidade. Assim, este trabalho foi desenvolvido com o objetivo de determinar um parâmetro de controle da variabilidade dos agregados reciclados, comparando a classificação pela composição e pela separação densitária, para utilização em dosagens de concretos. Foram realizadas caracterizações dos agregados reciclados obtidos a partir do beneficiamento de resíduos de construção e demolição coletados em três locais diferentes. Para produção dos concretos foram consideradas três relações a/c (0,50; 0,60 e 0,70) e três níveis de substituição tanto do agregado miúdo reciclado, quanto do agregado graúdo reciclado (0%, 50%, 100%), sendo que as combinações executadas foram definidas através de um projeto estatístico. As propriedades avaliadas foram resistência à compressão, resistência à tração por compressão diametral, módulo de deformação e absorção de água por imersão. A partir dos resultados obtidos foram elaborados modelos matemáticos para cada uma das propriedades avaliadas, e foram estabelecidas as relações entre os resultados de cada coleta e as características dos agregados reciclados de cada uma delas. Concluiu-se que o comportamento do concreto com agregados reciclados não pode ser previsto através da composição ou da densidade dos agregados, uma vez que ambos os aspectos e também outras características dos agregados influenciam na qualidade dos concretos, dependendo da propriedade considerada. / Civil construction consumes a large quantity of natural resources, energy, and it generates 50% of total wastes produced in the world. The recycling of construction and demolition wastes it is an important practice for the environment, being a good way to reduce the environmental impact caused by the sector. In many researches already developed about the use of the construction and demoliton wastes in concrete, there is a diversity of results. One cause of this is the great variability in the composition of recycled aggregates. The control of aggregates variability will become easier to control the properties of concretes with recycled aggregates. Thus, this work was developed with the purpose to find a control parameter of the variability of these aggregates, comparing the analysis by composition and heavy media separation, to use in concretes mix design. Characterizations of recycled aggregates obtained from construction and demolition wastes collected at three differente places were accomplished. Three water/cement ratio – 0,50; 0,60; and 0,70 – and three substitution proportion from fine and coarse recycled aggregate – 0%, 50%, 100% – were considered to produce concrete mixtures. The combinations executed were defined by a statistical project. The properties evaluated were compressive strength, split tensile strength, modulus of elasticity and water absorption. Mathematical models were obtained to estimate the properties evaluated. Relations between the results from each collection and the properties of the recycled aggregates were established. In conclusion, the concrete with recycled aggregates behavior can not be predict through composition or density of aggregates. Both aspects and other aggregates characteristcs have influenced on the quality of concretes, depending of the property evaluated.
166

Planejamento e controle do processo de projeto de sistemas pré-fabricados em ambientes de engineer-to-order / Design planning and control for engineer-to-order prefabricated building systems

Wesz, Josana Gabriele Bolzan January 2013 (has links)
O processo de projeto tem importante papel na geração de valor, pois define o produto de forma que este atenda às necessidades do cliente. No entanto, o planejamento e controle deste processo na indústria da construção são, em geral, informais e ineficazes. Estes problemas tendem a ser mais graves em empreendimentos rápidos e complexos, quando envolvem sistemas pré-fabricados, normalmente caracterizados como sistemas do tipo engineer-to-order (ETO). Visando a aprimorar o processo de projeto, muitas empresas tem implementado conceitos e princípios da produção enxuta, podendo ser destacado o uso do Sistema Last Planner (SLP), que contribui para proteger a produção da variabilidade do processo, assim como para eliminá-la. O presente estudo tem como objetivo propor um modelo de planejamento e controle de projetos em empresas que projetam, fabricam e montam sistemas pré-fabricados, com características de sistema de produção do tipo ETO. Foi realizado um estudo empírico no setor de projetos de empresa de sistemas construtivos metálicos, com sede na Região Sul do Brasil. Inicialmente, o SLP foi implementado em duas equipes de projeto, sendo refinado e adaptado ao contexto da empresa. Depois, o SLP refinado foi implementado em outras quatro equipes. Como principais contribuições destacam-se o papel do modelo proposto no aumento da transparência de processos e na melhoria da confiabilidade deste processo, possibilitando o planejamento integrado entre as equipes de projeto. O modelo pode ser aplicado a sistemas pré-fabricados do tipo ETO, não somente no contexto de sistemas construtivos metálicos, mas em equipes de projetos que desenvolvem múltiplos projetos simultaneamente. / The design process plays an important role in value generation, since it defines the products that must meet customer needs. However, design planning and control in the construction industry are often informal and ineffective. This problem tends to bring serious consequences, especially in fast and complex projects that involve prefabricated building systems, normally defined as engineer-to-order (ETO) environments. In order to improve the design process, several companies have implemented lean production concepts and principles, and especially the Last Planner System (LPS) for production control, which shields production from upstream variability as well as contributes for reducing it. The aim of this study is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated ETO building systems. An empirical study was carried out is the design department of a steel fabricator based in Southern Brazil. Initially, LPS was implemented in two design teams, being refined and adapted to the context of the company. Then, the existing LPS was implemented in four other design teams. The main contributions of this investigation is the role of the proposed model in increasing process transparency and improving the reliability of the design process, making it possible to produce an integrated plan for the whole design department. This model is not limited to steel fabricators, but is applicable to any ETO prefabricated building systems, in which design teams carry out multiple design projects simultaneously.
167

Dos canteiros ao sindicato: a formação política das lideranças da construção civil sob a égide do sindicalismo classista / From construction sites to syndicate: the political formation of construction sectorś leaders under the aegis of classist syndicalism

FARIAS, Paula Emanuela Lima de January 2013 (has links)
FARIAS, Paula Emanuela Lima de. Dos canteiros ao sindicato: a formação política das lideranças da construção civil sob a égide do sindicalismo classista. 2013. 96f. – Dissertação (Mestrado) – Universidade Federal do Ceará, Programa de Pós-graduação em Educação Brasileira, Fortaleza (CE), 2013. / Submitted by Márcia Araújo (marcia_m_bezerra@yahoo.com.br) on 2014-04-28T13:14:27Z No. of bitstreams: 1 2013-DIS-PELFARIAS.pdf: 1032711 bytes, checksum: e6524c2b6d0017536f463829e883aca4 (MD5) / Approved for entry into archive by Márcia Araújo(marcia_m_bezerra@yahoo.com.br) on 2014-04-28T14:26:14Z (GMT) No. of bitstreams: 1 2013-DIS-PELFARIAS.pdf: 1032711 bytes, checksum: e6524c2b6d0017536f463829e883aca4 (MD5) / Made available in DSpace on 2014-04-28T14:26:14Z (GMT). No. of bitstreams: 1 2013-DIS-PELFARIAS.pdf: 1032711 bytes, checksum: e6524c2b6d0017536f463829e883aca4 (MD5) Previous issue date: 2013 / The object of this research is to examine how the Union of Construction Workers of Fortaleza – STICCF – built a struggle workers history producing an ideological fortress and class consciousness that for many years had seemed the impossible sun of a lost summer night. In the research we present as political education appears as part of this ideological fortress of the proletariat and this revolutionary activity.We examine the problem bringing out observations, surveys and analyzes of the most fruitful relations between social struggle and the complex thematic about class consciousness and ideology. This is an issue that certainly inspires controversy, and could not be any other way. It seems fruitful the election of a clear perspective. With this in mind, we anticipate that are inspired by the Marx and the Marxist method with the strong conviction that, in theory, as in life, it is necessary make choices and set guidelines. Briefly, this is how the questions are dealt here, although we are aware that it is a long and complex discussion on which cannot imagine that already have at hand all the answers.Effectively, we have some hypotheses and they constitute our starting point. In that sense, we present as search results: 1) the rise and reorganization processes of the union movement, in which the STICCF was involved, contributed significantly to political education of a whole generation of leaders in the construction industry; 2) that part of the vanguard originated from the struggles of STICCF turned into an advanced detachment of class - union leaders - then taking responsibility for their political education and class consciousness; 3)STICCF contended your ideology and class consciousness even when sailing against the tide in which Brazilian unionism plunged in the first decade of the 2000s, keeping the political education of thousands of workers at construction sites, forming new generations of leaders in the civil construction of Fortaleza. / O objetivo desta pesquisa é examinar como o Sindicato dos Trabalhadores da Construção Civil de Fortaleza – STICCF construiu uma história de luta operária produzindo uma argamassa ideológica e consciência de classe que durante longos anos parecera o sol impossível de uma perdida noite de verão. Na pesquisa apresentamos como a educação política se apresenta como parte desta argamassa ideológica do proletariado e da sua atividade revolucionária. Examinamos o problema trazendo a lume observações, estudos e análises acerca das relações mais fecundas entre a luta social e as temáticas mais do que complexas da consciência de classe e da ideologia. Essa é uma questão que, decerto, provoca controvérsias, e não poderia ser de outra forma. Parece-nos frutífero nesse caminhar a eleição de uma clara perspectiva. Com isso em mente, antecipamos que inspiramo-nos em Marx e no instrumental marxista com a inabalável convicção de que, no plano teórico, assim como na vida, é necessário estabelecer escolhas e definir diretrizes. De forma resumida, é assim que as questões são aqui abordadas, ainda que estejamos cientes de que se trata de uma discussão longa e complexa e sobre a qual não nos cabe aqui imaginar que já tenhamos em mãos todas as respostas. Efetivamente, temos algumas hipóteses e com elas constituímos o nosso ponto de largada. Nesse sentido como resultados da pesquisa apontamos 1) o ascenso e os processos de reorganização do movimento sindical, na qual o STICCF esteve envolvido, contribuíram sobremaneira para educação política de toda uma geração de lideranças da construção civil; 2) que uma parte da vanguarda saídas das lutas do STICCF transformou-se em um destacamento avançado da classe – lideranças sindicais - responsabilizando-se, então, por sua educação política e consciência classista; 3) que o STICCF sustentou sua ideologia e consciência classista mesmo quando navegava contra a maré na qual o sindicalismo brasileiro mergulhou na primeira década dos anos 2000, mantendo a educação política de milhares de trabalhadores nos canteiros de obra, formando novas gerações de lideranças na construção civil de Fortaleza.
168

Estudo das reuniões de coordenação da produção em obras.

Haka, Osmar Roberto 23 August 2007 (has links)
Made available in DSpace on 2016-06-02T20:09:07Z (GMT). No. of bitstreams: 1 DissORH.pdf: 1389760 bytes, checksum: bf2c8f6cce9e62b72986dddae19744a7 (MD5) Previous issue date: 2007-08-23 / This work presents an exploratory study on the coordinating meetings, in the stage of production of the Civil Engineering in the subsector constructions, classifying the different forms of management, raising the ways of communication and identifying which are the fiscalized elements. Also will be treated the questions to the relations between the participants of the meetings, conditions for the establishment of partnerships between them and how its activities are made compatible. The planning meetings belong to the operational level, where the directions of the Production Projects and the Projects to Production, will be had, will be transmitted, if necessary adapted, made compatible and executed, propitiating a formal occasion, in which tools and techniques of management can be transmitted and be evaluated. Amongst main participants of the planning meetings, we can cite representatives of the constructors and the specialists subcontractors. The parameters raised will evidence which are the better ways of leading such meetings, in the diverse stages of production, in accordance with the constructive culture and with the technological resources of the company. / Este trabalho tem como objetivo apresentar estudo exploratório sobre as reuniões de coordenação de serviços na etapa de produção da construção civil no subsetor edificações, classificando as diferentes formas de gestão, levantando os meios de comunicação e identificando quais são os elementos fiscalizados. Também serão tratadas as questões das relações entre os participantes das reuniões, as condições para o estabelecimento de parcerias entre eles e de como suas atividades são compatibilizadas. As reuniões de planejamento pertencem ao nível operacional, onde as diretrizes dos Projetos da Produção e dos Projetos para Produção, se houverem, serão transmitidas, se necessário adaptadas, compatibilizadas e executadas, propiciando uma ocasião formal, na qual as ferramentas e técnicas de gestão podem ser transmitidas e avaliadas. Dentre os principais participantes das reuniões de planejamento, podemos citar representantes das construtoras e dos subempreiteiros. Os parâmetros levantados poderão evidenciar quais são as maneiras mais adequadas de se conduzir tais reuniões, nas diversas etapas de produção, de acordo com a cultura construtiva e com os recursos tecnológicos da empresa construtora.
169

Modelo de controladoria para as empresas do ramo de construção civil, subsetor edificações sob a ótica da gestão econômica / The model for controllership in construction companies, specifically the buildings sub-sector

Editinete André da Rocha Garcia 28 January 2003 (has links)
Este estudo, desenvolvido a partir da premissa de que o modelo de gestão econômica - Gecon é o modelo de atuação empresarial mais apropriado para desenvolvimento e implantação de uma Controladoria voltada à otimização do resultado econômico da organização, objetiva identificar através da utilização do conhecimento da teoria geral de sistemas, o modelo de Controladoria para as empresas de construção civil, subsetor edificações. Para tanto, é apresentada a fundamentação teórica necessária para o suporte ao modelo. São discutidos aspectos tais como; o modelo Gecon, a eficácia empresarial, o resultado como medida de eficácia e a Controladoria considerada sob dois vértices: ramo de conhecimento e área de responsabilidade. Através do estudo da empresa de construção civil, subsetor edificações, são apresentados aspectos em relação a sua evolução e antecedentes histórico, caracterizando e identificando suas particularidades, bem como, suas principais transações. O modelo proposto considera a Controladoria como uma área de responsabilidade, com missão definida e composta por todos os subsistemas do sistema empresa, que interagem para consecução de seus objetivos. Neste aspecto, é responsável por desenvolver ações visando a otimização do resultado econômico da organização, a minimização de riscos e incertezas e salvaguarda patrimonial. O estudo apresenta, portanto, a visão de cada subsistema que compõe a Controladoria de forma que a empresa, ao identificar a necessidade de implantação desta área, identifique suas características primordiais. / This study was undertaken according to the premise that the economic management model – GECON is the most appropriate business practice model for development and implementation of Controllership geared towards optimization of economic results in an organization. The research seeks to identify, by using knowledge of the General Systems Theory, the model for Controllership in construction companies, specifically the buildings sub-sector. For that purpose, the necessary theoretical background is presented in support of the model. Aspects such as the GECON model, business effectiveness, results as a measure of effectiveness and Controllership are seen from two angles: knowledge and responsibility area. By studying the construction company, buildings sub-sector, aspects related to evolution and historical background of these companies are explored, characterizing and identifying their peculiarities, as well as their main transactions. The model considers Controllership as an area of responsibility, with a clearly-defined mission, composed of all the subsystems of the business system, which interact in order to attain their objectives. In this regard, it is responsible for developing actions seeking optimization of the organization’s economic results, minimization of risks and uncertainties and preservation of assets. The study therefore presents the view of each subsystem comprising Controllership in order that the company may identify its basic characteristics and the need for its implementation.
170

Aplicação de método AHP para priorização de processos gerenciais na adoção de sistemas de gestão integrada no setor da construção civil: estudo aplicado em uma construtora

Moura, Luciana de Mendonça Santos Braatz 19 February 2014 (has links)
Made available in DSpace on 2016-06-02T19:52:04Z (GMT). No. of bitstreams: 1 5891.pdf: 12093424 bytes, checksum: 2f4be2e6dd8f12b62c9c9f9c787c2888 (MD5) Previous issue date: 2014-02-19 / Considering the representativeness of the Construction sector in the national economy, there is an increase in demand for the use and adaptation of concepts, techniques and methods developed for the manufacturing environment aiming to improve the production and management performance of companies. The use of information systems, especially ERP, has being the focus of several studies in the last decade. Thus, it is considered that the matter "ERPs" for construction, specifically considering the use of methods of decision making with multiple criteria, is far from being fully consolidated, and this research contributes to society and the academic community to enrich this discussion. The main objective of this work is to apply a form of prioritization of management processes to assist the selection of ERP system in construction company aimed at improving the flow of information held between the management system and production system, providing improved management processes management. The method of making multiple decision criteria provided AHP prioritization processes that must be considered in the selection and adoption of an ERP. The research supports the view of many studies that link the analysis of the internal processes of a company as relevant to the adoption of management information systems, as these should be oriented to business processes and not the opposite. Considering the importance of the issues raised by the analysis of the proposed case, the prioritization process, systematized by applying the AHP method can be considered as one (and not only) the guidelines in the selection of ERP systems available in the market process. / Considerando a representatividade do setor da Construção Civil na economia nacional, observa-se um aumento na demanda pela utilização e adaptação de conceitos, técnicas e métodos desenvolvidos para o ambiente de manufatura visando aprimorar o desempenho produtivo e gerencial das empresas. A utilização de sistemas de informação, em especial o ERP, está sendo o foco de diversas pesquisas nesta última década. Desta forma, considera-se que a temática adoção de ERP para Construção Civil pesada, especificamente considerando o uso de métodos de tomada de decisão com múltiplos critérios, encontra-se distante de estar completamente consolidada, e assim, a presente pesquisa contribui para a sociedade e para a comunidade acadêmica com o enriquecimento desta discussão. O objetivo principal deste trabalho é aplicar uma forma de priorização dos processos gerenciais para auxiliar a seleção de sistema ERP na indústria da construção civil pesada visando à melhoria do fluxo de informações realizado entre o sistema gerencial e o sistema de produção, proporcionando melhoria nos processos de gestão gerencial. O método de tomada de decisão múltiplos critérios AHP proporcionou a priorização de processos que devem ser considerados na seleção e adoção de um sistema ERP. A pesquisa corrobora a visão de diversos estudos que apontam a análise dos processos internos de uma empresa como relevante para a adoção de sistemas de informação gerenciais, pois estes devem ser orientados aos processos da empresa e não o inverso. Considerando a relevância dos aspectos levantados pela análise do caso proposto, a priorização de processos, sistematizada através da aplicação do método AHP, pode ser considerada como uma (e não a única) das diretrizes no processo de seleção de sistemas ERP disponíveis no mercado.

Page generated in 0.1041 seconds