• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 7
  • 4
  • Tagged with
  • 13
  • 13
  • 8
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Conservation Through Limited Development: An Approach for Land Conservancies

Tarone, Catherine Joy 01 March 2015 (has links)
The Land Conservancy of San Luis Obispo County is interested in determining the approach that it may take if it decides to pursue conservation and limited development as a strategy to preserve land. In using conservation and limited development, the Conservancy may put into practice its core values by employing this intensely-collaborative conservation tool and informing itself about development, conservation, collaboration and financing, in order to meet multiple community needs. Information about the limited development process was collected from books, news articles and personal communications with professionals to determine its components. Each chapter of this report analyzes one component, putting authors’ strategies into conversation, critiquing these and then offering conservancies several different approaches to accomplish each component. This report concludes that the most important decision that a conservancy must make when pursuing conservation and limited development, is determining the level of involvement appropriate for its conservation mission, resources, expertise, and role in realizing project goals. The final portion of the report provides two case studies that draw upon telephone interviews with professionals, and analyze the contrasting levels of involvement that each project’s conservancy assumed. Since this report was requested by the Land Conservancy of San Luis Obispo County, it addresses some concerns and realities particular to the county; however, most recommendations are generally applicable to other land conservancies.
2

Kommunikationsmodell för APD-plan vid användning av materialrutor och gångstråk / Model of communication for a construction site plan when using material zones and walking path

Ahlander, Alfred, Ekroth, Pontus January 2017 (has links)
Syfte: Platsbyggd byggnadsproduktion är en komplicerad process. En tillfällig fabrik, med nya materialupplag och nytt arbetsplatsområde upprättas vid varje enskilt projekt, vilket komplicerar processen ytterligare. Materialhanteringen utgör en stor besparingsmöjlighet i byggnadsprojekt och 40 % av tiden som förloras på en byggarbetsplats kan tillskrivas materialhantering. För att få bukt med slöseri kopplat till materialhantering krävs en väl bearbetad logistikplanering, fungerande kommunikation samt kunskapsbeaktning från tidigare genomförda projekt. Studiens mål är därför att identifiera förbättringsåtgärder gällande användning av materialrutor och gångstråk, samt skapa en kommunikationsmodell för arbetsplatsdispositionsplanen (APD-planen) som stödjer erfarenhetsåterföring. Metod: Studien har utfört fallstudier på två projekt inom NCC:s organisation. Kvalitativ datainsamling i form av litteraturstudie, intervjuer, dokumentanalys och observation har använts. Semistrukturerade intervjuer har utförts och innefattar sju respondenter med olika befattningar inom byggbranschen. Resultat: Studien har tagit fram faktorer som bör beaktas vid planeringen av materialrutor och gångstråk. Vidare visar resultatet att det krävs resurser och strukturerade processer för att erfarenhetsåterföring i byggnadsprojekt skall fungera. För att lyckas med användningen av materialrutor och gångstråk krävs god kommunikation av APD-planen. I studien har även en kommunikationsmodell av APDplanen som stödjer erfarenhetsåterföring tagits fram. Konsekvenser: Det är under inköps- och leveransplaneringen som förutsättningarna för materialrutor och gångstråk sätts, därför bör APD-planen vara mer i fokus under detta skede. En förutsättning för att användningen av materialrutor och gångstråk skall fungera är att det finns resurser som stödjer platsledningen vid planering och utförandet. Genom att använda sig av logistikresurser inom organisationen underlättas planering och hantering av material på byggarbetsplatsen och insamlade erfarenheter kan förmedlas mellan projekt. Ute i produktionen bör det finnas en ansvarig godsmottagare som är extra insatt i APD-planen och materialrutor, genom kontinuerlig kommunikation med platsledning och logistikresurs. Begränsningar: Eftersom arbetet endast omfattar studie av två byggnadsprojekt finns det en begränsning i vilka faktorer och resonemang som lyfts fram. Även om resultatet grundas från två byggnadsprojekt är de grundläggande processerna och händelseförloppen vid uppförande av byggnader likartade och resultatet kan därför tillämpas på liknande byggnadsprojekt. / Purpose: On-site construction is a complicated process. A temporary factory, with new zones for materials and workplace area must be established for each new project, which complicates the process further. Material management stands for a big saving opportunity in building projects and 40 % of the time lost on a construction site can be attributed to material management.  To overcome this waste connected to material management a well-processed logistics planning, god communication as well as experience feedback from previous projects is required. The aim for this thesis is therefore to identify improvement measure regarding the use of material-dedicated buffer zones and walking paths, and as well as create a model of communication that supports experience feedback. Method The thesis is a case study on two projects within the organization of NCC.  A qualitative data collection with literature review, interviews, document analysis and observation has been conducted. Semi-structured interviews have been conducted and includes seven respondents with different position within the construction industry. Findings: The thesis has produced factors that should be taken into consideration when material zones and walking paths are planned. The result shows that resources and structured processes are required if experience feedback should work during the construction project. To succeed with the use of material-dedicated buffer zones and walking paths, good communication of the construction site plan is needed. Furthermore, the thesis has resulted in a model of communication that supports experience feedback.   Implications: It’s during the purchase and delivery planning that the conditions for the material-dedicated buffer zones and walking paths are set, therefore the construction site planning should be involved more in this phase. A prerequisite for using dedicated material zones and walking paths are resources which supports the construction management with planning and performance. By using logistic resources within the organization facilitates planning and management of material at the construction site, enables that collected experience can be conveyed between projects. In the production there should be a responsible receiver of material deliveries, who is extra briefed in the constructions site plan and the material-dedicated buffer zones through continuous communication with the construction management and logistic resource. Limitations: Since the thesis only includes two building projects, there is a limitation of the factors and arguments that are treated. Although the result is based on two building projects the fundamental processes and course of events are similar and can therefore be applied on other building projects.
3

Logistik för byggarbetsplatser i tätbebyggda stadsområden / Logistics for construction sites in densely populated urban areas

Svensson, Mattias, Pasternak, Michal January 2018 (has links)
Purpose: Continously growing cities and increasing population sets new demands inthe building industry. Contractors are facing new challenges regarding constructionsite-logistics in densely populated areas where the use of large transports is limited.Many of the actors involved in construction logistics don’t seem to recognize thepotential in early-stage cooperation and sharing of information. Large improvementsare available in the construction logistics which seem to lack structure and goodplanning. Large demands are going to be put on contractor corporations where smartlogisticsolutions can be a deciding factor for competition and thus, important toidentify. Method: In order to supply answer to this thesis question formulation a case study wasperformed at Skanska AB Sverige. The methods used are literature-review, documentanalysisand interviews. The literature-review helped gathering knowledge in the fieldas well as providing a framework in chapter four. The document-analysis where usedto identify the guidelines and tools that Skanska AB Sverige uses today. The interviewstook place at Skanska AB Sverige where employees on influential positions suppliedtheir view on the construction logistics. Findings: The thesis examined four problem areas within construction logistics:material flow issues, internal communication, external communication and complexity.The study showed that the largest problem was material flow issues in citylogisticswhere it was shown that the problems included was uncertainty of time of delivery,transport issues, uncertainty of space requirement and space for waste storage. Theproblems may be solved through thorough planning and inclusion of more actors in theplanning. An increased use of join-distribution may also prove beneficial to the projectsas more space and time is created. Implications: The thesis conclude that information of solutions exist today but that itmust find a way to reach the project in a better way. Problems regarding the externalcommunication with subcontractors was found in the interviews which could beprevented through a better understanding between different actors through inclusion inthe early stage planning and continuous involvement. As a recommendation to furtherresearch we recommend to examine the profitability of joint-distribution and supplychain management. Limitations: The the thesis is limited to construction enterprise where logistics isexamined where it is in direct contact with the construction site. The supply chain ofsubcontractors and their handling of materials is not studied in this report. / Syfte: Ständigt växande stadskärnor och ökad befolkning ställer nya krav påbyggmarknaden. Entreprenörer ställs inför nya utmaningar gällandearbetsplatslogistiken på trånga innerstadprojekt där stora transporter är begränsade.Många inblandade som berörs av logistikfrågor ser inte den stora potentialen isamarbete och utbyte av information. Stora förbättringsmöjligheter finns gällandelogistiken inom byggbranschen vilken saknar struktur och bra planering. Stora kravkommer ställas på entreprenadföretag där smarta logistiklösningar kan vara enavgörande konkurrensfaktor därför är det viktigt att identifiera dessa möjligheter. Metod: För att besvara rapporten frågeställningar utgick examensarbetet från enfallstudie. Metoderna som användes för datainsamling var litteraturstudie,dokumentanalys och intervjuer. Litteraturstudier hjälpte med att införskaffa kunskap iämnet samt gav grund i empirikapitlet. Därefter gjordes dokumentanalys för attidentifiera Skanskas Sverige AB riktlinjer och hjälpmedel som finns idag.Avslutningsvis intervjuades personer på företaget för att se deras syn kringlogistiksituationen. Resultat: Rapporten undersökte fyra problematiska områden inom bygglogistiken:materialflöde, intern och extern kommunikation samt komplexitet. Studien visade attproblem kring materialflöde var största bekymmer utifrån logistiksynpunkt. Inom detområdet fastställdes problematik kring leveransreliabilitet, transportproblem påbyggarbetsplats, osäkerhet om utrymmeskrav och hantering av avfall. Problemen kanlösas genom noggrannare planering och inkludering av flera aktörer i planeringen.Ökning av samlastning tycks också gynna projekten där mer plats och tid skapas.Medarbetarnas okunskap gällande samlastning skapar rädslan för extra kostnaderistället för att se möjligheter. Konsekvenser: Rapportens slutsats är att information kring lösningar som finnstillgängliga i dagsläge måste nå projekten på ett bättre sätt. Problem kring den externakommunikationen med underentreprenörer konstaterades. Bättre förståelse förvarandras arbetssätt kan skapas genom täta avstämningar och bättre involvering. Somförslag till vidare studier kan lönsamhet av samlastning respektive supply chainmanagement för olika typer entreprenader undersökas. Begränsningar: Studien är avgränsad till ett byggentreprenadföretag på husbyggnaddär logistiken undersöks endast i direktkontakt med byggarbetsplats.Underentreprenörernas leveranskedja och hantering av material beaktas inte i dettaarbete.
4

Effektivare materialhantering från leveransmottagning till materialanvändning på en byggarbetsplats / Make the material management on a construction site more efficient from delivery to usage

Hallman, Mattias, Elham, Mirwais January 2017 (has links)
Purpose: The problem with the construction industry is inefficient material handling that creates waste in form of unnecessary activities that do not increase the value of the product. The construction industry is accused of production delays, exceedance of budget and difficulties in having a high quality. The aim is to find opportunities for improvements to make the material handling on a construction site at deliveries, material storage and material transports more efficient. Method: A qualitative case study of an organisation was carried out to achieve the aim of the report. The methods used in this study was unstructured observations, semi structured interviews and document analysis. Findings: A checklist for material handling based on the theories of Muda, 5S and JIT within Lean has been designed as an improvement and is intended to be used at a construction site. The checklist is based on the collected empirical study and consists of three parts, based on the issues of the study, which were deliveries, material storage and material transport. The purpose of the checklist is to improve the material handling at a construction site by identifying and eliminating wastes in terms of waiting, transport, storage and defects. Implications: By using the checklist, follow the delivery plan, improve the construction site plan and improve the contract between the suppliers and the company that have been concluded from the study result, waste in deliveries, material storage and material transport can be reduced. The recommendation is to follow the suggestions for improvement to make the material handling more efficient and reduce waste on a construction site. Limitations: The limitations that have been made in the study is to identify the wastes in the material handling moments that have been used in the study during the different material handling processes. The communication between workers, in what way the company plans their work activities, work environment and quality of work is not included in the study. / Syfte: Problemet i byggbranschen är ineffektiv materialhantering som skapar slöserier av resurser i form av onödiga aktiviteter som inte ökar värdet på slutprodukten. Byggnadssektorn anklagas för förseningar, budgetöverskridande och svårigheter att hålla en hög kvalitet. Målet är att hitta förbättringsmöjligheter för att effektivisera materialhantering på en byggarbetsplats vid leveransmottagning, materiallagring och materialförflyttning. Metod: För att uppnå studiens mål har en kvalitativ fallstudie av en organisation genomförts. De datainsamlingsmetoder som har använts är strukturerade observationer, semistrukturerade intervjuer och dokumentanalys. Resultat: En checklista för materialhantering baserad på teorierna Muda, 5S och JIT inom Lean har utformats som ett förbättringsförslag och är tänkt att användas på en byggarbetsplats. Checklistan är gjord utifrån studiens insamlade empiri och består av tre delar som utgår från studiens frågeställningar leveransmottagning, materiallagring och materialförflyttningen. Syftet med checklistan är att effektivisera materialhanteringen på en byggarbetsplats genom att identifiera och eliminera slöserierna i form av väntan, transport, lager och defekter. Konsekvenser: Genom att använda checklistan, följa leveransplanen, uppdatera APD-planen och förbättra kontraktet mellan leverantörer och företag som har framtagits i studiens resultat kan slöserier inom leveransmottagning, materiallagring och materialförflyttning minskas. Rekommendationerna blir att följa förbättringsförslagen för att effektivisera materialhanteringen och reducera slöserier på byggarbetsplatsen. Begränsningar: De avgränsningar som har gjorts i studien är att identifiera de valda slöserier inom Muda som behandlades i studien under olika materialhanteringsmoment. Kommunikationen mellan arbetarna, på vilket sätt företaget jobbar med att planera olika arbetsmoment, arbetsmiljö och arbetskvalitet ingår inte studien.
5

Vzdělávací a poradenské centrum Otevřená zahrada NNO v Brně - stavebně technologický projekt / Educational and counseling center Open garden NGOs in Brno - construction technology project

Marková, Veronika January 2018 (has links)
The subject of the diploma thesis is solving of the construction project of the administrative building "Educational and consulting center Open Garden of NGO in Brno" The building is designed as three-storey reinforced concrete skeleton with a flat vegetation roof and a light cladding. The diploma thesis includes technological prescriptions for the assembly of the light cladding and for window installation, inspection and quality plans, design of machine assembly, site equipment project, item budget, etc.
6

Utformning av flerbostadshus med avseende på trygghet och trivsel / Design of multi-family houses with regard to safety and comfort

Petersson, Lovisa, Tarabeih, Qamar January 2018 (has links)
Bostadsbristen som rådde i Sverige efter andra världskriget löstes genom ett bostadsprojekt som kom att kallas miljonprogrammet. Bostäderna som byggdes höll vid den tiden en hög standard invändigt medan utemiljön ofta bortprioriterades. Idag råder det än en gång ett stort behov av bostäder i Sverige, dock bör inte problemet lösas med samma metod som under miljonprogrammet. Syftet med arbetet är att ta fram ett förslag på hur ett område i ett mindre samhälle kan gestaltas. Målet är att besvara arbetets två frågeställningar som ska utreda hur en nybebyggelse på en tomt intill ett miljonprogramsområde skulle kunna utformas med hänsyn till platsens förutsättningar, omkringliggande bebyggelse samt upplevd trygghet och trivsel. Den metod som användes för studien är kvalitativa intervjuer, litteraturstudier och skissarbete. Ett förslag av flerbostadshus och en situationsplan för en tomt på en mindre ort har utformats med avseende på trivsel, trygghet och anpassning till kringliggande bebyggelse. Undersökningarna resulterade i åsikter kring vad som skulle prioriteras vid utformning av bostäder på tomten, men även vilka kvalitéer som önskades för övrigt i området. Dessa analyserades och kopplades till den teoretiska bakgrunden. Det analyserade resultatet applicerades sedan i studiens förslag. Studien resulterade i ett förslag som mottogs väl av beställaren, som förhoppningsvis kommer inspireras till vidare arbete med tomten.   Nyckelord: utformningsförslag, moderna planlösningar, situationsplan, flerbostadshus, nybyggnation, miljonprogrammet, trygghet, trivsel, visualisering, byggnadsutformning, bostadsanpassning, trygg miljö, bostäder, bygglovshandlingar, utemiljö. / The housing shortage from which occurred in Sweden after the second world war was solved through a housing project that later became known as The Million Homes Programme (miljonprogrammet). The houses were built with high standards according to the contemporary indoor standards, while the outside environment was often somewhat dull and non-prioritized. At this moment, Sweden is facing a similar type of housing shortage, a problem that should not be solved with the same methods used during The Million Homes Programme. The main purpose of this thesis is to develop a suggestion of a building design and a site layout plan in a small town, in collaboration with a Swedish municipality in Kronoberg county. The goal is to explore the different possibilities of how an estate owned by the municipality of Uppvidinge could be designed with multi-family houses which pays respect to safety and comfort and also is adapted to the surrounding built environment. The surrounding built environment consists of multi-family houses from The Million Homes Programme and one-family villas. The methods used for this thesis are pointed interviews, studies of prior published research and computer aided drawing. A suggestion of a building design accompanied with a site layout plan is presented in the report. The building design and the site layout plan pays respect to safety besides comfort and is also adapted to the surrounding built environment. The completed studies resulted in opinions about what should be a priority when designing multi-family houses on the site, but also what kind of qualities that were desired in the surrounding area. These results were analyzed and thence linked to the theoretical background. The analyzed result was thereafter applied in a suggestion. The study resulted in a suggestion that was well received by the client, which hopefully will be inspired for further work on site.   Key words: design plans, modern planning arrangement, site plan, apartment building, new housing estate, the million homes programme, safety, comfort, visualization, building design, housing adaptation, safe environment, residences, building permit documents, outdoor environment.
7

Bytové domy v Pardubicích - příprava a organizace výstavby / Apartment buildings in Pardubice - Project planning and management

Skřivánek, Jan January 2015 (has links)
The final thesis contains selected parts of construction technological project, this project are defined by a apartment building complex in Pardubice, Dubinská. This thesis deals with first two buildings with four flours and a basement. Coordination site plan, time and financial schedule including machinery setting, a study of main technological phases, construction site facility project, main technological machinery design, technological standard and time schedule, technological regulation for basement monolithic constructions, inspection and trial schedule with drawing of facing to it are regarded as parts of construction technological project.
8

Výrobní hala s administrativní částí v Ústí nad Orlicí - Hylváty, stavebně technologická příprava stavby / Production hall with an administrative part in Ústí n Orlicí - Hylváty, civil technological project

Dobrovská, Monika January 2016 (has links)
The subject of the thesis is the construction and technological preparation of a production hall building with an administrative part in Ústí nad Orlicí – Hylváty. For the construction project a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written. The other task includes a comparison of the two building envelope technologies, a contract for work, a plan of risks for the building evelope and pattern moving mechanical assemblies. The subject, which I deal with in this thesis, is in the field of constructions- selected details of the building envelope preparation.
9

Přístavba fary a komunitního centra ke kostelu v Brně-Líšňi / Annex of the parish office and the community building toward the church in Brno-Líšeň

Kosařová, Pavla January 2016 (has links)
The final thesis is focused on the annex of complex of mixed-use buildings toward the church in Brno-Lisen. A pair of buildings consists of a one-storey Building a community of Salesians and two-storey building with parish office. The group of buildings is located on the southern slope in the housing estate of a block of flats from the 80s. Objects vertically copy a curve of the slope and is increasing to the dominant church building. Block of buildings are adjacent by shorter side to the church building and form a small enclosed courtyard inside. The buildings are designed at brick ceramic blocks, buildings are withnout cellar, with flat green roof. Living rooms are located on the southern facade, the north is reserved for corridors. The entrance to the courtyard is connected to the existing service road. Pedestrian approach builds on the existing surrounding landscaping.
10

Příprava a realizace výrobní haly v Holešově / Implementation of Production Hall in Holešov

Ševela, Ondřej January 2019 (has links)
The diploma work has been dealing with the building and technological design of a production hall in Holešov. The work includes the general and specification report, the study of main technological phases, the site plan, the technological specification solving the transportation relations and coordination of oversize transportation, time and financial schedule of the construction, material supply plan including staff review, the time schedule for pre-cast frame assembly, machinery plan including the time employment, the site plan including the drawings, technological specification of pre-cast frame assembly and of steel-fibre-reinforced floor, inspection and test plan of pre-cast concrete frame assembly, assessment of lifting mechanism, the procedure scheme of pre-cast concrete frame assembly and the cost estimate of pre-cast concrete frame.

Page generated in 0.4409 seconds