• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 971
  • 153
  • Tagged with
  • 1124
  • 1093
  • 1075
  • 194
  • 153
  • 135
  • 132
  • 84
  • 79
  • 76
  • 75
  • 68
  • 67
  • 61
  • 55
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
271

Sambandet mellan produktionsplanering och arbetsmiljö : En studie hur produktionsplaneringen kan bli bättre med avseende på arbetsmiljö

Hermansson, Emil, Hesselgren, Mattias January 2019 (has links)
The work aims to investigate how site managers are planning projects, and how this is experienced by the craftsmen regarding work environment with a psychosocial and physical aspect and construction management. Recommendations are made to improve construction management based on the results from the interviews. The work is being carried out as there is a greater focus on work environment in the workplaces today. A way to facilitate the additional administrative work that arises with this focus is to improve production planning. Placing a greater focus and more time before production has started can be beneficial to the construction project. In the report ten interviews are made from five different projects where we interview a site manager and a craftsman on each project. Among the site managers, many felt that there was a high workload due to lack of resources or additional work. All interviewees agree unanimously that one should have a craftsman or safety representative at an earlier stage during the production planning. Several site managers are requesting a clearer structure in the organization at an earlier stage in production planning. Craftsmen request official meetings with a clearer structure on the information provided.
272

Hantering av ändrings- och tilläggsarbeten inom byggindustrin : En komparativ studie för en ökad produktivitet inom byggbranschen

Axell, Jonathan, Nilsson, Oscar January 2018 (has links)
With the housing shortage in Sweden today, effective solutions to the problems that arise are required. One of the issues in almost every construction project is change orders which often causes additional work and could negative impacts on the project such as reduced productivity; it could cause rework which could affect the working environment and increase the project cost. This report will review an alternative method of managing change work called “TvåTågsPrincipen” (TTP). What characterizes the method is that you produce in two teams, a production team that strives for continuous production, and a second team that comes in afterward as the production has passed from a moment or building component to carry out all changes and additions.  After several interviews with people within construction following conclusions were drawn: the method can bring both positive and negative effects to a project, and both are important to keep in mind. Examples of positive impacts could be accordingly: higher productivity, better working environment and lower costs. Incorrect use of the method could result in larger change orders, greater environmental impact and more material usage.
273

REVIT – ETT BRA HJÄLPMEDEL VID KLIMATDEKLARATION? : EN UNDERSÖKNING OM KLIMATDEKLARATION KAN UNDERLÄTTAS AV REVIT / Revit - a good tool for climate declaration? : A study if Revit can simplify climate declaration

Lind, Lucas January 2019 (has links)
According to SMHI the largest contributing factor to globalwarming is the increased greenhouse gas emissions in theatmosphere. In year 2018 Boverket submitted a proposal for climatedeclaration on new buildings. In the Boverkets climatedeclaration, a building's climate impact is calculated in the formof carbon dioxide equivalents on the material included in thefoundation, building envelope and the non-load-bearing interiorwalls. The unit in the climate declaration is kg Co2e / kg m2where m2 is BTA for the building.The purpose of the theoretical study was to describe what impactthe climate declaration will have in the building industry. Thepurpose of the empirical study was to investigate whether Revit isa good tool for calculating a building climate impact with a focuson greenhouse gas emissions.The result of the theoretical study indicates that the Boverket'sproposal on climate declaration will not lead to changes in theclimate impact of buildings. The study also shows that there willbe changes in the project planning of buildings and increased timespent by participants as the Boverkets estimation of the timerequired for the climate declaration is approximately 180 hours.The result of the empirical study shows that Revit is a good toolfor climate declaration. The study was based on evaluating Revitby the categories easy-to-use, time-consuming and presentationoptions. This resulted in a SWOT analysis showing Revit'scapacity
274

Partnering : En utvärdering av samverkan vid om- och tillbyggnad i vårdverksamhet / Partnering : An evaluation of collaboration during construction work in healthcare facilities

Wikström, Gustav January 2019 (has links)
Under många har det riktats kritik mot bygg- och fastighetsbranschen. T.ex. har offentliga utredningar påvisat att byggkostnaderna är för höga, kvaliteten för låg, tidplaner ofta överskrids, konkurrensen för liten etc. För att råda bot på problemen rekommenderar de offentliga utredningarna bl.a. ökad priskonkurrens, högre förprojekteringsgrad och ett större byggherreansvar. Förespråkare för utökad samverkan anser dock att dessa lösningar är felaktiga. De menar att lösningen istället består av utökad samverkan, även kallad partnering. Byggherren och entreprenören ska tillsammans, med gemensamma mål och öppna böcker arbeta för att projekt ska färdigställas i rätt tid, till rätt pris och med rätt kvalitet. Partnering lämpar sig väl när det tidigt i projektskedet finns ett behov att uppfånga entreprenörens produktionskunnande, när projektet har lång byggtid och/eller är av komplex karaktär. Syftet med denna studie är att genom en utvärdering av en om- och tillbyggnads-entreprenad identifiera framgångsfaktorer kopplat till partnering, föreslå hur framtida partneringprojekt kan genomföras ännu bättre samt utreda om partnering har underlättat utmaningarna i projektets olika faser. Målsättningen är att bidra till en ökad förståelse om styrkor och eventuella svagheter med samverkansformen partnering, i synnerhet vid entreprenader av komplex karaktär, samt föreslå hur framtida projekt kan genomföras ännu bättre. För att besvara frågeställningen och uppnå målsättningen har litteraturstudier, kvalitativa intervjuer och en fallstudie genomförts. I litteraturstudien har kunskap inhämtats från tidigare studier och böcker om partnering samt relevant underliggande teori i form av bl.a. entreprenadformer, standardavtal och ersättningsformer. De kvalitativa intervjuerna har genomförts muntligt med nyckelpersoner i det studerade projektet och utgör rapportens resultatdel. Projektspecifika dokument, såsom förfrågningsunderlag, styrdokument, allmänna föreskrifter etc. har studerats för få djupgående kunskaper om det studerade projektet. Resultatet visar att samtliga respondenter är nöjda med partnering. En stor framgångsfaktor grundar sig i den anbudsutvärdering som har gjorts, vilken baseras på mjuka parametrar. Beställaren har således valt den entreprenörsorganisation som lämpar sig bäst för projektet. De involverade personerna är kompetenta och tilliten och öppenheten är stor inom gruppen, vilket har gjort att utmaningar under projektets gång har kunnat lösas på ett framgångsrikt sätt. / For many years, the construction and real estate industry have been criticized. Public investigations have shown that construction costs are too high, the quality is too low, timetables are often exceeded, the competition too small etc. To remedy the problems, the public investigations made by the Swedish government recommend increased price competition, higher degree of pre-planning and greater responsibility for the developers. However, advocates for extended collaboration believe that those solutions are incorrect. They argue that the solution instead consists of extended collaboration, i.e. partnering. The developer and the contractor shall work together, with common goals and open books to ensure that projects are completed at the right time, at the right price and with the right quality. Partnering is well suited when it’s necessary to capture the contractor’s production knowledge early in the project, when the project has a long time span and/or is of a complex nature. The purpose of the study is to, through evaluation of a partnering project, identify success factors linked to partnering, suggest how future partnering projects can be implemented even better and to investigate whether partnering has eased the challenges in the different phases of the project. The goal is to contribute to an increased understanding of strengths and possible weaknesses in the form of collaboration (partnering), in particular in projects of a complex nature, and to suggest how future partnering projects can be carried through even better. To achieve the purpose and goal of the study, literature studies, qualitative interviews and a case study have been conducted. The literature study knowledge has been obtained from previous studies on partnering and relevant underlying theory in the form of e.g. contract forms, standard agreements and forms of compensation. The qualitative interviews, which are presented in the result section, have been conducted in person with main people in the studied project. Project documents, such as tender documents, regulatory documents, general regulations etc. have been studied to gain in-depth knowledge of the project. The results show that all respondents are satisfied with partnering. A great success factor is the tender evaluation that has been made, which is based on soft factors. The developer has thus chosen the entrepreneurial organization that is best suited for the project. The people involved are competent and the trust and openness is great within the group, which has made it possible to successfully solve challenges during the project.
275

Dimensioneringsdifferens mellan hand– och databeräkningsmetoder : En jämförelse mellan hand- och datadimensionering / Dimensioning difference between hand- and data calculation methods : A comparison between manual- and computer calculation

Gäwerth, Daniel, Alipour, Jamal January 2015 (has links)
Tekniken är i full framfart, allt mer blir datoriserat och automatiserat. Detta är en process som ständigt utvecklas för att få bättre lösningar på olika problem. Inom betongbranschen finns det tekniska lösningar som hjälper produktionen att bli mer effektiv. En av de stora anledningarna till att dessa tekniska lösningar framförs är för att spara en viktig resurs, tid. Dessa lösningar är bland annat dataprogram som underlättar olika stadier under produktionens gång.Inom betongbranschen används allt mer dataprogram i dimensioneringsstadiet. Konstruktörer har i många år genomfört sina arbeten med traditionella handberäkningar. På senare tid har dataprogram som bland annat WIN-Statik ändrat arbetssätten i dimensioneringsstadiet. Jämförelser mellan befintliga dimensioneringsprogram har genomförts och det har visat sig vara markanta skillnader i armeringsåtgång. Detta leder till frågeställningen: Ifall det är markanta skillnader i materialåtgång när man jämför olika dimensioneringsprogram, hur stor blir då skillnaden i materialåtgång när man jämför ett av det mest använda dimensioneringsprogrammet WIN-Statik mot handberäkningar?För att genomföra undersökningen har ett befintligt projekt valts ut som beräkningarna ska baseras på. Båda beräkningsmetoder är genomförda under samma förutsättningar när det gäller de yttre dimensioneringsmåtten så som balk/pelarens yttermått. Andra nämnbara gemensamma förutsättningar är livslängden för byggnaden, betongkvaliteten, armeringsarea för både pelare och balk, och sist men inte minst värdet på sprickvinkeln (cot).Resultaten från handberäkningarna ger att det krävs totalt 55 801 kg armering för byggnadens stomme, medan det krävs 51 516 kg från beräkningar från WIN-Statik. Detta innebär att det krävs 4285 kg mer armering om man genomför beräkningarna för hand istället WIN-Statik, vilket motsvarar 8,32 procent mer. Denna skillnad på 8,32 procent motsvarar en ökad kostnad på drygt 35 000 kr i endast materialåtgång. / The technology is in full progress, much is increasingly becoming computerized and automated. This is a process that is constantly evolving to get better solutions to various problems. In the concrete industry, there are technical solutions that make the production more efficient. One of the main reasons that these solutions are made is to save an important resource, time. These solutions include computer programs that facilitate various stages during production.Computer programs are getting more used in the dimensioning stage in the concrete industry. Structural engineers have for many years carried out their work with traditional hand calculations. Lately computer programs, including WIN-Statik has changed the working procedures in the dimensioning stage. Previous comparisons between existing dimensioning programs have proved that there are differences in reinforcement consumption. This leads to the issue: If there are marked differences in material consumption when comparing different dimensioning programs, then how much will the difference in material consumption be when comparing one of the widely used design software WIN-Statik against hand calculations?To implement this research, an existing building has been selected as the calculations shall be based on. Both calculation methods are conducted under the same conditions regarding the external dimension measurements. Other common conditions are the lifetime of the building, the concrete quality, reinforcing thickness for both pillars and beams, and last but not least the value of the crackangle (cot).The results from hand calculation equalize about 55 801 kg reinforcement that is required for the building, while the calculations from WIN-Statik requires 51 516 kg. This difference of 4285 kg means it requires 8.32 percent more reinforcement with hand calculation, which is equal to a cost increase of 35 000 (SEK) in only material consumption.
276

Tillämpning av Last Planner på materialhantering: : En fallstudie på medelstora byggarbetsplatser.

Mattsson, Oscar January 2019 (has links)
Byggnadsprojekt finns i många varianter, stora, små, enkla eller komplexa. Ett problem som är gemensamt för alla projekt är att flödet av material som ska monteras in i byggnaden ofta inte fungerar på ett bra sätt. Byggbranschen ligger bakom andra branscher exempelvis verkstadsindustrin när det kommer till att effektivisera och optimera processer. Under de två senaste årtiondena har tillverkningsindustrin utvecklats avsevärt inom effektivisering och produktivitet. Under samma tidsperiod har byggbranschen utvecklats väldigt långsamt. Symptomen inom byggbranschen är förseningar och budgetöverskridningar. Ett annat vanligt problem är att det under ett byggprojekt finns olika sorter av slöseri som påverkar produktiviteten negativt, exempelvis onödig väntetid, onödig lagring av material och onödiga transporter. I denna studie genomfördes intervjuer och platsbesök på två av Peabs arbetsplatser i Malmöregionen. Informationen från detta användes för att kartlägga flödet för fyra vanligt använda material, fönster, gips, kök och innerdörrar. Efter att flödet kartlagts användes Lean Construction teori om slöserier för att identifiera och kategorisera problemområden i dessa flöden. För att sedan hitta grundorsaken till dessa problem gjordes en rotorsaksanalys. Rotorsaksanalysen visade på att grundproblemet i nästan samtliga fall går att härleda till antingen brister inom planering eller kommunikation. Genom att tillämpa Last Planner System teoretiskt på grundproblemen kan en tänkbar lösning föreslås. Ur ett teoretiskt perspektiv kan en implementation av LPS eliminera problem med inleverans, materialhantering och lager av material enligt denna studie. För att lyckas med implementeringen är det viktigt att tänka på följande saker: 1. Utbilda personal inom verktyget 2. Ledarskapets stora betydelse 3. Sluta inte att utbilda och utveckla personalen 4. Lös konflikter direkt och låt inte dem ligga under ytan och förstöra samarbetet Ett digitalt kommunikationsverktyg hade sannolikt ökat integration och samarbete mellan parter. Fortsatt forskning krävs för att utvärdera den teoretiska lösningen genom att utföra fälttester med Last Planner System.
277

Effektiv dimensionering av stånginfästningar i Excel / Efficient dimensioning of bar connections in Excel

Ekman, Harald January 2018 (has links)
Byggbranschen anses ofta som långsam, dyr och ineffektiv, vilket skapar möjligheter till förbättring. Denna uppsats angriper projekteringsskedet då konstruktionsritningar skapas. Dimensionering av stålanslutningar kan upplevas som en komplicerad och lång process, speciellt vid handberäkning Det lämnar utrymme för effektivisering som på så sätt sparar både tid och pengar. Uppsatsen avgränsas till stålanslutningen stånginfästning som är vanligt förekommande i fackverkskonstruktioner av olika slag. Exempel på sådana konstruktioner är fackverkstakstolar, fackverksbroar samt vid stagning av andra konstruktioner med hänsyn till vippning och knäckning. En genomgång av dimensioneringsgången har gjorts och exempeluppgifter har skapats för att kunna tillämpa kunskaperna. Därefter programmerades samma dimensioneringsgång i Excel för att undersöka vilka möjligheter till effektivisering som finns med programvaran. En avgörande faktor till knutpunktens kapacitet uppmärksammades. Knutpunktens kapacitet beror till stor del av stängernas utformning i förhållande till varandra. Vidare observerades goda dimensioneringsmöjligheter i Excel där kontroller och dimensionering av alla möjliga stålprofiler utförs på ett ögonblick. Dessutom ges en visuell överblick av möjliga alternativ hållfasthetsmässigt men också ur ett ekonomiskt perspektiv. Stålprofilerna ställs mot varandra i grafer för att på så sätt förenkla valet av profil. Då fråga om tillgänglighet eller behov av anpassad redovisning av dimensioneringsberäkningar är aktuellt rekommenderas Excel.
278

Takinfästningar mot KL-trä- eller stålregelstomme / Attachment for roof brackets to cross-glued stud or steel stud

Khodabakhsh, Mohamad January 2019 (has links)
The study includes the complementation of CLT- or steel joist frames with wooden joists. The wooden bars are meant to be a link, a waler between different types of wall frames and roof elements. This study has been conducted in collaboration with the company Lättelement AB.   The study has been done with three attachments, where the focus has been on the connections between the planned walers and the various wall frames. The three conducted attachments were:   • Attachment between CLT and wood (CLT wall frame and waler of wood). • Attachment between wood and wood (waler and waler). • Attachment between steel frame and wood (wall frame of steel and waler of wood).   Each study has aimed at investigating attachment methods and calculating pull-out- and shear capacity for the screws or nails that together form the attachment to this link. Today, the wood screws sexk. SS-H Impreg+ in sizes 8 x 100 mm and 8 x 80 mm, are used when attaching the roof elements and all wall frames. The pull-out- and shear capacity of the screws is estimated to be low.   The study suggests that the attachment between the CLT frame and wood could be performed with a different type of screw, SCI A2, which has a size of 8 x 160 mm, meets the requirements of the CLT wooden handbook. Furthermore, it shows that the attachment between wood rule and wood rule could preferably be performed with wire nails, Kamg+ of the size 3.1 x 90 mm. Finally, the study shows that the attachment between the steel frame and wood rule, could preferably be performed with the wood screws Impreg+, kullrig which are 5 x 40 mm in size.   Characteristic pull-out and shearing capacity for screw, SCI A2, is 2.18 kN vs. 0.6 kN in the attachment between KL-wood board and wood rule, whereas for nail, wire nail, Kamg+, is 0.75 kN vs. 0.47 kN for the attachment between wood rule and wood rule. For wood screw, Impreg +, Kullrig, the values are 1.96 kN and 1.36 kN respectively for the attachment between steel rule and wood rule. The density of the wood is 350 kg/m3 within the three attachments.   The results I have found are possible according to theoretical formulas, but it can be questioned whether the results are realistic. This is considered to be due to the fact that the CLT theory available to this study has been considered defective. For future studies, it is proposed that each study's investigations ought to be tested through experimental laboratory sessions. / Detta arbete innefattar komplettering av KL-trä- eller stålregelstommar med träreglar. Träreglarna är tänkta att utgöra en länk, ett hammarband mellan olika typer av väggstommar och takelement. Arbetet har genomförts i samarbete med företaget Lättelement AB. Studien har undersökts i tre förband, där fokusen är på förbanden mellan de planerade hammarbanden och de olika väggstommarna. De tre förband som genomfördes var: • Förband mellan KL-trä och träregel (väggstomme av KL-trä och hammarband av trä). • Förband mellan träregel och träregel (hammarband till hammarband). • Förband mellan stålregel och träregel (väggstomme av stålregel och hammarband av trä). Denna studie har syftat till att dels undersöka infästningsmetoder, dels beräkna utdrags- och tvärkraftsbärförmåga för de skruvar eller spikar som tillsammans utgör förbanden till denna länk. Idag nyttjas träskruv sexk. SS-H Impreg+ i storlekar 8 x 100 och 8 x 80 mm, som infästning mellan takelementen och samtliga väggstommar. Skruvarnas kapacitet som infästning är idag låg. Studien visar att en åtgärd som skulle kunna nyttjas till förbandet mellan KL-trä och träregel är att använda en annan typ av skruv, SCI A2, som har en storlek på 8 x 160 mm och uppfyller kraven enligt KL-trähandboken. Vidare visar studien att förbandet mellan träreglar lämpligen kan utföras med Trådspik, Kamg+ av storlek 3,1 x 90 mm. Slutligen visar studien att förbandet mellan stålregel och träregel lämpligen kan utföras med träskruvarna Impreg+, kullrig, som är 5 x 40 mm i storlek. Karakteristisk utdrag- samt skjuvbärförmåga för skruv, SCI A2, är 2,18 kN repektive 0,6 kN i föbandet mellan KL-träskiva och träregel medan detta för spik, Trådspik, Kamg+, är 0,75 kN respektive 0,47 kN i förbandet mellan träregel och träregel. För träskruv ,Impreg+, Kullrig, blir värdena 1,96 kN respektive 1,36 kN i förbandet stålregel och träregel. Träets densitet är 350 kg/m3 i de tre förband. Resultaten jag kommit fram är enligt teoretiska formler möjliga, det kan dock ifrågasättas huruvida resultaten är realistiska. Detta anses bero på den omständighet att den KL-teori som funnits tillgänglig till denna studie har ansetts bristfällig. Till framtida arbete föreslås det att studiens undersökningar testas genom provningar i laboratorium.
279

Partnering i byggprojekt - Framtidens samarbetsform? / Partnering in construction projects - The futures cooperative?

Kram, Hanna January 2019 (has links)
Bristande kommunikation kostar byggbranschen i Sverige flera miljarder (SEK) varje år. I genomsnitt beräknas varje enskilt projekt bli ca 13 % dyrare än tänkt på grund av fel vid informationsdelning mellan aktörer delaktiga i projektet. För att få bukt med detta problem i byggbranschen behövs ett nytt arbetssätt och en annan inställning till kommunikation mellan ingående parter. Ett nytt sätt att arbeta är samverkansformen partnering. Partnering är en strukturerad samarbetsform där målet är att driva projekt med tydligare samarbete och öppenhet mellan aktörerna. Sammantaget kom det fram en positiv syn på partnering i undersökningen. Framförallt ansåg de intervjuade att partnering bidrog till ett öppnare klimat, mer kommunikation i form av formella och informella mindre möten samt större lyhördhet mellan partnerna. För att kommunikationen i partnering skulle fungera till det bättre fanns dock ett antal kriterier som behövde uppfyllas. Viktigast var beställarens delaktighet i projektet, tillit till varandra och inställningen att partnering är ett arbetssätt som kräver mer av varje inblandad aktör i projektet. Projekt, traditionella så väl som partnering, påverkas dock beroende på vilka företag och vilka individer som är delaktiga. Det gör att kommunikationen kan påverkas både till det bättre, men även sämre oberoende av vilken entreprenad- eller samverkansform projektet är upphandlat. Slutsatsen blev att partnering, under rätt förhållande för arbetssättet fungerar bättre kommunikationsmässigt och upplevs som en positiv utveckling. Min slutsats blir att syftets fråga besvaras med ett ja, partnering är en samarbetsform som bör vidareutvecklas för att bli mer effektiv och mer praktiskt tillämpbar för fler projekt i framtida byggprojekt.
280

Implementering av byggnadsinformationsmodellering i byggproduktionen / Implementation of Building Information Modeling in the building process

Jensen, Marie January 2012 (has links)
De större företagen i Sverige använder alltmer byggnadsinformationsmodellering (BIM) i sina byggprojekt. Examensarbetets syfte är att kartlägga i vilken utsträckning BIM påverkar effektiviteten i produktionsfasen på två byggarbetsplatser, Fortnox Arena och Myresjöhus Arena, båda i Växjö. Rapporten belyser BIM, med dess möjligheter respektive svårigheter samt hur det kan användas i produktionsskedet. Utgångspunkten för analysen är intervjuer av olika entreprenörer som medverkade i något av de två nämnda byggprojekten. Intervjuerna visade att BIM tillämpas till viss del på arbetsplatsen och BIM anses bidra till tidsbesparing i projekten. Med hjälp av intervjuerna och teori har analys och diskussion förts kring hur BIM kan användas i produktionen i större utsträckning för att uppnå en ökad effektivitet.

Page generated in 0.095 seconds