• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 245
  • 223
  • Tagged with
  • 468
  • 468
  • 468
  • 62
  • 62
  • 44
  • 41
  • 39
  • 36
  • 36
  • 35
  • 33
  • 33
  • 28
  • 28
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
201

The value of flexibility in a future electric power distribution system

Moberg, Elias January 2021 (has links)
The size and composition of the Swedish electricity generation are changing. This, in combination with new legal requirements from regulatory entities including the EU Directive 2019/944, creates several challenges for the design of the future system. Among other things, the directive suggests that flexibility solutions are to be integrated into grids to increase the degree of utilization and avoid congestions, when socio-economically profitable. This thesis evaluates what this could mean in a Swedish context, in combination with providing a basic understanding of the contradictions that can arise between a desired efficient grid use in an energy system that goes towards more distributed and intermittent energy generation sources. The work is carried out in collaboration with Vattenfall Eldistribution AB, focusing on the geographical area of Uppsala and Stockholm, the Swedish region hit hardest by local congestions. The work assumes that the economic value of a flexibility solution is at most equivalent to the cost of a conventional new construction aimed at capacity strengthening, or the Value of Lost Load (VoLL). The report’s most important deliverable is a model based on this view. The model is used to evaluate the economic value of flexibility per kWh, in three regional grid construction projects within the mentioned region.  The results show that there is a great potential for using flexibility resources to increase utilization in grids and also to optimize the costs that society pays for this infrastructure by such methods. However, the work concludes that the usage of flexible technologies primarily is to adapt electric consumption with intermittent energy generation, rather than being used to solve local grid capacity shortages.
202

Geomechanical testing of non-hardening grout : for determination of flowability and strength properties

Barrdahl, Axel January 2022 (has links)
Due to an increasing amount of aging tendencies in Swedish embankment dams, failures such as internal erosion has become a more common problem. Internal erosion is a phenomenon where certain soil material within the embankment dam is removed, often over a longer period of time. It is most common to occur at the inner core of the dam, and if it is allowed to continue for a longer time period the consequences can be disastrous. During the internal erosion, the inner material is washed out, creating larger voids and lowering the geotechnical stability of the dam. When larger voids start to appear, the seepage will increase allowing more material to be washed out and accelerating the process.  In order to repair an embankment dam, exposed to inner erosion, it requires both the location of the faults as well as a suitable method of repairing. A method to repair internal erosion is by using grout and injecting it into the location of the fault. The knowledge regarding what type of grout and how it should be treated is today lacking.  There are reasons to believe that a hardening mixture within an embankment dam using a till core will not cooperate well. For that reason, a grout with non-hardening properties is of interest. this thesis focuses on the Geomechanical strength parameters of two similar experimental non-hardening grouts. One with maximum grain size of 2 mm referred as grout 0/2, and one with maximum grain size of 4 mm, referred to as grout 0/4. The grouts consist of natural aggregates, calcium carbonate, water, bentonite, superplasticizer and defoamer.   The grouts are evaluated by its undrained shear strength, water content, bulk- and dry density using fall cone tests and uniaxial compressive strength tests. To evaluate the grouts angle of friction and angle of dilatancy together with young’s modulus, consolidated, drained triaxial tests were performed. Three tests with different consolidation pressures (50, 150 and 300 kPa) were performed for each grout. Since the grout will gain strength with time, the tests have been performed after certain number of days in order to see the development of the grouts. The laboratories stretch from 0 to 112 days since the time of mixing the grout, and was performed at Luleå University of technology.  Fall cone tests showed that the grout should most likely be mixed on site and left unstirred. Continuously stirring the grout quickly removed the grouts flowability which is why longer transportation should be avoided. At the same time, the accuracy of the grouts mixing is very demanding which needs to be taken into consideration.  Triaxial tests showed that the grout 0/2 had dilatant behavior for 50 and 150 kPa consolidation pressure while 300 kPa showed contractive behavior. The grout 0/4 had dilatant behavior for 50 kPa consolidation pressure while 150 and 300 kPa showed contractive behavior. A theory to explain this behavior was constructed where the bentonite is believed to be behind it. Bentonite slurries behave as a Bingham fluid, where it requires a certain amount of shear stress for the fluid to start to flow. With the same reasoning, the low consolidation pressures do not exceed that threshold, resulting in dilatant behavior. But once that threshold is surpassed the grout starts to contract. In addition, flow curve tests were performed for additives, superplasticizer and defoamer. Both these substances showed Newtonian behavior which leaves Bentonite to be the only additive with Binghamian behavior. / På grund av en ökad mängd med föråldrandetendenser hos svenska jordfyllningsdammar har brott så som inre erosion blivit ett alltmer vanligt problem. Inre erosion är ett fenomen där en viss jord inom jordfyllningsdammen är avlägsnad, generellt över en längre tidsperiod. Oftast inträffar detta vid den inre damkärnan och om erosionen är tillåten att fortskrida sig över en längre period kan konsekvenserna bli förödande. Inre erosion fungerar så att jordmaterial tvättas ut vilket skapar hålutrymmen och minskar den geotekniska hållfastheten för dammen. När större hålutrymmen bildats ökar läckaget som i sin tur tillåter mer material att bli urtvättat och processen blir accelererad. För att kunna reparera en jordfyllningsdam, utsatt för inre erosion, krävs både att platsen för brottet och metoden för att reparera är kända. En metod för att reparera inre erosion är genom att använda injektering och injektera hålutrymmet. Dock är kunskapen gällande vad för typ av injektering och hur den ska hanteras icke existerande i dagsläget. Det finns anledning att tro att ett härdande bruk inom en jordfyllningsdam, med en moränkärna, inte kommer samarbeta särskilt bra. På grund av det har ett bruk med icke-härdande egenskaper undersökt. Den här uppsatsen fokuserar på de geotekniska hållfasthetsegenskaperna för två liknande experimentella icke-härdande bruk. Ett med maximal kornstorlek på 2 mm benämnd som bruk 0/2 och ett med maximal kornstorlek på 4 mm, benämnd som bruk 0/4. Bruket består av natursand, kalciumkarbonat, vatten, bentonit, mjukgöringsmedel och skumdämpare. Bruken är utvärderade genom deras odränerade skjuvhållfasthet, vattenkvot, skrym- och torrdensiteten som har tagits fram från fallkorns-test och enaxiella trycktest (UCS).  För att utvärdera brukens friktionsvinkel och dilationsvinkel tillsammans med styvheten (initiella och 50 %) har konsoliderat, dränerat triaxiala tests utförts. Tre test med varierande konsolideringstryck (50, 150 och 300 kPa) har utförts för båda bruken. I och med att brukens hållfasthet kommer att öka med tiden, har testerna utförts efter ett visst antal dagar, för att se hur utvecklingen ser ut. Laborationerna har sträckt sig från 0 till 112 dagar sedan det att bruken har blandats, och utfördes vid Luleå Tekniska Universitet. Fallkornstesten visade att bruken bör med största sannolikhet blandas på arbetsplatsen och därefter förbli orörda. Kontinuerlig omrörning visade sig frånta brukens flytförmåga, vilket också är anledning till varför längre transporter bör undvikas. Samtidigt så är noggrannheten vid brukens blandning krävande vilket bör tas i beaktning. De triaxiala tester visade att bruk 0/2 visade ett dilatant beteende för både 50 och 150 kPa konsolideringstryck medan 300 kPa hade ett kontrakterande beteende. Bruket 0/4 hade dilatant beteende för 50 kPa konsolideringstryck medan 150 och 300 kPa visade kontrakterande beteende. En teori för att förklara detta beteende togs fram där bentoniten är den troliga orsaken. Bentonitblandningar (bentonite slurry) beter sig som en Bingham-vätska, där det krävs en viss mängd skjuvspänning för att få vätskan att börja flyta. Med samma resonemang applicerade på bruken innebar det att de låga konsolideringstrycken inte översteg tröskelvärdet, vilket resulterade i ett dilatant beteende. Däremot, när tröskelvärdet väl är överstiget börjar bruket att kontraktera istället. Det gjordes även flödestester på tillsatsmedlen, mjukgöringsmedel och skumdämpare. Testerna visade att båda medel betedde sig Newtoniskt, vilket lämnar bentoniten som det enda tillsatsmedlet med Bingham-beteende.
203

Sopsaltning som halkbekämpningsmetod på olika höjdnivåer i Jönköping : En studie för att utforska och undersöka kunskapsläget gällande sopsaltning i Sverige / Sweepsalting as a deicing method in different altitudes in Jönköping : A study to investigate and examine the level of knowledge regarding sweepsalting in Sweden

Petersson, Anton, Abdulsahib, Alia January 2019 (has links)
Abstract Purpose: The issue that this report addresses revolves around sweep-salting of footways and cycleways. More specifically, it focuses on the fact that large differences in elevation can lead to varying land surface temperatures, which, in turn, complicates winter maintenance when using the sweep-salting method. With Jönköping as basis of study, the aim of this report has been to examine the level of knowledge regarding sweepsalting of footways and cycleways in Sweden, this to show optimization possibilities to a developed sweepsalting in Jönköping, taken into account the height differences prevailing in the city.   Method: To obtain data, structured and semi-structured interviews have been carried out. All the interviews have been done and recorded via telephone calls and the interview questions have been emailed to the respondents in advance. The structured interviews have been targeted at four municipalities and the semi-structured interviews have been targeted at two concerned governmental bodies. Parallel to the interviews, three documents have been subject of analysis: Karlstadslaken by Tomas Stomberg, GCM-handboken published by Trafikverket, and Vinterväghållning och expertsystem – en kunskapsöversikt by Magnus Ljungberg. Findings: Sweep-salting as high winter maintenance method is a complicated task. It should be comprehensive, reliable, and conducted hastily over long distances and fairly large areas. It is a relatively new method and knowledge is, as of yet, limited. In the interviews, it became evident that municipalities largely are self-managing in this matter, but that a desire for more intermunicipal collaboration exists. Primarily, municipalities see the need of a governmental framework on how to conduct sweep-salting most efficiently.  De-icing is not carried out the same way in the north of Sweden as it is in the southern parts of the country. In the north of Sweden, the primary focus is snow clearance, and sweep-salting is only carried out when temperatures allow for it. In the south of Sweden, on the other hand, where temperatures often fluctuate around zero degrees Celsius, and snow quantities are manageable, sweep-salting is more prioritized. Implications: Besides keeping track of aerial and land surface temperatures, it is important to control the dew point, in order to apply the appropriate maintenance methods on the most crucial areas of footways and cycleways, at the right time. It is also important to stay updated on municipalities’ development of sweep-salting. Limitations: The economic aspect of sweepsalting is not considered in this study, neither is the perspective from cyclists nor pedestrians of the results of sweepsalting. The study would probably have reached a better result if more municipalities would have been included. Keywords: Brine, DYS spreader, Height difference, Latitudes, PC path, Plate spreader, Surface temperature, Sweepsalting, VVIS Puck.
204

Magnetitinblandad gjutasfalt : Uppvärmning och avsvalning

Berg, Ludvig, Wanselius, Johannes January 2021 (has links)
Uppvärmningen av gjutasfalt har traditionellt sett skett med fossila bränslen. Projektet SMMART undersöker möjligheterna att med inblandning av magnetit i asfaltsmassan kunna nyttja mikrovågsteknik för uppvärmning. Detta examensarbete är uppdelat i två delar. Första delen behandlar uppvärmningen av magnetitinblandad asfaltsmassa och andra delen avsvalningsförloppet vid utläggning. Del 1 Numeriska tredimensionella simuleringar med simuleringsverktyget COMSOL Multiphysics har utförts för att undersöka hur uppvärmningen påverkar temperaturskillnaden mellan den inblandade magnetiten och resterande asfaltsmassa. Detta görs för att höga temperaturskillnader kan orsaka koksning. Simuleringarna utförs som ett värmeöverföringsproblem där tillförseln av mikrovågsenergi simuleras som att magnetitkornen avger en viss effekt.  Resultatet visar på att temperaturskillnaden i hög grad beror på avståndet mellan magnetitkornen. Där framförallt höga vikt-% magnetit och små kornstorlekar på magnetiten påverkar avståndet och ger små temperaturskillnader. Detta resulterar i att den magnetitinblandade asfalten kan betraktas som ett kontinuum för höga vikt-% magnetit och mindre kornstorlekar på magnetiten.  Vidare undersöks om det finns någon optimal vikt-% magnetit vid uppvärmning av asfaltsmassan. Resultatet visar att det ur en värmeöverföringssynpunkt inte finns några begränsningar för hur mycket magnetit som kan blandas in.   Del 2 Ett fältförsök utfördes i Kungälv där både magnetitinblandad gjutasfalt och traditionell gjutasfalt lades ut. Båda asfaltstyperna tillverkades och värmdes upp i ett traditionellt gjutasfaltverk och utläggning skedde på Nordreälvsbron i Kungälv. Temperaturen mättes genom att temperaturgivare göts in i asfalten varefter mätvärden registrerades på olika höjdnivåer. Resultatet visade i stort på att den magnetitinblandade gjutasfalten avsvalnade långsammare än den traditionella, även om osäkerheter förekommer. Till exempel vad gäller nederbörd som påverkade asfaltstyperna olika.  Numeriska endimensionella simuleringar med simuleringsverktyget COMSOL Multiphysics har utförts för att jämföra med uppmätta värden från fältförsöket. Här konstateras att temperaturerna i den simulerade modellen avtar snabbare än vad som uppmätts i fältförsöket. Precis som vid fältförsöket noterades att den magnetitinblandade gjutasfalten svalnade av långsammare än den traditionella gjutasfalten. Osäkerheter vid modelleringen rör framförallt modellparametrarna.
205

Byggplatsledningens beslutsfattande : En fallstudie om informationsbehov och beslutsprocesser

Persson, Jacob January 2023 (has links)
Despite the construction industry making up a large portion of the global economy, it struggles withlow productivity and limited growth, notably marked by a lack of digitization and automation.Research in construction has highlighted artificial intelligence (AI) as a potential solution, butimplementation is complicated by the need for extensive data collection and challenges associatedwith construction sites. Several studies have explored various aspects of AI in the construction industry, but not with a focuson the needs of site management. This thesis aims to study site management's decision-making toidentify their data and information needs in their daily operations. A case study was conducted attwo construction companies, one smaller and one larger, focusing on site management's decisionmaking during the implementation phase. Semi-structured interviews and observations were used tocollect data, which was then contextualized within the literature to understand site management'sdecision-making and thereby identify the needs for data and information. The results show that site management regularly faces situations in their daily operations wherethey need to make decisions for the project's progress, often quick decisions. In these decisionmaking situations, site management primarily relies on experience and intuition but also considersthe experiences of colleagues/stakeholders. In their daily operations, site management expressesuncertainty in their decision-making and shows a need for more real-time information to supporttheir decision-making processes. The conclusions from the study indicate that the data and information needs of site managementare broad, varying for different decision-making situations. These needs span several areas, includingthe management of deviations, technical and financial considerations, safety, planning, scheduling,communication, coordination, resource allocation, and construction sequencing. Information isrequested to support decision-making, including rules and regulations, previous experiences,visualization of project status, deviations and specifications, schedules and the sequence ofactivities, safety conditions, and access to information systems.
206

Förseningar i byggprojektering och hur de kan förebyggas

Abdulkader, Ammar January 2023 (has links)
Idag är förseningar inom byggbranschen vanliga och orsakar problem och konsekvenser i byggprojekt. När ett projekt blir försenat uppstår extra kostnader för projektägaren, entreprenören eller båda parter. Med andra ord innebär förseningar ekonomiska förluster och skapar en stressig arbetsmiljö för alla inblandade aktörer och projektmedlemmar. I detta examensarbete identifieras betydande risker som kan orsaka förseningar i projekteringsfasen av byggprocessen, samt presenteras lösningar för att förebygga dem. Byggprocessen består av fyra faser: förstudie, projektering, produktion och överlämning. Projekteringsfasen är ett av de viktigaste stegen i byggprocessen och har stor betydelse för att förebygga förseningar. I denna fas utformas och ritas byggnader, och bygghandlingar tas fram med konstruktionsritningar, tekniska lösningar och beskrivningar upprättas för att styra hela byggprocessen. Detta arbete fokuserar på förseningar i själva projekteringsfasen och dess påverkan på hela projektet, samt hur de kan förebyggas. Arbetet består av en teoretisk och en praktisk del. Syftet med arbetet är att undersöka orsakerna till förseningar inom projekteringsfasen och att hantera dem på bästa sätt genom att utveckla riskhanteringen. Orsakerna kan vara ofullständig information, förändringar i projektspecifikationer och tekniska problem. Teorin bygger på litteratur om projektering i byggprocessen för att ge en bred kunskapsbas om projektering innan den praktiska delen genomförs. Den praktiska delen baseras på intervjuer med erfarna projektledare inom projektering som har varit involverade i olika försenade projekteringsprocesser. Resultatet presenterar projektledarens svar angående orsakerna till förseningarna i de två projekten. I diskussionen jämförs och analyseras resultaten med teorin, vilket visar att sjukdomar och bristande kommunikation, tillsammans med andra risker, kan vara orsaker till förseningar i projekteringsfasen. Förbättringsförslag inkluderar att skapa en trygg och hälsosam arbetsmiljö som en viktig faktor för projektets framgång, genom att anlita ytterligare konsulter från andra företag vid arbetsbelastning och erbjuda avkopplande aktiviteter som exempelvis spa-besök när det behövs. Andra förslag innefattar att lägga extra tid på riskanalys för att identifiera potentiella problem samt att etablera en kommunikationsmetod för grupper, såsom en grupp på Messenger eller en annan applikation, där all information om projektet regelbundet delas.
207

Seismic performance of a  bridge subjected to far-field  ground motions by a Mw 9.0  earthquake and near-field  ground motions by a Mw 6.9  earthquake

Goto, Reina January 2012 (has links)
In the last two decades, two major earthquakes have occurred in Japan: the 1995 Kobe earthquake and the 2011 Great East Japan earthquake. In the 2011 Great East Japan earthquake, many bridge structures were destroyed by the tsunamis, but it is interesting to study the ground motion induced damage and also how this earthquake differed from the one in 1995. In this thesis, the seismic response of a bridge designed according to the current Japanese Design Specifications was evaluated when it is subjected to near-field ground motions recorded during the 1995 Kobe earthquake and far-field ground motions recorded during the 2011 Great East Japan earthquake. For this purpose, a series of nonlinear dynamic response analysis was conducted and the seismic performance of the bridge was verified in terms of its displacement and ductility demand. It was found from the dynamic response analysis that the seismic response of the target bridge when subjected to the ground motions from the 2011 Great East Japan earthquake was smaller than during the 1995 Kobe earthquake. Although the ground motions from the 2011 Great East Japan earthquake were very strong, they were not as strong as the ground motions from the 1995 Kobe earthquake. The results obtained in this thesis clarify the validity of the Type I and Type II design ground motions. The target bridge used in this thesis was designed according to the post-1990 design specifications and showed limited nonlinear response when subjected to the different ground motions which shows how efficient the enhancement of the seismic performance of bridges has been since the 1990’s.
208

Dynamiska egenskaper hos håldäcksbjälklag belastade med gångtrafik / Dynamic properties of hollow core slabs excited by walking people

Gustafsson, Daniel January 2012 (has links)
Concrete floors have traditionally had no problems with annoying vibrations. However with the demand for larger spans the floors need to be made more slender with a higher degree of utilization and lower mass. Therefore new floors may have problems with vibration serviceability.   This thesis studies the vibration characteristics of hollow core slabs. The analysis was made in the finite element program Ansys. The hollow core slab was subjected to a varying force simulating one person walking across the slab. The point where the force was acting on the slab moved through the analysis to simulate the movement of a walking person. Hollow core elements are connected with concrete joints. These joints where modeled in three different ways, two models with hinges and one solid model. The comparison showed that the accelerations caused by the walking person where roughly the same for the models with hinges. In the solid model the amplitudes where slightly smaller.   The calculations show that the largest vibration amplitudes always occur when the forcing frequency is the same as the eigenfrequency of the floor. Also the path of the walking person strongly affects the vibrations in the floor. A path in mid span of a slab will cause larger maximum amplitudes than a path parallel to the hollow core elements. The Maximum Transient Vibration Value (MTVV) will however be larger for paths parallel to one element. Walking along an supported edge creates much lower amplitudes.   This study also shows that increasing the number of hollow core elements alongside of each other decrease the vibration amplitudes linearly with increasing number of elements. The number of contributing elements is also significantly more in the dynamic load case than in the static load case. Therefore load distribution rules from statics directly used in dynamics will be over conservative.
209

Hållbar dagvattenhantering och klimatanpassning genom blå-gröninfrastruktur i tre svenska västkustkommuner : En jämförande fallstudie mellan Kungsbacka, Varbergs och Halmstads kommun. / Sustainable stormwater management andclimate adaptation through blue-green infrastructure in three Swedish west coast municipalities : A comparative case study between Kungsbacka, Varberg and Halmstad municipality.

Persson Roos, Tilde, Svanstedt, Erika Göransdotter January 2023 (has links)
De aktuella klimatförändringarna skapar utmaningar för västkustens kommuner. Detta skapar möjligheter för den blå-gröna infrastrukturen att samspela med de traditionella dagvattenledningsystemen för att skapa en mer hållbar dagvattenhantering. Syftet med denna studie är därför att undersöka hur Kungsbacka, Halmstads och Varbergs kommun arbetar med hållbar dagvattenhantering i praktiken för att motverka framtida översvämningar samt att undersöka vilka faktorer som påverkar kommunernas arbete med blå-grön infrastruktur. Studien har en kvalitativ tillvägagångsmetod i form av dokumentanalys samt semistrukturerade intervjuer. Med utgångspunkt i hållbarhetsövergångsteorin Multi-level perspective har de framtagna dokumenten och intervjuerna analyserats vilket konstaterar att politikerna ofta försvårar utvecklingen av blå-grön infrastruktur. Även utmaningar som geotekniska förutsättningar och markbrist påverkar den blå-gröna infrastrukturens möjlighet att frodas. Den breda tolkningen som kommunerna har av begreppet hållbar dagvattenhantering bidrar till en vidareutveckling av den blå-gröna infrastrukturen. Även klimathändelser påverkar den blå-gröna infrastrukturens förutsättning för genomslag hos den traditionella dagvattenhanteringen. / Climate change is creating challenges for the municipalities on the West Coast. This provides opportunities for blue-green infrastructure to collaborate with traditional stormwater management systems to create more sustainable stormwater management. The purpose of this study is therefore to investigate how the municipalities of Kungsbacka, Halmstad, and Varberg are working with sustainable stormwater management to counteract future flooding, and to examine the factors that affect the municipalities' work with blue-green infrastructure. Based on the sustainability transition theory Multi-level perspective, the documents and interviews have been analyzed, which states that politicians often hinder the development of blue-green infrastructure. Challenges such as geotechnical conditions and land shortage also affect the blue-green infrastructure's ability to thrive. Municipalities' broad interpretation of sustainable stormwater management promotes the sustainable stormwater management and therefore blue-green infrastructure development. Climate events affect the conditions for breakthroughs in traditional stormwater management.
210

Utveckling av simuleringsverktyg: effekt- och energianalys för publika laddningsstationer / Development of simulation tool: power and energy analysis of public charging stations

Nabiallahi, Edwin, Broman, Markus January 2023 (has links)
Detta arbete har gjorts i samarbete med Mälarenergi AB i Västerås. Målet har varit att utveckla ett användarvänligt program för simulering av elbilsparkeringar i nutid och framtid. Data har samlats in och analyserats för flera nuvarande parkeringar i Västerås för att urskilja olika beteendemönster för olika typer av parkeringsplatser. Tillsammans med elbilsstatistik för Sverige har dessa data används som grund för simuleringsverktyget som skrivits i programmeringsspråket Python. För att kunna verifiera simuleringarnas kvalitet har även Monte Carlo-metoden använts. Det slutgiltiga verktyget kan simulera olika parkeringstyper med valfria indata för tre tidsscenarion, 2023, 2030 och 2045. Resultaten visar att verktyget till viss del överestimerar den mängd effekt som faktiskt behövs för parkeringarna och kan snarare användas som en grov uppskattning än en faktisk mall för hur användningen ser ut för en viss elbilsparkering i Västerås. Vidare analys av den verkliga datan visar att många av laddningsstationer uppnår lägre effektnivåer än vad de är dimensionerade för, vilket gör att utnyttjandet av smart laddning eller ett energilager inte skulle utnyttjas till fullo. För dessa fall finns det möjlighet att i dagsläget sänka den tillåtna maxeffekten av tekniska och ekonomiska skäl. Simuleringar för framtida scenarion visade att det kan vara relevant med nödvändigt med implementering av smart laddning för att inte överbelasta näten om det sker ett teknikskifte mot DC-laddning. / This project has been done in cooperation with Mälarenergi AB in Västerås. The goal has been to create software for simulating parking lots with EV-charging. By analyzing data collected from several types of parking lots in Västerås, behavioral patterns have been designed and used together with EV-statistics to create simulations. Code has been written in the programming language Python. To verify the integrity of these, a Monte Carlo method has been used and the results have been compared to the real-life powerdata from Västerås parking lots. Results show that the software simulates power patterns quite well but overestimates the actual power usage. Furthermore, forecasts for the growth of EVs in Sweden by Power Circle have been used as basis for future simulations, specifically years 2030 and 2045. Outcome of running the software shows that for all the current Västerås parking lots, the dimensions for the power consumptions, 63 A fuses, are much larger compared to actual power usage. Outcomes from the future simulations showed that smart charging of EVs as well as the use of energy storages could be necessary as the technology shifts more towards DC-charging. In conclusion, many of the current EV charging stations could be run at a lower max power threshold, which would lower company expenses but still make sure to provide enough power for consumers.

Page generated in 0.0969 seconds