Spelling suggestions: "subject:"[een] PORTFOLIO MANAGEMENT"" "subject:"[enn] PORTFOLIO MANAGEMENT""
511 |
Mathematical methods for portfolio managementOndo, Guy-Roger Abessolo 08 1900 (has links)
Portfolio Management is the process of allocating an investor's wealth to in
vestment opportunities over a given planning period. Not only should Portfolio
Management be treated within a multi-period framework, but one should also take into consideration
the stochastic nature of related parameters.
After a short review of key concepts from Finance Theory, e.g. utility function, risk attitude,
Value-at-rusk estimation methods, a.nd mean-variance efficiency, this work describes a framework
for the formulation of the Portfolio Management problem in a Stochastic Programming setting.
Classical solution techniques for the resolution of the resulting Stochastic Programs (e.g.
L-shaped Decompo sition, Approximation of the probability function) are presented. These are
discussed within both the two-stage and the multi-stage case with a special em phasis on the
former. A description of how Importance Sampling and EVPI are used to improve the efficiency of
classical methods is presented. Postoptimality Analysis, a sensitivity analysis method, is also
described. / Statistics / M. Sc. (Operations Research)
|
512 |
Metaheuristic approaches to realistic portfolio optimisationBusetti, Franco Raoul 06 1900 (has links)
In this thesis we investigate the application of two heuristic methods, genetic
algorithms and tabu/scatter search, to the optimisation of realistic portfolios. The
model is based on the classical mean-variance approach, but enhanced with floor and
ceiling constraints, cardinality constraints and nonlinear transaction costs which
include a substantial illiquidity premium, and is then applied to a large I 00-stock
portfolio.
It is shown that genetic algorithms can optimise such portfolios effectively and within
reasonable times, without extensive tailoring or fine-tuning of the algorithm. This
approach is also flexible in not relying on any assumed or restrictive properties of the
model and can easily cope with extensive modifications such as the addition of
complex new constraints, discontinuous variables and changes in the objective
function.
The results indicate that that both floor and ceiling constraints have a substantial
negative impact on portfolio performance and their necessity should be examined
critically relative to their associated administration and monitoring costs.
Another insight is that nonlinear transaction costs which are comparable in magnitude
to forecast returns will tend to diversify portfolios; the effect of these costs on
portfolio risk is, however, ambiguous, depending on the degree of diversification
required for cost reduction. Generally, the number of assets in a portfolio invariably
increases as a result of constraints, costs and their combination.
The implementation of cardinality constraints is essential for finding the bestperforming
portfolio. The ability of the heuristic method to deal with cardinality
constraints is one of its most powerful features. / Decision Sciences / M. Sc. (Operations Research)
|
513 |
Projektstyrning i offentlig verksamhet : En studie ur projektledarens perspektiv / Project Portfolio Management in the public sector : A study from the project managers perspectiveJens, Persson January 2018 (has links)
A multi project environment entails challenges to project members as well as for the unit who governs the projects. The purpose of this paper is to create a greater knowledge about how project portfolio management can function in practice in different contexts. This paper concerns the public sector which creates additional challenges for the project portfolio management. They must for example always respect how projects will affect the society. Furthermore, the projects in public sector usually have a much stricter budget as well as greater demands. The paper is based on a qualitative study in which eight project managers have been asked how they experience the project portfolio management within the public sector. The answers can be interpreted to that the relationship between the principal and the project manager is crucial to how the project portfolio management is experienced, especially concerning the degree of participation and expectations. Furthermore, there are several aspects which suggests that the mother organization and the project management are clashing. This shows itself for example in resource allocation problems and quick decision making. One way to interpret this is that it depends on two different views on decision making. The public sector entails a bureaucratic system that according to some respondents often slows decisions down, decisions which they maybe view as self-evident. To have a good and effective project management in the public sector seems hard. It is suggested though, that the project portfolio management should be adjusted to the prerequisites that each organization entails. The study also shows the importance of the relationship between agent and principal and how it affects the possibilities to operate projects effectively. / En multiprojektmiljö innebär utmaningar för såväl projektmedlemmar som för den ledning som samordnar och projektstyr. Syftet med denna uppsats är att skapa större förståelse för hur projektstyrning kan gå till i praktiken i olika kontexter. Den offentliga sektorn som studien berör innebär ytterligare utmaningar för hanteringen av en multiprojektmiljö. Uppsatsen baseras på en kvalitativ studie med åtta projektledare där projektledare har frågats hur de upplever projektstyrningen inom offentlig sektor. Resultatet tyder på att den personliga kontakten mellan uppdragsgivare och projektledare kan vara avgörande för hur projektstyrningen upplevs, exempelvis är delaktighet och förväntningar viktigt. Vidare finns det även flera aspekter som tyder på att linjeorganisation och projektverksamheten krockar. Det här tar sig bland annat uttryck vid resursprioritering och snabb beslutsfattning. Föregående kan tolkas bero på olika perspektiv på beslutsfattande. Den offentliga sektorn innebär ett byråkratiskt system som ofta upplevs bromsar beslut som de själva kanske tycker är självklara. Att bedriva en bra och effektiv projektledning i offentlig sektor tycks således vara svårt. Däremot så föreslås det att effektiviseringsarbetet bör anpassas efter de förutsättningar som vardera organisationen har för att skapa ett så effektivt system som det bara går. Studien visar även vikten av hur det personliga förhållandet mellan uppdragsgivare och projektledare påverkar möjligheterna att bedriva projekt effektivt.
|
514 |
L'évaluation de la performance des fonds mutuels : le cas de la France / Performance evaluation of mutual funds : the french contextBangash, Romana 19 April 2012 (has links)
Les fonds mutuels sont désormais reconnus comme une possibilité de diversifier des investissements en actions et constituent actuellement une alternative (ou un complément) aux investissements directs en actions. L'industrie des fonds mutuels est désormais présente dans la majorité des pays et a enregistré une croissance spectaculaire au cours des dernières années. En dépit de son importance, cette industrie a fait l'objet de peu de recherches en dehors des Etats-Unis. Notre étude a pour but de combler ce manque. A travers l'utilisation d'une base de données récente fournie par Eurofidai, nous analysons les attributs et la performance des fonds mutuels européens en fondant notre étude sur le cas des fonds d'actions français. Cette thèse de doctorat examine le problème de sélection des investisseurs confrontés à une masse d'information importante qui peut résulter en une certaine confusion lors de l'allocation d'actifs. Afin d'acquérir une meilleure compréhension des fonds mutuels, nous analysons certains facteurs et caractéristiques qui sont susceptibles d'avoir un impact sur leur performance et par conséquent influent sur la prise de décision des investisseurs. Notre étude empirique utilise des données mensuelles entre 1990 et 2009 sur un ensemble de fonds mutuels investis en actions françaises. Les objectifs de la recherche sont au nombre de trois : l'évaluation des performances des fonds mutuels, la détermination des caractéristiques ayant un impact sur ces performances et les explications potentielles de la structure des frais de gestion. Nos résultats révèlent que les fonds français préfèrent les actions à petite taille et book-to-market. Il apparaît que la taille du fonds et sa longévité ont un impact positif sur la performance. Nous montrons également qu'il existe des économies d'échelle dans les familles de fonds. Par exemple, les fonds contenant des titres à faibles capitalisation favorisent les investisseurs en réclamant des frais de gestion plus faibles.. Ce travail de recherche apporte aux chercheurs, analystes et investisseurs des éléments de réponse et permet ainsi à ces derniers d'affiner leur prise de décision relative à l'investissement dans l'industrie des fonds mutuels. / Ever since the investment community first recognized mutual funds as a means for diversification, asset preservation, and asset accumulation, academics and practitioners have conducted many studies designed to ascertain their appeal. The mutual funds are gaining importance worldwide and it has registered a spectacular growth in the entire world. Despite the importance of the mutual fund industry, it has received little academic attention outside the USA. Therefore, our study intends to contribute in filling this gap. Using a new database of Eurofidai, we analyze mutual funds' various aspects in European context with a case of French equity mutual funds. This study has introduced the problem investors have in selecting mutual funds, where the sheer amount of information on mutual funds results in investor confusion. To dispel this confusion and to bring a deeper understanding in mutual funds, we have examined certain factors and characteristics that affect the mutual funds performance and ultimately investors' decisions. This study followed suit by compiling monthly data from 1990 to 2009 for equity mutual funds domestically invested in France. We have three basic research objectives; performance evaluation of equity mutual funds; designating funds' characteristics effecting performance and potential determinants for structuring fund's fees being charged to investors. Our results reveal that French funds prefer smaller stocks and lower book to market ratio. We provide evidence of positive impact of funds' size and age on fund performance. We also found economies of scale in fund families. Funds having small cap holdings favor investors by charging low management fees. This research provides academics, analysts and investors some insight in mutual funds to refine their preferences and some key features to be considered while deciding their investments.
|
515 |
Gestão de portfólio de projetos tecnológicos : o caso das instituições brasileiras públicas de pesquisaPinheiro, Rafael Sanaiotte 22 March 2016 (has links)
Submitted by Caroline Periotto (carol@ufscar.br) on 2016-09-26T18:34:39Z
No. of bitstreams: 1
TeseRSP.pdf: 1976223 bytes, checksum: 6922d33bbe99be737758a8ea8e8d2f93 (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-27T20:12:42Z (GMT) No. of bitstreams: 1
TeseRSP.pdf: 1976223 bytes, checksum: 6922d33bbe99be737758a8ea8e8d2f93 (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-27T20:12:47Z (GMT) No. of bitstreams: 1
TeseRSP.pdf: 1976223 bytes, checksum: 6922d33bbe99be737758a8ea8e8d2f93 (MD5) / Made available in DSpace on 2016-09-27T20:12:53Z (GMT). No. of bitstreams: 1
TeseRSP.pdf: 1976223 bytes, checksum: 6922d33bbe99be737758a8ea8e8d2f93 (MD5)
Previous issue date: 2016-03-22 / Não recebi financiamento / Institutions are still looking for effective and efficient practices of their portfolio project management (PPM). Similarly, public research laboratories (PRL) are also pursuing this practice. However, these have organizational and institutional factors that differentiate them from private companies. In this way, through a literature review and case studies, developed a theoretical framework to identify and represent the organizational and institutional influence factors in practices and processes of PPM inside Brazilian public research institutions. Based on the five cases realized (a University, an institution with ties to state-owned company and three research institutions linked to Brazilian Government ministries) was able to evaluate the five factors: organizational aspects, institutional environment, identification, selection and priorization of opportunities, administration of resources and development of partnerships. It could be listed as findings of this thesis: the low adoption of PPM practices in national research institutions, the influence of public policy in the development of research activities of these institutions, and the need for a better development of managerial practices of administrative activities. Only two institutions studied have structured procedures to select, prioritize, track and monitor their projects portfolios. / Muitas instituições ainda buscam práticas eficazes e eficientes para o gerenciamento de seus portfólios de projetos. Essa busca não é diferente para os laboratórios públicos de pesquisa. Porém estes apresentam características institucionais e organizacionais que os diferenciam das empresas privadas. Neste intuito esta tese, por meio de uma revisão da literatura e estudo de casos, desenvolveu um quadro teórico para identificar os fatores que influenciam na adoção de práticas de gestão de portfólio de projetos nas instituições brasileiras públicas de pesquisa. Com base nos cinco casos realizados (uma universidade, uma instituição com vínculo a empresa estatal e três instituições de pesquisa vinculadas a ministérios do governo brasileiro) foi possível analisar os cinco fatores: Aspectos Organizacionais, Ambiente Institucional, Identificação, Seleção e Priorização de Oportunidades, Administração dos Recursos e Desenvolvimento de Parcerias. Podem ser listados como constatações do trabalho: a pouca adoção de práticas de gestão de portfólio de projetos nas instituições de pesquisa nacionais, a influência de políticas públicas no desenvolvimento das atividades de pesquisas destas instituições e a necessidade de um melhor desenvolvimento de práticas gerenciais administrativas das atividades realizadas. Apenas duas instituições estudadas possuem procedimentos estruturados para selecionar, priorizar, controlar e monitorar seus portfólios de projetos.
|
516 |
Influências da gestão de portfólio na eficiência dos produtos ambientalmente melhorados / Influences of portfolio management in the efficiency of environmentally improved productsLuiz, João Victor Rojas [UNESP] 21 July 2016 (has links)
Submitted by João Victor Rojas Luiz (jvluiz@yahoo.com.br) on 2016-08-19T12:40:24Z
No. of bitstreams: 1
Dissertação - João Victor Rojas Luiz.pdf: 1893584 bytes, checksum: b5735ccc426246b01b09995e22459954 (MD5) / Rejected by Ana Paula Grisoto (grisotoana@reitoria.unesp.br), reason: Solicitamos que realize uma nova submissão seguindo as orientações abaixo:
Informe o nome do orientador e coorientador na capa do trabalho.
Corrija esta informação no arquivo PDF e realize uma nova submissão contendo o arquivo correto.
Agradecemos a compreensão. on 2016-08-22T19:10:21Z (GMT) / Submitted by João Victor Rojas Luiz (jvluiz@yahoo.com.br) on 2016-08-22T19:27:57Z
No. of bitstreams: 1
Dissertação - João Victor Rojas Luiz.pdf: 1894494 bytes, checksum: 29dd2e656d58474d4ce9ecfe2615c4be (MD5) / Approved for entry into archive by Juliano Benedito Ferreira (julianoferreira@reitoria.unesp.br) on 2016-08-22T20:49:41Z (GMT) No. of bitstreams: 1
luiz_jvr_me_bauru.pdf: 1894494 bytes, checksum: 29dd2e656d58474d4ce9ecfe2615c4be (MD5) / Made available in DSpace on 2016-08-22T20:49:41Z (GMT). No. of bitstreams: 1
luiz_jvr_me_bauru.pdf: 1894494 bytes, checksum: 29dd2e656d58474d4ce9ecfe2615c4be (MD5)
Previous issue date: 2016-07-21 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP) / Um conjunto de atributos de projeto que vem se destacando nas últimas décadas, no que se refere ao desenvolvimento de produtos ambientalmente melhorados, é o relacionado ao conceito de Design for Environment ou Ecodesign. O emprego de métodos e ferramentas relacionados a esse conceito tem potencial para orientar as empresas nas escolhas associadas a projetos de novos produtos de menor impacto em termos ambientais. Este trabalho teve como objetivo geral identificar e analisar a adoção do desenvolvimento de produtos ambientalmente melhorados e sua influência nas práticas tradicionais de gestão de portfólio de produtos e no seu desempenho. Para isso, foi realizada pesquisa de levantamento tipo survey em empresas com atividade de desenvolvimento de produtos. Dentre os principais resultados em uma amostra de 79 empresas inovadoras, que desenvolvem produtos e que atuam no Brasil, pôde-se constatar que há intensa aplicação de métodos de gestão de portfólio e de desenvolvimento de produtos ambientalmente melhorados. Observou-se também que o uso de práticas ambientais voltadas ao desenvolvimento do produto influencia significativamente o desempenho de portfólio e na geração de oportunidades de mercado e tecnológicas. Por outro lado, não se verificou influências entre o emprego das práticas ambientais com os resultados do programa de desenvolvimento de novos produtos. Também houve indicações de que a obtenção de certificação de sistema de gestão ambiental (ISO 14001) não influencia o nível de adoção de práticas ambientais relacionadas ao desenvolvimento de novos produtos. / A set of product attributes that has been highlighted in recent decades, with regard to environmentally improved product development, is related to the concept of Design for Environment or Ecodesign. The use of methods and tools of ecodesign has the potential to guide companies in the choices associated with new product designs. This research had as main objective to identify and analyze the relations of influence between traditional product portfolio management practices and those related to environmentally friendly product development with product portfolio performance. Among the main results in a sample of 79 innovative companies that develop products and operate in Brazil, it could be seen that there is intense application of portfolio management methods and of development of environmentally improved products practices, such as checklists, financial techniques and product development with a focus on reducing resource consumption/waste generation. It was also noted that the use of environmental practices aimed at product development significantly influences the portfolio performance and the generation of market opportunities and technology. On the other hand, no influence was verified between the use of environmental practices and the results of new product development program. There have also been indications that obtaining environmental management system certification (ISO 14001) does not influence the level of adoption of environmental practices related to the development of new products. / FAPESP: 2015/00110-6
|
517 |
Influência da incerteza no processo de decisão: priorização de projetos de melhoria. / Influence of uncertaities in the decision process: priorization of improvement projects.Marcos Coitinho 18 December 2006 (has links)
Este trabalho descreve um experimento sobre o processo de decisão para priorização de projetos de melhoria em uma indústria de bens de capital. Apenas dois critérios eram aplicados na tarefa de priorizar projetos; exigências legais e complexidade técnica, então, foi proposto avaliar os projetos através de um conjunto mais amplo de critérios, incluindo imagem da marca, participação de mercado, alinhamento estratégico, tempo de lançamento de um novo produto. Para lidar com um número maior de critérios qualitativos e quantitativos, foi introduzido desde então, dois métodos multicritérios, a saber: o uso do AHP (analytical hierarchic process) e o DS-AHP (Dempster-Shafer /AHP). Os fundamentos teóricos dos dois métodos são apresentados. O primeiro método é usado para determinar as importâncias relativas das alternativas, por meio de ponderações em cada nível da estrutura hierárquica; a qualidade dos julgamentos é avaliada por um \"índice de consistência\". O segundo método também utiliza a plataforma de análise do AHP acrescentado mensuração da ignorância no processo de julgamentos por meio de probabilidades subjetivas. São comentadas as aplicações dos métodos em uma específica indústria. Foram observadas objeções dos decisores à aplicação do processo AHP, decorrentes da necessidade de numerosas re-avaliações dos julgamentos, quando o \"índice de consistência\" apresentava-se maior que os valores recomendados. Como ponto positivo foi destacada a simplicidade do método para aplicações no ambiente empresarial. Quanto ao método DS-AHP, o uso do conceito de crença nos julgamentos dos decisores, permitiu melhores aproximações às situações reais; neste caso, a alternativa eleita pôde ser claramente compreendida como a mais provável, e não classificada como provavelmente ou certamente a melhor. O DS-AHP quandocomparado ao AHP apresenta-se como um ferramental de condução mais direta para a obtenção dos resultados principalmente no que se refere ao menor número de comparações exigidas, também ajuda o decisor a identificar e corrigir as possíveis fontes de ignorância, que podem afetar a qualidade da decisão. / This study describes an experiment about the definition of portfolio of improvement projects in an industry of capital goods, which had until recently been prioritized based mainly on legislation demand and technical complexity. It was proposed to increase the criteria numbers including: market image, market share, strategic alignment, launch time to new products. To handle several criteria with focus quantitative and qualitative aspects was necessary introduced two multcriterial methods, namely, analytical hierarchic process (AHP) and Dempster-Shafer AHP process (DS-AHP). The first referred method is used to manage the relative importance of alternatives regarding the fore mentioned criteria based on weights attributed to structure hierarchical levels. The second referred method also uses AHP platform to enable ignorance measurement based on subjective probabilities. Results from direct application of the methods in this specific industry are commented. It was observed that the decision makers have some objections with respect to the AHP process, in the sense that there were judgment inconsistencies which required additional evaluation of the candidate solutions, what was seen as somewhat tiresome. The main advantages which was emphasize by decision makers refers to the ease of application in corporate environmental . As for the DS - AHP process, the possibility of considering believes in a structured way was felt as more appropriated to the real decision process, which effectively involves uncertainties. In this way, the elected alternative can be clearly understood as most probably - and not certainly - the best. Also the DS-AHP process was seen as more directly conducive to the final results in comparison with the AHP process.
|
518 |
Aplicação de métodos computacionais multidisciplinares de engenharia para otimização de carteiras de investimentos. / Application of multidisciplinary engineering methods to optimize investment portfolios.Marcelo Rosario da Barrosa 14 April 2015 (has links)
Este trabalho apresenta uma nova metodologia para otimizar carteiras de ativos financeiros. A metodologia proposta, baseada em interpoladores universais tais quais as Redes Neurais Artificiais e a Krigagem, permite aproximar a superfície de risco e consequentemente a solução do problema de otimização associado a ela de forma generalizada e aplicável a qualquer medida de risco disponível na literatura. Além disto, a metodologia sugerida permite que sejam relaxadas hipóteses restritivas inerentes às metodologias existentes, simplificando o problema de otimização e permitindo que sejam estimados os erros na aproximação da superfície de risco. Ilustrativamente, aplica-se a metodologia proposta ao problema de composição de carteiras com a Variância (controle), o Valor-em-Risco (VaR) e o Valor-em-Risco Condicional (CVaR) como funções objetivo. Os resultados são comparados àqueles obtidos pelos modelos de Markowitz e Rockafellar, respectivamente. / This work presents a new methodology for optimizing financial asset portfolios. The proposed methodology, based on universal interpolators such as Artificial Neural Networks and the Kriging Method, allows for approximating the risk surface - and thus the optimal solution to the problem - in a generalized fashion and applicable to any risk measure known in literature, relaxing every restrictive hypothesis inherent to the available methods and with the ability to estimate the error in the approximation. Illustratively, the proposed methodology is applied to the portfolio problem with the Variance (control), Value-at-Risk and Conditional Value-at-Risk as objective functions. Results are compared to those obtained by Markowitz and Rockafellar models, respectively.
|
519 |
Early termination of R&D projects / Terminação precoce de projetos de P&DLeandro Rodrigues Gonçalves 27 October 2015 (has links)
Early project termination is one of the most difficult decisions to be made by Research and Development managers. While there is the risk of terminating good projects, there is also the opposite risk of not terminating bad projects and overspend resources in unproductive research. Criteria used for identifying these projects are common subject of research in Business Administration. In addition, companies might take important lessons from its interrupted projects that could improve their overall portfolio technical and commercial success. Finally, the set and weight of criteria, as well as the procedures companies use for achieve learning from cancelled projects may vary depending on the project type. This research intends to contribute to the understanding of policies applied to projects that were once considered attractive, but by some reason is not appreciated anymore. The research addressed the question: How companies deal with projects that become unattractive? More specifically, this research tried to answer the following questions: (1) Are projects killed or (otherwise) they die naturally by lack of resources? (2) What criteria are used to terminate projects during development? (3) How companies learn from the terminated projects to improve the overall portfolio performance? (4) Are the criteria and learning procedures different for different types of projects? In order to answer these questions, we performed a multiple case study with four companies that are reference in business administration and innovation: (1) Oxiteno, considered the base case, (2) Natura, the literal replication, (3) Mahle and (4) AES, the theoretical replications. The case studies were performed using a semi-structured protocol for interviews, which were recorded and analyzed for comparison. We found that the criteria companies use for selecting projects for termination are very similar to those anticipated by the literature, except for a criteria related to compliance. We have evidences to confirm that the set of criteria is not altered when dealing with different project types, however the weight they are applied indeed varies. We also found that learning with cancelled projects is yet very incipient, with very few structured formal procedures being described for capturing learning with early-terminated projects. However, we could observe that these procedures are more common when dealing with projects labeled as innovative, risky, big and costly, while those smaller and cheaper derivative projects aren\'t subject of a complete investigation on the learning they brought to the company. For these, the most common learning route is the informal, where the project team learns and passes the knowledge though interpersonal information exchange. We explain that as a matter of cost versus benefit of spending time to deeply investigate projects with little potential to bring new knowledge to the project team and the organization / Terminação precoce de projetos é uma das decisões mais difíceis a serem tomadas pelos gerentes de pesquisa e desenvolvimento. Enquanto há o risco de terminar bons projetos, há também o risco oposto de não encerrar maus projetos e ter recursos alocados em pesquisa improdutiva. Os critérios utilizados para a identificação destes projetos são objeto comum de investigação em Administração de Empresas. Além disso, as empresas podem tirar lições importantes com seus projetos interrompidos que poderiam melhorar o desempenho técnico e comercial da sua carteira. Finalmente, o conjunto de critérios e respectivos pesos, bem como os procedimentos usados pelas empresas para reter aprendizado a partir da interrupção de projetos, podem variar dependendo do tipo de projeto. Esta pesquisa pretende contribuir para a compreensão das políticas aplicadas a projetos que já foram considerados atraentes, mas por alguma razão não são mais apreciados. A pesquisa abordou a questão: Como as empresas lidam com projetos que se tornam pouco atraentes? Mais especificamente, esta pesquisa procurou responder às seguintes questões: (1) São os projetos encerrados ou (caso contrário) eles morrem naturalmente por falta de recursos? (2) Que critérios são usados para encerrar projetos durante o desenvolvimento? (3) Como as empresas aprendem com os projetos terminados de modo a melhorar o desempenho geral da carteira? (4) Os critérios e procedimentos de aprendizagem são diferentes para diferentes tipos de projetos? A fim de responder a essas perguntas, foi realizado um estudo de caso múltiplo com quatro empresas que são referência em administração de empresas e inovação: (1) Oxiteno, considerado o caso base, (2) Natura, a replicação literal, (3) Mahle e (4) AES, as replicações teóricas. Os estudos de caso foram realizados utilizando um protocolo semiestruturado para as entrevistas, que foram gravadas e analisadas para comparação. Descobrimos que os critérios usados pelas empresas para identificação dos projetos candidatos ao cancelamento são muito semelhantes àqueles antecipados pela literatura, com exceção de um critério relacionado com a existência de indícios de corrupção. A pesquisa gerou evidências que corroboram a ideia de que o conjunto de critérios não é alterado quando se lida com diferentes tipos de projeto, no entanto, varia o peso atribuído a cada um na sua aplicação. Também descobrimos que a aprendizagem com projetos cancelados é ainda muito incipiente. As empresas descreveram muito poucos procedimentos formais estruturados para a captura de aprendizagem com projetos terminados precocemente. No entanto, pode-se observar que estes procedimentos são mais comuns quando se trata de projetos rotulados como inovadores, arriscados, grandes e caros. Os projetos derivados, menores e mais baratos, não são objeto de uma investigação completa sobre o aprendizado que eles trouxeram para a empresa. Para estes, a rota de aprendizagem mais comum é a informal, onde a equipe do projeto aprende e passa o conhecimento à frente por meio de intercâmbio de informações entre as pessoas. Nós explicamos este achado como uma questão de custo versus benefício de pessoal de P&D para investigar profundamente projetos com pouco potencial de trazer conhecimentos valiosos para a organização.
|
520 |
Priorização de projetos de TI utilizando metodologia multicritério: proposta para o comitê de TI de uma empresa de transporte de gásSouza, Leandro Peçanha de 05 April 2016 (has links)
Submitted by Marcia Silva (marcia@latec.uff.br) on 2016-10-07T19:57:13Z
No. of bitstreams: 1
Disssert Leandro Peçanha de Souza.pdf: 11466487 bytes, checksum: 099df51af11e59887ad31dab009228a8 (MD5) / Approved for entry into archive by Biblioteca da Escola de Engenharia (bee@ndc.uff.br) on 2017-01-26T12:26:11Z (GMT) No. of bitstreams: 1
Disssert Leandro Peçanha de Souza.pdf: 11466487 bytes, checksum: 099df51af11e59887ad31dab009228a8 (MD5) / Made available in DSpace on 2017-01-26T12:26:11Z (GMT). No. of bitstreams: 1
Disssert Leandro Peçanha de Souza.pdf: 11466487 bytes, checksum: 099df51af11e59887ad31dab009228a8 (MD5)
Previous issue date: 2016-04-05 / A alta concorrência e a necessidade crescente de melhores resultados com recursos cada vez mais reduzidos impõem que as empresas selecionem e invistam em projetos que tenham maior potencial para gerar vantagem competitiva. O Comitê de TI (Tecnologia da Informação) é uma das estruturas de Governança de TI mais elementares e utilizadas nas organizações para potencializar o desempenho da TI, sendo que uma das suas principais atribuições consiste em priorizar os projetos de TI. Definir com clareza um portfólio alinhado aos objetivos estratégicos, não levando em conta somente fatores financeiros ou exclusivamente técnicos, é um problema de decisão multicritério complexo. Este estudo pretende demonstrar a utilização de uma metodologia de Apoio Multicritério à Decisão (AMD) através da aplicação de um método híbrido composto pelo AHP (Analytic Hierarchy Process) e TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution), que permitirá ordenar (ranking) os projetos de investimento do portfólio da TI / The high competition and growing need for the best results with increasingly limited resources require companies to select and invest in projects that have the greatest potential to create a competitive advantage. The IT Committee (Information Technology) is one of the most basic IT Governance structures and is used in organizations to enhance IT performance, since one of its main attributes is prioritizing IT projects. Clearly defining a portfolio aligned to strategic objectives, taking into account not only financial or purely technical factors, is a complex multi-criteria problem for decision-making. This study aims to demonstrate the use of a Multi-criteria Decision Aid (MCDA) methodology, by applying a hybrid method composed of the AHP (Analytic Hierarchy Process) and TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution), which will allow for sorting (ranking) IT portfolio investment projects
|
Page generated in 0.0609 seconds