• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 340
  • 164
  • 95
  • 37
  • 30
  • 23
  • 20
  • 19
  • 17
  • 3
  • 2
  • 2
  • 2
  • 1
  • Tagged with
  • 808
  • 298
  • 295
  • 255
  • 214
  • 178
  • 171
  • 170
  • 119
  • 114
  • 106
  • 93
  • 90
  • 79
  • 74
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

BIM-Projektering som metod för att minska antalet ÄTA-arbeten inom anläggningsproduktion

Johansson, Pontus, Olander, Pontus January 2016 (has links)
Purpose: BIM has the potential to reduce the number of design errors in construction projects. Possibilities to change parts at a later stage, as well as better opportunities to which the designer himself can detect if anything wrong has been done. The possibility to discover faults easier and with better opportunities for changes should lead to the defects related to design errors in production decreases. The introduction of BIM in a firm may be costly and clear evidence that the design errors decreased by BIM has not been found. The goal of the work is to find out whether the introduction of BIM in the design stage in construction has led to fewer defects related to design errors in the production stage. Method: In order to achieve the target set has interviews with designers at two consulting companies been implemented. This is to find out how the methods of the designing has become more BIM-based. A document analysis has been carried out on the lists of defects and changes from eleven different engineering projects of varying size. These documents come from two large contractors in Sweden. Findings: The deisgners interviewed describe the methods for designing roads and facilities have gone on to become more BIM-based. Having previously designed in 2D CAD it has gone over more to the 3D models. In the 3D software it is also possible to add different models to the same file and check for any errors between them. To check itself has also become easier than when the designing was done in 2D CAD. The lists of changes and defects also shows that the amount of the defects related to design errors was reduced significantly compared to how it looked in a study conducted in 1999 and mentioned in a study from 2014. Implications: The introduction of BIM in the design has led to the defects related to design errors out in production has fallen. This would be of interest to companies thinking of introducing BIM in their organization but have not yet seen the benefits that BIM brings. Limitations: The thesis is relevant to both designers and contractors in civil engineering. This is when the work has been focused more towards the road and facility than designing of houses. Designers and entrepreneurs from different companies in different parts of Sweden have contributed to the collection of data, which means that the results can be assumed to be general. Contact with more companies from more places in Sweden had definitely been able to make the results even more generally. Keywords: BIM, design, changes, design errors / Syfte: BIM har potentialen att minska antalet projekteringsfel i anläggningsprojekt. Möjligheter att ändra delar i ett senare skede samt bättre möjligheter att som projektör själv upptäcka eventuella fel man gjort. Upptäcks fel enklare och med bättre möjligheter för ändringar bör därför leda till att ÄTA-arbetena i produktionen minskar. Att införa BIM på ett företag kan dock vara kostsamt och tydliga bevis på att projekteringsfelen minskat med BIM har inte kunnat hittas. Målet med arbetet var att ta reda på om införandet av BIM i projekteringsskedet vid anläggningsarbeten har lett till färre ÄTA- arbeten relaterade till projekteringsfel ute i produktionsskedet. Metod: För att uppnå det mål som satts har intervjuer med projektörer på två konsultföretag genomförts. Detta för att ta reda på hur metoderna för att projektera blivit mer BIM-baserade. En dokumentanalys har sedan genomförts på ÄTA-listor från elva olika anläggningsprojekt i varierande storlek. Dessa dokument kommer från två större entreprenadföretag i Sverige. Resultat: De projektörer som intervjuats beskriver att metoderna för att projektera vägar och anläggningar har gått mot att bli mer BIM-baserat. Från att tidigare ha projekterat i 2D-CAD har man gått över mer till 3D-modeller. I programmen med 3D finns även möjligheter att lägga in olika modeller i samma fil och kontrollera eventuella fel. Att kontrollera sig själv har även det blivit enklare jämfört med när projektering genomfördes i 2D-CAD. ÄTA-listorna visar även de att mängden ÄTA-arbeten relaterade till projekteringsfel minskat betydligt jämfört med hur det såg ut i en studie genomförd 1999 som även nämns i en studie genomförd 2014. Konsekvenser: Införandet av BIM i projekteringen har lett till att ÄTA-arbetena ute i produktionen har minskat. Detta skulle kunna intressera företag som funderat på att införa BIM i sin organisation men som ännu inte sett nyttan och de fördelar som BIM för med sig. Begränsningar: Examensarbetet är relevant för både projektörer och entreprenörer inom anläggningsbranschen. Detta då arbetet har koncentrerats mer mot väg och anläggning än mot hus. Projektörer och entreprenörer från olika företag i olika delar av Sverige har bidragit till datainsamlingen vilket gör att resultatet kan antas vara generellt. Kontakt med fler företag från fler platser i Sverige hade definitivt kunnat göra resultatet än mer generellt. Nyckelord: BIM, projektering, ÄTA-arbeten, projekteringsfel.
52

BIM - Detaljeringsnivåer av byggnadsmodeller : En studie i hur olika detaljeringsnivåer påverkar informationsinnehållet av byggnadsmodeller / Levels of detail in building information models : A study of how different levels of detail affects the information in building models

Jacobsson, Jonatan January 2016 (has links)
BIM, Building Information Modelling, är inget nytt begrepp för byggbranschen och ämnet är välutforskat i teorin. Den praktiska tillämpningen har dock inte nått ut till hela den svenska branschen och lägst implementation finns idag hos förvaltningen. För att BIM ska nå ut till denna del av branschen, behöver beställarna förstå vilken funktion BIM kan bistå med och ställa BIM-krav i sina projekt. Då det inte finns någon övre gräns på hur mycket information en modell kan innehålla, behöver beställarna också definiera vilken information som är nödvändig för sökta funktioner. Denna studie ämnar att tydliggöra hur informationsinnehållet i en modell påverkas av olika detaljeringsnivåer. Genom en sammanställning av befintliga standarder och nivåsystem har en utbildningslokal på 150kvm modellerats med hjälp av Autodesk Revit Architecture. Med hjälp av denna modell och sammanställd teori dras följande slutsatser. Det är möjligt att säkerställa informationsbehoven hos beställarens organisation med hjälp av ett detaljeringsnivåsystem. Olika fastigheter har olika funktionsbehov och kräver olika detaljeringsnivåer. En generell nivå på vilken information som ska ingå i dessa modeller borde gå att fastställa. En förutsättning för lyckade BIM-projekt är att tydliga anvisningar och krav upprättas inför modellering och att dessa är förankrade i byggprojektets och förvaltningens informationsbehov. / BIM, Building Information Modelling, is not a new concept for the construction industry and the subject is well reviewed in theory. The practical application has not yet reached out to the whole Swedish construction industry and the lowest implementation of BIM can be found in facility management. For BIM to reach this part of the industry, clients’ needs to understand the functions that BIM can assist with and set BIM requirements for their projects. Since there is no upper limit on the level of information a model may contain, clients also needs to define which information is necessary for the sought functions. This study aims to clarify how the information content of a model is affected by different levels of detail. Through a compilation of existing standards and level system has an education facility of 150sqm been modeled using Autodesk Revit Architecture. With the help of this model and the compiled theory, following conclusions has been drawn. It is possible to ensure the information needs of the client's organization with the help of a system for level of development. Different buildings have different functional needs and require different levels of detail. A general level of detail to be included with these models should be possible to determine. A prerequisite for successful BIM project is that clear instructions and requirements are established for the modeling process and that these are anchored in the needs of the project and management.
53

BIM 360 Field : Ett verktyg att tidseffektivisera besiktning

Fagersson, Emma, Hilmersson, Viktoria January 2019 (has links)
Byggprocessen är lång från idé till färdig produkt och arbetsmetoder skiljer sig från olika företag. Denna studie handlar om hur besiktningsskedet kan effektiviseras med programvaran BIM 360 Field. Det är en molnbaserad programvara för byggadministration på arbetsplatsen som kan användas via läsplatta ute i fältet eller som ett webbaserat verktyg för administrering och rapporthantering. En besiktning innebär att en besiktningsman bedömer om entreprenören uppfyller de funktionskrav och tekniska lösningar som står i kontraktet från beställaren. Syftet med studien är att undersöka fördelar och nackdelar med BIM 360 Field så att Skanska Hus Väst kan påskynda processen för användandet av programmet från förbesiktning till garantibesiktning. Detta arbete genomfördes med litteraturstudie, intervjuer och praktisk tillämpning på referensobjekt. Intervjuerna gjordes med personer inom Skanska som har olika mycket erfarenheter av programmet. Respondenterna kunde även visa i programmet hur olika funktioner fungerar. Av de intervjuer och den litteraturstudie som gjordes framstod funktionen issues lämpligast i besiktning, i issues lokaliseras fel med pins, en markering som visar var på ritningen ett fel identifierats, vilket företag som berörs samt möjligheten att kommentarerna och lägga till bilder. Resultatet av studien är att BIM 360 Field kan effektivisera besiktningsprocessen. Eftersom det utförs digitalt kan fel börja åtgärdas direkt efter färdig besiktning, i jämförelse med den traditionella arbetssättet då det tar 2-3 dagar att vänta på ett protokoll. Pappersarbete och ett flertal mail undviks då allt finns i programmet och är tillgängligt för alla som är delaktiga i projektet. Samtliga aktörer kan se över sina punkter och markera att de åtgärdats. Nackdelen är att vid de tillfällen då alla aktörer inte använder sig av programmet leder det till dubbelarbete. BIM 360 Field är ett omfattande program med många olika funktioner och en stor grupp i branschen har bristande digitala kunskaper, vilket försvårar implementering av programmet. För att se långsiktig vinning är det viktigt att lägga mycket tid i början av inlärningen. En fördel är att lära upp de som har intresse för teknik först så de kan lära vidare eller finnas som stöd för de som behöver mer hjälp. För framtida projekt kan statistik sammanställas i programmet för att förebygga vanliga fel och se över vilka företag som ofta gör fel. I slutet av studien gjordes en prövning där BIM 360 Field användes i besiktning på referensobjektet Sjöstaden. Åsikter som respondenter haft kan fastställas, programmet fungerar bra vid besiktning om alla använder sig av det. / The construction process is lengthy and time-consuming from idea to finished product and working methods differ between different companies. This report aims to explore how the inspection phase, within a construction process, could be performed more efficiently with the BIM 360 Field software. BIM 360 Field is cloud-based software used for project management and administration in construction projects, and can be operated through a tablet in the field or as a web-based tool for administration and reports. The goal of an inspection is for the inspector to assess whether the contractor fulfilled the functions and technical solutions that were stated in the contract from the client. The purpose of this study is to investigate the advantages and disadvantages of BIM 360 Field software so that Skanska Hus Väst can accelerate the process of using the software from pre-inspection to warranty inspection. This study was conducted by literature studies, interviews and a practical application on a reference object. The interviews were conducted with professionals in Skanska who have had experiences with the program. The respondents could also show and explain how the different functions in the program worked. By those who were interviewed and the literature study, it appeared that the most appropriate function that was used in the inspection is issues. Imperfections is located with pins, a marking where in the design the imperfection was discovered, which company is affected and adding comments and pictures. The result of the study is that BIM 360 Field streamline the inspection process. Since it is performed digitally, imperfections can be fixed immediately after completed inspection, in comparison with the traditional way of working when it takes 2-3 days to wait for a protocol. Paperwork and a number of emails are avoided since everything is in the program and is available to anyone who is involved in the project. All occupational categories can mark in the program that their imperfections have been corrected. A disadvantage is that if all occupational categories is not using the program it leads to work duplication. BIM 360 Field is an extensive program with many different functions and a large group in the industry has a lack of digital knowledge, which makes implementation of the program more difficult. For a long-term profit it is important to to spend a lot of time of learning initially. An advantage is to teach those who have an interest in technology first so that they can learn others or provide support for those who need more help. For future projects, statistics can be compiled in the program to prevent common imperfections and review which companies often repeat inaccuracy. At the end of the study, an examination was conducted where BIM 360 Field was used for inspection on the reference object Sjöstaden. Respondents opinions can be determined, the program works when inspecting if everyone uses it.
54

BIM : Förvaltning, inventering och användningsområden

Axelsson, Henrik January 2015 (has links)
ByggnadsInformationsModellering, BIM är ett komplext begrepp med varierande innebörd beroende på var i byggprocessen det används. Det finns ingen enkel definition av hur arbetet med BIM tillämpas och innefattar många aktiviteter.   I rapporten har en litteraturstudie samt intervjufrågor legat till grund för resultat och slutsatser, dessa har riktats mot att ta reda på hur digital informationshantering anpassas till en byggnads förvaltningsskede och hur inventering av en befintlig byggnad kan utföras med dagens teknik. Genom att studera vad som tidigare skrivits inom ämnet samt med kontakter via personer som sysslar med konsultuppdrag eller förvaltningsadministration inom byggbranschen har en sammanställning av nuvarande tillämpningar kunnat visas. I grund och botten är BIM ett modernt arbetssätt som kan nyttjas av alla discipliner för att tillge information i ett projekt som även kan fortsätta att uppdateras vidare genom produktion, förvaltning, ombyggnader samt renovering, och slutligen rivning.   Inventering av en äldre byggnad som saknar data kan återskapas med laserskannerteknik och ger en tillförlitlig datainsamling som sedan bearbetas i CAD-program. Forskning har skett för att försöka hitta ett sätt att lokalisera inbyggnadsmaterial utan att göra åverkan på byggnadskonstruktionen. / Building Information Modeling, BIM is a complex idea which has varying meaning depending on where in the building process it is used. There is no simple definition of how the working with BIM is applied and consists of many areas of activity.     This report is based upon the study of available literature and interview questions, which both have set the ground for the result and conclusions presented. These have aimed to investigate how digital information processing can be applied in the facility management for a building and furthermore, how inventory of an already built building can be improved by today’s technology.  By studying what´s already have been written on the subject and contacting people who works in the building consulting business or building facility management, a combination of available techniques is presented. The bottom-line is that BIM (Building Information Modeling) is a modern working method which can be used by all disciplines for applying information to a project, and which also can be used progressively into production, facility management, rebuilding and renovation, and finally deconstruction.   Inventorying of an old building which lacks data can be recreated by the use of laser scanner technique and gives a reliable collection of data, which afterwards is processed in a CAD program. Studies have been made in order to find a way for localizing inbuilt material without making any permanent damage to the building construction.
55

Energisimulering av byggnadertidigt i projekteringsfasen : En utvärdering av Energy Analysis som verktyg för hållbar byggnadsdesign / Energy simulation of buildings in an early design phase : An evaluation of Energy Analysis as a tool for sustainable building design

Knutsson, Tobias January 2015 (has links)
Dagens samhälle står idag inför en stor utmaning, nämligen att minska dess påverkan påmiljön. EU har satt upp riktlinjer mot en mer hållbar utveckling, vilket Sverige beslutat attfölja, där ett mål varit att energianvändningen 2020 ska ha minskat med 20 % jämfört med år2008. År 2021 införs krav på att alla nybyggnationer minst ska uppfylla näranollenergihuskrav.Detta medför ett större ansvar på projektörer att skapa underlag förenergieffektivare byggnader.Den tidiga designprocessen av byggnader kännetecknas av en initiativrik process där mångabeslut fattas på kort tid. De tidiga besluten som berör byggnadsutformningen har enbetydande roll för hur stora energibehov den färdiga produkten kommer att få. Energibehovetpåverkar både byggnadens livscykelkostnad och dess miljöpåverkan. Den här studien ärinriktad på energisimuleringar tidigt i projekteringsprocessen vars syfte är att skapadesigndrivande underlag till beslut rörande byggnadsutformning.Autodesk Revit har ett integrerat verktyg, Energy Analysis, som gör energisimuleringar avBIM-modellen i programmet. Verktyget är framtaget för att göra snabba energisimuleringarsom ska fungera som beslutsunderlag vid projektering mot hållbara byggnadsdesigner. Måletmed studien var att kartlägga beräkningarnas tillförlitlighet och resultatens användbarhet försvenska arkitekter. Utifrån en CAD-fil på ett hus från Klara arkitektbyrå gjordes simuleringari Energy Analysis som jämfördes med samma hus skapat Strusofts VIP-Energy.Resultaten visar att programmen redovisar olika utdata där vissa ej är jämförbara. Jämförelserav transmissionen i de båda programmen visar dock att beräkningsmotorn i Energy Analysisger rimliga resultat. Programmen räknar förhållandevis lika på solinstrålning genom fönster,dock finns det en svaghet hos Energy Analysis när de räknar på fönster med solskydd.Av resultaten dras en slutsats att Energy Analysis gör tillräckligt noggranna beräkningar föratt kunna användas tidigt i projekteringen. Verktyget behöver dock utvecklas och anpassa enversion för svenska förhållanden och normer för att det ska bli användbart i Sverige, vilketredovisas i ett förslag till produktutveckling i rapporten. / Today's society is facing a major challenge, namely to reduce its impact on the environment.The EU has set guidelines towards a more sustainable development, something in whichSweden has decided to comply; where the goal has been to minimize energy consumptionwith 20 % until 2020 compared to the consumption in 2008. In 2021, a requirement will beintroduced. It says that all new buildings in the EA must be “Nearly zero energy buildings” atleast. This implies a greater responsibility on the drafters to create the basis for energyefficient buildings.The early design process of buildings is characterized by a proactive process where manydecisions are made during a short amount time. Early decisions taken regarding the design ofa building affects its total need of energy when the house is put into use. Energy demandsaffects both the building life cycle cost and environmental impact. This study focuses onenergy simulations early in the design process that aims to create design driven basis fordecisions regarding building design.Autodesk Revit has an integrated tool, Energy Analysis, which allows energy simulations ofthe BIM model in the program. The tool is designed to make quick energy simulations thatcan provide a basis for planning the sustainable building designs. The goal of the study was toidentify the reliability of the calculations and usefulness of the results for Swedish architects.Based on a CAD file of a house from Klara arkitketbyrå(architectural firm) simulations weremade in Energy Analysis and then compared to simulations in StruSoft´s VIP Energy.The results show that the programs present different outputs in which some are notcomparable. Comparisons of conductivity in both of the programs show that the calculationengine in the Energy Analysis provides reasonable results. The programs estimate the solarradiation through the windows relatively similar; however, there is a weakness in the EnergyAnalysis as to how it calculates when the window is shaded by sunshields.By the results a conclusion has been drawn that the Energy Analysis allows sufficientlyaccurate calculations to be used early in the design process. The tool needs to be developedand customize a version for Swedish conditions and standards for it to be useful in Sweden, asreported in a suggestion for product development in the report.
56

[en] INTEROPERABILITY IN THE BIM PROCESS UTILIZING INDUSTRY FOUNDATION CLASSES (IFC) FOR STRUCTURAL MODELING / [pt] INTEROPERABILIDADE NO PROCESSO BIM UTILIZANDO INDUSTRY FOUNDATION CLASSES (IFC) PARA MODELAGEM DE ESTRUTURAS

GUSTAVO HENRIQUE AUAD FREIRE 27 January 2016 (has links)
[pt] A crescente difusão e aplicação dos processos BIM (Building Information Modeling) na indústria AEC (Arquitetura, Engenharia e Construção) vem agrupando atores das mais variadas disciplinas e lugares em um mesmo projeto. A velocidade com que as informações são passadas atualmente, torna necessária a busca pela maior eficiência na prática do BIM. O fluxo de trabalho necessita ser melhorado para atender á demanda do mercado em prazos cada vez mais curtos. Um dos grandes obstáculos que surge nos processos BIM é a falta de flexibilidade na utilização dos softwares, ocorrendo muitos problemas de incompatibilidade de informações dentro de um projeto. A interoperabilidade passa a ser um assunto mundialmente discutido e buscado. Foi criado um formato neutro para intercâmbio de informações nas indústrias AEC, o Industry Foundation Classes (IFC). A dificuldade ocorre na criação, adoção e implementação de um formato que consiga representar de maneira correta os mais variados elementos relacionados às diferentes disciplinas envolvidas no projeto. Este trabalho tem como objetivo a avaliação da interoperabilidade nos processos BIM utilizando um modelo físico-estrutural de concreto armado e o IFC como formato neutro de troca de informação. Analisa de forma relativa a eficiência com que as informações são trocadas entre as diferentes ferramentas computacionais utilizadas, com ênfase na Análise Estrutural. / [en] The increasing di↵usion and application of BIM (Building Information Modeling) processes in the AEC (Architecture, Engineering and Construction) industry has been gathering different actors in a variety of disciplines and from different places in the same project. The speed with which information is passed today demands the search for greater efficiency in the BIM practice. The workflow needs to be improved to meet market demand in increasingly short deadlines. One of the major obstacles that arise in the BIM process is the lack of flexibility in the use of programs, occurring many information incompatibility issues within a project. Interoperability becomes a subject discussed around the world and pursued. A neutral format was created to exchange information in the AEC industry, the Industry Foundation Classes (IFC). The difficulty occurs in the creation, adoption and implementation of a format that can represent correctly the various elements related to the di↵erent disciplines involved in the project. This work aims to evaluate the interoperability in BIM processes using a reinforced concrete physical-structural model using the IFC as a neutral format for information exchange. Analyzes the efficiency with which information is exchanged between different computer tools, emphasizing the Structural Analysis.
57

Configurable nD-visualization for complex Building Information Models / Konfigurierbare nD-Visualisierung für komplexe Building Information Models

Tauscher, Helga 09 November 2017 (has links) (PDF)
With the ongoing development of building information modelling (BIM) towards a comprehensive coverage of all construction project information in a semantically explicit way, visual representations became decoupled from the building information models. While traditional construction drawings implicitly contained the visual representation besides the information, nowadays they are generated on the fly, hard-coded in software applications dedicated to other tasks such as analysis, simulation, structural design or communication. Due to the abstract nature of information models and the increasing amount of digital information captured during construction projects, visual representations are essential for humans in order to access the information, to understand it, and to engage with it. At the same time digital media open up the new field of interactive visualizations. The full potential of BIM can only be unlocked with customized task-specific visualizations, with engineers and architects actively involved in the design and development process of these visualizations. The visualizations must be reusable and reliably reproducible during communication processes. Further, to support creative problem solving, it must be possible to modify and refine them. This thesis aims at reconnecting building information models and their visual representations: on a theoretic level, on the level of methods and in terms of tool support. First, the research seeks to improve the knowledge about visualization generation in conjunction with current BIM developments such as the multimodel. The approach is based on the reference model of the visualization pipeline and addresses structural as well as quantitative aspects of the visualization generation. Second, based on the theoretic foundation, a method is derived to construct visual representations from given visualization specifications. To this end, the idea of a domain-specific language (DSL) is employed. Finally, a software prototype proofs the concept. Using the visualization framework, visual representations can be generated from a specific building information model and a specific visualization description. / Mit der fortschreitenden Entwicklung des Building Information Modelling (BIM) hin zu einer umfassenden Erfassung aller Bauprojektinformationen in einer semantisch expliziten Weise werden Visualisierungen von den Gebäudeinformationen entkoppelt. Während traditionelle Architektur- und Bauzeichnungen die visuellen Reprä̈sentationen implizit als Träger der Informationen enthalten, werden sie heute on-the-fly generiert. Die Details ihrer Generierung sind festgeschrieben in Softwareanwendungen, welche eigentlich für andere Aufgaben wie Analyse, Simulation, Entwurf oder Kommunikation ausgelegt sind. Angesichts der abstrakten Natur von Informationsmodellen und der steigenden Menge digitaler Informationen, die im Verlauf von Bauprojekten erfasst werden, sind visuelle Repräsentationen essentiell, um sich die Information erschließen, sie verstehen, durchdringen und mit ihnen arbeiten zu können. Gleichzeitig entwickelt sich durch die digitalen Medien eine neues Feld der interaktiven Visualisierungen. Das volle Potential von BIM kann nur mit angepassten aufgabenspezifischen Visualisierungen erschlossen werden, bei denen Ingenieur*innen und Architekt*innen aktiv in den Entwurf und die Entwicklung dieser Visualisierungen einbezogen werden. Die Visualisierungen müssen wiederverwendbar sein und in Kommunikationsprozessen zuverlässig reproduziert werden können. Außerdem muss es möglich sein, Visualisierungen zu modifizieren und neu zu definieren, um das kreative Problemlösen zu unterstützen. Die vorliegende Arbeit zielt darauf ab, Gebäudemodelle und ihre visuellen Repräsentationen wieder zu verbinden: auf der theoretischen Ebene, auf der Ebene der Methoden und hinsichtlich der unterstützenden Werkzeuge. Auf der theoretischen Ebene trägt die Arbeit zunächst dazu bei, das Wissen um die Erstellung von Visualisierungen im Kontext von Bauprojekten zu erweitern. Der verfolgte Ansatz basiert auf dem Referenzmodell der Visualisierungspipeline und geht dabei sowohl auf strukturelle als auch auf quantitative Aspekte des Visualisierungsprozesses ein. Zweitens wird eine Methode entwickelt, die visuelle Repräsentationen auf Basis gegebener Visualisierungsspezifikationen generieren kann. Schließlich belegt ein Softwareprototyp die Realisierbarkeit des Konzepts. Mit dem entwickelten Framework können visuelle Repräsentationen aus jeweils einem spezifischen Gebäudemodell und einer spezifischen Visualisierungsbeschreibung generiert werden.
58

BIM Undersökning : Undersökning av kompetens och erfarenhet för BIM / Investigation of competence and experience for BIM

Prejner, Magnus January 2017 (has links)
BIM är ett steg i rätt riktning för att klara av den höga produktionstakten som krävs för populationsökningen i Sverige samt den rådande bostadsbristen. Det är viktigt att alla små och medelstora byggföretag hänger med på den omfattande digitaliseringen som sker av byggsektorn för att kunna fortsätta vara konkurrenskraftiga i både Sverige och Europa. Increase Competence in Northern Building är ett projekt som startat för att se till att små och medelstora företag i Norden fortsätter att vara konkurrenskraftiga i Europa. ICNB är ett interregnord projekt tillsammans med Norge och Finland.   Building Information Modeling avser processer att hantera information gällande en byggnads hela livscykel eller delar av den. Det finns en mängd fördelar med att använda BIM. Det är även en av de största faktorerna till att det är viktigt att hänga med i digitaliseringen för att fortsätta vara konkurrenskraftiga i Europa. Genom intervjustudie med olika branschorganisationer och ett par företag tillhörande respektive branschgren ska kompetens och erfarenhet för BIM undersökas.   Resultatet visar att företagen är eniga i de positiva aspekterna av BIM-användning. Fokuset på kompetensutbildningar varierar mellan konsultföretagen och NCC, där det huvudsakliga syftet med utbildningarna är den största skillnaden mellan dem. Konsultföretagen och NCC utbildar rent praktiskt men NCC jobbar även med att utveckla tankesättet och förståelsen för BIM. / Building Information Modeling is a step in the right path to be able to handle the production rate that is needed for the increase in population in Sweden and handle the current housing shortage. It is important that the small and medium sized enterprises follow the extensive digitization which is happening to the construction sector, and it is also essential to keep being competitive in both Sweden and Europe. Increase Competence in Northern Building is a project which started to make sure the small and medium sized enterprises from the Nordic countries keep being competitive in Europe. ICNB is an interregional project together with Norway and Finland.   Building Information Modeling refers to the process of handling information regarding a buildings whole life cycle or parts of it. There are plenty of benefits from using BIM, and it is also one of the biggest reasons that it is important to follow this digitization to keep being competitive in Europe. Through interviews with different trade organizations and a couple of companies from each industry branch will competence and experience for BIM be investigated.   The results show that the companies agree on the positive aspects with usage of BIM. It varies a lot between NCC and the consulting companies what focus the educations have, where the main purpose with the educations is the biggest difference between them. The consulting companies educate purely to be able to use the software practically, where NCC also works with developing the mind-set and understanding for BIM.
59

Användning av 5D-BIM för planering av både industriellt och traditionellt byggande

Aho, Joel January 2020 (has links)
BIM – Building information modelling används idag av bl.a. arkitekter, konstruktörer,entreprenörer och fastighetsägare. BIM är ett verktyg där en 3D-modell av projektet kan användassom informationskälla.Genom att 3D-modellen innehåller mått/dimensioner, materialtyper, mm blir användandet avmodellen ett kraftfullt verktyg vid både kalkylering och produktionsplanering. Användandet avBIM-modeller vid dessa arbeten är ett relativt nytt arbetssätt där det finns väldigt få standarderoch beprövade metoder. För att använda sig av en BIM-modell vid kalkylering ochproduktionsplanering krävs dessutom en implementering av kalkyl- och planeringsprogram somstödjer användandet av BIM. Standarder och riktlinjer saknas också för själva utformandet avmodellen.Forskning visar att användandet av en BIM-modell vid mängdavtagning ochproduktionsplanering är både tidsbesparande och mer kostnadseffektivt än de traditionellametoderna där 2D-CAD-ritningar med tillhörande beskrivningar utgör de endainformationskällorna. Tidigare rapporter och examensarbeten har dessutom visat hur 5D-BIManvänds idag och hur det kan implementeras hos både industriella- och traditionelltplatsbyggande företag. 5D-BIM är ett arbetssätt där det utöver den tredimensionella modellenäven tillkommer tid och kostnad som dimension 4, och 5.Denna rapport syftar till att utvärdera de förutsättningar som krävs för implementering avarbetssättet 5D-BIM hos en entreprenör med både industriellt- och platsbyggande, samt utvärderavilka möjligheter och problem som en implementering av arbetssättet bidrar med. Användandetav BIM skiljer sig åt för industriella och platsbyggande entreprenörer. Författaren vill därförutvärdera vad som krävs för att arbetssättet ska kunna implementeras hos en entreprenör somproducerar hus med ett öppet byggsystem samt avgöra vad som krävs av själva BIM-modellen.En explorativ fallstudie har genomförts hos en delvis industriellt byggande småhustillverkare därarbetssättet 5D-BIM implementerats samt nuvarande arbetsgång genom projektering-,kalkylering till produktionsplanering kartlagts. Kartläggningen står som grund förimplementeringen av arbetssättet 5D-BIM där även utformandet av BIM-modellen utvärderats.Studien visar hur implementering av arbetssättet 5D-BIM kan gå till hos en entreprenör med bådeindustriellt- och traditionellt byggande utifrån den utförda kartläggningen, samt huranvändningen ökar förutsägbarheten i projekten. / BIM – Building information modelling is used today by architects, structural engineers,contractors and property owners among others. BIM is a tool where a 3D-model of the projectcan be used as a source of information.When the 3D-model contains measurements/quantities and types of material it becomes apowerful tool when doing cost estimations/quantity takeoffs and production planning. The usageof BIM-models for these activities is a relatively new way of working and there are very fewstandards and proven methods. To have use of the BIM-model it also takes an implementation ofcost estimate- and planning programs that supports the use of BIM. Also, there are no standardsor guidelines for the configuration of the BIM-model.Research show that the use of BIM-models in quantity takeoff and production planning is bothtime-saving and more cost efficient then the use of the traditional ways where 2D-CAD drawingswith included descriptions is the only source of information. Earlier reports and master thesis’salso show how 5D-BIM is used today and how it can be implemented for companies with eitherindustrial- or more traditional concepts. 5D-BIM is a method where beyond the 3D-model, timeand cost are also included as dimensions 4, and 5.This report aims to evaluate under what conditions an implementation of 5D-BIM is possible fora contractor with a concept that includes both industrial- and traditional building, and alsoevaluate the possibilities and problems that occur during implementation. The use of BIM differsbetween industrial “off-site construction” and traditional “on site construction”. The author ofthis thesis therefor wants to study a company with a concept that includes both industrial andtraditional practices and also evaluate what information is requested in the BIM-model.An explorative case study has been conducted at a partially industrial contractor that produceshouses. The method 5D-BIM has been implemented and current workflow has been studied thrumodel configuration-, cost estimation to production planning. The study of the current workflowis the foundation for the implementation of 5D-BIM and the evaluation of § model configuration.The study shows how 5D-BIM as a method can be implemented for a company that has both onandoff site construction as a concept, and used to increase predictability in the projects.
60

Implementación de la metodología BIM en la construcción del proyecto multifamiliar DUPLO para optimizar el costo establecido / Implementation of the BIM methodology in the construction of the DUPLO multifamily project to optimize the established cost

Chirinos Santander, Lizett Rosario, Pecho Llacta, Julio Cesar 01 April 2019 (has links)
El mundo de la construcción viene cambiando, siempre buscando la mejora continua y la optimización de los procesos. Debido a ello surge la necesidad de usar nuevas metodologías aplicadas en otros países donde los procesos de la construcción se vienen industrializando. Dentro de estas metodologías tenemos: • Las Tecnologías de Información y Comunicación, donde resalta la manera correcta de gestionar un proyecto de construcción. • Lean Proyect Delivery System, introducido por Ballard (2000). • Virtual Desing and Construction (VDC). • Bim Execution Plan (BEP). Siendo el BEP el plan de implementación del BIM a un proyecto. Nosotros optamos por usar la metodología BIM en el proyecto Multifamiliar DUPLO ubicado en el distrito de Breña, tiene 28 pisos y cuenta con 05 sótanos. El plazo para la ejecución otorgado según contrato fue de 12 meses. La finalidad de aplicar la metodología BIM es poder controlar el costo del proyecto según el presupuesto adjudicado. Con la aplicación del BIM pretendemos evitar: • Los tiempos muertos por consultas a los proyectistas durante la construcción. • Las ampliaciones de plazo por indefiniciones o RFI´s no resueltos. • El sobrecosto que conlleva una ampliación de plazo (mayores gastos generales, sobre costo por alquiler de equipos, máquinas y herramientas, mano de obra). La aplicación de la metodología BIM al proyecto Duplo servirá para identificar todas las interferencias de las diversas especialidades antes de la ejecución en el terreno. Realizando las reuniones colaborativas y/o ICE SESIONS encabezadas por un Bim Manager se logran identificar y resolver las incompatibilidades, cada participante sabe el papel que desempeña. Al finalizar el proyecto, se evaluará los resultados con la aplicación de la metodología BIM, en nuestro caso el resultado fue favorable. / The world of construction is changing, always looking for continuous improvement and optimization of processes. Due to this, there is a need to use new methodologies applied in other countries where construction processes are being industrialized. Within these methodologies we have: • Information and Communication Technologies, where the correct way to manage a construction project stands out. • Lean Project Delivery System, introduced by Ballard (2000). • Virtual Design and Construction (VDC). • BIM Execution Plan (BEP). The BEP being the BIM implementation plan for a project. We chose to use the BIM methodology in the DUPLO Multifamily project located in the district of Breña, it has 28 floors and has 05 basements. The term for execution granted under the contract was 12 months. The purpose of applying the BIM methodology is to be able to control the cost of the project according to the allocated budget. With the BIM application we intend to avoid: • Downtime due to consultations with the designers during construction. • Term extensions due to undefined or unresolved RFIs. • The cost of extending the term (higher overhead costs, cost of renting equipment, machines and tools, labor). The application of the BIM methodology to the Duplo project will serve to identify all the interferences of the various specialties before the execution in the field. Conducting collaborative meetings and / or ICE SESSIONS led by a BIM Manager can identify and resolve incompatibilities, each participant knows the role it plays. At the end of the project, the results will be evaluated with the application of the BIM methodology, in our case the result was favorable. Keyword: BIM Methodology reduces incompatibilities in a project; This optimizes and controls the cost established in the budget. / Trabajo de investigación

Page generated in 0.0205 seconds