• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 94
  • Tagged with
  • 94
  • 94
  • 94
  • 70
  • 70
  • 70
  • 70
  • 70
  • 64
  • 52
  • 36
  • 34
  • 26
  • 23
  • 23
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Análisis de la figura de declaración de desierto en las licitaciones públicas y concursos públicos y su aplicación en resoluciones del Tribunal de Contrataciones del Estado

Loayza Quispe, Andrea Belen 23 March 2022 (has links)
El objetivo de la presente investigación es explicar con mayor detalle la declaratoria de desierto de las licitaciones públicas y concursos públicos puesto que, a nivel doctrinario, no existe un estudio que aborde dicho tema con exhaustividad. Para ello, abordaremos las principales diferencias de los procedimientos de selección, todo esto por la indebida aplicación del desierto en una resolución del Tribunal de Contrataciones del Estado. El método de investigación empleado en el desarrollo del presente ensayo es el uso de las diversas fuentes del derecho como la legislación y la doctrina. Asimismo, nos apoyamos en diversas directivas de la Dirección Técnico Normativa del OSCE que ahondan con mayor profundidad en los temas propuestos. Las principales conclusiones fueron que, el único motivo por el cual el procedimiento de una adjudicación simplificada reemplaza a un concurso público y licitación pública es por la prontitud en la cual culmina la contratación, ya que tiene menor cuantía, duración del procedimiento, etapas procedimentales, exigencias y complejidad. Asimismo, en atención a la legislación comparada, una ventaja de nuestra normativa, en lo que se refiere al desierto, es que expresamente se menciona que se deben de corregir aquellas causas que originaron que no se culmine con la contratación; por el contrario, una desventaja es que, a diferencia con las legislaciones de Chile y España, no se contrata con un postor de manera directa luego de una segunda convocatoria desierta. / The objective of this research is to explain in greater depth and detail the declaration of void of public tenders, since, at the doctrinal level, there is no study that addresses this issue in an exhaustive way; for this, we will address the main differences in the selection procedures, all this due to the improper application of the desert in a resolution of the State Procurement Court. The research method used in the development of this essay is the use of the various sources of law such as legislation and doctrine. Likewise, we rely on various directives from the OSCE's Technical Normative Directorate that delve more deeply into the proposed topics. The main conclusions were that, the only reason why the simplified award procedure replaces a public tender and public tender is due to the promptness in which the contracting ends, since it has a lower amount, duration of the procedure, procedural stages, demands and complexity. Additionally, in attention to comparative legislation, an advantage of our regulations, as regards the desert, is that it is expressly mentioned that those causes that led to the hiring not being completed must be corrected; on the contrary, a disadvantage is that, unlike the laws of Chile and Spain, a bidder is not contracted directly after a second void call.
42

El uso indebido de la contratación directa en pandemia : Problemática y propuestas de solución

Mori Inga, Eimy 25 April 2023 (has links)
Con este trabajo de investigación se pretende poner en evidencia el uso excesivo e injustificado de la contratación directa; es decir, el abuso de la contratación directa, durante pandemia, el cual ha vulnerado el principio de libre concurrencia, competencia y transparencia que debe regir las contrataciones del estado. Puesto que, algunas entidades estatales amparadas en la normativa vigente, que las faculta a realizar contrataciones directas, a razón de la emergencia sanitaria, han adquirido bienes mediante contrataciones directa, cuando no correspondía usar dicho método de contratación; debido a ello, se busca hacer notar que no es un problema de falta de regulación normativa, sino de inobservancia de las mismas, que viene amparándose en una falta de control y/o fiscalización de las contrataciones directas. Como principales conclusiones del trabajo de investigación son: advertir que diversas entidades estatales han usado indebidamente la contratación directa; confirmar si los principios de libre concurrencia y transparencia se aplican a las contrataciones directas; asimismo demostrar el uso indebido de la contratación directa vulnera el principio de libre competencia concurrencia y transparencia; se pretende demostrar que se requiere un adecuado control de las contrataciones directas; por último, señalar propuestas de mejora para superar las deficiencias en las contrataciones directas. / The purpose of this research work is to highlight the excessive and unjustified use of direct contracting; that is, the abuse of direct contracting during the pandemic, which has violated the principle of free competition, competition and transparency that should govern state contracting. Since, some state entities, protected by the regulations in force, which empower them to make direct contracting, due to the sanitary emergency, have acquired goods through direct contracting, when it was not appropriate to use such contracting method; due to this, it is intended to point out that it is not a problem of lack of normative regulation, but of non-observance of the same, which is covered by a lack of control and/or supervision of direct contracting. The main conclusions of the research work are: to warn that several state entities have improperly used direct contracting; to confirm whether the principles of free competition and transparency apply to direct contracting; to demonstrate that the improper use of direct contracting violates the principle of free competition, competition and transparency; to show that an adequate control of direct contracting is required; and finally, to point out proposals for improvement to overcome the deficiencies in direct contracting. / Trabajo académico
43

Criterios especiales para la determinación de la Fuerza Mayor en el Sector Eléctrico

Chavez Chinchihualpa, Rodrigo Javier 21 March 2022 (has links)
El presente trabajo tiene como objetivo analizar la regulación y aplicación de la fuerza mayor en el derecho administrativo, con especial énfasis en el sector eléctrico. Para ello, se utiliza el método de investigación de tipo dogmático interdisciplinario, centrándose en el estudio de doctrina y jurisprudencia de derecho civil y administrativo. Se realiza un estudio de las principales posiciones teóricas al momento de conceptualizar las instituciones del caso fortuito y la fuerza mayor, así como su regulación en el Código Civil y los criterios especiales que existen en la normativa del sector eléctrico, para su análisis y determinación. Asimismo, se estudia la casuística existente, tanto a nivel de instancias administrativas como jurisdiccionales respecto a controversias que impliquen la configuración de un evento de fuerza mayor relacionado al objeto de estudio. Las principales conclusiones a las que llegamos es que no resulta necesaria una conceptualización particular a nivel de derecho positivo aplicable al ámbito administrativo de la fuerza mayor; a su vez, resulta importante que, en aquellos casos en los que la normativa especial establezca criterios específicos, estos sean debidamente aplicados por los funcionarios administrativos; y por último, que los jueces del contencioso administrativo tienen el deber de observar dichos criterios particulares y diferenciarlos del esquema genérico del derecho civil, en aquellos casos que provengan de dichos sectores
44

El conflicto de intereses en la compra pública de medicamentos

Cossío Castañeda, Martin Sebastián 17 August 2020 (has links)
Quienes ejercen el servicio público tienen el deber de velar por la integridad de sus decisiones y por garantizar la defensa del interés general. Este principio natural de toda actividad pública, se hace mucho más presente para aquellos sectores de alto riesgo, como salud, específicamente, para aquellos actores relacionados con la compra pública de medicamentos. ¿Qué herramientas tienen los funcionarios públicos para cumplir su función libre de un conflicto de intereses? ¿cómo lo identifican? ¿a quién pueden acudir en caso tengan una duda de carácter ético o moral? ¿qué hace el Estado por prevenir situaciones de conflicto de intereses en la compra pública de medicamentos? ¿la regulación vigente es suficiente? Son solo algunas de las interrogantes que se presentan. Con el propósito de contribuir a dilucidar una alternativa de solución, esta tesis propone una restructuración de la infraestructura institucional a cargo de la ética e integridad pública. Esto a partir de la aplicación de una serie de buenas prácticas de prevención y gestión adecuada de los conflictos de intereses al interior de las entidades vinculadas a la compra, enfocadas en el funcionario o servidor público. Arribo a esta conclusión, después de haber revisado los aspectos teóricos de diversos autores, la experiencia en otros países, así como del análisis práctico de una encuesta realizada a los funcionarios y servidores públicos del Perú vinculados a la compra pública de medicamentos. La propuesta permitirá una efectiva mitigación de riesgos de corrupción, así como una herramienta de medición periódica de quienes toman decisiones en el sector materia de la investigación.
45

Laudo arbitral del arbitraje ad hoc entre Consorcio Som Lima Norte y el Servicio de Parques de Lima – SERPAR Lima

Bedoya Aranda, Nickoll Ailyn 15 August 2022 (has links)
En el presente informe se analiza el laudo arbitral del arbitraje seguido entre el Consorcio Som Lima Norte y el Servicio de Parques de Lima – SERPAR LIMA cuyas controversias centrales son el incumplimiento de obligaciones contractuales, la intervención económica de la obra, la resolución de parcial de contrato realizada por SERPAR y la posterior resolución total del contrato realizada por el Consorcio. Así como el consentimiento de esta última al no haberse sometido a controversia dentro del plazo de caducidad establecido en la normativa de contrataciones. Por un lado, SERPAR imputó al Consorcio Som Lima Norte la reducción de recursos de obra y paralización progresiva de ejecución como incumplimiento de obligaciones contractuales. Por ello, primero resuelve intervenir económicamente la obra y luego resolver de forma parcial el contrato respecto al saldo de ejecución pendiente. Por otro lado, el Consorcio Som Lima Norte imputó a SERPAR el incumplimiento de obligaciones de pago y la demora en liberación de terrenos para la ejecución de obra, lo cual se materializó en la resolución total del contrato por parte del contratista. Así, en el presente informe se analiza si las partes cumplieron con los procedimientos y requisitos establecidos en la Ley de Contrataciones del Estado y su reglamento y si el razonamiento del Tribunal Arbitral para tomar la decisión plasmada en el laudo es conforme a la normativa de contrataciones. / This report analyzes the arbitration award of the arbitration followed between Consorcio Som Lima Norte and the Servicio de Parques de Lima - SERPAR LIMA, whose central disputes are the breach of contractual obligations, the economic intervention of the work, the partial resolution of contract carried out by SERPAR and the subsequent total resolution of the contract carried out by the Consortium. As well as the consent of the latter for not having submitted to controversy within the expiration period established in the contracting regulations. On the one hand, SERPAR charged the Som Lima Norte Consortium with the reduction of work resources and the progressive stoppage of execution as non-compliance with contractual obligations. For this reason, it first resolves to financially intervene in the work and then partially resolve the contract with respect to the balance of pending execution. On the other hand, the Som Lima Norte Consortium charged SERPAR with non-compliance with payment obligations and the delay in releasing land for the execution of the work, which materialized in the total termination of the contract by the contractor. Thus, this report analyzes whether the parties complied with the procedures and requirements established in the State Procurement Law and its regulations and whether the reasoning of the Arbitral Tribunal for making the decision embodied in the award is in accordance with the procurement regulations.
46

Expediente N°20513/ASM : controversia entre el Programa Nacional de Saneamiento Urbano y el consorcio nippon KOEI.OIST

Huamán Vega, Joselyn Mariana 07 March 2022 (has links)
El presente informe jurídico analiza el expediente Nº 20513/ASM el cual versa respecto a la controversia suscitada entre el Programa Nacional de Saneamiento y el Consorcio Nippon Koei- OIST. Se realiza con la finalidad de reafirmar la naturaleza de los conceptos de liquidación de contrato de consultoría de obra, certificado de conformidad y carta fianza; así como, cuestionar las decisiones por las cuales el Tribunal Arbitral opto como convenientes para la resolución de la controversia. Del análisis de los actuados en el expediente de la controversia se identifican tres problemas: el primer problema, refiere a la obligatoriedad de las formalidades para emitir la liquidación de contrato de prestación de servicios de obra. El segundo problema se encuentra relacionado con los efectos del certificado de conformidad y, si su entrega, limita el reclamo de penalidades. Finalmente, la posibilidad de solicitar indemnización posterior al consentimiento de la liquidación. En ese sentido, los mencionados problemas jurídicos se analizan utilizando jurisprudencia, doctrina y normas jurídicas. Principalmente se concluye que la liquidación del contrato de prestación de servicios debe de realizarse conforme a lo dispuesto en el artículo 43º de la Ley de Contrataciones y Adquisidores con el Estado debido a la obligatoriedad normativa. Asimismo, la entrega del Certificado de Conformidad manifiesta la idoneidad de las obligaciones realizadas y solo la manifestación contraria podría realizarse si existen vicios ocultos en la y prestación, lo cual no sucede en la controversia. De igual forma, la naturaleza de la carta fianza ratifica la adecuación de las obligaciones cuando se devuelva corroborando las prestaciones. Por tal, el consentimiento de la liquidación refiere a la culminación del contrato y de todas sus obligaciones las cuales son reconocidas como idóneas al entregar el Certificado de Conformidad y devolver la Carta Fianza.
47

Expediente 00581-2019: Anulación del laudo arbitral por falta de motivación según el artículo 63 numeral 1 inciso b) del DL 1071

Angeles Gomez, Veronica Esperanza 19 August 2021 (has links)
El presente informe versa sobre el análisis realizado a la resolución N°7 del expediente 00581-2019-0-1817-SP-CO-02 emitida por la Segunda Sala Civil Subespecialidad Comercial de la Corte Superior de Justicia de Lima, la cual trata sobre el recurso de anulación interpuesto por el PROYECTO ESPECIAL DE INFRAESTRUCTURA NACIONAL- PROVIAS DEL MINISTERIO DE TRANSPORTES Y COMUNICACIONES – PROVÍAS NACIONAL contra el laudo de fecha 22 de julio de 2019 emitido en el arbitraje seguido contra OBRAS DE INGENIERÍA S.A - OBRAINSA. A través de este informe, analizamos el problema acerca de la motivación que se produce en los laudos arbitrales, lo cual conlleva a abrir una ventana a que en sede judicial pueda revisarse de manera externa la decisión de estos laudos arbitrales y comprobar si efectivamente se cumplió o no con motivar el laudo arbitral. En ese sentido, en el presente informe, se concluye que la inexistencia de motivación en el laudo arbitral, transgrede el derecho a la debida motivación, no cumple con el principio de congruencia procesal y termina siendo correcto solicitar la anulación del laudo mediante el artículo 63 numeral 1 inciso b) del Decreto Legislativo 1071. Este análisis se desarrollará conforme a la revisión doctrinaria y jurisprudencial efectuada para el presente informe. / This report deals with the analysis carried out on Resolution No. 7 of the file 00581-2019-0-1817-SP-CO-02 issued by the Second Civil Chamber Commercial Subspecialty of the Superior Court of Justice of Lima, which deals with the annulment action filed by the SPECIAL PROJECT OF INFRASTRUCTURE NATIONAL PROVIAS OF THE MINISTRY OF TRANSPORT AND COMMUNICATIONS PROVÍAS NACIONAL against the award dated July 22, 2019 issued in the arbitration against OBRAS DE INGENIERIA SA - OBRAINSA. Through this report, we analyze the problem regarding the motivation that occurs in arbitration awards, which leads to opening a window so that the decision of these arbitration awards can be reviewed externally and check whether it was actually complied with or not with justifying the arbitration award. In this sense, in this report, it is concluded that the absence of reasons in the arbitration award, violates the right to due reason, does not comply with the principle of procedural consistency and ends up being correct to request the annulment of the award through article 63 numeral 1 subsection b) of Legislative Decree 1071. This analysis will be developed in accordance with the doctrinal and jurisprudential review carried out for this report.
48

Informe Jurídico sobre la Resolución N°2338-2018-TCE-S2 de fecha 28 de diciembre de 2018, emitida por el Tribunal de Contrataciones del Estado del Organismo Supervisor de las Contrataciones del Estado

Chinchay Yancunta, Juan Jose 16 August 2021 (has links)
En los últimos diez (10) años, el marco especial de las Contrataciones del Estado ha sido modificado cada dos años de diferencia aproximadamente, bajo la lógica y el razonamiento hipotético de obtener un cuerpo normativo que fomente las compras públicas eficientes. Lo cierto, sin embargo, es que las modificaciones en el régimen sancionador no han sido alentadores en tanto y en cuanto se han apartado de las garantías y condiciones mínimas establecidas en la Ley del Procedimiento Administrativo General. El presente caso sancionador (Resolución N°2338-2018-TCE-S2 bajo análisis) surgió durante la etapa de modificación de la Ley N° 30225, por el Decreto Legislativo N° 1341, en el que se reconocieron derechos y garantías mínimas como la separabilidad de las fases de instrucción y sanción en los procedimientos sancionadores seguidos por el Tribunal de Contrataciones del OSCE, así como la caducidad, y el cambio del tipo infractor relacionada a la presentación de documentación inexacta
49

Informe de relevancia jurídica sobre el Expediente E-2561: Anulación de laudo por indebida notificación y nulidad de oficio del contrato público por afectación al principio de presunción de veracidad

Ayala Rojas, Dánery 29 November 2023 (has links)
El presente informe analiza la controversia arbitral entre un consorcio y una entidad, que culmina con la emisión de un primer laudo que fue anulado por la Primera Sala Civil con Subespecialidad Comercial de la Corte Superior de Justicia de Lima, resolviéndose por segunda vez con un laudo, dictado por mayoría, el 8 de julio de 2013. La relevancia de estudio de este expediente radica en que con su análisis se logran consolidar conocimientos respecto de dos grandes ramas del derecho, el arbitraje y las contrataciones públicas. Ello, debido a que el expediente es sobre un caso emblemático que surge cuando el arbitraje en contratación pública se encontraba en sus inicios en nuestro país. En ese sentido, se plantean como objetivos la revisión de los siguientes puntos: 1) La debida notificación a las partes del nombramiento de un árbitro o de las actuaciones arbitrales, 2) El impedimento a las partes de hacer valer sus derechos dentro del arbitraje, 3) El cumplimiento del requisito previo para acudir al proceso de anulación de laudo, 4) Aplicabilidad de las normas de contrataciones que sustentan la nulidad de oficio y el control difuso realizado por el Tribunal Arbitral, y, 5) La nulidad de oficio del contrato y el derecho al debido procedimiento. Las hipótesis planteadas radican en que la anulación de laudo por parte del Poder Judicial no fue debidamente realizada, ya que no existía una causal aplicable, y que el contrato anulado de oficio por la Entidad no fue realizado acorde a ley. Finalmente, la metodología empleada para realizar dicho análisis es la dogmática, ya que todo surge por la revisión de diversas normas, así como la jurisprudencia y doctrina relevante. Todo ello, relacionado a las ramas del derecho de arbitraje, sobre las causales de anulación de laudo, y contratación pública, en lo pertinente a la anulación de oficio de un contrato público.
50

Naturaleza jurídica del pronunciamiento de la Administración Pública durante la fase de ejecución contractual

Mayorca Munive, Gonzalo Orlando 11 December 2023 (has links)
La presente investigación, busca definir la naturaleza jurídica del pronunciamiento de la Administración Pública durante la ejecución de los contratos administrativos, ya que no está regulada como tal en la legislación peruana. Para desarrollar la investigación, se utilizó la metodología cualitativa, mediante la revisión de doctrina nacional, extranjera, jurisprudencia, así como legislación nacional y comparada, incluyendo el estudio de laudos arbitrales en sede nacional e internacional. Como resultado del presente trabajo, propusimos que se instituya en el ordenamiento jurídico peruano el acto administrativo contractual, entendido como aquella categoría del acto administrativo que se adecúa a las circunstancias particulares del pronunciamiento de la Administración Pública en la ejecución contractual. De esta forma, se podrá orientar a la Administración Pública cuando emita sus pronunciamientos en el marco de un contrato administrativo, pues deberá cumplir mínimamente con los requisitos del acto administrativo, lo cual a su vez permitirá ejercer un control más predecible sobre su decisión. Además, garantizará los derechos de los contratistas, pues estarán posibilitados a exigir, en la vía administrativa, que las entidades contratantes cumplan con observar las disposiciones normativas del acto administrativo y otras de carácter público en salvaguarda de sus intereses legítimos.

Page generated in 0.091 seconds