• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 18
  • 6
  • Tagged with
  • 24
  • 8
  • 8
  • 7
  • 7
  • 7
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Moving towards BIM : Managing the gap between design and construction / Flytta mot BIM : Hantera klyftan mellan design och konstruktion

Purba, Prisila Putri Pinarsinta January 2018 (has links)
Many literature suggested that BIM (Building Information Modeling) is a promising future for the AEC (Architecture, Engineering, and Construction) industry that offers enormous benefits to its actors, such as improved design quality due to less collision between disciplines and better understanding of building overview for better communication among the project team and decision-making process. However, lack of BIM knowledge and skill, absence of BIM legal acts, huge investment, software limitations, etc, are most of the time becoming barriers for them to reap the full potential of BIM. Especially during the project processes, there is a loss of value in information assets across phases.  In a project setting, CPM (construction project management) organisation is believed to be in a key position between the client and the other project team members to encourage BIM implementation, for instance by the ability to formulate BIM guidelines, influence the organisational and contractual arrangement, and mandating model-based deliverables. Yet, this power comes with a bigger responsibility to manage those challenges aforementioned. The purpose of the study is to investigate the current practise of a chosen CPM organisation, Forsen Projekt AB, and propose a suggestion of improvement to implement BIM during the design and construction phase. This study adopts qualitative method that builds on literature study and semi-structured interview in order to answer the research questions on what are the gaps faced by CPM organisation in implementing BIM and how to align BIM with the CPM practise in order to manage those gaps. The interview with eight different project roles from Forsen and its affiliated organisations in a project setting enables multiple perspectives about the challenges they perceived when working in BIM environment. The findings revealed that the major gaps founded in BIM implementation are related to organisational, legal or contractual, people and process, and IT-capacity. Suggestions on how to bridge those gaps are then formulated accordingly, such as the collaborative organisational structure, BIM general guidelines, and knowledge management strategies. / Många litteratur föreslog att BIM (Building Information Modeling) är en lovande framtid för AEC (arkitektur, teknik och konstruktion) som erbjuder enorma fördelar för sina aktörer, till exempel förbättrad designkvalitet på grund av mindre kollision mellan discipliner och bättre förståelse för byggande överblick för bättre kommunikation bland projektgruppen och beslutsprocessen. Bristen på BIM-kunskaper och färdigheter, frånvaron av BIM-rättsakter, stora investeringar, programvaru begränsningar, etc, är emellertid oftast hinder för att de kan skörda BIMs fulla potential. Speciellt under projektprocesserna finns värdeminskning i informations tillgångar över faser. I en projektinställning antas CPM-organisation (byggprojektledning) vara en nyckelposition mellan klienten och de andra projektgruppsmedlemmarna för att uppmuntra BIM-genomförandet, till exempel genom förmågan att formulera BIM-riktlinjer, påverka organisatoriska och avtalsmässiga arrangemang , och mandatmodellbaserade leveranser. Ändå kommer denna kraft med ett större ansvar för att hantera de utmaningar som nämns ovan. Syftet med studien är att undersöka den nuvarande praxisen hos en utvald CPM-organisation, Forsen Projekt AB, och föreslå ett förslag om förbättring för att implementera BIM under design och konstruktionsfasen. Denna studie antar kvalitativ metod som bygger på litteraturstudie och halvstrukturerad intervju för att svara på forskningsfrågorna om vilka luckor som CPM-organisationen står inför för att implementera BIM och hur man anpassar BIM med CPM-praxis för att hantera dessa luckor. Intervjun med åtta olika projektroller från Forsen och dess anknutna organisationer i en projektinställning möjliggör flera perspektiv på de utmaningar som de uppfattar när de arbetar i BIM-miljö. Resultaten visade att de stora luckorna som grundas i BIM-genomförandet är relaterade till organisatoriska, juridiska eller avtalsmässiga, människor och processer och IT-kapacitet. Förslag på hur man överbryggar dessa luckor formuleras därefter i enlighet med den samarbetsorganisationsstruktur, BIM: s allmänna riktlinjer och strategier för kunskapshantering.
22

Modellbaserade leveranser : Fallstudie av modellbaserade leveransers inverkan i produktionen av ett anläggningsprojekt / Model-based Deliveries : Case study of the impact of modelbased deliveries in the production phase on a civilworks project

Tillberg, Hampus January 2020 (has links)
Forskning visar på att dålig integration av byggprocessens skeden, samarbetsproblem och byggbranschens organisatoriska egenskaper begränsar utvecklingen av teknisk innovation inom byggbranschen. Framgångsrik implementering av innovativ teknik har visats bero av fler faktorer än teknikens egenskaper. Tekniken påverkas bland annat av teknikens omgivning, användarens kompetens och hur den upplevs av användaren. Forskning visar att organisatoriska förändringar och anpassningar är nödvändiga för att tillgå teknikens fördelar. Byggbranschens organisatoriska egenskaper är väsentliga för att studera implementering av teknisk innovation. En fallstudie har genomförts på ett anläggningsprojekt och undersökt implementeringen av modellbaserade leveranser och hur den nya teknologin har tagits emot och påverkat entreprenören. Fallstudien utfördes på en utförandeentreprenad varpå implementeringen av modellbaserade leveranser var beslutad av beställaren. Studien genomförde 14 semistrukturerade intervjuer med entreprenörens personal i projektet för att samla information om upplevelser av arbetet med modellbaserade leveranser. Intervjuerna analyserades för att kartlägga och identifiera entreprenörens uppfattningar av modellbaserade leveranser. En viktig utgångspunkt i analysen av modellbaserade leveranser är att handlingarnas informationsbärare tillsammans bildar en komplett bygghandling. Undersökningen visar att implementeringen av modellbaserade leveranser påverkar produktionen i anläggningsprojektet och organisatoriska förändringar hos entreprenören. Resultatet förser insikter om organisatoriska och produktionsmässiga omställningar entreprenörer kan ställas inför vid implementering av modellbaserade leveranser. Entreprenören har digitaliserat produktionsmetoder och anpassat organisationen på grund av implementeringen. Modellbaserade leveranser har också inneburit en digitalisering för entreprenören med digitala verktyg och mjukvaror. Entreprenören har tillfört upportfunktioner i organisationen för omställningen till den modellbaserade informationsleveransen. Nya tjänster har skapats för att stödja och utbilda projektorganisationen, centrala roller har påverkats med förändrade arbetsrutiner och ansvarsområden och kompetens har behövt tillföras i projektet. Förändringar har varit utmanande för entreprenören som upplever en kontinuerlig utveckling i arbetet med modellbaserade leveranser. Informationshanteringen av handlingarna har varit den största hindret medan 3D-modellers visuella egenskaper ansågs som största möjligheten för entreprenören. / Research shows that poor integration of the building process stages, collaboration problems and organizational characteristics restricts the development of technological innovation in the construction industry. Successful implementation of technology has previously been shown to depend on more factors than just the technology's properties, for example the implementation of technology is influenced by the environment of the technology, the users competence, for whom it is developed and adapted by and how it is perceived by the user. Research also shown that organizational changes and adaptations may be necessary to access the benefits of technology. The characteristics of the construction industry are essential for studying the implementation of technology innovation. The study has therefore carried out a case study on a construction project and examined the implementation of model-based deliveries and how the technology has been adapted and influenced the contractor. The case study was carried out on a project with design-bid-build contract, whereupon the implementation of model-based deliveries was decided by the client. Fourteen semi-structured interviews were carried out with the contractor's staff in the project to gather information about model-based deliveries. Interview results were analyzed to identify the respondent’s perception of model-based deliveries. An important starting point in the analysis of model-based deliveries is that the information together makes complete building documents for the project. The study shows that the implementation of model-based deliveries affects production in the construction project and require organizational changes at the contractor. The results provide insights on organizational and construction production-related changes contractors can face when implementing model-based deliveries. The contractor has digitized production methods and adapted the organization because of the implementation. Model-based deliveries have meant a digitalization for the contractor with new tools and software. The organization has added support functions in the organization for the transition to the model-based information delivery. New positions have been created to support and train the project organization, key positions have been affected with changed work routines and responsibilities and competence has to be added to staff in the project. The changes have been challenging for the contractor who is experiencing continuous development in the work with model-based deliveries. Information management has been the major obstacle and the visual properties of 3D models were considered the greatest opportunity for the contractor.
23

The Military Utility of Unmanned Aerial Systems for Swedish Tactical Deliveries : A Defence Systems Perspective / Militära Nyttan av Obemannade Flygande System för Svenska Taktiska Leveranser : Ett Försvarssystemperspektiv

Lomaeus, Anton January 2021 (has links)
There is a rapid development within the unmanned aerial systems (UAS) technologies and the logistics industry leads the research, motivated by potential future profits when used for last-mile deliveries. The military have used unmanned aerial vehicles (UAV) for many decades, but the military usage of UAVs for deliveries is almost unheard of.  The main purpose of the study is to theoretically evaluate if existing payload carrying UAVs could increase the Swedish defence-logistics organizations capabilities. This study is delimited to tactical deliveries and UAVs with a maximal takeoff weight of less than 250 kg.  This study begins by investigating the Swedish Armed Forces logistical needs and the capabilities of the existing UAVs. It then performs a research overview in the subject to be updated on the latest insights which are complemented by discussions with expertise in the subject. The theory utilized are Systems Science, Systems Engineering and Military Capability which lay ground to the Military Utility concept which is developed to evaluate the value of military systems to support decision-makers when acquiring new complex systems. To evaluate the military logistics performance, Mosh Kress book Operational logistics was used.  The research is split into three phases, phase one utilizes the insights from the background research to select UAVs to evaluate and to develop three potential scenarios. In phase two the Military Utility evaluation models are developed for each scenario. Phase three evaluates the concept systems performance for the scenarios. The conclusion is that there is circumstantial Military Utility with UAS within the Swedish logistics organization. The potential exists when used for their strengths such as low response time in hard-to-reach areas, and where there is a desire to remove the operators from danger during the transport. Further there is a potential to save operative costs in terms of man-hours, but UAVs are quite vulnerable to electronic disturbances and the cold and windy Swedish climate. The civil airspace regulation is also a major hinder for UAS effective use as well as their limited payload capacity. / Den teknologiska utvecklingen inom obemannade flygande system (UAS) går snabbt framåt. Det är logistikindustrin som leder forskningen motiverade av framtida vinster när tekniken används för sista kilometern-transporter. Militären har använt obemannade flygande fordon (UAV) i flera decennier, men inte för materielleveranser i någon betydande utsträckning. Det huvudsakliga syftet med den här studien är att teoretiskt utvärdera om befintliga transport UAV:er kan öka den svenska försvarslogistiska förmågan. Studien är avgränsad till taktiska leveranser med UAV:er som har en maximal startvikt på 250 kg. Studien börjar med att undersöka de svenska försvarslogistiska behoven samt förmågorna av existerande UAV:er. Den genomför sedan en forskningsöversikt i ämnet för att uppdateras om de senaste insikterna som även kompletteras av diskussioner med experter i ämnet. Teorin som används är Systemteori, Systemteknik och Militär förmåga som lägger grunden för det Militär Nytta-konceptet. Konceptet är utvecklat för att utvärdera värdet av militära system och förse beslutstagare med stöd vid anskaffande av nya komplexa system. För att utvärdera den militära logistikprestandan används Mosh Kress bok Operational Logistics. Genomförandet delas upp i tre faser. I fas ett används insikterna från initiala undersökningen för att välja ut UAV:er att utvärdera samt utvecklas tre potentiella scenarier. I fas två utvecklas Militära Nytta utvärderingsmodellerna för vartdera scenario. I fas tre utvärderas systemkonceptens prestanda i scenarierna. Slutsatsen är att Militär Nytta med UAS finns till varierande grad beroende på omständigheterna. Potentialen för tekniken finns främst när den används för sina styrkor till exempel vid behov av snabba leveranser till svåråtkomliga platser, samt när det finns ett behov att få bort förare från farliga platser. Vidare så finns det potential att spara operativa kostnader genom reducering av man-timmar, men UAV:er är ganska sårbara till elektroniska störningar och det svenska klimatet. Även luftrumsregelverken är ett hinder för effektiv användning samt dess begränsade lastkapacitet.
24

Den juridiska statusen för 3D-modeller som bygghandlingar / The legal status and impact on 3D-models as construction documents

Aasa, Emma, Rosell, Michaela January 2023 (has links)
Introduction – This thesis in Building Engineering at Jönköping University, in collaboration with Tyréns Sweden AB, examines the issues surrounding 3D models as construction documents from a legal perspective and investigates how digitization affects stakeholders in the construction industry. The goal of the study is to explore a relevant and interesting research area in order to contribute to knowledge development and the advancement of new theories or methods in the field. Method – The study will employ qualitative research, including primary data collection through interviews, to address the research questions posed in the report. The authors have chosen this method to achieve a comprehensive understanding of the respondents' perspectives and identify important themes and patterns. The interviews were conducted with participants from various sectors of the construction industry to obtain a broader picture of the subject. Results – The study revealed that there are certain legal barriers to the use of 3D models as drawing documentation. These barriers are related to a lack of knowledge and uncertainty in handling the models. This includes issues of copyright, liability, and evidential value. There is a need to update current regulations to facilitate the management of digital models. Analysis – The analysis of the results clarifies that industry standards and clearer guidelines would prevent uncertainties and address knowledge gaps in the use of BIM and 3D models. An industry standard could have facilitated a smoother transition to a more digitized construction industry. There is also a need for education in the field for professionals and decision-making stakeholders. Discussion – The discussion focuses on possible solutions to the identified problems, such as the development of standards and guidelines, education, and regulatory updates. There is also a need to raise awareness about the legal aspects of using 3D models in the construction industry, as the uncertainty regarding their legal status is high. Legally, it is possible to use 3D models as contractual documents, but the study shows that concerns about the legal aspects are a reason for the weak implementation. Keywords – 3D model, 3D design, BIM, Building Information Modeling, construction documents, contractual law, and copyright. / Introduktion – Detta examensarbete inom Byggnadsteknik vid Jönköpings Tekniska högskola i samarbete med Tyréns Sverige AB undersöker problematiken med 3D-modeller (tredimensionell modell) som bygghandlingar ur ett juridiskt perspektiv och undersöker hur digitaliseringen påverkar aktörer inom konstruktion. Studiens mål är att undersöka ett relevant och intressant forskningsområde för att bidra till kunskapsutveckling och utveckling av nya teorier eller metoder inom området. Metod – Studien kommer att använda kvalitativ forskning som inkluderar primärdatainsamling genom intervjuer för att besvara frågeställningarna i rapporten. Författarna har valt denna metod för att uppnå en omfattande förståelse av respondenternas perspektiv och identifiera viktiga teman och mönster. Intervjuerna genomfördes med respondenter från olika delar av byggbranschen för att få en bredare bild av ämnet. Resultat – Studien visade att det fanns vissa juridiska hinder för användningen av 3D-modeller som ritningsunderlag. Dessa hinder kopplas till bristande kunskap och osäkerhet i hantering av modellerna. Detta inkluderar frågor om upphovsrätt, ansvar och bevisvärde. Det finns ett behov att uppdatera dagens regelverk för att lättare hantera digitala modeller. Analys – I analys av resultatet klargörs det att en branschstandard och tydligare riktlinjer skulle förebygga osäkerheterna och förebygga kunskapsluckor för användandet av BIM och 3D-modeller. En branschstandard hade kunnat leda till en säkrare övergång till en mer digitaliserad byggbransch. Det finns också ett behov av utbildning inom området för yrkesverksamma och beslutsfattande aktörer. Diskussion – Diskussionen fokuserar på möjliga lösningar på de identifierade problemen, så som utveckling av standarder och riktlinjer, utbildning och uppdatering av regelverk. Det finns också ett behov av att öka medvetenheten om de juridiska aspekterna av användningen av 3D-modeller inom byggbranschen då osäkerheten av den juridiska statusen är hög. Juridiskt sett går det att använda sig av 3D- modeller som kontraktshandling, men studien visar att oron för det juridiska är en anledning till den svaga implementeringen. Nyckelord – 3D-modell, 3D-projektering, BIM, Building Information Modeling,, bygghandling, kontraktsha juridik och upphovsrätt

Page generated in 0.0442 seconds