1

ÄTA-arbeten : - En otillåten direktupphandling? / Variation orders : - An illegal direct award of contract?

Heinefeldt, Moa January 2016 (has links)
Huvudregeln när staten, landstinget eller kommunen vill få ett arbete utfört för deras räkning är att arbetet ska upphandlas i konkurrens mellan ett antal entreprenörer i enlighet med LOU:s regelverk. LOU och det nya upphandlingsdirektivet har dock vissa undantagsregler som medger att en direktupphandling av kompletterande byggentreprenader är tillåten under förutsättning att de i bestämmelserna stadgade rekvisiten är uppfyllda. Om ett tillkommande arbete som beställs av den upphandlande myndigheten inte faller in under dessa undantagsbestämmelser kan myndigheten gjort sig skyldig till en otillåten direktupphandling. Ett ÄTA-arbete är ett entreprenadrättsligt begrepp som dels ger entreprenören en rätt och skyldighet att utföra tillkommande arbeten, dels ger beställaren en vid ändringsbefogenhet i den bemärkelsen att denne kan göra ändringar från de ursprungliga kontraktshandlingarna. Just möjligheten att kunna göra ändringar från det ursprungliga kontraktet är en av de mest särskiljande egenskaperna hos entreprenadavtalet.    Det går följaktligen att urskilja att det å ena sidan föreligger ett regelverk, LOU, som verkar för att samtliga arbeten ska upphandlas och att ändringar av redan upphandlade byggentreprenader i största möjliga mån ska motverkas. Det föreligger å andra sidan ett annat regelverk, AB 04, enligt vilket det anses nödvändigt för parterna att kunna göra ändringar från redan ingånget avtalet varför BKK föreskrivit detta som en rättighet och skyldighet som är skadeståndssanktionerad. I den fortsatta framställningen redogörs närmare för innebörden av begreppen ÄTA-arbete och kompletterande byggentreprenader, vilka ändringar som åsyftas med regelverken samt hur kompatibla regelverken de facto är. Det kommer efter den företagna redogörelsen och analysen påvisas att det finns fler aspekter som visar att LOU:s undantagsregler om direktupphandling tar sikte på andra ändringar än ÄTA-arbeten. Det kommer också visa sig att om LOU är tillämplig i fråga om ÄTA-arbeten medför detta en rad olägenheter för parterna i entreprenadavtalet som kan leda till att entreprenaden aldrig färdigställs.
2

Motivation vid monotona arbeten : En kvalitativ arbetsplatsundersökning

Rahlén, Amanda, Hansson, Linnéa January 2014 (has links)
Syftet med denna studie var att undersöka hur personal på ett callcenter som arbetat länge med monotona arbetsuppgifter upplever sitt arbete i förhållande till känslan av kompetens, samhörighet och autonomi, samt vad de tycker kan förbättras för att det ska uppfyllas i större utsträckning. Sex intervjuer genomfördes och materialet analyserades med hjälp av en induktiv tematisk analys. I studien framkom att alla respondenterna ansåg att det är viktigt att ha kompetens oavsett vad man arbetar med inom organisationen. Kompetensen utvecklades av individens eget driv men skulle kunna utvecklas ytterligare med fler utbildningar inom organisationen. Samhörigheten ansågs vara stark vilket gynnade samarbetet och den skulle kunna stärkas ytterligare genom fler aktiviteter arbetsgrupperna emellan. Resultatet visade att alla respondenterna upplevde att de har en känsla av autonomi i sitt arbete och kan påverka sitt arbete. Detta trots att arbete på callcenter i tidigare studiers ansetts vara mycket styrt.
3

Arbete till varje pris : arbetslinjen i 1920-talets arbetslöshetspolitik /

Eriksson, Lena, January 2004 (has links)
Diss. Stockholm : Univ., 2004.
4

Framgångsfaktorer för hantering av Ändrings-, Tilläggs- & Avgående arbeten (ÄTA) inom renovering och ombyggnadsprojekt / Factors that contributes to successful management of alteration labour, additional labour and retiring labour within renovation and redevelopment projects

Fransson, Tom, Petersmo, Kalle January 2019 (has links)
Purpose: Alteration labour, additional labour and retiring labour are the sort of extra work that the contractor can add in addition to the original order. The management of this type of construction work have comprehensive variation from project to project. This sort of work provides changes in both labour hours and project costs. In other words, a high amount of these will increase the project costs. The goal with this thesis is to identify the success factors that contributes to better management process of alteration labour, additional labour and retiring labour for renovation and redevelopment projects.  Method: This thesis has been made with qualitative research. Literature study, document analysis and semi structured interviews are the methods that have been used. The literature study provided insight in the already available research in this area. The document analysis gave understanding of the company and comprehension regarding the amount of alteration labour, additional labour and retiring labour for each project. Lastly the interviews provided profound knowledge to how the employees at Skanska Direkt manage their handling process, and which type of improvements they thought will make positive change.  Findings: The thesis has resulted in clear and concrete factors that contribute to the management process for alteration labour, additional labour and retiring labour. There have not been presented any new methods for this, however the success factors have been brought to light. Both the empiricism and theory show that a symbiosis between the design, the number of crewmembers, documentation and registration, the cooperation with the client and the possibility for the co-workers to understand and know the project is of most importance. Implications: By implementing the success factors presented in this report the amount of alteration labour, additional labour and retiring labour can be reduced. The labour that anyway emerge can be handled in a smarter and more efficient ways. The implications of this actions will for instance result in lower personnel costs, gainful cooperation’s between contractors and client, less risk for penalty expenses connected to delays. And no more than a successful company.  Limitations: The thesis only contains research including four different projects. There has been no comparison between new construction and redevelopment. The research has not taken the clients aspects into consideration. The result of this research study will be useful for average and large construction companies focusing on renovation and redevelopment projects.  Keywords: Alteration labour, additional labour, retiring labour, turnkey contract, general contract, renovation, redevelopment, project planning, construction documents, cooperation.
5

”Vi ska kämpa för att få ett jobb” : En studie om utrikesfödda akademikers upplevelser av vägen in till kvalificerade arbeten

Gallego Escudero, Gicela January 2016 (has links)
Denna kvalitativa studie syftar till att studera hur utrikesfödda akademiker som är etablerade på den svenska arbetsmarknaden upplever vägen till arbete, samt på vilket sätt deras sociala nätverk och kontakter har inverkat på deras jobbmöjligheter. Intervjuer har gjorts med åtta personer från olika länder utanför EU/EES som invandrat till Sverige som vuxna och som har akademisk utbildning från sitt eget hemland eller akademisk utbildning från Sverige. Studien tyder på att svensk akademisk utbildning och att ha bott i Sverige under en längre tid verkar vara något som upplevs öka möjligheterna att få arbeten som motsvarar den egna utbildningen. Studien tyder också på att sociala nätverk och kontakter ökar jobbmöjligheterna. Samtliga utrikesfödda akademiker i denna studie upplever att de har kämpat för att nå aktuella positioner.
6

ÄTA-arbeten på Trafikverket / Changes, Supplementary and Retiring works in the Swedish Transport Administration

Magnusson, Carl January 2014 (has links)
“ÄTA-work” (Changes, Supplementary and Retiring works) is more or less common in all construction projects whether it is about houses, roads or railways, in the planning stage, or in the construction stage. For the Swedish Transport Administration, which is the largest purchaser of infrastructure in Sweden, ÄTA-work is a hotter topic than ever.Economists and managers want to draw conclusions on the projects share ÄTA-work, while the project manager is concerned about whether it is possible to draw any conclusions at all as each project is unique in itself and has its own merits. There is a big variation in the amount of ÄTA-work in different geographic districts in the Swedish Transport Administration.This study shows that the Swedish Transport Administration does not have a unanimous approach regarding the management of “ÄTA-work”. Forms and systems is not fully used and “ÄTA-works” are accounted wrong in many projects, sometimes because of the project managers’ hesitation about how to handle it. / ÄTA-arbeten(Ändrings-, Tilläggs- och Avgående arbeten) är mer eller mindre vanligt förekommande i alla byggprojekt vare sig det gäller hus, väg eller järnväg, i projekteringsskede, eller i byggskede. För Trafikverket, som är Sveriges största beställare av infrastruktur är ÄTA-arbeten ett hetare diskussionsämne än någonsin då andelen ÄTA-arbeten ökar.Ekonomer och chefer vill dra slutsatser på projekts andel ÄTA-arbeten, medan projektledare ställer sig frågande till om det går att dra några slutsatser överhuvudtaget då varje projekt är unikt i sig och har sina egna förutsättningar. Samtidigt har olika distrikt relativt skilda andelar ÄTA-arbeten vid uppsummeringar på distriktsnivå.Detta arbete visar att Trafikverket inte har ett enhälligt arbetssätt kring hanteringen av ÄTA-arbeten. Blanketter och system används inte fullt ut och ÄTA-arbeten konteras fel i många projekt, ibland på grund av att projektledare har svårt att veta hur de ska hantera ÄTA-arbeten.
7

BIM-Projektering som metod för att minska antalet ÄTA-arbeten inom anläggningsproduktion

Johansson, Pontus, Olander, Pontus January 2016 (has links)
Purpose: BIM has the potential to reduce the number of design errors in construction projects. Possibilities to change parts at a later stage, as well as better opportunities to which the designer himself can detect if anything wrong has been done. The possibility to discover faults easier and with better opportunities for changes should lead to the defects related to design errors in production decreases. The introduction of BIM in a firm may be costly and clear evidence that the design errors decreased by BIM has not been found. The goal of the work is to find out whether the introduction of BIM in the design stage in construction has led to fewer defects related to design errors in the production stage. Method: In order to achieve the target set has interviews with designers at two consulting companies been implemented. This is to find out how the methods of the designing has become more BIM-based. A document analysis has been carried out on the lists of defects and changes from eleven different engineering projects of varying size. These documents come from two large contractors in Sweden. Findings: The deisgners interviewed describe the methods for designing roads and facilities have gone on to become more BIM-based. Having previously designed in 2D CAD it has gone over more to the 3D models. In the 3D software it is also possible to add different models to the same file and check for any errors between them. To check itself has also become easier than when the designing was done in 2D CAD. The lists of changes and defects also shows that the amount of the defects related to design errors was reduced significantly compared to how it looked in a study conducted in 1999 and mentioned in a study from 2014. Implications: The introduction of BIM in the design has led to the defects related to design errors out in production has fallen. This would be of interest to companies thinking of introducing BIM in their organization but have not yet seen the benefits that BIM brings. Limitations: The thesis is relevant to both designers and contractors in civil engineering. This is when the work has been focused more towards the road and facility than designing of houses. Designers and entrepreneurs from different companies in different parts of Sweden have contributed to the collection of data, which means that the results can be assumed to be general. Contact with more companies from more places in Sweden had definitely been able to make the results even more generally. Keywords: BIM, design, changes, design errors / Syfte: BIM har potentialen att minska antalet projekteringsfel i anläggningsprojekt. Möjligheter att ändra delar i ett senare skede samt bättre möjligheter att som projektör själv upptäcka eventuella fel man gjort. Upptäcks fel enklare och med bättre möjligheter för ändringar bör därför leda till att ÄTA-arbetena i produktionen minskar. Att införa BIM på ett företag kan dock vara kostsamt och tydliga bevis på att projekteringsfelen minskat med BIM har inte kunnat hittas. Målet med arbetet var att ta reda på om införandet av BIM i projekteringsskedet vid anläggningsarbeten har lett till färre ÄTA- arbeten relaterade till projekteringsfel ute i produktionsskedet. Metod: För att uppnå det mål som satts har intervjuer med projektörer på två konsultföretag genomförts. Detta för att ta reda på hur metoderna för att projektera blivit mer BIM-baserade. En dokumentanalys har sedan genomförts på ÄTA-listor från elva olika anläggningsprojekt i varierande storlek. Dessa dokument kommer från två större entreprenadföretag i Sverige. Resultat: De projektörer som intervjuats beskriver att metoderna för att projektera vägar och anläggningar har gått mot att bli mer BIM-baserat. Från att tidigare ha projekterat i 2D-CAD har man gått över mer till 3D-modeller. I programmen med 3D finns även möjligheter att lägga in olika modeller i samma fil och kontrollera eventuella fel. Att kontrollera sig själv har även det blivit enklare jämfört med när projektering genomfördes i 2D-CAD. ÄTA-listorna visar även de att mängden ÄTA-arbeten relaterade till projekteringsfel minskat betydligt jämfört med hur det såg ut i en studie genomförd 1999 som även nämns i en studie genomförd 2014. Konsekvenser: Införandet av BIM i projekteringen har lett till att ÄTA-arbetena ute i produktionen har minskat. Detta skulle kunna intressera företag som funderat på att införa BIM i sin organisation men som ännu inte sett nyttan och de fördelar som BIM för med sig. Begränsningar: Examensarbetet är relevant för både projektörer och entreprenörer inom anläggningsbranschen. Detta då arbetet har koncentrerats mer mot väg och anläggning än mot hus. Projektörer och entreprenörer från olika företag i olika delar av Sverige har bidragit till datainsamlingen vilket gör att resultatet kan antas vara generellt. Kontakt med fler företag från fler platser i Sverige hade definitivt kunnat göra resultatet än mer generellt. Nyckelord: BIM, projektering, ÄTA-arbeten, projekteringsfel.
8

Brister i förfrågningsunderlag och dess påverkan på slutsumman vid en totalentreprenad / Flaws in contract documents and how it affects the total cost in a turnkey contract

Lindquist, Fredrik, Ristic, Neno January 2018 (has links)
Det är viktigt med väl utförd planering för att ett byggprojekt ska gå smidigt och stå färdigt inom utsatt tid. Det är också viktigt för att hålla utsatt budget, så att det inte tillkommer onödiga och oväntade kostnader. Ju senare ett fel upptäcks, desto dyrare är det att rätta till, många gånger dyrare än om det upptäcks i ett tidigt skede innan byggstart. Det är förarbetet och projekteringen som sätter alla förutsättningar för bygget.   Ett bristfälligt förfrågningsunderlag kan få stora konsekvenser för slutsumman i ett projekt, och detta examensarbete har som avsikt att undersöka förfrågningsunderlag och kartlägga vilka brister som är vanligast och vilka som har störst påverkan på slutsumman. Målet har varit att skapa en förståelse och översikt över bristerna i ett förfrågningsunderlag hos läsaren.  Med hjälp av en litteraturstudie kring ämnet har en intervju genomförts med väl genomtänkta frågor för att få så bra svar som möjligt på frågeställningen och kunna presentera ett bra resultat. I rapportens slut presenteras de vanligaste bristerna och vad de kan få för konsekvenser, och detta resultat diskuteras sedan och följs upp med en slutsats på hela arbetet.  Resultatet av intervjuerna visade att det finns bristande förfrågningsunderlag, vilket genererar i onödiga kostnader. Detta är främst på grund av tillkommande ÄTA-arbeten och tvister som uppstår mellan de olika parterna. Dessa brister i förfrågningsunderlaget kan bero på att det inte lagts ner tillräckligt med tid och arbete i det tidiga respektive sena skedet av ett projekt. Det vill säga både vid skapandet av förfrågningsunderlaget och vid granskningen av ett avslutat projekt. / It is important to have well-planned planning for a construction project to go smoothly and be completed within the deadline. It is also important to keep exposed budget, so that there are no unnecessary and unexpected costs. The later an error is discovered, the more expensive it is to adjust, many times more expensive than if it's discovered early in the process of a project. It's the preparation and the projecting that sets all the prerequisites for the building.   A lack of specifications in these contract documents may have major consequences for the total cost of a project, and this examination project aims to investigate the contract documents and identify the most common shortcomings and those that have the greatest impact on the total cost of a project. The aim has been to provide an understanding and overview of the shortcomings in these contract documents for the reader.  With the help of a literature study on the subject, an interview has been conducted with well thought-out questions to get the best answers possible on the issue for this report and to present a good result. At the end of the report, the most common shortcomings and their consequences are presented, and this result is then discussed and followed up with a conclusion on the whole work.  The results of the interviews showed that there is a lack of specifications in contract documents, which generates unnecessary costs. These are mainly additional contract changes and disputes that arise between the various parties. These shortcomings in the specifications may be due to the fact that no time has been spent in the early and late stages of a project. That is to say in the preparation of the contract documents and in the examination of a completed project.
9

"Friskvård är det viktigaste vi har på arbetsplatsen" : En kvalitativ studie om chefers syn på och arbete med friskvård på arbetsplatsen

Nilsson, Ida January 2019 (has links)
Syftet med denna kvalitativa studie är att undersöka chefers syn och arbete med hälsa och friskvård på arbetsplatsen. För att uppfylla syftet användes dessa frågeställningar i studien; Hur arbetar de olika verksamheterna med friskvård? Hur är chefers syn på hälsa och friskvård på arbetsplatsen? Hur väljer cheferna att använda sig av friskvård och hälsofrämjande arbeten?    För att samla in data har intervjuer använts som datainsamlingsmetod, där nio enhetschefer inom sex olika yrkestyper har intervjuats.    Resultatet visar en tydlig bild att friskvård används på de olika arbetsplatser och att det går att använda det på olika sätt. Resultaten visar även tydligt att cheferna anser att friskvården bör användas utifrån hur de fysiska kraven samt hur den fysiska miljön ser ut på arbetsplatsen.   Nyckelord:  Friskvård, hälsa, hälsofrämjande arbeten, enhetschefer
10

Var går gränsen? : En kvantitativ studie av oreglerade arbeten och dess psykosociala hälsokonsekvenser

Birgersdotter, Ylva, Wåhlstrand, Tove January 2011 (has links)
Allt fler jobb blir mindre reglerade, vilket förändrar förutsättningar, krav och hälsokonsekvenser av arbete. Tidigare studier visar att de minst reglerade jobben finns inom bland annat universitetsvärlden. Syftet med studien är att studera psykosociala hälsokonsekvenser av oreglerade arbetsformer bland universitetsanställda. De psykosociala hälsokonsekvenserna av oreglerade jobb är ännu inte helt kända men de har kopplats samman med utbrändhet. Tidigare forskning säger att gränslöshet kan vara positivt då det skapas en frihet i arbetet. Men forskning har även visat att gränslöshet i arbetet kan ha negativa effekter på den psykiska hälsan. Individen tenderar att ta på sig för mycket jobb i kombination med för lite återkoppling från arbetsgivaren. Uppsatsen har en kvantitativ ansats och den statistiska analysen utgörs av OLS regressioner. Datamaterialet består av genomförd enkätstudie från 2009 riktad till anställda på ett universitet som visat sig ha hög andel oreglerade arbeten. Resultatet visar att frihet i arbetet kan kombineras med någon form av kontroll eller tydliga ramar för att inte ha negativa konsekvenser för den psykosociala hälsan. Resultatet visar även att det finns en skillnad mellan samband av grad av reglering och psykosocial hälsa mellan män och kvinnor där den positiva effekten av gränslöshet är större för kvinnor.