Spelling suggestions: "subject:"byggprojekten."" "subject:"byggprojektet.""
1 |
Byggnadsprojektering och dess problem förvidare effektivisering. : En fallstudie för den interna projekteringen av Råbäckens förskolaKarim, Bobby, Karim, Simon January 2016 (has links)
The number of newly built houses has increased by a total of 44% between 2010-2015.As a result of the increased housing per year, the pressure increases to deliver theprojects in time and deliver according to the customer's wishes. Uppsala municipalityexpects that the number of preschool children will increase markedly between 2019-2020, this results in a need to optimize the construction projects of pre-schools so thatthe municipality can handle to build and can afford to meet the need. Constructionprojects today involve many different consultants in the same project, in order for theproject to progress, it is important for the communication between members to work.This report aims at identifying the problems that exist today when designing apreschool.The interviews have been conducted as a case study, where previous literature has laidthe foundation for the work. The work first involves a literature study where previouslyknown problems were raised after that an interview study was conducted.There are many problems that may occur, among other things, that consultants blameeach other, mistakes are repeated, and lack of communication between the projectmembers. A number of these problems can be counteracted by using experiencefeedback, message plan and an experienced construction project management / Sett utifrån en årlig basis, har antalet nybyggda bostäder har mellan 2010-2015 ökatmed hela 44%. I samband med den ökade bebyggelsen så ökar pressen på att fåprojekten klara i tid och leverera enligt kundens önskemål. Uppsala kommun förväntarsig att antalet förskolebarn kommer öka markant under 2019-2020, detta medför att detfinns ett behov av att effektivisera projekteringen av förskolorna så kommunen hinnermed att bygga och har råd att tillgodose behovet. Projektering idag innefattar mångaolika konsulter i samma projekt, för att projektet ska kunna fortskrida gäller det attbland annat kommunikationen mellan medlemmarna fungerar.Denna rapport syftar till att identifiera vilka problem som finns idag vid projektering aven förskola.Undersökningen har utförts som en fallstudie, där tidigare litteratur har legat till grundför arbetet. Arbetet innefattar först en litteraturstudie där tidigare kända problem tas uppsedan utfördes en intervjustudie.Det finns många problem som kan uppstå, bland annat att konsulter skyller ifrån sig,misstag upprepas och bristande kommunikation mellan medlemmarna. Ett antal avdessa problem kan motverkas genom att använda sig utav som bland annaterfarenhetsåterföring, beskedsplan och en erfaren projektledning
|
2 |
BIM - Tillämpning och effekt i byggprocessens olika skeden / BIM - Application and effectsLinder, Viktor January 2013 (has links)
Byggbranschen står inför stora förändringar i framtiden i och med att BIM (Building Information Model/Modelling/Management) successivt introduceras inom området. BIM innebär en förändrad arbetsmetod som kan ge förbättrade möjligheter att minska tidsåtgången och omarbetningar i ett förprojekteringsskede samt skapa ett effektivare projekterings- och produktionsskede med färre fel. BIM är ett relativt nytt sätt att inom byggbranschen bedriva projekt och innebär en förändring för olika skeden inom byggprocessen vilket påverkar inblandade parter. Syftet med denna studie är att ta reda på hur Peab i Kiruna på bästa sätt kan nyttja möjligheterna som finns med BIM samt redogöra för några av de förändringar BIM kan innebära jämfört med nuvarande arbetsmetoder. En teoretisk del beskriver BIM och dess för- och nackdelar inom olika områden samt vilka hinder det finns för arbetsmetoden. Ett resultat baserat på den teoretiska delen förklarar att BIM i dagsläget främst bör nyttjas av Peab i Kiruna i ett anbudsskede, där ett förfrågningsunderlag görs om till en BIM-modell. Detta kan leda till underlättande för företaget att se fel i förfrågningsunderlag samt att utförande av mängdavtagning och kalkylering kan ske på ett enklare sätt. Detta kräver dock att företaget har kompetensen som krävs för att kunna skapa BIM-modeller samt att de bekostar licenser förnödvändiga programvaror. Vidare förklaras det i rapporten hur tillämpning av BIM i ett anbudsskede kan ske, via ett praktiskt genomförande där möjligheterna och nyttorna med att utföra mängdavtagning av en BIM-modell beskrivs. Mängdavtagningen utfördes i CAD-programmet Autodesk Revit där en byggnad användes som modell. Genom att i programmet använda lämpliga funktioner, kan valfria nyttovärden erhållas från valfritt material i byggnaden. Om Peab kan använda BIM på detta sätt i sin arbetsmetod kommer det att underlätta för företaget vid framtida projekt och kan möjligtvis även utgöra ett första steg för en implementering av BIM i dess projekterings- och produktionsskede. / The construction industry is facing major changes in the future, as a result of BIM (Building Information Model/Modelling/Management) that gradually makes its arrival. BIM implies a changed working method that can provide improved possibilities to reduce time and rework in the pre-planning stage and create a more efficient design and production stage with fewer errors. BIM is a relatively new way of conducting projects in the construction industry and implies a change in different sections of the building process, which affects involved parts. The purpose of the study is to find out how Peab in Kiruna in the best possible way can take advantage of the potential of BIM, also describe some of the changes BIM can mean compared to current practices. A theoretical part describes BIM and its advantages and disadvantages in different areas and explains the barriers that exist for the working method. A result based on the theoretical part explains that BIM today primarily should be utilized by Peab in Kiruna in a tender stage where a contract document is converted to a BIM model. While this may help them to see errors in the specifications, they also can perform quantity takeoff and calculation in an easier way. However, this requires that the company has the expertise necessary for creating BIM models and that they pay for licenses for the essential software. Further, it is explained in the report how this can be done, by a practical implementation carried out where an outlining of the potential and benefits of performing quantity takeoff of a BIM model is shown. The quantity takeoff is performed in the CAD software Autodesk Revit, where a building was used as a model. By using suitable functionsin the program, optional utility values can be obtained from optional materials in the building. If Peab can use BIM in this manner in their working method, it will make it easier for them in future projects and could even be a first step for an implementation of BIM in their design and production stage.
|
3 |
Analytisk implementering av 4D projektering / Analytical implementation of 4D planningLinder, Ludvig January 2016 (has links)
The building sector is in need of enhanced efficiency. The methodology behind Building Information Modeling, BIM, which is being used increasingly in extent, has shown to improve the efficiency of the flow of information in projects. The concept of 4D is based on the working method and methodology of integration between BIM and a time schedule. This can under certain circumstances further improve the efficiency of the planning phase of building- and civil engineering projects. Today there are not many companies that have begun to use this method and methodology, even though it has been shown to be effective for some conditions. This report addresses this dilemma, why and how companies can implement the work and process of 4D.
|
4 |
Att klimatdeklarera byggnader : En studie om utmaningar och möjligheter med Boverkets förslag på klimatdeklarationer / Declaring climate impact from buildingsÖstberg, Agnes, Torgersson, Josefin January 2020 (has links)
The increased greenhouse effect is today a global environmental problem that affects all living things on our planet. One fifth of the domestic emissions of greenhouse gases in Sweden originate from the construction and real estate sector. The Swedish Government has taken action to reduce the climate impact and is therefore suggesting a climate declaration requirement. This means that all buildings whose planning permission is handed in after the 1st of January 2022 is obliged to follow this requirement. To climate declare implies to show the total amount of greenhouse gases related to the materials used. The purpose of this study is to increase knowledge about the challenges and possibilities the proposition of climate declaration might bring. Four structural engineers were interviewed with aim to investigate their point of view on this issue and how their way of working might be affected in the future. To identify challenges that might occur with reference to the proposition of climate declaration, two calculations of climate impact were done. Results from the interviews indicate that the structural engineers enter the process of a project too late to contribute in an optimal way to a reduced climate impact. The calculation of climate impact shows e.g. that glass wool contributes to a higher climate impact than insulation of cellulose regardless of which environmental data was used. Calculation of climate impact shows that the majority of the materials contributes to a higher climate impact if generic data was used instead of product specific data. When the climate declaration requirement is introduced it will be important to allocate resources to investigate alternative material and methods, in order to reduces the climate impact. The idea of who traditionally access the different stages of the process of building may need to be questioned. / Den förstärkta växthuseffekten är idag ett globalt miljöproblem som påverkar allt levande på vår planet. I Sverige beräknas en femtedel av utsläppen av de inhemska växthusgaserna härledas till bygg- och fastighetssektorn. Som ett steg mot en minskad klimatpåverkan föreslår Sveriges regering att alla byggnader vars bygglov söks från 1 januari 2022 ska klimatdeklareras och har gett Boverket i uppdrag att lägga fram ett förslag på utförandet. Att klimatdeklarera en byggnad innebär att redovisa det totala utsläppet av växthusgaser från de material som byggs in i en byggnad. Detta examensarbete har genomförts i samarbete med enheten för Hållbara byggnader på Ramboll Sweden AB med syfte att sprida kunskap om vilka utmaningar och möjligheter Boverkets förslag kan komma att innebära. I studien har fyra konstruktörer intervjuats för att undersöka deras syn på Boverkets förslag och hur det kan komma att påverka deras arbetssätt. För att få förståelse för de utmaningar som kan tänkas uppstå har det i studien även gjorts klimatberäkningar för att identifiera olika typer av problem. I intervjuerna vittnar respondenterna om att konstruktörer ofta kommer in för sent i byggprocessen för att optimalt kunna bidra till en minskad klimatpåverkan. Ur studiens klimatberäkningar framgår det till exempel att ett vindsbjälklag isolerat med glasull har en nästan dubbelt så stor klimatpåverkan som ett vindsbjälklag isolera med cellulosaisolering. Samtidigt ser man att beräkningsmetoderna och miljödatakällorna ger förhållandevis stor skillnad avseende materialens klimatpåverkan. Det kan vid införandet av klimatdeklarationer komma att bli viktigt att avsätta tid för att undersöka alternativa material och metoder i syfte att minska klimatpåverkan. Synen på byggprocessen, vilka aktörer som traditionellt medverkar i vilka skeden, kan även behöva utmanas.
|
5 |
BIM: KOMMUNIKATION MELLAN PROJEKTERING OCH PRODUKTION : - Hur BIM effektiviserar informationsflödet / BIM: Communication between construction management and construction work : - How BIM streamlines the flow of informationÖsterblom, Fredrik, Thunell, Andreas January 2016 (has links)
Denna rapport syftar till att bistå projekterings- och produktionspersonal med effektiviserande verktyg och metoder för att med BIM som bas öka och förenkla informationsutbytet. NCC använder idag BIM-metoder för projektering av projekt, däremot nyttjas inte BIM-metodernas fulla potential för samarbetet mellan disciplinerna i projekten. För att undersöka behovet inom produktionen hölls intervjuer med personal från ett brett spektrum av åldrar och befattningar. Intervjuerna låg sedan till grund för kriterier till utvärdering av BIM-verktyg. Intervjuerna hölls även med personal med befattningar som projekteringsledare, modellsamordnare och konstruktör, för att med deras kunskaper utvärdera BIM-verktyg. För att på ett verklighetsförankrat vis utvärdera digitala verktyg i form av BIM-verktyg modellerades ett hus i Tekla Structures 21.1 och Revit 2015. Även A- och K-modellerna för NCCs projekt Trollhättan 33, T33 fanns att tillgå för tester. Från utvärderingarna utkristalliserades två program som författarna anser vara bäst i respektive stadium av byggprocessen i det studerade projektet, T33. Solibri Model Checker, SMC anses som bäst lämpat verktyg i projekteringsskedet och Trimble Connect anses bäst under produktionsskedet. Solibri Model Checker har bäst möjligheter för validering och kvalitetskontroller och Trimble Connect är ett verktyg där modeller och handlingar kan lagras för enkel kommunikation och samarbete i projektgrupper. Verktyget har även möjlighet att visuellt presentera modeller och handlingar på en dator, surfplatta eller mobiltelefon. De BIM-verktyg som utvärderades var: Solibri Model Checker v9.6 Autodesk Navisworks Manage 2016 Autodesk BIM 360 Glue Trimble Tekla BIMsight Trimble Connect / The purpose of this report is to enable project management and construction personnel to use BIM tools and methods more efficiently. Although NCC is currently using some functionality of such digital tools, NCC is not using the full tool suite to better manage their projects, specifically to leverage the cross discipline collaboration capabilities. In order to gather a comprehensive view of construction personnel requirements, interviews were conducted across a varied and wide range of age, seniority, and job position. These interviews formed the basis for the evaluation criteria of the BIM tools. Additional interviews were held with other staff, including project leads, model coordinators and construction engineers to ensure their knowledge was incorporated into the evaluation. To compliment the interviews, and further evaluate the digital tools for cross collaboration capabilities a house was modeled in Tekla Structures and Revit. Also the architectural and construction models of NCC project Trollhättan 33, T33, was available for testing. Two programs emerged as ‘best in class’ post the assessment, differentiated primarily by which phase of the construction lifecycle they were used for. Solibri Model Checker, SMC was considered most suitable tool in the project management phase and Trimble Connect considered best during the construction phase. SMC is suited for validation and quality control and Trimble Connect is a tool, in which models and documents can be stored for easy collaboration in project teams as well as visualizing models, which are easily shared via computer, tablet or mobile phone. The following BIM tools were tested: Solibri Model Checker v9.6 Navisworks Manage 2016 Autodesk BIM 360 Glue Trimble Tekla BIMsight Trimble Connect
|
6 |
Förseningar i byggprojektering och hur de kan förebyggasAbdulkader, Ammar January 2023 (has links)
Idag är förseningar inom byggbranschen vanliga och orsakar problem och konsekvenser i byggprojekt. När ett projekt blir försenat uppstår extra kostnader för projektägaren, entreprenören eller båda parter. Med andra ord innebär förseningar ekonomiska förluster och skapar en stressig arbetsmiljö för alla inblandade aktörer och projektmedlemmar. I detta examensarbete identifieras betydande risker som kan orsaka förseningar i projekteringsfasen av byggprocessen, samt presenteras lösningar för att förebygga dem. Byggprocessen består av fyra faser: förstudie, projektering, produktion och överlämning. Projekteringsfasen är ett av de viktigaste stegen i byggprocessen och har stor betydelse för att förebygga förseningar. I denna fas utformas och ritas byggnader, och bygghandlingar tas fram med konstruktionsritningar, tekniska lösningar och beskrivningar upprättas för att styra hela byggprocessen. Detta arbete fokuserar på förseningar i själva projekteringsfasen och dess påverkan på hela projektet, samt hur de kan förebyggas. Arbetet består av en teoretisk och en praktisk del. Syftet med arbetet är att undersöka orsakerna till förseningar inom projekteringsfasen och att hantera dem på bästa sätt genom att utveckla riskhanteringen. Orsakerna kan vara ofullständig information, förändringar i projektspecifikationer och tekniska problem. Teorin bygger på litteratur om projektering i byggprocessen för att ge en bred kunskapsbas om projektering innan den praktiska delen genomförs. Den praktiska delen baseras på intervjuer med erfarna projektledare inom projektering som har varit involverade i olika försenade projekteringsprocesser. Resultatet presenterar projektledarens svar angående orsakerna till förseningarna i de två projekten. I diskussionen jämförs och analyseras resultaten med teorin, vilket visar att sjukdomar och bristande kommunikation, tillsammans med andra risker, kan vara orsaker till förseningar i projekteringsfasen. Förbättringsförslag inkluderar att skapa en trygg och hälsosam arbetsmiljö som en viktig faktor för projektets framgång, genom att anlita ytterligare konsulter från andra företag vid arbetsbelastning och erbjuda avkopplande aktiviteter som exempelvis spa-besök när det behövs. Andra förslag innefattar att lägga extra tid på riskanalys för att identifiera potentiella problem samt att etablera en kommunikationsmetod för grupper, såsom en grupp på Messenger eller en annan applikation, där all information om projektet regelbundet delas.
|
7 |
Ju förr desto bättre : Arbetsmiljöingenjörens roll vid planering och projektering av nya kontorsarbetsmiljöer. / The sooner the better. : The role of the safety and health engineer when planning new officesPondman Lagerström, Jessica January 2016 (has links)
Bakgrund: Arbetsgivaren har det övergripande ansvaret för att arbetsmiljön är tillfredställande på arbetsplatsen - bruksskedet. Flertalet av de fysiska arbetsmiljöfaktorerna som arbetsgivaren har att ansvara för bestäms tidigt i byggprocessen, i planerings- och projekteringsstadiet. Arbetsmiljölagen beskriver vilka uppgifter och ansvar som åligger byggherre och projektörer som låter utföra ett byggnads- eller anläggningsarbete. Litteraturen beskriver en utveckling där arkitekter och andra projektörers ansvar för att beakta arbetsmiljöaspekten har ökat. Ett ansvar där deras insatser ofta är begränsade. Syfte: Syftet med uppsatsen är att undersöka vilken roll arbetsmiljöingenjören kan ha i att beakta arbetsmiljön gällande bruksskedet vid planering och projektering av nya kontorsarbetsplatser. Metod: Uppsatsen bygger på litteraturgenomgång samt intervjuer med huvudsakligen arbetsmiljöingenjörer och arkitekter. Resultat: Litteratur och intervjuer visar att arbetsmiljöingenjörer engageras sent i processen vilket resulterar i brister i arbetsmiljön och ombyggnationer som åtgärd. Här framträder också en situation där kunskapsläget runt arbetsmiljöfrågor hos arkitekter upplevs som svagt, vilket bekräftas av de intervjuade. Respondenterna menar att checklista som arbetsverktyg används i mer eller mindre stor utsträckning. Befintliga checklistor från Arbetsmiljöverket presenteras i uppsatsen, dessa rekommenderas som arbetsverktyg. Slutsats: Av intervjuerna framkommer att respondenterna menar att arbetsmiljöingenjören kan agera sakkunnig, utifrån sin kunskap och erfarenhet, i projekteringsprocessen. Arbetsmiljöingenjören utgör därmed med sin sakkunskap runt arbetsmiljöfrågor ett stöd för byggherre och projektör. Den ansvarsroll som Arbetsmiljölagen beskriver, Byggarbetsmiljösamordnare - planering och projektering (BAS-P), torde utgöra en naturlig roll för arbetsmiljöingenjören. I och med detta får arbetsmiljöingenjören en naturlig roll tidigt i byggprocessen. Nyckelord: Byggprojektering, arkitekt, arbetsmiljö, företagshälsa, checklista. / Abstract Background: The employer has the overall responsibility that the work environment is satisfactory in the work place, the usage stage. Most of the physical working environment factors which the employer has the responsibility for are determined early in the construction process, in the planning and design stage. Work environment legislation describes the tasks and responsibilities for the property developer and design engineers, how the work environment should be considered and who is responsible for the construction process from design to operation stage. The literature describes a development in which architects and other property developers responsibility to take into account the working environment aspect has increased. A responsibility where their efforts are often limited. Purpose: The purpose of this thesis is to examine which role the occupational health and safetey (OHS) engineer may have to take into account in the planning and design of new office workplaces. Method: The thesis is based on literature review and interviews with mainly working engineers and architects. Results: The literature and interviews shows that the OHS engineer is involved late in the process, resulting in shortages and rebuilding as a measure. It also emerges a situation where the knowledge of work environment legislation of architects are perceived as weak, which is confirmed by those interviewed. Respondents believe that checklist as a tool is used more or less often. Existing checklists from the Swedish Work Environment Authority (Arbetsmiljöverket) are presented in the thesis and are recommended as tool to be used. Conclusion: The interviews reveal that respondents believe that the OHS engineer can act as an expert, based on their knowledge and experience in the planning process. The OHS engineer thus constitutes its expertise and supports the property developer and the design engineer. The role, described in Swedish Work Environment Legislation (Arbetsmiljöverket), construction work environmental coordinator - planning and design (BAS-P) would be a natural role for the OHS engineer. The OHS engineer is given a natural role early in the construction process. Keywords: Construction planning, Architect, Work Environment, Occupational Health Service, Checklist
|
8 |
Effektivisering av byggprojektering med hjälp av grafisk programmering / Improving the efficiency of building design using graphic programmingDahl, Gunnar, Ahlner, Nils January 2018 (has links)
BIM (Building Information Modeling) är idag ett vedertaget begrepp inom byggprojektering.En viktig styrka med BIM är möjligheten till koordinering mellan samtligaaktörer i projektet. BIM-verktygen bygger på parametrisering vilket innebär att modellensobjekt har en stor uppsättning data kopplad till sig. Objektens egenskaperkan ändras genom att justera parameterdatan. Parametriseringen medför också attdata relativt enkelt kan nås, extraheras och styras av externa program. Det är i dettasyfte som implementeringen av grafisk programmering fyller en viktig funktion. Medhjälp av grafisk programmering kan flera operationer i BIM-arbetet automatiseras.Därmed finns potentialen att spara värdefull tid för byggprojektören. Autodesk Revit är ett av de verktyg som dominerar BIM-marknaden. I Revit kananvändaren designa och dokumentera ett byggprojekt i alla dess faser. Sedan någraår tillbaka finns det ett tillägg till programmet som heter Dynamo. Dynamo tillåteranvändaren att styra Revit med hjälp av skript i en användarvänlig grafisk miljö.I denna uppsats redogörs för Dynamos möjligheter och begränsningar applicerat påväletablerade arbetsmoment inom byggprojektering. Här redogörs för optimeringspotentialenoch lämpliga användningsområden. Slutsatser som dragits grundar sig ihög grad på en empirisk undersökning där ett antal grafiska skript har skapats ochutvärderats. Resultatet visar på att fl era vitala moment i byggprojektörens vardagliga arbetsflödekan effektiviseras med hjälp av införandet av grafisk programmering. Med effektiviseringavses i detta fall primärt tidsbesparingar som bidrar till ökad ekonomiskhållbarhet för byggprojekteringsföretaget. / BIM (Building Information Modeling) is today a proven concept in construction design.An important strength with BIM is the possibility of coordination between allactors in the project. The BIM tools are based on parameterization, which meansthat the model's object has a large set of data attached to it. The properties ofthe objects can be changed by adjusting the parameter data. Parameterization alsomeans that data can be easily accessed, extracted and controlled by external applications.It is for this purpose that the implementation of graphic programming playsan important role. With the help of graphical programming, several operations inthe BIM work can be automated. Thus, there is the potential to save valuable timefor the construction projector. Autodesk Revit is one of the tools that dominates the BIM market. In Revit, theuser can design and document a construction project in all its phases. For a fewyears back, there is an addition to the program called Dynamo. Dynamo allows theuser to control Revit using scripts in a user-friendly graphical environment.This essay explains Dynamo's possibilities and limitations applied to work processesin building design. It describes the optimization potential and appropriate applications.Conclusions are mainly drawn based upon the generation and evaluation ofgraphical scripts. The result shows that several vital moments in the construction projector's dailywork ow can be rationalized through the introduction of graphic programming. Rationalizationmeans time savings that contribute to increased economic sustainabilityfor the construction company.
|
9 |
Tillämpning av BIM i ett byggnadsprojekt : Centrum för idrott och kultur i KnivstaTaher, Abdo, Ulger, Benyamin January 2021 (has links)
Byggbranschen är en konservativ sektor där traditionella arbetssätt hindrar digitaliseringen från att nå sin fulla potential. BIM som står för building information modeling eller building information managment är det begreppet som står i fokus när digitaliseringen för byggprojekt diskuteras. Majoriteten av alla byggprojekt genomförs, trots fördelarna med BIM, fortfarande på ett mer eller mindre traditionellt sätt. I detta examensarbete undersöks CIK-projektet som står för Centrum för idrott och kultur i Knivsta. Projektet projekterades och framställdes med traditionella metoder. Utifrån personliga erfaranheter och flertalet personliga kommunikationer är det tydligt att kunskapsnivån kring den praktiska tillämpningen av BIM är väldigt låg i byggbranschen. Problematiken kring den låga kunskapsnivån för den praktiska tillämpningen leder till en underutvecklad digitalisering. Syftet med detta examensarbete är att redogöra för hur CIK-projektet utfördes. Vidare undersöks det huruvida CIK-projektet hade kunnat projekteras med BIM som arbetssätt och vilka förändringar det skulle innebära för projektet. Metoden i arbetet har bestått av en litteraturstudie för att undersöka begreppet BIM och hur BIM tillämpas i byggprocessen. Därtill utfördes en litteraturstudie av Revit, BIMeye och StreamBIM som är BIM-verktygen som används i detta examensarbete. Vidare genomfördes en fallstudie av CIK-projektet där objektet beskrevs samt dokument och intervjuer analyserades. Slutligen utfördes ommodelleringar och observationer av CIK-projektet med BIM-verktygen som nämnts ovan. Resultatet påvisar inledningsvis hur de traditionella arbetsmetoderna genomfördes och därmed präglade CIK-projektet. Den uteblivna detaljerade kravställnigen från politikerna och beställarna resulterade i många oklarheter när den efterfrågade produkten skulle utformas. Arkitekterna använde sig av traditionella skissmetoder vid gestaltningen för att hitta lösningar på de efterfrågade behoven. Kalkyl och tidsplaneringen skapades samt justerades manuellt, vilket utfördes separerat från 3D-modellen. 3D-modellerna i CIK-projektet användes för visualiseringar och samordningar för kollisionskontroller. De kontrakterade handlingarna vid diverse leveranser var dock traditionella 2D-ritningar. Av dokumentanalysen kunde det konstateras att arkitekterna framställde över 300 ritningar och över 100 olika dörrar som presenterades på ett flertal olika ritningar. Revideringar under produktionen arbetades in i ritningarna och molnades därefter in för att markera ändringen. Därtill skapades det ett separat PM där revideringarna presenterades mer ingående. När byggnationen var färdigställd arbetades ytterligare korrigeringar in i handlingarna av konsulterna. Utvalda handlingar i samråd med beställarna stämplades sedan om till relationshandlingar och levererades som PDF-filer till förvaltarna. Vidare visar resultatet hur CIK-projektet med en BIM-tillämpning hade kunnat utföras. CIK med BIM innebär att det tillkommer minst två nya roller, en BIM-strateg och en BIM-samordnare. Vid projektstart skapar BIM-strategen tillsammans med beställarna en kravspecifikation i form av en BIM-manual för att beskriva standarder, leverensspecifikationer, kommunikationsmetoder med mera. Därtill ska det bland annat framgå hur den kommande modellen skall berikas med information samt vilka BIM-verktyg som skall användas. Den ansvariga BIM-samordnaren har sedan som arbetsuppgift att de ställda kraven för BIM-projektet efterföljs. Under gestaltningen ska beräkningskrafterna från parametrisk och generativ design användas för att hitta olika lösningar på krav. Därtill ska simulationer och analyser användas under projektets gång för att ta hänsyn till och säkerställa att kraven och behoven uppnås. Kalkylen och tidplanen ska vara kopplade till BIM-modellen för att ständigt få korrekta och uppdaterade kostnader och tidsåtgångar. Med hjälp av molntjänster som exempelvis BIMeye kan all data och information från BIM-modellen hanteras och diverse rapporter av informationen exporteras av samtliga i projektet. Via exempelvis StreamBIM hämtar sedan produktionen all nödvändig information från BIM-modellen för att kunna framställa CIK utan traditionella ritningar. Viktiga detaljritningar och kompletterande handlingar som exempelvis dörrkortet som skribenterna skapade ska kopplas till objekten i StreamBIM. Under hela produktionen ska sedan BIM-modellen ständigt uppdateras för att kunna skapa en digital tvilling av den verkliga byggnaden som sedan överlämnas till beställarna för förvaltning. BIM-modellen används och berikas sedan under hela byggnadens livstid. Vidare fördes det diskussioner i anknytning till resultatet, därtill diskuterades även metod och begränsningar för arbetet. CIK-projektet är ett bevis på att det går att arbeta på ett traditionellt sätt och ändå kunna framställa bra byggnader. Däremot hade ett BIM-tillämpat arbetssätt kunnat skapa ett mervärde för beställarna genom att kvalitetssäkra hela arbetet från idé till förvaltning. För att en tillämpning av BIM ska verkställas krävs det dock tydliga och specificerade krav från beställarna. Skribenterna anser därför att nationella krav skulle påskynda digitaliseringen i byggbranschen. BIM motiverar sig själv eftersom ändringar blir mer kostsamma i senare skeden jämfört med tidigt i projekteringen. Därför borde det läggas ner mer tid och kostnader på att analysera och hantera bygginformation tidigt för att inte riskera att större kostnader tillkommer senare i projektet. Eftersom begreppet BIM är brett och uppfattningarna kan variera mellan aktörer i branschen försvårades inhämtningen av vetenskaplig litteratur. Däremot underlättades säkerställandet av källkritiken genom författarnas erfarenheter av projektering på arkitektsidan. De slutsatser som kan dras från detta examensarbete är att bygginformationshanteringen är en viktig aspekt att beakta under byggprocessen. För komplexa projekt som CIK hade BIM inneburit ett helt nytt sätt att hantera och centralisera informationen genom att knyta data till objekten i modellen. Poängen med BIM-projekt är att ständigt vända sig till modellen eller molntjänstens databas som i sin tur är kopplad till modellen för att hämta nödvändig information. Resultatet blir därför ett frigörande från de informationsöarna och dubbelarbete som bildades i CIK-projektet med en traditionell projektering. / Purpose: The purpose of this study is to describe how the CIK project was executed. Furthermore, it is investigated how the CIK project could have been designed with BIM as a working method and what changes it would entail for the project. Method: This study has consisted of a literature study of BIM and a case study of the CIK project. The case study included an object description as well as documents and interviews were analyzed. In addition, remodeling and observations of the CIK project were performed with BIM tools. Results: The results initially show how the traditional working methods were implemented in the CIK project. The initial lack of requirements created ambiguities. The architects used traditional sketching methods for the design. Calculation and scheduling were handled separately from the 3D model. The 3D models in the CIK project were used for visualizations and coordination. However, the contracted documents for various deliveries were traditional 2D drawings. The architects produced over 300 drawings and over 100 different doors that were presented on different drawings. At the end of the production, selected PDF-documents were re-stamped in consultation with the customers for the administration. Furthermore, the results show how the CIK project with a BIM application could have been carried out. Initially, a BIM manual is created by a BIM strategist to specify the requirements. During design, parametric and generative design are used to find different solutions to meet the requirements. The calculation and schedule must be linked to the BIM model. All information management takes place in cloud services such as BIMeye. Through StreamBIM, the production then retrieves all the necessary information from the BIM model. Additional detailed drawings should be linked to the objects in StreamBIM. During production, the BIM model is updated before the delivery to the customers. Conclusions: The conclusions that can be drawn from this study are that the information management is an important aspect to implement during the construction process. For the CIK project, BIM would mean a completely new way of managing and centralizing the information by linking data to the objects in the model. The point of BIM projects is to constantly turn to the model or database, which is linked to the model to retrieve the necessary information. The result is therefore a release from the information islands and duplication of work that is formed in a traditional design.
|
10 |
Armering i pålfundament : Effektivare byggprojektering med grafisk programmering / Reinforcement of Pile Caps : Increased Efficiency of Structural Design with Visual ProgrammingSchmied, August, Strömberg, Moa January 2019 (has links)
En stor del av projekteringsskedet är framtagandet av bygghandlingar, främst ritningar i 2D. En modernare metod är istället att samla all information om ett byggnadsprojekt i en samordnad 3D-modell, så kallad BIM-modell. Building Information Modeling (BIM) är en välkänd projekteringsmetod som bygger på att digitala 3D-modeller innehåller tillräcklig information för att beställas och produceras i fysisk form. Modellen består av parametrar som representerar olika egenskaper och när en parameter ändras uppdateras modellen automatiskt. Parametrarna kan nås och modifieras av insticksprogram, så kallade plug-ins som utökar den ursprungliga programvarans funktionalitet med hjälp av programkod. Grafisk programmering är en modern programmeringsmetod med ett visuellt gränssnitt som underlättar för oerfarna användare. Med hjälp av grafisk programmering kan parameterstyrning av 3D-modeller effektiviseras och värdefull tid sparas. Av denna anledning har Dynamo, ett plug-in utvecklat av företaget Autodesk för Revit, studerats för att ta fram ett så kallat skript som automatiserar 3D-modelleringsprocesser i Revit kopplat till placering av armering i pålfundament. Dessutom har möjligheter till standardisering undersökts, samt för- och nackdelar med metoden. I detta examensarbete redogörs för potentialen med Dynamo och de skript som skapats genom en empirisk studie. En enklare fallstudie utfördes för att kunna åskådliggöra graden av tidsbesparing gentemot motsvarande arbete manuellt i Revit. För att komplettera armeringsskripten togs beräkningsmallar fram som, enligt fackverksmetoden och Eurokod 2, försåg skripten med korrekt indata. Resultatet av projektet visar på att Dynamo och grafisk programmering kan effektivisera armeringsplacering i pålfundament. Graden av effektivisering beror på varje enskilt fall, men fallstudien visade på ca 85–90% sparad tid. En generell slutsats pekar mot att ju mer komplicerad utformning av armering desto mer tid finns att spara. Då grafisk programmering bygger på automatisering av arbetsprocesser av upprepande karaktär finns stor potential för att standardisera projektering med hjälp av dynamoskript. Företag kan då skapa rutiner som ökar kontinuitet och kvalitet i sina projekt. Automatiseringen leder även till färre mänskliga fel och utförandet blir effektivare. Uppdragsgivaren uppmanas att vidareutveckla metoden genom att implementera tydliga rutiner vad gäller 3D-modellering med grafisk programmering, samt undersöka möjligheten med automatiserad armering i andra bärande konstruktioner. / Most of the time spent on project planning is dedicated to the development of construction documents, mainly 2D-drawings. A more modern method is to gather all information about a building project in a coordinated 3D-model, so called BIM-model. Building information modelling (BIM) is a well-known design method based on a digital 3D model having enough information to enable procurement work and actual production. The model consists of parameters that represent different properties and when a parameter is changed, the model is updated automatically. These parameters can be accessed and modified through external programs, so called plug-ins that extend the original software’s functionality using program code. Visual programming is a modern programming method which utilizes a visual interface that favours users with little or no experience. Using visual programming, parameter control can be made more efficient and save valuable time. For this reason, Dynamo (a plugin developed by the company Autodesk for Revit), has been studied to create a so-called script that automates 3D modelling processes in Revit linked to placement of reinforcement in pile caps. In addition, possibilities for standardization have been investigated, as well as the advantages and disadvantages of the method. With this project, the potential of Dynamo and the scripts created through an empirical study is described, where a relatively simple case study is carried out in order to illustrate the amount of time saved through visual programming compared to corresponding work manually done in Revit. Furthermore, calculation templates were created, according to the strut and tie model and Eurocode 2, to provide the script in Dynamo with the correct inputs. The result shows that Dynamo and visual programming can make placement of reinforcement in pile caps more efficient. While the degree of efficiency is case dependent, the case study showed an overall 85-90% time saving. A general conclusion suggests that the more complicated rebar designs, the more time there is to be saved. Since visual programming is based on the automation of repetitive processes, there is great potential to standardize structural design with the help of Dynamo scripts. Companies can thus create routines that increase continuity and quality in their projects. The automation also leads to fewer human errors and a more efficient execution. The client is advised to further develop this method by implementing explicit routines regarding 3D modelling with visual programming and investigate the possibilities of automation of reinforcement design in other load-bearing structures.
|
Page generated in 0.071 seconds