• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 6
  • 2
  • Tagged with
  • 8
  • 7
  • 7
  • 6
  • 6
  • 5
  • 5
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Kontrollplan för nybyggnation av ett flerbostadshus / Inspection plan for the construction of a multi-family residential building

Lundmark, Viktor January 2023 (has links)
In the construction sector, errors, damages, and deficiencies in buildings often occur, and are estimated to result in significant economic costs of up to 111 billion Swedish kronor annually in Sweden. Addressing these errors also has ecological consequences in terms of inefficient use of materials and resources. The purpose of this work is to investigate the critical aspects of constructing a multi-family residential building and to examine the requirements of the Planning and Building Act for an inspection plan. The goal is to create a template for an inspection plan for the construction of a multi-family residential building with comprehensive checks to minimize the risk of these errors, deficiencies, and damages. The standard building in the inspection plan is a multi-family residential building with a concrete frame and a slab-on-grade foundation. The work has resulted in a template for an inspection plan for the standard building, containing 35 checkpoints covering 8 of the 11 technical performance requirements. The checkpoints refer to relevant regulations and requirements in the Swedish Building Regulations (BBR) and the National Board of Housing, Building, and Planning Construction Regulations (EKS), and describe the nature of the checks, who is responsible for them, and when they should be carried out. The conclusion of this work is that an inspection plan with comprehensive checks is time-consuming and complicated to establish, as it must be adapted based on the competence possessed by the developer's organization. The time and effort involved in creating a detailed inspection plan may be worth the investment, as there are economic and environmental benefits in preventing errors and damages. / Inom byggsektorn förekommer ofta fel, skador och brister på byggnader och uppskattas ge stora ekonomiska kostnader upp mot 111 miljarder kronor årligen i Sverige. Att åtgärda dessa fel har även ekologiska konsekvenser med avseende på ineffektiv material- och resursanvändning. Syftet med detta arbete är att undersöka vilka de kritiska momenten är för en nybyggnation av ett flerbostadshus samt undersöka vilka krav Plan- och bygglagen har för en kontrollplan. Målet är skapa en mall till kontrollplan för nybyggnation av ett flerbostadshus med omfattande kontroller för att minimera risken att dessa fel, brister och skador uppstår. Typbyggnaden i kontrollplanen är ett flerbostadshus med betongstomme och platta på mark som grundläggning. Arbetet har resulterat i en mall till kontrollplan för typbyggnaden innehållandes 35 kontrollpunkter som omfattar 8 av de 11 tekniska egenskapskraven. Kontrollpunkterna hänvisar till relevanta föreskrifter och krav i BBR och EKS samt beskriver vad kontrollen innebär, vem som ansvarar för kontrollen och när den ska utföras. Slutsatsen av detta arbete är att en kontrollplan med omfattande kontroller är tidskrävande och komplicerad att upprätta då den ska anpassas utifrån kompetens byggherrens organisation besitter. Tidsåtgången och arbetet med en utförlig kontrollplan kan vara värd investeringen då det finns ekonomiska och miljömässiga fördelar genom att förebygga att fel och skador uppstår.
2

En väg till att minimera felaktigheter vid ansökan om bygglov : En jämförelse mellan olika kommuner avseende hur bygglovsprocessens första del kan förbättras genom bygglovshandläggare respektive sökande / Pathway to minimize errors in submitting building permit applications : A comparison between different municipalities regarding how the first part of the building permit process can be improved through building permit administrator and private individuals as applicants

Akpan, Dennis, Jasim, Khalid January 2022 (has links)
Att söka bygglov kan uppfattas som en komplicerad process för privatpersoner som inte är insatt i bygglovssökandet, därför har rapporten ett mål med att utföra en del undersökningar för att finna nya lösningar som kan implementeras och minska andelen icke kompletta ärenden. Denna rapport riktar sig också på bristerna i bygglovsprocessens första skede samt hur det går att åtgärda dem genom att till exempel identifiera problemen och därefter förbättra respektive del.Studien grundar sig på att gå in på detalj såsom de olika kommunikations tillvägagångssätt för respektive kommun. Vi kommer även att undersöka på ifall informationen som ges av kommuner är tillräckligt samt lättillgängligt för sökande.Skrivandeprocessen som har använts för att utföra denna fallstudie har byggts på kvantitativ forskningsmetod då vetenskapliga artiklar, litteraturstudie, enkätundersökning användes. Utöver detta ingick en kvalitativ forskningsmetod genom intervjuer via Teams med olika bygglovschefer och bygglovhandläggare från respektive kommun.Resultatet består av besvarade enkäter som delades ut till både bygglovssökande och bygglovhandläggare i respektive kommun som ingår i studien. Kommuner som ingår i studien är Karlstad, Eskilstuna och Surahammars kommun. De besvarade enkäterna har formulerats på ett sätt för att kunna redovisa data i olika figurer såsom diagram och tabeller, vilket i sin tur ger en tydlig bild över de oklarheter som uppstår vid ansökan.Utifrån arbetets resultat har det visat sig att det som var mest problematiskt för bygglovssökande var kontrollplanen. Det upplevdes som den svåraste handlingen att få tag på och skicka komplett. Åtgärd till det är att ge möjlighet för sökande att få en liknande komplett bygglovsansökan som de kan ladda ner ifrån kommunhemsida vilket kan användas som en jämförelse. En lagändring eller förtydligande ifrån Boverkets hemsida är också en lösning då alla tre kommuner har hämtat exakt information och även behövt göra tillägg med information, beskrivningar och exemplar.Förtydligande av exempelritningar samt hemsidan är också en lösning för att underlätta för sökande genom att göra innehållet mer lättförståeligt. En text på hemsidan som upplyser om att väntetiden blir kortare vid en korrekt bygglovsansökan var också en lösning och dessutom att förbättra kommunikationen mellan handläggare och sökanden så att det blir mer lättillgängligt att nås via e-post, telefon och även fysiska möten vid frågor.En annan lösning som ficks fram från resultatet var att en spalt med handläggarens kontaktuppgifter för att få direkt kontakt och på så sätt förbättra kommunikationen mellan sökande och handläggaren gällande oklarheter och frågor. / Applying for a building permit can be perceived as a complicated process for private individuals who are not familiar with building permit applications. Therefore, this study has the goal of reducing the proportion of incomplete applications through conducting some surveys to find innovative solutions that can be implemented. We also focus on the shortcomings in the first stage of the building permit process, as well as how they can be remedied by e.g., identifying problems and then improving each part. The study goes into detail on different communication approaches for each municipality. We also investigate whether the information provided by municipalities is easily accessible to applicants. In achieving the above stated goals, a quantitative research method where scientific articles, literature studies and questionnaires were used. In addition to this, qualitative research methods were included through team interviews, primarily with different building permit managers and building permit administrators for each municipality. The results consist of answered questionnaires that were distributed to both building permit applicants and building permit administrators in each municipality who have collaborated with them. The partners in the report have been Karlstad, Eskilstuna and Surahammar municipality. The responses have been formulated in a way to be able to present data in various figures such as diagrams and tables, which in turn give a clear picture of most of the ambiguities that arise in the application. Based on the results of the work, it has turned out that it was most problematic for building permit applicants regarding the control plan. It was perceived as the most difficult document to get hold of and send complete. A measure for this is to give applicants the opportunity to receive a similar complete building permit application that they can download from the municipal website, which can be used as a comparison. A change in the law or clarification from the National Board of Housing, Building and Planning's website is also a solution as all three municipalities have obtained exact information and needed to make additions with information, descriptions, and copies. Clarification of sample drawings and the website is also a solution to make it easier for applicants by making the content easier to understand. A text on the website stating that the waiting time will be shorter with a correct building permit application was also a solution and to improve communication between administrators and applicants so that it becomes more accessible to be reached via e-mail, telephone, and even physical meetings with questions. Another solution that emerged from the result was that a column with the administrator's contact information to get direct contact and thus improve the communication between the applicant and the administrator regarding ambiguities and questions.
3

Hur får man sökande att skicka in kompletta bygglovshandlingar / How to get applicants to submit complete building permit documents.

Djioui, Zakaria, Mizori, Ravand January 2019 (has links)
När man ska bygga något nytt, ändra en byggnad eller riva en byggnad behövs ett bygglov från kommunen där åtgärden ska utföras. Örebro kommun har sett att majoriteten av enklare bygglovsärenden behöver kompletteras innan de kan beviljas. Detta medför en förlängd bygglovsprocess i väntan på en komplett bygglovsansökan. Syftet med denna rapport är att undersöka de underliggande faktorerna som medför att personer som söker bygglov inte skickar in kompletta bygglovshandlingar samt att hitta lösningar på dessa. En enkätundersökning har genomförts för att undersöka vad bygglovssökare i Örebro kommun upplevde var bra respektive dåligt med deras ärende och bygglovsprocess. Det genomfördes även en granskning på kommunens hemsida för bygglov i syfte att försöka förbättra den och hitta faktorer som leder till att bygglovssökare inte skickar in kompletta handlingar. Denna rapport avgränsar sig till privatpersoner som fått komplettera sin bygglovsansökan innan de fått ett beviljat bygglov mellan sommaren 2018 och våren 2019 i Örebro kommun. Bygglovstyperna som undersökts är nybyggnad av komplementbyggnad, tillbyggnad av komplementbyggnad samt tillbyggnad av enbostadshus. Resultat visar att kontrollplanen som är nödvändig för en ansökan ofta är bristfällig jämfört med andra handlingar. De som sökt bygglov menar att den är svår att förstå och information om kontrollplanen som hittas på Örebro kommuns hemsida inte är tillräckligt tydlig. Det visar sig också att hälften av respondenterna i enkäten som gjorts är positivt inställda till en kort informationsfilm på Örebro kommuns hemsida där det förklaras vad som ska skickas in samt hur handlingarna ska se ut. Kontrollplanen visade sig vara problematisk för personer som sökt bygglov. De tyckte att det fanns en osäkerhet gällande om den skulle skickas med, vad för punkter som ska finnas med i kontrollplanen för respektive ansökan samt vad punkterna man kontrollerar mot betyder. En åtgärd som kan förbättra detta problem är att tydligt på Örebro kommuns hemsida informera att en kontrollplan måste skickas in med en ansökan samt vad för konsekvenser en ej komplett ansökan får. Konsekvensen är en förlängd bygglovsprocess i väntan på en komplett bygglovsansökan. Man kan också på Örebro kommuns hemsida tydligt förklara vad varje kontrollpunkt i kontrollplanen som ska med betyder. Det Örebro kommun också kan tänka på är att minska mängden text som finns på bygglovssidorna. Detta för att personer som söker bygglov ska se en kort och koncist förklaring på vad för handlingar som ska skickas in för att underlätta för dem. Örebro kommun bör också visa exempel på kontrollplaner i exempelritningar som finns på Örebro kommuns hemsida för att sökande på ett enkelt sätt ska kunna se vilka handlingar som ska skickas in. / When you want to build something new, reconstruct a building or demolish a building, a building permit is needed from the municipality. Örebro municipality has seen that a majority of building permit cases needs to be supplemented before they can be approved. This results in an extended building permit process. The purpose of this report is to examine the underlying factors that leads to people seeking building permits do not submit complete. A survey has been carried out to investigate what people applying for building permits in Örebro municipality experienced was good and bad with their case regarding the building permit process. An inspection was also carried out on the municipality's website for building permits to find reasons why people applying for building permits do not submit complete documents. This report is limited to individuals who have supplemented their building permit application before receiving a granted building permit between summer 2018 and spring 2019 in Örebro municipality. The building permits that were investigated are of simpler cases. Results show that the control plan is often inadequate compared to other documents. Those who have applied for a building permit mean that it is difficult to understand the information in the control plan found on the Örebro municipality's website and that the information is not sufficiently clear. It also turns out that half of the respondents in the survey have been positively set towards a short information film on the Örebro municipality's website. The information film would explain what type of documents that should be submitted and how the documents should look. The control plan proved to be problematic for people who applied for a building permit. They felt that there was an uncertainty regarding the control plan whether it should be sent in with the apply for building permits. They also felt an uncertainty regarding what type of control points should be included in the control plan for each application and what the controls you check against means. An action that can solve this problem is to clearly inform on Örebro municipality's website that a control plan must be submitted with an application and what consequence a non-complete application results in. The consequence is an extended building permit process pending a complete building permit application. Örebro can also clearly explain on their website what each control point in the control plan means. What the Örebro municipality also can think about is to reduce the amount of text that is on the building permit webpages. This is because people who apply for a building permit should see a brief and concise explanation of what documents should be submitted in order to facilitate them. Örebro municipality should also have examples of control plans in the example documents that are available on the website, in order for applicants to easily see which documents that should be submitted.
4

En studie av byggnadsnämndens kontroll och tillsyn vid uppförande av flerbostadshus

Boström, Jenny, Danielsson, Maria January 2009 (has links)
<p>When a new building is constructed, or some changes are taking place in the already existing building, it is required according to PBL  chapter 8 that the developer applies for planning permissions at the building committee in that municipality where the real estate is located. In the planning permission, the documents of the current building are examined.<strong></strong></p><p> </p><p>The developer will appoint a quality manager that helps the developer to ensure that all necessary controls are done and that the requirements in these are met. The developer has the final responsibility to ensure that the building is built according to all requirements and rules. The building committee establishes a control plan that shows which controls have to be carried out and which certificates and documents have to be sent in during the time of the construction.</p><p>This study aims to finding out which documents that will be submitted at the construction of a new building, according to the laws found in PBL, if these documents are required and if they are examined of the municipalities before the building is approved.</p>
5

Värmeisoleringsberäkningar av flerbostadshus : byggda 1996-2005 / Thermal insulation calculations of multi-dwelling buildings : built 1996-2005

Winton, Marcus, Engström, Anders January 2009 (has links)
År 1987 trädde en ny byggnadslag i kraft, Plan- och bygglagen(PBL). I och med den nya lagen minskade kommunens och byggnadsnämndens kontroll av projekteringshandlingar och besiktningar ute på arbetsplatsen. Efter lagändringen beror den slutgiltiga kvaliteten på en byggnad i större utsträckning på byggherrens och entreprenörernas egenkontroll. P.g.a. olika intressekonflikter inom kommunen, och att det kan förekomma starka kopplingar mellan byggherre och entreprenör, är det inte alltid självklart att kommunens tillsyn vid nybyggnation gällande till exempel egenskapskrav på energihushållning och värmeisolering utförs tillfredsställande.Med ovanstående i åtanke undersökte vi fyra flerbostadshus, två i Värnamo kommun samt två i Kristianstad. Vi undersökte om husen uppfyller de ställda värmeisoleringskraven enligt BBR(Boverkets Byggregler) 9 Kap. samt vilka krav som fanns med i respektive projekts kontrollplan. Endast ett av de fyra husen uppfyllde de ställda kraven. I kommunens kontrollplaner för de undersökta objekten ställs krav på värmeisoleringsberäkningar men några beräkningar på detta finns ej arkiverade hos kommunerna. / In 1987, a new law of building became effective, Plan- och bygglagen(PBL). The building committees' inspection of construction sites and documents decreased. The final quality of the buildings now depended in greater extent on the property developers and the contractors internal control. Due to different interests within the municipality and because of strong connections between property developers and contractors, it is not always a matter of course that e.g. the inspection of thermal insulation and energy housekeeping is executed in a satifactory fashion. With the above in mind we examined four multi-dwelling buildings, two in municipality of Värnamo and two in Kristianstad. We examined if the buildings comply with the thermal insulation requirement according to BBR (the swedish building code) and which requirements that were stated in the different projects documents of inspection.Only one out of the four buildings complies with the requirements according to BBR. In the municipality documents there are requirements of thermal insulation calculations but there are no documents that verifies that such calculations have been executed.
6

En studie av byggnadsnämndens kontroll och tillsyn vid uppförande av flerbostadshus

Boström, Jenny, Danielsson, Maria January 2009 (has links)
When a new building is constructed, or some changes are taking place in the already existing building, it is required according to PBL  chapter 8 that the developer applies for planning permissions at the building committee in that municipality where the real estate is located. In the planning permission, the documents of the current building are examined.   The developer will appoint a quality manager that helps the developer to ensure that all necessary controls are done and that the requirements in these are met. The developer has the final responsibility to ensure that the building is built according to all requirements and rules. The building committee establishes a control plan that shows which controls have to be carried out and which certificates and documents have to be sent in during the time of the construction. This study aims to finding out which documents that will be submitted at the construction of a new building, according to the laws found in PBL, if these documents are required and if they are examined of the municipalities before the building is approved.
7

Värmeisoleringsberäkningar av flerbostadshus : byggda 1996-2005 / Thermal insulation calculations of multi-dwelling buildings : built 1996-2005

Winton, Marcus, Engström, Anders January 2009 (has links)
<p>År 1987 trädde en ny byggnadslag i kraft, Plan- och bygglagen(PBL). I och med den nya lagen minskade kommunens och byggnadsnämndens kontroll av projekteringshandlingar och besiktningar ute på arbetsplatsen. Efter lagändringen beror den slutgiltiga kvaliteten på en byggnad i större utsträckning på byggherrens och entreprenörernas egenkontroll. P.g.a. olika intressekonflikter inom kommunen, och att det kan förekomma starka kopplingar mellan byggherre och entreprenör, är det inte alltid självklart att kommunens tillsyn vid nybyggnation gällande till exempel egenskapskrav på energihushållning och värmeisolering utförs tillfredsställande.Med ovanstående i åtanke undersökte vi fyra flerbostadshus, två i Värnamo kommun samt två i Kristianstad. Vi undersökte om husen uppfyller de ställda värmeisoleringskraven enligt BBR(Boverkets Byggregler) 9 Kap. samt vilka krav som fanns med i respektive projekts kontrollplan. Endast ett av de fyra husen uppfyllde de ställda kraven. I kommunens kontrollplaner för de undersökta objekten ställs krav på värmeisoleringsberäkningar men några beräkningar på detta finns ej arkiverade hos kommunerna.</p> / <p>In 1987, a new law of building became effective, Plan- och bygglagen(PBL). The building committees' inspection of construction sites and documents decreased. The final quality of the buildings now depended in greater extent on the property developers and the contractors internal control. Due to different interests within the municipality and because of strong connections between property developers and contractors, it is not always a matter of course that e.g. the inspection of thermal insulation and energy housekeeping is executed in a satifactory fashion. With the above in mind we examined four multi-dwelling buildings, two in municipality of Värnamo and two in Kristianstad. We examined if the buildings comply with the thermal insulation requirement according to BBR (the swedish building code) and which requirements that were stated in the different projects documents of inspection.Only one out of the four buildings complies with the requirements according to BBR. In the municipality documents there are requirements of thermal insulation calculations but there are no documents that verifies that such calculations have been executed.</p>
8

Kontroll för ökad kvalitet - mallar för kontrollplan-PBL, egenkontroll samt riskanalys

Hasselgren, Elin January 2011 (has links)
There are problems with poor quality, poor scheduling and poor working climate in the Swedish construction industry. Many parts have been involved, trying to solve the problem. This spring a new planning and building-law becomes final. In this law, the requirements set on the controls are greater. Hopefully this will lead to fewer construction errors. The requirements set on the working environment have also increased, forcing consultants and contractors to focus on safe workplaces. For each project requiring a building permit, an inspection plan has to been drawn. The inspection plan aims to ensure that the constructed building is operational. To ensure that the control plan is followed, self monitoring is performed. For each project, every designer also has to do a risk analysis to ensure a safe working environment. This report presents an investigation of stakeholders’ roles in the construction process. It also points out what by law should be controlled and against what. The result of the report is templates for control against PBL, self-monitoring plan and risk analysis. / Det finns stora problem med bristande kvalitet, dålig tidplanering och undermåligt arbetsmiljöklimat i den svenska byggbranschen. Detta problem är något som berörda parter lagt ner mycket tid på för att komma till rätta med. Som ett led i strävan mot kvalitetssäkring träder en ny Plan- och bygglag i kraft den 2 maj, som ökar kravet på innehåll i kontrollplaner, och därmed egenkontrollplaner. Arbetsmiljöfrågor har under senare år även de blivit mer aktuella med krav på byggarbetsmiljösamordnare och riskanalys. För samtliga projekt som kräver bygglov, rivningslov, marklov eller anmälan krävs en kontrollplan. Dessutom ska en egenkontrollplan samt en riskanalys finnas för samtliga projektörer i samtliga projekt. Riskanalyser ligger ofta till grund för val av lösningar eller omdirigeringar för att undvika personskador. I denna rapport redovisas en grundlig utredning av nyckelpersoners roll i kvalitets- och arbetsmiljöarbetet, samt vad som egentligen ska kontrolleras och mot vad. Nyckelpersonerna identifieras efterhand i rapporten. Resultatet av utredningen är förslag på utformning av mallar för kontrollplan-PBL, egenkontrollplan samt riskanalys.

Page generated in 0.049 seconds