BIM-Projektering som metod för att minska antalet ÄTA-arbeten inom anläggningsproduktionJohansson, Pontus, Olander, Pontus January 2016 (has links)
Purpose: BIM has the potential to reduce the number of design errors in construction projects. Possibilities to change parts at a later stage, as well as better opportunities to which the designer himself can detect if anything wrong has been done. The possibility to discover faults easier and with better opportunities for changes should lead to the defects related to design errors in production decreases. The introduction of BIM in a firm may be costly and clear evidence that the design errors decreased by BIM has not been found. The goal of the work is to find out whether the introduction of BIM in the design stage in construction has led to fewer defects related to design errors in the production stage. Method: In order to achieve the target set has interviews with designers at two consulting companies been implemented. This is to find out how the methods of the designing has become more BIM-based. A document analysis has been carried out on the lists of defects and changes from eleven different engineering projects of varying size. These documents come from two large contractors in Sweden. Findings: The deisgners interviewed describe the methods for designing roads and facilities have gone on to become more BIM-based. Having previously designed in 2D CAD it has gone over more to the 3D models. In the 3D software it is also possible to add different models to the same file and check for any errors between them. To check itself has also become easier than when the designing was done in 2D CAD. The lists of changes and defects also shows that the amount of the defects related to design errors was reduced significantly compared to how it looked in a study conducted in 1999 and mentioned in a study from 2014. Implications: The introduction of BIM in the design has led to the defects related to design errors out in production has fallen. This would be of interest to companies thinking of introducing BIM in their organization but have not yet seen the benefits that BIM brings. Limitations: The thesis is relevant to both designers and contractors in civil engineering. This is when the work has been focused more towards the road and facility than designing of houses. Designers and entrepreneurs from different companies in different parts of Sweden have contributed to the collection of data, which means that the results can be assumed to be general. Contact with more companies from more places in Sweden had definitely been able to make the results even more generally. Keywords: BIM, design, changes, design errors / Syfte: BIM har potentialen att minska antalet projekteringsfel i anläggningsprojekt. Möjligheter att ändra delar i ett senare skede samt bättre möjligheter att som projektör själv upptäcka eventuella fel man gjort. Upptäcks fel enklare och med bättre möjligheter för ändringar bör därför leda till att ÄTA-arbetena i produktionen minskar. Att införa BIM på ett företag kan dock vara kostsamt och tydliga bevis på att projekteringsfelen minskat med BIM har inte kunnat hittas. Målet med arbetet var att ta reda på om införandet av BIM i projekteringsskedet vid anläggningsarbeten har lett till färre ÄTA- arbeten relaterade till projekteringsfel ute i produktionsskedet. Metod: För att uppnå det mål som satts har intervjuer med projektörer på två konsultföretag genomförts. Detta för att ta reda på hur metoderna för att projektera blivit mer BIM-baserade. En dokumentanalys har sedan genomförts på ÄTA-listor från elva olika anläggningsprojekt i varierande storlek. Dessa dokument kommer från två större entreprenadföretag i Sverige. Resultat: De projektörer som intervjuats beskriver att metoderna för att projektera vägar och anläggningar har gått mot att bli mer BIM-baserat. Från att tidigare ha projekterat i 2D-CAD har man gått över mer till 3D-modeller. I programmen med 3D finns även möjligheter att lägga in olika modeller i samma fil och kontrollera eventuella fel. Att kontrollera sig själv har även det blivit enklare jämfört med när projektering genomfördes i 2D-CAD. ÄTA-listorna visar även de att mängden ÄTA-arbeten relaterade till projekteringsfel minskat betydligt jämfört med hur det såg ut i en studie genomförd 1999 som även nämns i en studie genomförd 2014. Konsekvenser: Införandet av BIM i projekteringen har lett till att ÄTA-arbetena ute i produktionen har minskat. Detta skulle kunna intressera företag som funderat på att införa BIM i sin organisation men som ännu inte sett nyttan och de fördelar som BIM för med sig. Begränsningar: Examensarbetet är relevant för både projektörer och entreprenörer inom anläggningsbranschen. Detta då arbetet har koncentrerats mer mot väg och anläggning än mot hus. Projektörer och entreprenörer från olika företag i olika delar av Sverige har bidragit till datainsamlingen vilket gör att resultatet kan antas vara generellt. Kontakt med fler företag från fler platser i Sverige hade definitivt kunnat göra resultatet än mer generellt. Nyckelord: BIM, projektering, ÄTA-arbeten, projekteringsfel.
|
22 |
24 kV luftledning – projektering och konstruktionsmall / 24 kV power line – project and construction templateLandberg, Johan January 2019 (has links)
Projektet utförs på IKKAB, ett elkonsultbolag som växte fram i slutet av 2006. I projektet utförs en projektering av en friledning med belagd ledare på 24 kV där syftet är att skapa förståelse för luftledningar och dess ingående komponenter. En litteraturstudie genomförs i rapporten där viktig kunskap inom bland annat isolation och överspänningar sammanställs. Viktiga komponenter beskrivs mer i detalj tillsammans med riktlinjer för utförande nära allmän väg. Profiler tas fram för mark och stolplinje utifrån lägesdata och utgör grunden för att ta fram det material som erfordras till stolplinjen. Detta material sammanställs för den färdiga projekteringen och presenteras i rapporten tillsammans med de framtagna profilerna. Arbetet har resulterat i en färdig mall för luftledningskonstruktioner och från denna presenteras ett utdrag av tre viktiga konstruktioner av stolpar för en överblick över materialet. Det finns inte enbart ett sätt att utforma en mall för luftledningskonstruktioner varav stora krav på både erfarenhet och jämförelse av material har uppkommit genom projektets gång. Genom samråd har ett gott resultat uppnåtts där utrymme finns att utveckla och forma mallen även utefter framtida behov när den tillämpas i skarpa projekt. Denna mall kommer att utgöra ett underlag för beredare på IKKAB vid arbete med luftledningar och efter projektets slutförande skall materialsammanställningen infogas i IKKABs programvara för beredningar. / The project is performed at IKKAB, a consulting company specialized in electricity that emerged at the end of 2006. In the project an overhead power line of 24 kV is planned where the purpose is to gather understanding for power lines and its components. A literature study is performed where important knowledge is compiled for isolation and overvoltages among other things. Important components are described in more detail together with the guidelines regarding implementation near public roads. Profiles are created based on location data for the ground and power line and forms the foundation for the collection of materials required in the power line. A list for the material included in the power line along with profiles are presented in the report. The result of this work is a complete template for constructions in overhead power lines, and from this template an excerpt is presented for three essential constructions to give an overview of the material. There is not one single way to design a template for overhead power lines, therefore great demands on both experience and comparisons regarding choice of materials emerged throughout the project. Through consultation a satisfying result has been achieved where room for future demands in shaping and development of the template is accounted for. This template will form a support for workers at IKKAB in projects including overhead power lines and will be inserted into IKKAB’s software for planning projects.
|
23 |
Nyckeltal inom projektering : En undersökning av uppdelade kostnader förprojektering av förskolor och skolor / Key figures during design phaseJansson, Johan, Jumlin, Kenny January 2019 (has links)
The objective of this report is to examine the estimated cost in thedesign phase when building schools or preschools in Sweden. The contentcan be used in early stages of a project to get a better picture ofwhat the cost might be of each profession. Furthermore the reportexamines current key figures used in the industry as of today. The workhas been done in collaboration with ÅF-Pöyry AB. The backgroundgenerating this report is the uncertainty around the design phase costsand how it is divided between the professions.The key figures are presented as a percentage of the total productioncost and the result in design phase is 11,2 % for preschools and6,9 % for schools.Additionally the report present how the total production cost varieswith increasing amount of children or size (BTA). Finally the reportsuggest how the new key figures and results should be used.
|
24 |
Brister i förfrågningsunderlag och dess påverkan på slutsumman vid en totalentreprenad / Flaws in contract documents and how it affects the total cost in a turnkey contractLindquist, Fredrik, Ristic, Neno January 2018 (has links)
Det är viktigt med väl utförd planering för att ett byggprojekt ska gå smidigt och stå färdigt inom utsatt tid. Det är också viktigt för att hålla utsatt budget, så att det inte tillkommer onödiga och oväntade kostnader. Ju senare ett fel upptäcks, desto dyrare är det att rätta till, många gånger dyrare än om det upptäcks i ett tidigt skede innan byggstart. Det är förarbetet och projekteringen som sätter alla förutsättningar för bygget. Ett bristfälligt förfrågningsunderlag kan få stora konsekvenser för slutsumman i ett projekt, och detta examensarbete har som avsikt att undersöka förfrågningsunderlag och kartlägga vilka brister som är vanligast och vilka som har störst påverkan på slutsumman. Målet har varit att skapa en förståelse och översikt över bristerna i ett förfrågningsunderlag hos läsaren. Med hjälp av en litteraturstudie kring ämnet har en intervju genomförts med väl genomtänkta frågor för att få så bra svar som möjligt på frågeställningen och kunna presentera ett bra resultat. I rapportens slut presenteras de vanligaste bristerna och vad de kan få för konsekvenser, och detta resultat diskuteras sedan och följs upp med en slutsats på hela arbetet. Resultatet av intervjuerna visade att det finns bristande förfrågningsunderlag, vilket genererar i onödiga kostnader. Detta är främst på grund av tillkommande ÄTA-arbeten och tvister som uppstår mellan de olika parterna. Dessa brister i förfrågningsunderlaget kan bero på att det inte lagts ner tillräckligt med tid och arbete i det tidiga respektive sena skedet av ett projekt. Det vill säga både vid skapandet av förfrågningsunderlaget och vid granskningen av ett avslutat projekt. / It is important to have well-planned planning for a construction project to go smoothly and be completed within the deadline. It is also important to keep exposed budget, so that there are no unnecessary and unexpected costs. The later an error is discovered, the more expensive it is to adjust, many times more expensive than if it's discovered early in the process of a project. It's the preparation and the projecting that sets all the prerequisites for the building. A lack of specifications in these contract documents may have major consequences for the total cost of a project, and this examination project aims to investigate the contract documents and identify the most common shortcomings and those that have the greatest impact on the total cost of a project. The aim has been to provide an understanding and overview of the shortcomings in these contract documents for the reader. With the help of a literature study on the subject, an interview has been conducted with well thought-out questions to get the best answers possible on the issue for this report and to present a good result. At the end of the report, the most common shortcomings and their consequences are presented, and this result is then discussed and followed up with a conclusion on the whole work. The results of the interviews showed that there is a lack of specifications in contract documents, which generates unnecessary costs. These are mainly additional contract changes and disputes that arise between the various parties. These shortcomings in the specifications may be due to the fact that no time has been spent in the early and late stages of a project. That is to say in the preparation of the contract documents and in the examination of a completed project.
|
25 |
Projektering av vindkraftspark i Juddhult, SmålandPettersson, Daniel, Svantesson, Per January 2008 (has links)
<p>The aim with this study was to collect fundamental information, and to plan, a wind</p><p>power farm in Juddhult , Småland in southern Sweden. The goal is to collect the best</p><p>available projecting planning support. The pieces of this projecting planning support</p><p>that will be presented is; Environmental Consequence Description (MKB), production</p><p>calculations, comparisons between different plant types, economic calculations, evaluate</p><p>the economy and give some farm design suggestions. The imagined wind farm will be</p><p>located in forest environment and which may cause a number of new problems. Special</p><p>interest that will be affected, where special consideration because of the forest</p><p>environmental is requested is, hunting, wetlands, ancient monuments and wind</p><p>turbulence. To perform calculations of expected energy transformation, sound-, shadowand</p><p>landscape influence the program WindPro has been used for these calculations. The</p><p>economic calculation methods used in this project is the annual method and electricity</p><p>price prognosis. Among the results some interesting KPI (Key Performince Indicator) for</p><p>the wind farm is presented. To be able to do a risk analysis three scenarios has been</p><p>created, the worst case scenario, the most likely scenario and the best possible scenario.</p>
|
26 |
LEED - Hur har projekt Gruset 1 påverkats av en miljöcertifiering enligt LEED, "New Construction and Major Renovations"Isaksson, Karl, Petrén, Lars January 2013 (has links)
Innan årsskiftet 2011-2012 blev Sveriges första lager som är miljöcertifierat enligt LEED färdigställt. LEED står för Leadership in Energy and Environmental Design och är en miljöcertifiering som har funnits sedan år 2000. LEED finns i fyra olika nivåer - certified, silver, gold och platinum. Vilken nivå som projektet når baseras på ett poängsystem som bedömer byggnaden i sju kategorier och projektet som avser vår fallstudie är certifierad i nivå gold. LEED växer ständigt och är idag en internationellt väletablerad miljöcertifiering. Till dagens datum (2012-03-27) finns 31450 projekt (560 miljoner m2 lokalyta) certifierade enligt LEED. Examensarbetet görs för Skanska Hus Sydost och har som syfte och mål att få svar på hur LEED-certifiering påverkat projektering och produktion, hur mycket merkostnad certifieringen har inneburit för projekt Gruset 1 samt hur det påverkat byggnadens mervärde, det vill säga åtgärder som ökar fastighetens marknadsvärde. Utifrån tillgängliga data har vi utifrån fakturor relaterade till miljöcertifieringen beräknat att LEED-certifieringen har resulterat i en tilläggskostnad på 2,11 %. För att nå målet i examensarbetet som nämns i ovanstående stycke har det gjorts intervjuer med följande respondenter: Byggherre/beställare, entreprenörer, konsulter och hyresgäst. LEED har utifrån respondenternas svar framstått som ett bra alternativ även om det har inneburit vissa problem under projektets gång. / Before the end of 2011 the first warehouse that is certified under LEED was completed. LEED stands for Leadership in Energy and Environmental Design and is a environmental certification that was first launched the year of 2000. LEED is available in four levels - certified, silver, gold and platinum. What level the project will be certified with is based on a point-system that assesses the building in seven categories. This case study was certified with the level of gold. LEED is growing steadily and is now a well-established international environmental certification. At the time of writing (2012-03-27) more than 560 million m2 of commercial (which primarily serves the interests of profit) facilities are certified under LEED and are distributed over more than 31450 projects. This bachelor thesis is done on the behalf of Skanska Region Hus Sydost and includes how a LEED-certification affects the planning and production, how much additional cost the certification has brought to this project and how it affects the buildings value (measures that increase the property's market value) and how the certification is used by involved parties. For this case study it has been estimated that the LEED-certification has resulted in an additional cost of 2.11 %. To achieve the goal of the thesis mentioned in the paragraph above, there have been interviews with the following respondents: developer / clients, contractors, consultants and tenants. LEED is based on respondents' answers appeared to be a good alternative even if it meant some problems during the project.
|
27 |
Analys av kommunikation under projektering i partnering / Analysis of communication during construction planning in partneringAndersson, Robert, Gergesa, Igor January 2015 (has links)
Purpose: During the planning phase of a construction there are many participants involved; architects, building contractors, constructors, developers and so on. Communication problems occur between these participants and may lead to wrong planning and high costs. Partnering focuses on relationship-building, transparency and trust, which in theory should reduce the problems for a project. The objective of this study is to analyse the communication in the planning phase to identify how communication problems can be prevented in a partnering. Method: To achieve the objective, literature studies and interviews have been selected as methods. The interviewees were selected from two partnering projects that Skanska was involved in. Findings: Results show that partnering reduces communication problems and create a greater involvement and commitment of the project planners. However, some problem still exists such as the use of project portals, choice of communication channels, coordination and information transfer on a formal and informal level. To prevent these problems, literature studies and interviewees contributed a few examples; a detailed meeting agenda, add comments on the blueprints, production personnel should participate in planning meetings and economic incentives. The interviewees have felt that partnering has worked well which has produced good results during the project planning. Implications: To create an effective planning group and remove the participants own interest, partnering should be applied. Planners should work with one project at a time and should be located with each other to benefit the work and communication at formal and informal level. Planners should work in a project portal that they are experienced and comfortable with. Limitations: This thesis will only analyze the planning stage. The two analyzed partnering projects were under planning stage during the thesis, which made it impossible to continue the research on the handover phase from planning to production. The interviewees have been limited to architects, contractors, constructors, developers, electrical and plumbing planners. Keywords: Planning stage, communication, partnering, communication problems / Syfte: När ett byggnadsverk ska projekteras är det många aktörer som är inblandade; arkitekter, byggentreprenörer, byggherrar, konstruktörer, el- och VVS-projektörer. Kommunikationsproblem förekommer mellan dessa aktörer vilket leder till felprojektering och extra kostnader. Samverkansformen partnering fokuserar på relationsbyggande, öppenhet och förtroende vilket i teorin ska minska problemen för kommunikation inom ett projekt. Målet med detta examensarbete är att analysera kommunikationen i projekteringsskedet för att identifiera hur kommunikationsproblem kan överbryggas för partnering. Metod: För att uppnå målet har litteraturstudier och intervjuer valts som metoder. Elva stycken intervjupersoner valdes utifrån två partneringsprojekt som Skanska var delaktiga i. Resultat: Resultat visar på att partnering minskar kommunikationsproblem och skapar en större delaktighet och engagemang hos projektörerna enligt intervjupersonerna själva. Tyvärr förekommer det fortfarande vissa problem så som användning av projektportaler, val av kommunikationskanaler, samordning samt informationsöverföring på en formell och informell nivå. För att förhindra dessa problem har litteraturstudierna och intervjupersonerna bidragit med några förslag; en detaljerad mötesagenda, infoga kommentarer på ritningar, produktionspersonal bör delta i projekteringsmöten, samlokalisering och införa ett ekonomiskt incitament. Intervjupersonerna har annars ansett att partnering har fungerat bra och gett goda resultat under projekteringen. Konsekvenser: För att skapa en effektiv projekteringsgrupp och få bort aktörernas eget intresse bör partnering tillämpas. Projektörerna bör arbeta med ett projekt i taget och gärna samlokaliserat för att underlätta arbetet och kommunikationen på den formella och informella nivån. Projektörerna bör jobba i en projektportal som de är erfarna och bekväma med. Begränsningar: Examensarbetet kommer endast behandla projekteringsskedet. De två undersökta partneringsprojekten befann sig under projekteringsskedet under rapportens gång vilket omöjliggjorde vidare forskning kring överlämnandet från projektering till produktionen. Intervjupersonerna har avgränsats till arkitekter, byggentreprenörer, byggherrar, konstruktörer, el- och VVS-projektörer. Nyckelord: Projektering, kommunikation, partnering, kommunikationsproblem
|
28 |
En undersökning gällande optimering av användandet utav projektportaler / A study on opimizing the use of project portalsEkberg, Louise, Krstevska, Diana January 2015 (has links)
No description available.
|
29 |
Projektering av vindkraftspark i Juddhult, SmålandPettersson, Daniel, Svantesson, Per January 2008 (has links)
The aim with this study was to collect fundamental information, and to plan, a wind power farm in Juddhult , Småland in southern Sweden. The goal is to collect the best available projecting planning support. The pieces of this projecting planning support that will be presented is; Environmental Consequence Description (MKB), production calculations, comparisons between different plant types, economic calculations, evaluate the economy and give some farm design suggestions. The imagined wind farm will be located in forest environment and which may cause a number of new problems. Special interest that will be affected, where special consideration because of the forest environmental is requested is, hunting, wetlands, ancient monuments and wind turbulence. To perform calculations of expected energy transformation, sound-, shadowand landscape influence the program WindPro has been used for these calculations. The economic calculation methods used in this project is the annual method and electricity price prognosis. Among the results some interesting KPI (Key Performince Indicator) for the wind farm is presented. To be able to do a risk analysis three scenarios has been created, the worst case scenario, the most likely scenario and the best possible scenario.
|
30 |
Partneringupphandling inom anläggningssektorn : Kommunernas intresse i MälardalenKarlsson, Anton January 2014 (has links)
Partnering is a collaboration method where the contractor and the client work together, based on a mutual trust towards each other and with a common goal for the project. The method originates from the United States where it was early adapted by the U.S. Army Corps of Engineers. It later spread internationally where the United Kingdom and Denmark were early in Europe to see the potential with partnering, to help aid with the issues they were having where construction projects kept running late, going over budget and lacked in quality. By using partnering you can achieve a shorter building time, improved work relationships and enhanced efficiency and cost effectiveness. In Sweden state-owned Swedish Transport Administration commonly use partnering in highway road projects, where Skanska has been involved as the contractor. Skanska wishes to use partnering in wider measure, especially with the municipalities in the Mälardalen region. In order to research the municipalities’ usage of partnering interviews were held with a selected group. These interviews resulted in a conclusion that the usage of partnering was very limited and the focus shifted to research the potential use of partnering in the future. Overall the attitude towards partnering was positive, but due to lack of time and knowledge about the collaboration method they hadn’t used it yet. In order for them to use it in the future they most likely will have to find a project where the advantages of partnering makes it more advantageous than the traditional forms of contract.
|