• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 14
  • 13
  • 10
  • 5
  • 3
  • 1
  • 1
  • 1
  • Tagged with
  • 51
  • 51
  • 10
  • 9
  • 7
  • 7
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

BIM - Förvaltarens Framtid / BIM - The future for Facility Management

Gustafsson, Sofie, Mårtensson, Ted January 2010 (has links)
<p>For nearly twenty years people have been talking about Product models, but given that the building industry is so conservative, it is hard to implement new working methods. Product models are these days known as Building Information Modeling, BIM. People often say they work with BIM but they often forget the most important part, the information. A 3D model should be linked with characteristics and information. Information that can be invaluable for the facility manager.</p><p>We have a vision that in the best of worlds the facility manager would be able to "walk" into the model and see what kind of installations are inside the wall or in the roof. You should be able to point at an object and gain complete information about operation and maintenance off the installation. You should also be able to gain information such as the name of the product and article number if you have to buy a new one. That’s why in our thesis we want to highlight the possibilities for the facility manager.</p><p>In order to have high achievements with BIM, coordination is highly needed. All participants in the construction process have to work together at an early stage; they must have the possibility to affect the stage of inquiry. By having the facility manager connected to the process at an early stage, other members have the opportunity to understand what’s expected from them. In the same way the facility manager will understand if any of the requirements are unreasonable or difficult to solve. Planning must be allowed to cost money. A well planned project can later save a lot of money due to less problems at the building worksite. In a well planned project there will be less changes and less additional work. The key words are Coordination and review.</p><p>During the facility management stage there are great opportunities to save money with BIM. The benefits of BIM have been shown and larger facility companies demand a model that work in the facility management stage. The greatest advantages are gained by the visual model that gives a greater understanding and a better base for decisions. There are also great advantages in more effective processes, better quality and better documentation for maintenance, operation, future rebuilding and future sale.</p><p>To be able to get a good image of BIM, how it is used today and what expectations there are, we have interviewed facility managers, system manager and BIM experts. We have also researched information in reports and articles.</p> / <p>I snart 20 år har man pratat om Produktmodeller men i byggbranschen är det svårt att införa nya arbetsmetoder. Produktmodeller har senare fått namnet Building Information Modeling eller Byggnadsinformationsmodeller på svenska, fortsättningsvis kallat BIM. Många säger idag att de BIM:ar när de gör 3D modeller men de glömmer ofta den viktigaste delen, informationen. Till 3D modellen kan egenskaper och information kopplas till varje objekt. Information som sedan kan vara ovärderlig för förvaltaren.</p><p>Vi har en vision av att i de bästa av världar skall förvaltaren kunna ”gå” in i modellen och se vad för installationer som finns i t.ex. väggar och ovanför takplattor. Dessutom ska man bara kunna peka på  ett don och få all information om det vad gäller drift och underhåll samt produktnamn och artikelnummer för att köpa ett nytt. Därför försöker vi i examensarbetet lyfta fram förvaltaren och fördelarna för denne.</p><p>För att få ut det bästa med BIM krävs samordning. De olika aktörerna i processen måste börja arbeta tillsammans i ett tidigt stadium, d.v.s. vara med och påverka redan i utredningsstadiet. Kan man ha med förvaltningen redan i utredningen får övriga aktörer en bättre förståelse för vad som förväntas av dem. Samtidigt kan förvaltningen tidigt få veta om några krav är orimliga eller svårlösta.Projektering måste få kosta. Ett väl projekterat projekt kan senare spara massor med pengar på att inga problem behöver lösas på byggarbetsplatsen. I väl projekterade projekt minskar ÄTA-arbeten och kollisioner. Nyckelorden för detta är Samordning och Samgranskning.</p><p>I förvaltningsskedet finns det stora utsikter att spara kostnader med hjälp av BIM, fördelarna har börjat visa sig och en del större förvaltare har börjat ställa krav på en produktmodell som går vidare in i förvaltningsskedet. De största fördelarna är bl.a. visualiseringen som ger en bättre förståelse och ett bättre underlag för beslut, effektiviseringen som spar både tid och material, kvalitetshöjning och bättre dokumentation för underhåll, drift, uthyrning, framtida ombyggnad och framtida försäljning.</p><p>För att skapa oss en bild om BIM, hur det används idag och vilka förväntningar som finns branschen, har vi intervjuat förvaltare, systemansvariga och BIM-experter. Vi har även sökt information i rapporter och tidsskrifter.</p>
32

BIM - Förvaltarens Framtid / BIM - The future for Facility Management

Gustafsson, Sofie, Mårtensson, Ted January 2010 (has links)
For nearly twenty years people have been talking about Product models, but given that the building industry is so conservative, it is hard to implement new working methods. Product models are these days known as Building Information Modeling, BIM. People often say they work with BIM but they often forget the most important part, the information. A 3D model should be linked with characteristics and information. Information that can be invaluable for the facility manager. We have a vision that in the best of worlds the facility manager would be able to "walk" into the model and see what kind of installations are inside the wall or in the roof. You should be able to point at an object and gain complete information about operation and maintenance off the installation. You should also be able to gain information such as the name of the product and article number if you have to buy a new one. That’s why in our thesis we want to highlight the possibilities for the facility manager. In order to have high achievements with BIM, coordination is highly needed. All participants in the construction process have to work together at an early stage; they must have the possibility to affect the stage of inquiry. By having the facility manager connected to the process at an early stage, other members have the opportunity to understand what’s expected from them. In the same way the facility manager will understand if any of the requirements are unreasonable or difficult to solve. Planning must be allowed to cost money. A well planned project can later save a lot of money due to less problems at the building worksite. In a well planned project there will be less changes and less additional work. The key words are Coordination and review. During the facility management stage there are great opportunities to save money with BIM. The benefits of BIM have been shown and larger facility companies demand a model that work in the facility management stage. The greatest advantages are gained by the visual model that gives a greater understanding and a better base for decisions. There are also great advantages in more effective processes, better quality and better documentation for maintenance, operation, future rebuilding and future sale. To be able to get a good image of BIM, how it is used today and what expectations there are, we have interviewed facility managers, system manager and BIM experts. We have also researched information in reports and articles. / I snart 20 år har man pratat om Produktmodeller men i byggbranschen är det svårt att införa nya arbetsmetoder. Produktmodeller har senare fått namnet Building Information Modeling eller Byggnadsinformationsmodeller på svenska, fortsättningsvis kallat BIM. Många säger idag att de BIM:ar när de gör 3D modeller men de glömmer ofta den viktigaste delen, informationen. Till 3D modellen kan egenskaper och information kopplas till varje objekt. Information som sedan kan vara ovärderlig för förvaltaren. Vi har en vision av att i de bästa av världar skall förvaltaren kunna ”gå” in i modellen och se vad för installationer som finns i t.ex. väggar och ovanför takplattor. Dessutom ska man bara kunna peka på  ett don och få all information om det vad gäller drift och underhåll samt produktnamn och artikelnummer för att köpa ett nytt. Därför försöker vi i examensarbetet lyfta fram förvaltaren och fördelarna för denne. För att få ut det bästa med BIM krävs samordning. De olika aktörerna i processen måste börja arbeta tillsammans i ett tidigt stadium, d.v.s. vara med och påverka redan i utredningsstadiet. Kan man ha med förvaltningen redan i utredningen får övriga aktörer en bättre förståelse för vad som förväntas av dem. Samtidigt kan förvaltningen tidigt få veta om några krav är orimliga eller svårlösta.Projektering måste få kosta. Ett väl projekterat projekt kan senare spara massor med pengar på att inga problem behöver lösas på byggarbetsplatsen. I väl projekterade projekt minskar ÄTA-arbeten och kollisioner. Nyckelorden för detta är Samordning och Samgranskning. I förvaltningsskedet finns det stora utsikter att spara kostnader med hjälp av BIM, fördelarna har börjat visa sig och en del större förvaltare har börjat ställa krav på en produktmodell som går vidare in i förvaltningsskedet. De största fördelarna är bl.a. visualiseringen som ger en bättre förståelse och ett bättre underlag för beslut, effektiviseringen som spar både tid och material, kvalitetshöjning och bättre dokumentation för underhåll, drift, uthyrning, framtida ombyggnad och framtida försäljning. För att skapa oss en bild om BIM, hur det används idag och vilka förväntningar som finns branschen, har vi intervjuat förvaltare, systemansvariga och BIM-experter. Vi har även sökt information i rapporter och tidsskrifter.
33

Sectarian Conflict And Inability To Construct A National Identity In Northern Ireland In Christina Reid

Yazan, Bedrettin 01 August 2008 (has links) (PDF)
Based on Christina Reid&rsquo / s five Plays &ldquo / Tea in a China Cup,&rdquo / &ldquo / Did You Hear the One About the Irishman &hellip / ?,&rdquo / &ldquo / Joyriders,&rdquo / &ldquo / The Belle of the Belfast City,&rdquo / and &ldquo / My Name, Shall I Tell You My Name?&rdquo / the aim of this study is to put under discussion the idea that the sectarian conflict between the two ethno-religious communities in Northern Ireland is maintained deliberately and a national identity unique to the people in this country cannot be constructed at least in the near future. The Protestants in Northern Ireland cannot choose Irishness as a national identity because the Irishness has been monopolized by the Catholics, and cannot adopt the Britishness as a national identity because of the varieties in the social factors they have. Likewise, the Catholics in Northern Ireland do not call themselves British because their Catholicism involves an Irish identity with the rejection of the British rule, and they cannot truly entitle themselves Irish due to the differences in social conditions. However, both factions try to adhere themselves to a national identity through their communal ideology. The Protestants claim that they are part of Britain, while the Catholics claim that they are members of Irish Nation. This situation has led to reluctance in both communities to stop the conflictual circumstances which encourage both groups to tether to their traditions more intensely, to contribute to the otherization process reinforcing their social identity and lead them to impose their working ideology on their new members whose divergence from traditions will definitely pose a threat to their identity. Also, in this country the forgetting / remembering process, which is actually exploited to forge a national identity, is orchestrated by the two communities to enlarge the intercommunal chasm through the narration of the old stories and memories, creation of stories, commemoration activities and museumizing certain objects. Throughout the study the key points which will be highlighted are as follows: nation, national identity and nation building process, the sectarian conflict between the two communities in Northern Ireland, maintenance of conflictual situation and the employment of the forgetting / remembering process in Northern Ireland.
34

Co-evolución entre la Web Social y la Web Semántica

Torres, Diego 10 October 2014 (has links)
La Web Social y la Web Semántica han impactado en la forma en que la creación de conocimiento se ha llevado a cabo en la Web. La Web Social promociona la participación de los usuarios para crear y editar contenido y conocimiento en la Web. La proliferación de contenido y la necesidad de tener una administración automatizada de esta información disparó la aparición de la Web Semántica. Actualmente, la Web Social y la Web Semántica conviven y comparten un mismo tema: un mejor manejo del conocimiento. Sin embargo, la mayoría de la información en la Web Social no es parte de la Web Semántica, y la información de la Web Semántica no es utilizada para mejorar a la Web Social. Esta tesis presenta un enfoque innovador para estimular una co-evolución entre la Web Semántica y la Web Social: las fuerzas que impulsan la Web Social y las herramientas que llevan a cabo la Web Semántica trabajando en conjunto con el fin de tener beneficios mutuos. En este trabajo afirmamos que la co-evolución entre la Web Social y la Web Semántica mejorará la generación de información semántica en la Web Semántica, y mejorará la producción de conocimiento en la Web Social. Esto invita a responder las siguientes preguntas: ¿Cómo puede incluirse la generación de datos semánticos en las actividades de los usuarios de la Web Social? ¿Como puede definirse la semántica de un recurso web en un entorno social? ¿Cómo puede inyectarse en la Web Social las nuevas piezas de información extraídas de la Web Semántica? ¿Poseen las comunidades de la Web Social convenciones generales que deban ser respetadas? Con el fin de mejorar la Web Semántica con las fuerzas de la Web Social, en este trabajo se proponen dos enfoques de Social Semantic Tagging: P-Swooki que permite a usuarios de una wiki semántica gestionar anotaciones semánticas permitiendo completar el proceso de construcción de conocimiento, y Semdrops que permite a los usuarios describir en forma semántica cualquier recurso de la Web tanto en un espacio de conocimiento personal como en un espacio compartido. Además, con el fin de mejorar el contenido de la Web Social, proponemos BlueFinder: un sistema de recomendación que detecta y recomienda la mejor manera de representar en un sitio de la Web Social, información que es extraída de la Web Semántica. En particular, BlueFinder recomienda la manera de representar una propiedad semántica de DBpedia en Wikipedia, respetando las convenciones de la comunidad de usuarios de Wikipedia. / Tesis realizada en co-tutela con la Universidad de Nantes (Francia). Director de tesis por la Universidad de Nantes: Pascal Molli; co-director de tesis por la Universidad de Nantes: Hala Skaf-Molli. Grado alcanzado por la Universidad de Nantes: Docteur de l'Université de Nantes.
35

Visualisering av APD-Plan med hjälp av 3D och BIM : En studie om utveckling av APD-visualisering i byggbranschen / Visualization of construction site planning by using 3D and BIM : A study about development of site layout visualization in construction process

Alameri, Muhamed, Zaaroura, Mahmoud January 2021 (has links)
Trots den nytta som BIM har på ett projekt så finns det fortfarande företag som väljer att skapa sina APD-planer på det traditionella arbetssättet. Det traditionella arbetssättet innebär att APD-planen upprättas på den gamla metoden som vanligtvis görs med 2D. Anledningen bakom att det fortfarande finns företag som upprättar APD-planer på den traditionella arbetsmetoden är att de inte finns någon tillräcklig vilja eller kunskap att ändra arbetsmetod trots att metoden anses vara osäker och tidskrävande. Det har istället förekommit en ny arbetsmetod för att frambringa planer och ritningar som ska ersätta den traditionella arbetsmetoden. Denna arbetsmetod skapar modeller i 3D där de ingående byggkomponenterna även innehåller information. Denna arbetsmetod kallas för BIM som står för byggnadsinformationsmodellering. Modellen som upprättas med BIM och som innehåller information om de tillgängliga byggkomponenterna kallas för BIM-modell. BIM som arbetsmetod kan i sin tur användas för att skapa APD-planer med hjälp av stödjande verktyg som tex SketchUp och Revit vilket medför många fördelar.  Denna studie syftar därför till att undersöka hur APD-plan visualiseras i dagens läge samt upplysa vilka faktorer som samtliga byggföretag ska beakta vid val av verktyg för visualisering av byggarbetsplatsen. Fördelar, nackdelar samt hinder kommer att lyftas fram i denna studie med hänsyn till 3D och BIM i syfte att undersöka vilken dimension det är som lämpar sig bäst för visualisering av APD-planen samt vilken dimension APD-planen visualiseras med i dagsläget. Ytterligare ett syfte är att undersöka var i byggprocessen som APD-Planen bör integreras. Fokus kommer ligga på att påvisa fördelarna med att utöka användandet av 3D respektive BIM-relaterade APD-visualiserings verktyg. Det som tas upp i frågeställningarna är vilka de olika fördelar respektive nackdelar samt hinder som finns med att tillämpa 3D och BIM vid visualisering av APD-plan. Dessutom görs två olika visualiseringar med 3D och BIM verktyg för att visa hur APD-planen visualiseras.       Den mest användbara dimensionen vid visualisering av APD-planen är 2D där APD-planen upprättas med Bluebeam. Det finns vissa företag som har övergått till 3D vid visualisering men som kombinerar med 2D ritningar eller skisser. Att visualisera med BIM har inte varit aktuellt för de samtliga intervjuade företagen. Däremot används de färdigprojekterade BIM modellerna som en del av 3D visualiseringen i syfte att skapa en så verklighetsanpassad visualisering som möjligt. Fördelarna med att visualisera en APD-plan med 3D och BIM-verktyg är att det ger en förverkligad bild på hur byggarbetsplatsen kommer att se ut och att risker, möjligheter och problem som inte skulle kunna upptäckas med 2D-modellen blir upptäckbara. Nackdelen däremot med att visualisera en APD-plan med 3D eller BIM-verktyg är att filerna kan bli alltför tunga vilket leder i sin tur till verktyget blir svår hanterligt samt upplevs som hackigt. Det som dock hindrar många ifrån att implementera 3D och BIM-relaterade verktyg är den mänskliga faktorn som sätter stop för utvecklingen, där människans bekvämligheter och arbetsrutiner är avgörande för implementeringen av verktygen. De absolut viktigaste faktorer som ett företag bör beakta vid val av verktyg vid visualisering av APD-plan är Lönsamhet, användarupplevelse, kompatibilitet och support. / Despite the benefits that BIM has on a project, there are still companies that choose to create their APD plans in the traditional way. The reason why there are still companies that draw up APD plans on the traditional working method is that they do not have sufficient will or knowledge to change working method despite the method being considered uncertain and time consuming. Instead, there has been a new working method for producing plans and drawings that will replace the traditional working method. This working method creates models in 3D where the constituent building components also contain information. This working method is known as BIM as a wound for building information modeling. The model that is established with BIM and which contains information about the available building components is called the BIM model. BIM as a working method can in turn be used to create APD plans with the help of supporting tools such as SketchUp and Revit, which brings many benefits. This study therefore aims to investigate how APD plans are visualized in the current situation and to inform which factors all construction companies must take into account when choosing tools for visualization of the construction site. Advantages, disadvantages and obstacles will be highlighted in this study with regard to 3D and BIM in order to investigate which dimension is best suited for visualization of the APD plan and which dimension the APD plan is visualized with at present. Another purpose is to investigate where in the construction process the APD Plan should be integrated. The focus will be on demonstrating the benefits of expanding the use of 3D and BIM-related APD visualization tools, respectively. What is addressed in the issues is what are the different advantages and disadvantages as well as obstacles that exist with applying 3D and BIM when visualizing APD plans. In addition, two different visualizations are made with 3D and BIM tools to show how the APD plan is visualized. The most useful dimension in visualizing the APD plan is 2D where the APD plan is created with Bluebeam. There are some companies that have switched to 3D in visualization but which are combined with 2D drawings or sketches. Visualization with BIM has not been relevant for all the companies interviewed. On the other hand, the pre-designed BIM models are used as part of the 3D visualization in order to create as realistic a visualization as possible. The advantages of visualizing an APD plan with 3D and BIM tools are that it provides a realistic picture of what the construction site will look like and that risks, opportunities and problems that could not be detected with the 2D model become detectable. The disadvantage, however, of visualizing an APD plan with 3D or BIM tools is that the files can become too heavy, which in turn leads to the tool becoming difficult to handle and perceived as choppy. However, what prevents many from implementing 3D and BIM-related tools is the human factor that puts a stop to development, where human conveniences and work routines are crucial for the implementation of the tools. The most important factors that a company should consider when choosing tools when visualizing APD plans are Profitability, user experience, compatibility and support.
36

Objekt výzkumného centra v Brně - příprava realizace stavby / The Building of the Research Center in Brno - Preparation of Building Process

Dvorník, Pavel January 2012 (has links)
The purpose of the bachelor thesis is to develop selected parts of technologically-building project of the Masaryk university´s campus in Brno, Hall A29. The building will be used as a research establishment. It has eleven building sites and the main one is tackled in detail. The bachelor thesis includes a technical report about the technologically-building project, the time schedule, suggestion of the realization of the main stages of its construction, including recommendation of the major building machines. The bachelor thesis also includes the project of site equipment, technological regulations for carrying out the pilotage, the check and test plan, the plan of safety and health protection during work, the budget of fabric and specialization in the field of building construction.
37

3D för allmänheten : En kvalitativ studie om hur 3D-kartor påverkar användbarheten och förståelsen hos allmänheten i medborgardialoger inom samhällsbyggnadsprocessen. / 3D for the general public : A qualitative study on how 3D maps affect the usability and understanding of the public in citizen dialogues in the community building process.

Zendeli, Ron, Åkerman, Olle January 2022 (has links)
Den svenska regeringen har beslutat om en strategi för IT-politiken, där målet är att Sverige ska vara bäst i världen på att använda digitaliseringens möjligheter. Dessa möjligheter kommer öppna upp för en enklare vardag för privatpersoner och företag. Flera kommuner har idag samarbeten med EU, regioner och kommuner där syftet är att digitalisera samhällsbyggnadsprocessen med hjälp av att utveckla innovativa digitala verktyg. Offentliga utredningar har påvisat brister i hur lösningarna presenteras och att det finns utvecklingspotential. I nuläget presenteras information för allmänheten i form av text och bilder, vilket ger en ofullständig bild av pågående och framtida byggprojekt. Tidigare studier inom andra områden har visat att 3D-teknik kan vara värdefullt på en bred front. Syftet med studien var att undersöka hur 3D-kartor påverkar användbarheten och förståelsen hos allmänheten i medborgardialoger inom samhällsbyggnadsprocessen. Studien berörde även hur processens virtualiserbarhet påverkas. Som teoretiskt ramverk och principer som underlag för studien, användes modellen Process Virtualization Theory (PVT) och användbarhet. Inom det sistnämnda används komponenter som effektivitet, fel, minnesbarhet, lärbarhet och tillfredsställelse för att mäta användbarheten av tjänsterna. PVT-modellen kan användas för att mäta hur lämpad en process är att vara digital och huruvida IT kan möjliggöra en bättre digital process eller inte. Studien har en genomgående kvalitativ ansats som undersökte  användbarheten och hur lämpad processen är att vara digital. Användbarhetstest med kompletterande intervjuer utfördes under två separata tillfällen där det ena riktades mot en befintlig webbtjänst och den andra mot en ny webbtjänst med en 3D-karta.  Resultatet i användandet av 3D-kartan påvisade att igenkänning och ovana är två återkommande teman där tillfredsställelse uppvisas i form av nyfikenhet och intresse. I jämförelse mellan webbtjänsterna så bidrog 3D-kartan till en ökad visuell förståelse av informationen som presenterades. Å andra sidan gav informationsdokumenten en djupare förståelse. 3D-kartan påverkade den undersökta processen positivt och var framförallt användbar för den visuella förståelsen. Processen var lämpad för att vara digital där representationen var en bidragande faktor för vad IT möjliggjorde. / The Swedish government has decided on a strategy for IT policy where the goal is for Sweden to be the best in the world at utilizing the possibilities of digitalisation. These opportunities will open up for a simpler everyday life for individuals and companies. Several municipalities today have collaborations with the EU, regions and municipalities where the purpose is to digitize the community building process with the help of developing innovative digital tools. Public investigations have shown shortcomings in how the solutions are presented and that there is development potential. At present, information is presented to the public in the form of text and images, which gives an incomplete picture of ongoing and future construction projects. Previous studies in other areas have shown that 3D technology can be valuable on a broad front. The purpose of the study was to investigate how 3D maps affect the public's usefulness and understanding in citizen dialogues in the community building process. The study also touched on how the virtualisability of the process is affected. As a theoretical framework and principles as a basis for the study, the model Process Virtualization Theory (PVT) and usability were used. Within usability, components such as efficiency, error, memorability, learnability and satisfaction are used to measure the usefulness of the services. The PVT model can be used to measure how appropriate a process is to be digital and whether IT can enable a better digital process or not. The study has a consistent qualitative approach that relates to examining usability and how appropriate the process is to be digital. Usability tests with supplementary interviews were performed on two separate occasions, where one is aimed at an existing web service and the other at a new web service with a 3D map. The results in the use of the 3D map showed that recognition and unfamiliarity are two recurring themes where satisfaction is shown in the form of curiosity and interest. In comparison between the web services, the 3D map contributed to an increased visual understanding of the information presented. However, the information documents provided a deeper understanding. The 3D map proved to have a positive effect on the investigated process and was above all useful for the visual understanding. The process also proved to be suitable for being digital, where representation was a contributing factor to what IT made possible.
38

State building process

Mukhimer, Tariq 02 August 2005 (has links)
Nach dem Oslo prozess im Gaza-Streifen und Westjordanland (weiter WJGS), die palästinensische Selbstverwaltung eingesetzt wurde. Die wichtigste Frage, eine Antwort auf die diese Dissertation zu geben versucht, ist: Hat es diese Regierung geschafft, sich in ihrem ersten Jahrzehnt (1994 - 2004) zu einer staatlichen, im Sinne von einer differenzierten, zentralisierten und autonomen Organisation zu entwickeln, die das Gewaltmonopol innehat und in der Lage ist, landesweit verbindliche Gesetze zu etablieren? Die Realität nach dem Oslo-Prozess: Tatsächlich fand eine Konzentration der Macht in den Händen Arafats und einer kleinen regierenden Elite in seinem Umkreis statt. Dies geschah auf Kosten der Mehrheit der Bevölkerung, welcher der Zugang zu staatlichen Institutionen auf nationaler Ebene verwehrt wurde. Dieser Zustand der Marginalisierung der Bevölkerungsmehrheit hemmte die Durchsetzung eines demokratischen Systems nach den Prinzipien Gewaltenteilung, Verantwortlichkeit und Transparenz und erstickte die rechtsstaatlichen Ansätze im Keim. Arafat und die kleine Elite in seinem Gefolge verhinderten nicht nur den Aufstieg eines demokratischen und rechtsstaatlichen Systems, sondern auch das Aufkommen eines Verwaltungssystems, das nach fairen Prinzipien (Leistung, Kompetenz) und nicht nach informellen/persönlichen Kriterien besetzt wurde, klare Spezialisierungen und Hierarchien aufwies sowie durchschaubar war, wie Max Weber vorschlägt. Näher betrachtet, erschwerten der Friedensprozess von Oslo und seine Vereinbarungen den Aufbau von stabilen und reaktionsfähigen politischen Institutionen genauso wie den eines professionellen Verwaltungssystems. Dies geschah, da der Prozess Menschen demobilisierte (aus der Unfähigkeit heraus, die Bestrebungen Palästinas, ein selbstbestimmter souveräner Staat zu werden, wahrzunehmen), außerdem ermöglichte er Arafat und dessen kleiner Machtelite, die Macht bei sich zu konzentrieren und ein halbautokratisches, von patrimonialen Zügen gekennzeichnetes Regime einzuführen, das dem Machthaber ermöglichte, öffentliche Fonds und Institutionen auszunutzen, um sich Loyalität zu sichern und seinem Regime Legitimität zu verschaffen. Als Antwort darauf stärkten die Gegner des Prozesses von Oslo und Arafats, also die Hamas, der Islamische Djihad und PFLP ihre Institutionen und begannen parallel zu den Institutionen der Autonomiebehörde parastaatliche Funktionen auszuüben. Am wichtigsten ist die Tatsache, dass diese Institutionen von den Milizen der politischen Parteien, denen sie angegliedert sind, beschützt werden. Zum Beispiel wird die Al Salah Islamic Society von den Izz El Din El Kassam Brigaden dem militärischen Flügel derHamas beschützt. Die 'Freunde der Märtyrer' sind dem Islamischen Djihad angegliedert und werden vom militanten Flügel der Gruppe, den Al Quds Brigaden beschützt. Dementsprechend ist der Staat - im Sinne einer zentralen Organisation mit Macht zur Autoritätsausübung und einem Gewaltmonopol (wie Joel Migdal vorschlägt) nicht präsent auf der politischen Bühne in Palästina. / In 1994, the Palestinian self-government was established on the Gaza Strip and West Bank (hereinafter WBGS) as result of Oslo process. One of its main challenges of that government was how to deal with this debilitating heritage whilst promoting institutions and institutional capacity building, both of which began gaining momentum from 1994 onwards. However, the reality of the Oslo process has meant that in fact what has occurred is a concentration of power into the hand of the ruling elite (Arafat and the small elite around him) at the expense of the majority of population who were denied access to national level institutions of state functions. This state of the political marginalization (or denationalization) of the majority of population hindered the emergence of a democratic political system based on the principles of the separation of powers, accountability, and transparency, and stifled the emergence of the rule of law. Arafat and the small elite around him had not only hindered the emergence of a democratic political system, and stifled the emergence of the rule of law, but also the emergence of a bureaucratic system with a recruitment system based on achievement rather than informal/irrational criteria (competence), highly specialized and differentiated administrative role of civil servants (differentiation), and well established and thoroughly understandable system of super-ordination and sub-ordination (hierarchy) as Max Weber suggests. In response, the opponents of Oslo process & Arafat- Hamas, Islamic Jihad, and PFLP-had strengthened their institutions, and started to practice Para-state functions parallel to PA institutions (as chapter V shows). These instituions are protected by the militia of the political party with which it is affiliated, like Izz El Din El Qassam Brigades, the military wing of Hamas, and others. Accordingly, State- in the term of central organization with the power of issuing authoritative binding legal rules and monopolizing coercion (as Joel Migdal suggests)- was absent from the Palestinian scene.
39

Influência da capacidade organizativa na concessão de benefícios fiscais: estudo sobre a formação da agenda para concessão de crédito presumido do ICMS/SC / Influence of organizational capacity in obtaining tax relief: study of the agenda building process in granting matching credit to enterprises in Santa Catarina Brazil

Eli, Sidirlei da Silva 07 June 2011 (has links)
Made available in DSpace on 2016-12-01T19:18:51Z (GMT). No. of bitstreams: 1 Sidirlei.pdf: 1342197 bytes, checksum: 55ad7335bcb5089a410ca26dc9d827da (MD5) Previous issue date: 2011-06-07 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / This dissertation analyzes the influence of organizational capacity on the governmental decisions of issuing tax relief in Santa Catarina state. The study is based on the propositions of Olson (1971) who uses an economic approach to understand individual and organizational activity by emphasizing the costs and benefits individuals bear by engaging in collective action. The objective is to understand why certain interest groups (business categories) have more influence on State actors than others. The study uses both qualitative and quantitative methodologies for collecting and analyzing data. The qualitative part was conducted through semi-structured interviews with public officials in the Treasury Department to map the agenda building process. The quantitative part was carried out by collecting and analyzing the data needed for testing the hypotheses using the following variables: organizational capacity, size, revenue, geographical location and jobs generated by the business categories. The sources of primary data were the Tax Administration System of Santa Catarina, and the regulations and the list of matching credit (crédito presumido) in the 2003 2010 timeframe. The data analysis was carried out by crossing the information on the independent variables (business categories) with the dependent variable (tax relief), through statistical analysis of correlation between variables and multiple linear regression. The results of the study do not support the propositions of Olson. Rather, decisions to grant matching credit proved to be more likely in numerous business categories (r = 0.236), in business categories that generate more jobs (r = 0.378) and in business categories that generate more revenue (r = 0.392). Geographical localization proved to be sterile to the analysis. Also contrary to Olson's propositions, the test between the independent variable "organizational capacity" and the dependent variable showed a negative correlation (r = - 0.283). The results of the qualitative part of the research showed that the agenda building is not transparent, and there are no criteria for the entry and the proceeding of applications of matching credit. Moreover, the governor holds unrestricted autonomy to grant tax benefit, and the decisions respond primarily to the war tax between Brazilian states. And as a general conclusion from the quantitative part, the small business categories or privileged had less chance of getting the tax benefit that the major business categories or latent / Esta dissertação analisa a influência da capacidade organizativa no processo de construção da agenda governamental de concessão de crédito presumido do ICMS em Santa Catarina. Partese das proposições de Olson (1971) que utiliza uma abordagem econômica para entender a atividade individual e organizacional, ao enfatizar os custos e os benefícios relacionados com o engajamento individual em ações coletivas. Busca-se aqui entender porque determinados grupos de interesses (categorias empresariais) têm mais influência sobre atores estatais e, em razão disso, obtêm benefícios fiscais, enquanto outras categorias empresariais não conseguem. O estudo fez uso de metodologia qualitativa e quantitativa de coleta e análise de dados. A parte qualitativa foi viabilizada por meio de entrevistas semiestruturadas com servidores da Secretaria da Fazenda para identificar como ocorre o processo de construção da agenda. A parte quantitativa foi viabilizada por meio de coleta e análise dos dados para a realização de testes de hipóteses com uso das seguintes variáveis: capacidade organizativa, tamanho, faturamento, localização geográfica e empregos gerados pela categoria empresarial. As fontes de dados primários foram o Sistema de Administração Tributária de Santa Catarina, e os dispositivos regulamentares e a lista de Créditos Presumidos do período de 2003 a 2010. Para a análise dos dados foi feito o cruzamento das informações das variáveis independentes, que se referem às categorias empresariais, com a variável dependente que se refere à consecução de crédito presumido de ICMS, por meio de análises estatísticas de correlação entre variáveis e regressão linear múltipla. Os resultados encontrados neste estudo não dão sustentação às proposições de Olson. Pelo contrário, as decisões de concessão de crédito presumido a categorias empresariais demonstraram-se mais prováveis em categorias empresariais numerosas (r=0,236), em categorias empresariais que geram mais empregos (r=0,378) e em categorias empresariais que geram mais faturamento (r=0,392). A variável localização geográfica da categoria empresarial demonstrou-se pouco útil para as análises feitas. Também contrário às proposições de Olson, o teste entre a variável independente capacidade organizativa e a variável dependente consecução de crédito presumido , pois demonstrou uma correlação negativa (r= - 0,283). Os resultados da pesquisa qualitativa levam a crer que o fluxo de montagem da agenda não é transparente, porque não há critérios para entrada e trâmite dos pedidos de crédito presumido. Além disso, há autonomia irrestrita do Governador para a concessão, e a política de benefício fiscal do crédito presumido responde, prioritariamente, à guerra fiscal. E como conclusão geral identificou-se que, as categorias empresariais pequenas ou privilegiadas tiveram menor chance de conseguir benefício fiscal que as categorias empresariais grandes ou latentes, no período estudado
40

Běloruská národní myšlenka v samizdatových periodikách v letech 1970-1980 / Belarusian national idea in samizdat periodicals in BSSR in 1970-1985

Smalianchuk, Volha January 2015 (has links)
5 Abstract Diploma thesis deals with the topic of the Belarusian national movement in the late Soviet period. After the end of the Stalinist terror in the 70th-80th of the 20th century civic movements have been reborn in the Soviet Belarus. A rising national movement continued the national- building process, started in 20th years with the program of Belorusisation, which was interuppted by Soviet government in the late 20th. The research subject of the thesis is the Belarusian national idea in samizdat periodicals during 1970-1985. Content analysis of samizdat journals allows to define and understand the period's thinking. Since Soviet samizdat at that time was the only media environment, independent from the ideology and censorship. The thesis as well includes analysis and development of Belarusian national idea from its beginning; characteristic of the political, economic and social context of the Soviet period; appearance and analysis of dissent and democratic activities in 1970-1985.

Page generated in 0.0878 seconds