Spelling suggestions: "subject:"then construction sector"" "subject:"them construction sector""
81 |
Intressentdialog och väsentlighetsanalys på Wästbygg : Hållbarhetsredovisning enligt det internationella ramverket GRI, Global Reporting Initiative / Stakeholder dialogue and materiality analysis at Wastbygg : Sustainability reporting according to global standard GRI, Global Reporting InitiativeCarlsson, Jenny January 2017 (has links)
The demands from the outside world that companies should take active responsibility for a sustainable society are constantly increasing. Companies are no longer responsible for just generate a good return to their shareholders but also for acting for sustainable development. EU directive with sustainability reporting that came into force in 2014 in member countries was incorporated into Swedish law on 1 December 2016, starting for the 2017 fiscal year. The sustainability report will describe how companies work with environment, human rights, social conditions, and corruption. This concerns all major companies in Sweden who for each of the last two fiscal years meet two of three criteria to have exceeded; SEK 350 million (EUR 40 million) in net sales, average employees with 250 and a total of SEK 175 million (EUR 20 million).Wastbygg is a construction and project development company that builds and develops logistics facilities, commercial real estate and housing. The company is growing steadily and currently has approximately 230 employees. Net sales amount to just over SEK 2 billion. In the coming years, the law will require sustainability accounting.The purpose of the master's thesis is to help Wästbygg carry out an interest dialogue and essentiality analysis, which is the first initial step in a sustainability report according to the international framework GRI. The result will show which sustainability issues stakeholders consider to be most prioritized and addressed by Wastbygg. This will form Wastbygg first sustainability report with the GRI framework.The stakeholder dialogue was conducted in spring 2017 through web-based surveys, personal interviews, and dialogue with prospective building engineer students. In the material analysis it was unanimous that stakeholders felt that the social aspect of health and work environment should be the highest priority issue for Wästbygg. Already today, the issue is a priority as Wästbygg is ISO-certified according to the OHSAS 18001 standard. Other sustainability issues that stakeholders consider should be prioritized by Wastbygg ecological aspects such as phasing out of environmentally and health hazardous building materials and energy-efficient buildings and construction sites as well as the social aspect ethics and anti-corruption. / Kraven från omvärlden om att företag ska ta ett aktivt ansvar för ett hållbart samhälle ökar hela tiden. Företagen ansvarar inte längre bara för att generera en god avkastning till sina aktieägare utan också för att agera för en hållbar utveckling.EU-direktivet som kom 2014 med krav på hållbarhetsredovisning i medlemsländerna införlivades i svensk lag den 1 december 2016 med start för räkenskapsåret 2017. Hållbarhetsredovisningen ska redogöra för hur företag arbetar med miljö, mänskliga rättigheter, sociala förhållanden och motverkande av korruption. Detta berör alla större företag i Sverige som för vart och ett av de två senaste räkenskapsåren uppfyller två av tre kriterier att ha överstigit; 350 miljoner kronor (40 miljoner Euro) i nettoomsättning, medeltalet anställda med 250 och en balansomslutning på 175 miljoner kronor (20 miljoner Euro).Wästbygg är ett entreprenad- och projektutvecklingsbolag som bygger och utvecklar logistikanläggningar, kommersiella fastigheter och bostäder. Företaget växer stadigt och har idag cirka 230 anställda. Nettoomsättningen uppnår till drygt 2 miljarder kronor. Inom de närmaste åren kommer man enligt lagen att behöva hållbarhetsredovisa.Syftet med magisteruppsatsen är att hjälpa Wästbygg att genomföra en intressentdialog och väsentlighetsanalys som är det inledande steget i en hållbarhetsredovisning enligt det internationella ramverket GRI. Resultatet ska visa på vilka hållbarhetsfrågor som intressenterna anser ska högst prioriteras och adresseras av Wästbygg. Detta kommer ligga till grund för Wästbyggs första hållbarhetsredovisning med ramverket GRI.Intressentdialogen genomfördes under våren 2017 genom webbaserad enkät, personliga intervjuer och dialog med blivande byggingenjörsstudenter.I väsentlighetsanalysen framkom det enhälligt att intressenterna anser att sociala aspekten hälsa och arbetsmiljö bör vara den högst prioriterade frågan för Wästbygg. Redan idag är frågan prioriterad då Wästbygg är ISO-certifierade enligt standarden för arbetsmiljö: OHSAS 18001.Andra hållbarhetsfrågor som intressenterna anser bör prioriteras av Wästbygg är de ekologiska aspekterna utfasning av miljö- och hälsofarliga byggnadsmaterial och energieffektiva byggnader och byggarbetsplatser samt sociala aspekten etik och antikorruption.
|
82 |
Dopad ekonomické krize na stavební trh a aktuální trendy ve stavebnictví / Impact of the economic crisis on the construction market and the current trends in the construction sectorNováková, Barbora January 2015 (has links)
The diploma thesis Impact of the economic crisis on the construction market and the current trends in the construction sector focuses mainly on the development of the Czech construction market in relation to the economic crisis of 2008-2009, while looking for conjunctions with macroeconomic indicators. It also describes the following period of development of the construction sector with an emphasis on current trends. Exemplifying how this is implemented into practice, the diploma thesis includes a description of the activities of a group of companies called EBM Group.
|
83 |
Återbruk av byggprodukter - En fallstudie i Växjö / Reuse of construction products - A case study in VäxjöThiel, Elsa January 2021 (has links)
The construction sector accounts for about one fifth of Sweden's greenhouse gas emissions. It is also the sector that produces the second most waste in Sweden. Today there is an increased need for housing in Sweden, at the same time as the construction sector must reduce its greenhouse gas emissions. Usually when renovating a building, construction products are disposed despite having a remaining service of life. The purpose of this study is to investigate how the reuse of construction products can be increased in the construction sector. And to find out how companies in Växjö work with reusing construction products. The work was based on the project Kv. Stommen, the project was about a new preschool in Vikaholm, Växjö. In the project the buyer had requested that some construction products should be reused. The purpose of the study was addressed by using interview methodology and partaking in focus group discussion with Godahåll during their meeting. According to the results there are seven challenges that must be overcome before the reuse of construction products in the construction sector can increase. The representatives from the companies in Växjö, who were interviewed had a positive attitude towards reuse of construction products. One conclusion is that there is an interest in the construction sector to use reused construction products and that it will increase in the future. Another conclusion is that by using reused construction products, the construction sector´s waste volumes can be reduced and contribute to a circular construction.
|
84 |
Analýza vybraného podnikatelského subjektu pomocí vybraných metod / Analysis of the Selected Company by Using the Selective MethodsKouřil, Jakub January 2017 (has links)
Diplomová práce se zabývá komplexním zhodnocením aktuální situace podniku XXX s.r.o. První část práce teoreticky obsahuje jednotlivé analýzy, které jsou využity v analytické části. Analytická část práce zhodnocuje externí, sektorové a interní okolí firmy. Dále stručně analyzuje finanční zdraví podniku. Na základě provedených analýz s přihlédnutím na specifika podniku jsou formulována doporučení a opatření vedoucí ke zlepšení současné pozice na trhu.
|
85 |
Propuesta de aplicación de elementos prefabricados de concreto armado para mejorar la productividad en la construcción de edificios multifamiliares en Lima / Proposal for the application of precast reinforced concrete elements to improve productivity in the construction of multifamily buildings in LimaPerez Santamaria, Sandra Pamela, Soplin Diapiz, Luz Clarita 18 February 2022 (has links)
La industria de la construcción de viviendas en Lima, tiene como principal característica la aplicación de métodos de construcción tradicionales, basados en construcción in situ. Los procesos constructivos implican una serie de actividades de gran complejidad que muchas veces alteran la producción y dificultan el eficiente empleo de los recursos. Por ejemplo, la alta demanda de mano de obra genera un entorno de incertidumbre en los procesos de producción, por una mayor probabilidad a errores que generan pérdidas. En los últimos años se han hecho importantes esfuerzos para optimizar los recursos y mejorar la eficiencia y el desempeño de la construcción convencional a través de metodologías y herramientas como Lean Construction, BIM, Last Planner entre otros; sin embargo, alcanzados sus máximos posibles, no logran incrementar la productividad ni disminuir los efectos adversos de la construcción tradicional en términos reales a través del tiempo. Por ende, este estudio propone la aplicación de los sistemas constructivos prefabricados altamente industrializados en la construcción del casco estructural de viviendas multifamiliares con el objetivo de elevar la productividad a los estándares internacionales. Del estudio se encontró una reducción del 5% en el costo por metro cuadro de construcción y una reducción en el plazo y el costo de la mano de obra del 26% y 61% respectivamente. Se puede concluir que el método de construcción por prefabricados permite incrementar la productividad dado un eficiente empleo de los recursos como la mano de obra, materiales y el tiempo de construcción. / The main characteristic of the housing construction industry in Lima is the application of traditional construction methods, based on on-site construction. Construction processes involve a series of highly complex activities that often alter production and hinder the efficient use of resources. For example, the high demand for labor generates an environment of uncertainty in the production processes, due to a greater probability of errors that generate losses. In recent years, significant efforts have been made to optimize resources and improve the efficiency and performance of conventional construction through methodologies and tools such as Lean Construction, BIM, Last Planner, among others; however, having reached their maximum possible levels, they fail to increase productivity or reduce the adverse effects of traditional construction in real terms over time. Therefore, this study proposes the application of highly industrialized prefabricated construction systems in the construction of the structural hull of multi-family homes with the aim of raising productivity to international standards. The study found a 5% reduction in the cost per square meter of construction and a reduction in the term and cost of labor of 26% and 61%, respectively. It can be concluded that the prefabricated construction method allows increasing productivity due to an efficient use of resources such as labor, materials and construction time. / Tesis
|
86 |
Propuesta de uso de la herramienta dynamo para optimizar el tiempo en el proceso de valorización de subcontratistas de acabados en edificios multifamiliares menores de 10 pisos de NSE A y B ejecutado por una Pyme constructora en Lima Metropolitana / Proposal for the use of Dynamo software to optimize time in subcontractor’s schedule of values of finishes process in less than 10-story multi-family buildings of Socioeconomic Status A & B executed by a small and medium-sized construction enterprise in Metropolitan LimaChavez Guerrero, Rodrigo Americo, Vilchez Chung, Sebastian Rodrigo 25 June 2021 (has links)
Lima es el principal escenario de desarrollo de proyectos de vivienda, por ello es una importante fuente de oportunidades para las empresas constructoras. Un significativo porcentaje de estas lo conforman pequeñas y medianas empresas, que buscan estrategias para competir en el mercado. Por ejemplo, la canalización de sus actividades a través de la subcontratación.
En este escenario, suelen presentarse dificultades en el proceso de valorización de los subcontratistas de las partidas de acabados, dado que son tareas que requieren de mayor tiempo y detalle para validar. Estos problemas son resueltos de manera sintomática porque no se trabaja con herramientas que permitan anticiparlos ni entenderlos en su totalidad.
El objetivo de la presente investigación es desarrollar una propuesta de solución frente a los problemas identificados, a través de la implementación de una herramienta de programación visual (Dynamo) dentro de un entorno de trabajo BIM, que permita optimizar el tiempo en el proceso de valorización de subcontratistas de acabados en edificios multifamiliares menores de 10 pisos de NSE A y B ejecutado por una PYME constructora en Lima Metropolitana.
Se realizaron entrevistas a profesionales encargados de realizar las valorizaciones para identificar las principales deficiencias que se presentan en este proceso y de esta forma, plantear la propuesta de solución.
Finalmente, se realizó la validación de la propuesta de solución a través del juicio de expertos, como resultado de las opiniones emitidas por estos y su nivel de interés percibido se concluyó que la propuesta sería de gran aporte en una posible implementación. / Lima has been the main scenario for the development of building projects, which makes it an important source of opportunities for construction enterprises. A significant percentage of these are made up of small and medium-sized enterprises (SMEs), which constantly seek strategies to compete in the construction industry. One of these is assigning their activities through subcontracting.
In this common practice, difficulties often arise in subcontractor’s schedule of values of finishes process, since they are tasks that demand more time and detail to track the progress, even more critical situation in projects with a reduced site-based staff. These problems are solved symptomatically because they do not work with tools for anticipate or understand them entirely.
The objective of this research is to develop a proposed solution to the problems identified, through the implementation of a visual programming tool (Dynamo) within a BIM environment, for optimize time in subcontractor’s schedule of values of finishes process in less than 10-story multi-family buildings of Socioeconomic Status A & B executed by a construction SME in Metropolitan Lima.
In order to identify the main deficiencies that appears in traditional process, interviews were conducted with in-charge professionals of subcontractor’s schedule of values of finishes. Then, collected information was analyzed to propose a solution for the problem.
Finally, the proposed solution was validated through expert judgment, which through the opinions expressed by the professionals and their perceived level of interest, it was concluded that the proposal would be of great contribution in a possible implementation. / Tesis
|
87 |
Hur gör man projektledare till innovatörer? : En analys av projektledares arbetsprocess inom byggbranschen / How to make project managers into innovators : An analysis of a project manager’s work process within the construction industryMöllerberg, Erik, Tingelöf, Gustav January 2021 (has links)
Aim - The purpose of this thesis is to examine the possibilities for feedback and learning in the construction sector. In addition, it is also examining the possibilities of how to get employees involved into new solutions in a more flexible way. Theory - Innovation as a science field within construction bases much of its theories on Rogers, Schillings, Slaughters and Tatum’s work on innovation models and how they affect the implementation of the innovation. The theories also regard innovation diffusion and its focus on different actors and how they adapt to an innovation over time and about different key individuals such as Champions and Gatekeepers and their role in spreading the innovation. Method - This thesis is a qualitative study with an inductive approach which was conducted as a case study on a consultant company in Uppsala, Sweden which is active in the construction industry. 10 interviews were conducted with different project managers and two more interviews with individuals with connection to their work. In addition, an observation study was also carried out. Findings - The results showed that the innovation process is not prioritized due to time requirements and that it is not the main task of the consultant to be innovative. They should rather focus on delivering a stable product for its customers. However, the co-workers do overall want to be more innovative but the current way of spreading and delivering new solutions might not be the best suitable way based on the time it requires for them to engage in the innovation. Conclusion - The conclusion is that key individuals could be implemented and reduce other colleagues’ workload in the innovation work by absorbing ideas and new innovations. And summarize and visualize its benefits to the entire team.
|
88 |
Hur byggbranschen är i gasen : Om medvetenheten och byggsektorns utsläpp av växthusgaser / The construction industry and greenhouse gas emissions : The awareness about greenhouse gas emissions in the construction sectorLarsson, Alva January 2022 (has links)
Det här arbetet är forskningsresultatet av den studie som genomförts för att försöka hitta de gemensamma nämnarna mellan byggbranschen och klimatkrisen. Under den utbildning som författaren erhållit har stora delar av undervisningen varit kopplad till branschens klimatpåverkan och den obefintliga klimatmedvetenhet som branschen tycks ha. Då samhällets klimatåtgärder kanske är den viktigaste frågan idag är författaren intresserad av att se hur de teoretiska påståendena om byggandet och miljön faktiskt överensstämmer med den praktiska verkligheten. Att läsa om byggande och arkitektur är en sak, men det som fysiskt sker i branschen är minst lika avgörande. Därför är det av vikt att även arkitektstudenter studerar den praktiska verkligheten, vilket är anledningen till att denna rapport kommit fram. Forskningen syftar till att visa på den enkelhet som krävs för att lösa och förena flera komplexa system med utgångspunkt i att förstå vad byggbranschens utsläpp av växthusgaser beror på och hur detta kan minskas på lång sikt. Här inkluderas hur byggindustrins aktiva hantverkare och aktörer som eventuellt redan nu försöker påverkar industrins omställning mot klimatneutralitet tänker och gör samt hur de högre insatserna arbetar i frågan. Forskningen har bedrivits genom två fall, en svensk Stor stad och en svensk Mindre stad, där jämförelser i planarbetet och hållbarhetsarbetet kring byggbranschen är utrett. På så sätt är denna forskning triangulerande. En databassökning är även gjord för att med teoretisk kunskap stödja fallstudien och intervjuerna. Flera nyckelpersoner från hela branschens värdekedja har intervjuats för att få en förståelse för hur arbetet sker på alla nivåer samt att se attityden och hur kunskapsnivåerna är. Forskningen visar att klimatkrisen inte hör hemma i våra liv om vi vill rädda kommande generationer. Klimatkrisen förenar en värld- samhällen och näringslivet, och tvingar oss att hitta nya lösningar för en gemensam morgondag. Och byggindustrin har ett ansvar i det arbetet precis som alla andra. För precis som misstänkt finns det i världen, EU och Sverige ett väletablerat arbete för att motverka klimatkrisen och uppnå klimatneutralitet till år 2045, men att det arbetet inte följs upp och arbetas med på ett tydligt sätt hos de privata byggherrarna. Orsakerna till detta är många. Bland annat dåligt specificerade lagar och regler men också en stor klyfta i den generella kunskapsnivån bland myndigheter och branschens hantverkare eller utförare. / This work is the research result of the study conducted to try to find the common denominators between the construction industry and the climate crisis. During the education that the author has received, large parts of the teaching have been linked to the industry's climate impact and the non-existent climate awareness that the industry seems to have. As society's climate measures are perhaps the most important issue today, the author is interested in seeing how the theoretical claims about construction and the environment actually correspond to the practical reality. Reading about construction and architecture is one thing, but what happens physically in the industry is at least as crucial. Therefore, it is important that architecture students also study the practical reality, which is the reason why this report has been published. The research aims to show the simplicity required to solve and unite several complex systems based on understanding what the construction industry's greenhouse gas emissions depend on and how this can be reduced in the long term. This includes how the construction industry's active craftsmen and actors who may already be trying to influence the industry's transition to climate neutrality think and do, as well as how the higher efforts work in the issue. The research has been conducted through two cases, a Swedish Large City and a Swedish Small City, where comparisons in the planning work and sustainability work around the construction industry have been investigated. In this way, this research is triangulating. A database search is also done to support the case study and the interviews with theoretical knowledge. Several key people from the entire industry's value chain have been interviewed to gain an understanding of how the work is done at all levels and to see the attitude and how the knowledge levels are. Research shows that the climate crisis does not belong in our lives if we want to save future generations. The climate crisis unites world societies and business, and forces us to find new solutions for a common tomorrow. And the construction industry has a responsibility in that work just like everyone else. Just as suspected, there is in the world, the EU and Sweden a well-established work to counteract the climate crisis and achieve climate neutrality by the year 2045, but that this work is not followed up and worked on in a clear way by the private builders. The reasons for this are many. Among other things, poorly specified laws and regulations but also a large gap in the general level of knowledge among authorities and the industry's craftsmen or performers.
|
89 |
Drömkandidaten : En kritisk diskursanalys om hur den ideale sökande konstrueras i platsannonser inom bygg- och fastighetssektorn / The Dream Candidate : A critical discourse analysis of how the ideal applicant is constructed in job advertisements in the construction and real estate sectorÅström, Ida January 2018 (has links)
The purpose of this bachelor thesis is to investigate how an ideal job applicant is described when searching real estate janitors and real estate managers in job advertising using a Swedish linguistic perspective. This is achieved by looking at how the model reader is constructed i.e. if the ways to describe the two occupational groups differ, if the descriptions tend to include or exclude groups of applicants, and if and how a relationship is created between the employer and the recipient and if so what kind of relationship. The material consists of ten job advertisements where the employer is looking for real estate janitors and ten job advertisements where the employer is looking for real estate managers. The choice of method for the study is systemic functional grammar, critical discourse analysis and gender coding. Theoretically I also start from the systemic functional grammar and the critical discourse analysis, though with an emancipatory approach. The descriptions of the dream candidates that is created in the ads differ between the two occupations. Real estate janitor is a job which requires more practical skills, while the job as a manager requires more theoretical skills. The ideal real estate janitor has equal numbers of masculine and feminine qualities. The dream candidate is self-propelled, service-oriented and is able to plan the working day in an efficient way. Since the employer seems to have a dominant attitude towards the janitor their relationship tends to not be very close. The ideal dream candidate created for real estate managers is also very self-sufficient, but he or she also has a strong internal drive and likes to run projects in combination with a strong sense of responsibility. The ideal real estate manager has a little more feminine than masculine qualities. The relationship between the employer and the ideal real estate manager is more symmetrical than the relationship that is constructed with the ideal real estate manager.
|
90 |
Energieffektivisering – Vintergjutning : En studie om gjutning av platta på mark vintertid / Energy efficiency- winter casting of concreteReinberth, Amanda, Björk Ryttar, Emma January 2022 (has links)
Betong är ett byggmaterial som allt fler byggnader byggs av. Byggnaden kan vara uppbyggda av platsgjutna eller förtillverkade betongelement. Vid platsgjutning av betongelement är det av vikt att tänka på att betongens egenskaper ska anpassas till byggnadens krav samt väderlekens förutsättningar. Byggnadsdelar av betong är kritiska att gjuta vintertid. Det beror på att betongen inte får frysa innan konstruktionen uppnått 5 MPa i hållfasthet samt att nerkylning av konstruktionen kan bromsa hållfasthetsutvecklingen. Bygg- och fastighetssektorn svarar för 35% av landets totala energianvändning. En av många bidragande faktorer är gjutning av betong vintertid. I dagens läge är värmekablar vanligt förekommande för att underlätta gjutning av betong vintertid. Syftet med studien är att studera metoder för att minska energianvändningen vid gjutning av betong vintertid med avseende platta på mark på Byggdialogs byggarbetsplatser. Målet är att föreslå energieffektiviserande åtgärder som kan användas av Byggdialog för att bli mer energieffektiva. Studien avgränsas till att undersöka gjutning av platta på mark vintertid för nybyggnationen av Mora Lasarett. Studien avgränsas även till att endast undersöka hållfastheten för betong den första 10 dygnen. För att besvara rapportens frågeställning och syfte används metoderna: litteratur och dokumentstudie, webbaserad enkät, material från byggarbetsplatsen,beräkningar för energiåtgång och koldioxidutsläpp samt simuleringsprogram PPB ProduktionsPlanering Betong. Genom programmet PPB ges mätdata för temperatur och hållfasthet över tid för betong. Rapportens resultat visar att den mest energieffektiva åtgärden för att gjuta betong vintertid utan risk för för frysning och nedsatt hållfasthet är att applicera cellplast 100 mm. Andra icke energianvändande metoder för gjutning av betong är isoleringsmattor/vintertäckmattor, väderskydd, högre temperatur vid gjutning samt att tilläggsisolera formen. / Concrete is a commonly used building material in today's constructions. Buildings made of concrete are either cast in place or prefabricated. It's important to consider the properties of concrete while casting in different temperatures and weathers. Casting in winter is a critical moment. If the concrete freeze before it reaches 5MPa in strength it can slow down the process and possibly destroy the element. The construction sector answers for 35% of Sweden's total energy use. One of the contributing factors is winter casting. Electric heating cables are a commonly used method during winter casting. The purpose of this report is to study the energy consumption while casting a concrete slab in the winter at one of Byggdialogs construction sites. The goal is to find a more energy-efficient method for Byggdialog so they can become more sustainable. The methods used in this report are literature-and document study, web-based survey, calculations, and simulations in the PPB program. The results show the case where the concrete was covered with a 100 mm thick cellular plastic insulation is the best alternative for casting in the winter without jeopardizing the strength development. Other methods presented in this report are insulation mats, weather protection, young concrete that is heated, and also insulating the form.
|
Page generated in 0.1362 seconds