• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5
  • Tagged with
  • 5
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Partnering : Möjligheter och risker / Partnering : Opportunities and risks

Delimedjac, Emina, Sinik, Nelly January 2019 (has links)
Denna studie är gjord i samarbete med NOCA Teknik AB som är ett projekt- och byggledningsföretag med bas i Göteborg. Partnering, även kallat utökad samverkan, är ett relativt nytt arbetssätt i Sverige. Partnering utgår ifrån att alla parter i byggprojektet samarbetar och använder sig av öppna böcker gällandeekonomi projektering, planering, beslut och dokumentation. Partnering går ut på att alla i projektet, entreprenör, konstruktör, arkitekt projektledare mm, samarbetar och använder sig av varandras erfarenhet och kunskap. På så sätt nås de gemensamma målen där alla arbetar mot samma vision. Rapporten behandlar möjligheter och risker med partnering, dessa skildras utifrån beställare och entreprenörers erfarenheter. Till hjälp i studien har en enkätundersökning utförts där 23 svar mottagits. Möjligheterna med partnering är många. En av de största möjligheterna är att som entreprenör få vara med och påverka projektet redan i planering och projekteringsskede. Detta är ett bra sätt att undvika oförutsedda kostnader senare i projektet. En risk med partnering är att kostnaderna ökar på grund av ökad bemanning och projektering. Det är en faktor som måste vägas mot möjligheten att projektet ska kunna bli klart fortare än beräknat. Ytterligare en risk som flera respondenter i enkätundersökningen har påpekat är ombyggherren inte är engagerad genom hela projektet. Detta leder ofta till att partneringprojektet misslyckas och att flera parter blir missnöjda och i framtiden negativt inställda till partnering. / This study was conducted in collaboration with NOCA Teknik AB, a project and construction management company based in Gothenburg, Sweden. Partnering, also known as extended collaboration, is a relatively new way of working in Sweden. Partnering assumes that all parties in the construction project collaborates and use open books concerning financial planning, planning, decisions and documentation. Partnering is that everyone in the project, contractor, designer, architect project manager etc., collaborates and uses each other's experience and knowledge. In this way, the common objectives are reached where everyone works towards the same vision. The report deals with the opportunities and risks of partnering, these are portrayed from the experience of the client and contractors. For help in the study, a survey was conducted where 23 responses were received. The possibilities of partnering are many. One of the biggest opportunities is that as an entrepreneur you have to influence the project already in the planning and design stage. This is a good way to avoid unforeseen costs later in the project. A risk with partnering is that costs increase due to increased staffing and design. It is a factor that must be balanced against the possibility that the project will be clearly faster than expected. Another risk that several respondents in the survey has pointed out is whether the developer is not engaged throughout the project. This often leads to a failure of the partnering project and the dissatisfaction of several parties and, in the future, a negative attitude towards partnering.
2

Jämförelse av projekteringsrelaterade avvikelser i ROT-projekt mellan entreprenadformer / Comparison of design-related deviations in Restoration, Reconstruction and Extension projects between contractforms

Block, Maria, Sundell, Ida January 2020 (has links)
Generellt i byggbranschen avslutas sällan ett projekt utan att ha stött på hinder. För Region Uppsala har ROT-projekt, som står för renovering, ombyggnad och tillbyggnad, ofta slutat dyrare än förväntat. Det är vanligt att beskylla projekteringen men en kartläggning av anledning till uppkomst av kostnadsdrivande avvikelser finns inte i dagsläget, eller om entreprenadform har någon påverkan. Detta är ett examensarbete inom byggteknik vid Uppsala Universitet på 15 hp och är utfört tillsammans med Region Uppsalas förvaltning Fastighet och Service som ansvarar för Regionens fastighetsbestånd. Deras uppgifter består av uthyrning, ombyggnad, nybyggnad och skötsel för drift av fastigheterna. Projektavdelningen är den avdelning på förvaltningen som driver de större bygg- och installationsprojekten. Deras största beställare är Akademiska sjukhuset. Syftet med arbetet är att kartlägga de kostnadsdrivande avvikelser som uppkommer i ROT-projekt för respektive entreprenadform, och målet är att undvika återkommande avvikelser i Fastighet och Service framtida ROTprojekt. Arbetet består dels av en litteraturstudie för att ge en fördjupning inom ämnet och förståelse för dagens problematik. Vidare har sju ROT-projekt tillhandahållna av Fastighet och Service analyserats i fallstudier. Projekten var begränsade till 15 miljoner i entreprenadpris för att fler projekt skulle kunna analyseras och bestod av både total- och utförandeentreprenader. En jämförelse gjordes mellan dessa. Utöver detta utfördes intervjuer med projektledare hos Fastighet och Service om deras erfarenheter och tankar kring ämnet. I detta arbete har en kartläggning över upprättade avvikelser gjorts och statistiken presenteras för varje projekt samt sammanlagt för entreprenadformerna. Resultatet visar att projekteringsprocessen består av flera skeden och det kan vara svårt att påvisa i vilket projekteringsmissarna grundar sig i. Sammanlagt bestod dessa av en tredjedel av de upprättade avvikelserna men det fanns andra orsaker som bidrog till större kostnader. Utifrån intervjuerna framkom det att upprättade avvikelser inte ligger till grund för val av entreprenadform utan andra parametrar var mer väsentliga. I slutsatsen presenteras för- och nackdelar för båda entreprenadformerna.
3

Beställarens syn på offentlig upphandling av byggentreprenader / Purchasers’ perspective on procurement of public works

Gylin Janoff, Adrian, Sandén, Emil January 2016 (has links)
Syfte: Lagen om offentlig upphandling tillämpas av alla myndigheter som upphandlar varor, tjänster och byggentreprenader med skattepengar. Syftet med denna studie är att få insikt över hur offentliga beställare tänker när de genomför upphandlingar av byggnader. Målet är att lista de faktorer som påverkar beslutfattandet angående kort och långsiktiga aspekter när en offentlig myndighet skall handla upp byggentreprenader samt att få förståelse för vilka egenskaper krävs av beställare för att kunna utföra enupphandling. Metod: Genom litteraturstudier undersöks hur lagen om offentlig upphandling är utformad, och vilka arbetsuppgifter en beställare har. Vidare studeras hur det kan bli fel och vilka konsekvenser som kan förekomma ifall beställaren upphandlar olagligt. I intervjuerna framkommer praktisk erfarenhet som beställare och fastighetsförvaltare har av LOU, hur de arbetar för att få fram den produkt de vill ha och vad som anses vara besvärligt med lagen. Resultat: Studien visar att beställarens arbete är omfattande och risken är stor att göra fel i upphandlingen. Egenskaper som påverkar beställarens arbete inkluderar erfarenhet, kompetens, branschkunskap. I litteraturstudien framkommer att ett anbud kan vinnas med lägsta pris, eller med ekonomiskt mest fördelaktiga anbud. Det sistnämnda beslutas genom att analysera mjuka parametrar, exempelvis driftkostnader, anbudsgivares organisation, genomförandetider m.m. Faktorer som påverkar beställarens valmöjligheter angående kort- och långsiktiga aspekter beror på branschkunskap, LOU:s utformning, organisationens struktur, politiska policys, miljöcertifieringar, entreprenadformer och byggnadens användningsområde. Mjuka parametrar kan vara svåra att kontrollera och kan leda till överklagan. De som ofta analyseras i dagsläget utöver pris är entreprenörens organisation. Pris är alltid en parameter som beställare analyserar och ofta den enda parameter som granskas. Konsekvenser: LOU finns för att gynna konkurrensen i landet och i EU. Vissa delar av lagen hämmar beställarens valmöjligheter och kan göra deras arbete krångligt att genomföra. Det är bra för alla som arbetar med LOU att förstå hur en beställare resonerar kring kvalitéer för en byggnad och hur de arbetar med anbudsutvärderingen. Begränsningar: Studien är begränsad till offentliga beställare som arbetar i kommuner med ca 100 000 invånare i storlek. Intervjuerna är begränsade till beställare och förvaltare. Studien undersöker beställares resonemang som arbetar med byggentreprenadupphandlingar. / Purpose: The law of public procurement is used by all governments who procure products, services and public works using tax funds. The purpose of this study is to acquire an overview of how public purchasers’ reason regarding procurement of public works. The aim of this study is to list factors that affect decision-making regarding short and long-term aspects when a public government is to purchase public works, and to acquire an understanding of what personal qualities are needed to undergo a procurement. Method: Literature studies examine how the law of public procurement is designed,and what tasks a procurer has. Further studies are made on how things can go wrong and what the consequences can be if the purchaser undergoes an unlawful procurement. The interviews illustrate practical experience that procurers and property managershave on the law of public procurement, how they go about acquiring their wanted product and their views on what is problematic about this law. Findings: This study shows us that the procurers work is comprehensive and that there is a big risk of doing something wrong in the procurement. Qualities that affect aprocurer’s work include experience, competence and knowledge of the industry. The literature studies show that a bid can be won by the lowest cost, or by the most economically advantageous tender. The latter is determined through analysing soft parameters, such as operating costs, the bidders’ organisation, production times and more. Factors that affect the procurers options regarding short and long-term aspects depends on industry knowledge, configuration of the public procurement law, structure of the organisation, political policies, environmental certifications, type of contracting and the usage of the building. Soft parameters can be difficult to control and can lead to a judicial appeal. What is currently analysed other than price is usually is the organisation of the contractor. Price is always a parameter that procurers analyse and often the only one. Implications: The public procurement law exists to favour competition in the nationand in EU. Some parts of law inhibits procures’ options and can make their work difficult to carry out. How procurers’ reason on choice of qualities of buildings and how they work with evaluating bids are good things to know for anyone involved with the public procurement law. Limitations: This study is limited to public procurers working in municipalities of about 100 000 inhabitants. The interviews are restricted to procurers and property managers. The study investigates how buyers working with procurement of public works reason.
4

FÖRFRÅGNINGSUNDERLAG-TOTALENTREPRENAD : BYGGNATION AV DUBBELSPÅRFUNKTION GODSSTRÅKET HALLSBERG- DEGERÖN DELEN STENKUMLA-DUNSJÖ

Mofti, Wirya January 2014 (has links)
Turnkey contract is a commonly used form of contract for procurement of projects, however not so common when it comes to rail infrastructure, because railway installations are so complex and makes greater demands on availability and traffic safety. Performance contracts have occurred in railway projects for a long time. The Swedish Transport Administration has received directives from the government to push for increased productivity and increased degree of innovation in the construction industry. The Swedish Transport Administration has the ambition to transform its role as a client to create the conditions for the market and its driving forces for increased innovation and productivity by handing over a greater commitment and responsibility to the contractors. A strategic primary focus is to increase the proportion of turnkey projects within the construction industry. Contracts relating to investments between 25-500 million will be procured through turnkey projects. The purpose of this report is to identify how the market views the specifications with emphasis on object-specific technical description, its calculability, structure and clarity. The section that has been analyzed in this report is the construction of the freight line between Stenkumla - Dunsjö that is part of the whole distance between Hallsberg - Degerön. Interviews were conducted with entrepreneurs who have participated in the bidding contest. The purpose of the interviews was to get the contractors' views on the specifications that can be taken into account in future projects. Responses will be analyzed by the Swedish Transport Administration and taken into account for the development of future specifications in turnkey contracts for the construction industry. OTB for the route Stenkumla - Dunsjö, entrepreneurs are not allowed to come up with innovative solutions, since the specifications contain many technical solutions specified by the Swedish Transport Administration. The contractors want more freedom in the specifications in order to provide innovative solutions. One reason that there are many technical solutions in this project is because, the project was meant to be procured as performance contract and Traffic Authority had already planned a lot before they decided to purchase it as Turnkey contract. / Totalentreprenader är vanligt förekommande entreprenadformen vid upphandling av projekt dock inte så vanligt när det gäller järnvägsanläggningar eftersom järnvägsanläggningar är så komplexa och ställer större krav på tillgänglighet och trafiksäkerhet. Utförandeentreprenader har varit entreprenadformen som har förekommit vid järnvägsprojekt under en längre tid. Trafikverket har fått direktiv från regering att verka för ökad produktivitet och ökad innovationsgrad i anläggningsbranschen. Trafikverket har som ambition att förändra sin roll som beställare för att skapa förutsättningar för marknaden och dess drivkrafter till ökas innovation och produktivitet genom att överlämna ett större åtagande och ansvar till entreprenörerna.   En strategisk huvudinriktning är att öka andelen totalentreprenader inom anläggningsbranschen. Entreprenader som avser investeringar mellan 25 – 500 Mkr ska 50 % av entreprenaderna upphandlas genom totalentreprenader. Syftet med denna rapport är att kartlägga hur marknaden ser på förfrågningsunderlaget med tonvikt på det objektspcifik tekniska beskrivningen, dess kalkylbarhet, struktur och tydlighet. Sträckan som har i denna rapport analyserat är byggnationen av godsstråket mellan Stenkumla – Dunsjö som är en del av hela sträckan mellan Hallsberg – Degerön. Intervjuer har utförts med entreprenörerna som har deltagit i anbudstävlingen. Syftet med intervjuerna har varit för att få entreprenörernas synpunkter på förfrågningsunderlaget som kan tas hänsyn till i kommande projekt.  Svaren kommer analyseras av Trafikverket och tas i hänsyn till utvecklingsarbetet av framtida förfrågningsunderlag inom totalentreprenader för anläggningsbranschen. OTB för just sträckan Stenkumla – Dunsjö, tillåts inte entreprenörerna komma med innovativa lösningar eftersom förfrågningsunderlaget innehåller många tekniska lösningar som angivits av Trafikverket. Entreprenörerna vill ha mer frihet i förfrågningsunderlagen för att kunna bidra med innovativa lösningar. En anledning till att det finns många tekniska lösningar i detta projekt är att det finns en beslutad järnvägsplan. Järnvägsplanen styr utformningen av anläggningen.
5

FÖR EN ÖKAD ANVÄNDNING AV DIGITALA VERKTYG I BYGGPRODUKTIONEN : En studie om vad som krävs för att byggbranschen ska digitaliseras i takt med omvärlden / FOR AN INCREASED USE OF DIGITAL TOOLS IN CONSTRUCTION PHASE : A study of how the construction industry can be digitized in line with the society

Lisstrand, Johanna, Sikell Lundin, Peter January 2017 (has links)
Bakgrund: I dagens samhälle går den digitala utvecklingen ständigt framåt inom flera olika områden. Inom byggbranschen blir projekten allt mer komplexa och installationstekniskt avancerade. Samtidigt haltar arbetsmetoderna inom byggproduktionen efter och kan i vissa fall upplevas som föråldrade. För att hänga med övriga branscher både när det kommer till teknik och metoder behöver byggföretag satsa på frågor som rör användandet av digitala verktyg inom byggproduktionen. Syfte: Forskningen visar på en vinst för byggprojekt inom både tids- och kostnadseffektivisering vid användning av BIM och digitala verktyg i byggprojekt. Med denna utgångspunkt kommer examensarbetet rikta in sig på att undersöka orsaken till den begränsade användningen av digitala verktyg i produktionen. Rapporten vill också belysa svårigheterna i användning av digitala verktyg där extra fokus kommer att ligga på 3D-modeller och arbetet med tidsplaneringen i produktionen. Metod: Teori inom ämnet har inhämtats dels genom litteratur men också i form av tidigare studier. Genom kvalitativa intervjuer och en större kvantitativ enkätundersökning önskade författarna att kunna besvara rapportens frågeställningar. Båda metoderna jämfördes för att undersöka om svårigheterna med användning av digitala verktyg delades av centrala resurser på Skanskas huvudkontor och ute hos medarbetarna i produktionen och hur utbrett problematiken var på Skanskas olika projekt. Resultat: Viljan att börja arbeta mer digitalt finns redan hos medarbetarna. Okunskap och brist på erfarenhet leder till att digitala verktygen upplevs som besvärliga istället för något som hjälper medarbetaren i dess vardag. Med rätt resurser och utbildningen kommer ett ökat användande av digitala verktyg inte vara en omöjlighet för byggbranschen inom en snar framtid. Konsekvenser: En ökad användning av digitala verktyg genom hela byggprocessen har flera fördelar. Företaget kommer klara av allt mer komplexa projekten och få en ökad operativ effektivitet som i sin tur leder till nöjdare kunder, medarbetare och en högre kvalité på slutprodukten. En ökad digitalisering kommer med stor sannolikhet göra företaget mer attraktivt på arbetsmarknaden. Avgränsningar: Rapporten är avgränsad mot byggproduktionens användning av digitala verktyg, med ett extra fokus på 3D-modeller och tidsplanering. Dessutom har författarna valt att även avgränsa rapporten till Skanska Sverige AB:s arbete med ett utökat användande av digitala verktyg. / Background: In today's society, the digital development is constantly advancing in several different areas. In the construction industry, the projects are getting more complex and installations more advanced. At the same time, working methods in the construction industry get behind other industries and may in some cases be perceived as outdated. In order to keep up with other industries when it comes to technology and methods, construction companies need to focus on issues related to the implementation of digital tools in construction phase. Purpose: Research shows a profit for construction projects in both time and cost efficiency when using BIM and digital tools in construction projects. With this starting point, the bachelor thesis will focus on investigating the reason for the limited use of digital tools in production. The report also wants to highlight the difficulties in using digital tools with extra focus on 3D-models and the work on scheduling in production. Method: Theory of the subject has been obtained partly through literature but also in form of previous studies. Through qualitative interviews and a larger quantitative questionnaire survey, the authors wanted to be able to answer the report's questions. Both methods were compared to investigate whether the difficulties with using digital tools were shared by the central resources at Skanska's headquarters and the coworkers in the production and how widely the problem was on Skanska's various projects. Result: The willingness to start working more digital already exists among coworkers. Lack of knowledge and experience leads to that digital tools are experienced as difficult instead of something that will helps employee in the everyday work. With the right resources and education, increased use of digital tools will not be an impossibility for the construction industry in the near future. Consequences: I ncreased use of digital tools throughout the construction process has several advantages. The company will be able to handle more complex projects and increase their operational efficiency which in turn leads to satisfied customers, coworkers and a higher quality on the final product. Increased digitization will most likely make the company more attractive in the labor market. Restrictions: The report is limited to the construction phase use of digital tools with an additional focus on 3D-models and scheduling. In addition, the authors have chosen to delimit the report to Skanska Sweden AB's work on increasing the use of digital tools.

Page generated in 0.0156 seconds