291 |
Polyfunkční dům / Mixed-use buildingNejedlý, Petr January 2020 (has links)
The subject of this thesis is a new mixed-use building in Brno in the part of Pisárky. The building will have one basement and four aboveground floors. In the basement will be a collective garage and apartment accessories. In the ground floor are designed offices for rent. On the first to fourth floor are designed eight flats. The main entrance to the building and the entrance to the property is situated on the northeast side of Vinařská street. The mixed-use house is designed from a wall structural system. The basement basement, first floor and staircase space is designed of lime-sand blocks, with a ceiling construction of monolithic iron concrete slabs. The bearing structure of the second to fourth floors is designed as a timber structure building. The roof structure will be double-skinned, flat with a vegetation layer with extensive greenery.
|
292 |
Hodnocení úspěšnosti developerského projektu / The Evaluation of Development ProjectŠrom, Marek January 2009 (has links)
The master's thesis is focused on evaluation of development project for the purpose of recommendation, how the company should continue with the project in the future. The analysis of the commercial real estate market and evaluation of up-to-date financial results are included. In the practical part, alternatives of selling the project and the prediction of future progress in case of lease-continuation are compared.
|
293 |
Administrativní objekt / Commercial buildingTejkl, Jakub January 2013 (has links)
The master thesis „ Administrative object“ is processed as a project for building construction. The object is situated on plots No. 651/1 and 652/1 in the Brno. The building is designed to use for administration, 1 st floor is used for gallery, sweet-shop, newspaper shop and garrage. The house hasn´t cellar, it has 3 aboveground floors. The skeleton of construction is designed from reinforced concrete, walls are from brick-walled POROTHERM. Roofing is designed from reinforced concrete board. The building will be roofed with arched trusses with metal roofing. In 2nd and 3rd floor are situated offices, meeting rooms, conference halls and social background. The work includes the study of building and heat considerations.
|
294 |
Stanice technické kontroly / Technical inspection stationSmolík, Jindřich January 2013 (has links)
This thesis deals with a new building technical control station, office space and hotel. The building is situated on three floors, on the first floor we find technical inspection station and office premises manual technical lines. On the second floor there are offices. On the third there is a hotel. The building is designed by a rectangular shape with a flat roof and on the third floor there is a trafficable terrace. The supporting structure consists masonry Porotherm and reinforced concrete system columns, which is found only on the first floor. The supporting structure of tensioned ceiling consists of prestressed beams ceilings Spiroll a concrete slab. External surface finish on the first floor is made up of silicate plaster paste and the remaining two floors are made of ventilated facades. Utility room is located on the first floor, from where a chimney Schiedel is build. Most of the floor space in the building are made of a carpet or tiles, only in the service line is epoxy coating
|
295 |
Multifunkční objekt - Mikulov / Multifunctional facility - MikulovNovotný, Miloslav January 2016 (has links)
Diploma thesis is focused on design and elaboration of detailed design of multifuncional object in Mikulov na Morave, the parcel number 6905, 6910 and 6919. Proposition of the object respects both commune plan and current street buildings. It‘s not supposed to create stress with its shape and size, but complete actual buildings. It has three elevated floors, one basement and mono - pitched roof. Object has laboratories, offices and conference room, it‘s determinate for study purpose.
|
296 |
Polyfunkční dům / Polyfunctional BuildingBulíček, Jakub January 2017 (has links)
This diploma thesis (A POLYFUNCTIONAL BUILDING) was prepared at the level of a project documentation. The theme of this diploma thesis is a project of the polyfunctional building with offices, tenis club and coffe room. The projected building should be located in the city Jemnice. The house is designed as the FIVE-floor building, with partial basement. The house is built of brick blocks POROTHERM, in basement od concrete blocks. The ceilings of the house are made out of fundamentals roofs Miako. The partitions are combination of brick systems POROTHERM and Rigips plasterboard partitions. The roof is flat double-coated Fatrafol foil.
|
297 |
Zdravotně technické instalace obchodně administrativních center / Plumbing Systems for Shopping and Office CentresHošek, Petr January 2017 (has links)
THE THESIS DEALS WITH PROBLEMS OF SANITARY INSTALLATIONS IN OFFICE BUILDING WITH SHOPS IN THE CITY OF BRNO. THE THEORETICAL PART FOCUSES OPTIONS OF PREPARING HOT WATER. EXPERIMENTAL PART FOCUSES ON DRINKING WATER CONSUMPTION. ANOTHER PART FOCUSES TO OPTIONS OF SPECIALIZATION. THE LAST PART OF THESIS FOCUSES TO SELECTED SANITARY INSTALLATIONS IN BUILDING.
|
298 |
Rekonstrukce městského úřadu / Renovation of municipality officeJohn, Josef January 2017 (has links)
This thesis deals with the reconstruction of the Adamov municipality,based on a solution of barrier-free building use, overall improvement of the energy performance of the building and creation of new office spaces in the form of a loft. The object is located on a building site in the town Adamov. The object is currently connected to a III. road, parking space and utilities. It is a building with three above-ground floors and one basement floor. The ground plan of the municipality is rectangle-shaped, the maximum outline dimensions of the rectangle are 28.38 x 16.70m. Existing vertical supporting constructions are mason made of fired bricks. The roof frame structure is made of wood, construction framework stagnant stool, fired tiles are used as roofing. Floor surfaces are formed by ceramic tiles or vinyl. The entrance part is covered with a flat roof. The entrance area will be redesigned as a barrier-free, with a connection to the elevator that goes through the entire object. The sanitary facilities in the first and in the second floor will be renovated. Newly created attic floor will be – except for the lift - connected to the interior of the building by a new steel staircase and the walls on this floor will be of a light type. Holes fillings will be changed in the perimeter walls. A thermal insulation of the entire object by a contact heating system will take place. This thesis consists of preparatory work and studies, implementing documentation, text reports, calculations of the thermal technical assessment and fire safety solutions. Project documentation is made in accordance with currently valid laws, regulations and standards.
|
299 |
Essays on the effect of local offices and economic policy uncertainty in the private equity industryMettner, Sven 15 January 2021 (has links)
This cumulative dissertation aims to complement existing literature with insights on two topics gaining strong importance in the Private Equity Industry: 1) cross-border investments and 2) co-investments with portfolio firm management in times of uncertainty. Results in paper on cross-border investments suggest that the physical presence of a local office of PE firms can actually make a difference for foreign investments. With a local office, operating performance of PE firms is higher after the buyouts. Local offices are especially beneficial for performance the higher the perceived foreignness between PE firm and portfolio firm is. In addition, PE firms increase deal flow after a local office opening, do less syndicates and have higher deal volumes. Respective results imply it is worth in future research to differentiate between pure cross-border deals and deals operated through a local office. The forth paper sheds light on the positive relationship between management buyouts (MBOs) and economic policy uncertainty. Analyses indicate that access to information is a relevant channel for higher propensity of MBOs in uncertain times.:1 Introduction
1.1 Trends in private equity industry
1.2 Overview of essays
2 The Cross-Border Buyout Next Door
2.1 Introduction
2.2 Theoretical background
2.3 Data
2.4 Operating performance results
2.5 Insights from semi-structured interviews
2.6 Conclusion
3 Opening a Local Office - PE Firms' Engine for International Expansion?
3.1 Introduction
3.2 Theoretical background
3.3 Sample and data
3.4 Determinants of office openings
3.5 Impact of local offices
3.6 Conclusion
3.A Appendices
4 Entrepreneurial Activity in Times of Uncertainty: The Case of Management Buyouts
4.1 Introduction
4.2 Literature review and hypotheses
4.3 Material and methods
4.4 Results and discussion
4.5 Conclusions
4.A Appendices
References
|
300 |
Nybyggnad av konverteringsbara kontor : Praktiska och ekonomiska konsekvenser / Construction of convertible offices : Practical and Economical consequencesLöwstett, Johan, Norberg, Emil January 2015 (has links)
Frågan om hur kontorsbyggnader som är anpassade för att konverteras till bostäder är idag inte utredd för svenska förhållanden. I arbetet så visar vi hur marknadens aktörer ställer sig till konceptet. Vi redovisar vilka ekonomiska och byggtekniska förutsättningar som bör beaktas i en projektering och vilken påverkan dessa har på utformning och ekonomi. Den främsta förutsättningen för att konceptet ska fungera är var byggnaden är placerad. Det bästa läget har visat sig vara i områden där vilken verksamhet som kommer dominera är osäker eller verkar kunna ändras de kommande 10-20 åren. I det läget kan olika ekonomiska strategier användas, antingen som riskminimering vid osäker framtid eller för att på ett effektivare sätt använda marken i ett område där kommersiell verksamhet är lämpligast idag, men bostäder kommer passa bäst inom överskådlig framtid. Ifall konceptet är något som kommer kunna stärka miljöprofilen får idag sägas vara oklart. Idén har väckt störst intresse hos fastighetsägare som ser sig själva som långsiktiga med ett perspektiv som överstiger 10 år. Byggnadstekniskt så har de största utmaningarna vid konvertering av konventionella kontor identifierats till installationer och geometri. Det är inte möjligt att lösa dessa problem utan att göra avkall på andra faktorer som smalare huskroppar för att kunna placera lägenheter på ett lämpligare sätt eller andra typer av bjälklag som antingen bygger med i höjd eller ger längre produktionstid. Ekonomiskt så är den största utmaningen risken att förlora uthyrningsbar area som kan uppstå för att uppnå godtagbar geometri för bostäder. Konvertering leder till lägre nyttjande av fastigheten. Konceptet kan fungera som en lönsam försäkringspremie förutsatt att krav på exploateringen kan tillgodoses, vilket får anses vara svårt i dagsläget. Dessutom finns ett motstånd i branschen mot att betala för de merkostnader som uppstår. Risken för en fördröjd planprocess bör även ses som en kostsam faktor som minimierar möjligheter av konceptet. / The question about the construction of office buildings which are prepared to be converted into dwellings has not yet been sufficiently explored for Swedish conditions. In this report we will show how the markets participants approach the subject. We will show which conditions are necessary to consider during the construction process and the effects these have on the design and economy. The primary condition has been identified as the location of the building. It has been shown that an area where the future functions are uncertain, or susceptible to change in the coming 10-20 years, is the most suitable. In such an event different economic strategies may be applied, either as reduction of risks to answer to an uncertain future or to use the property in a more efficient way where a commercial function might be preferred today but residence will be the most suitable in a foreseeable future. As of construction, the biggest problem during conversions from offices to residence has been identified as geometry and installations. It is not possible to solve these without sacrificing different factors and may cause thinner buildings and different type of floor structures that may cause taller buildings or increased construction time. Economical, the toughest challenge is the risk of losing rentable area due to the adaptation of the buildings geometry, although key indicators are showing the efficiency of the property compared in this study indicates that there is no significant difference in that aspect. The concept might work as a profitable insurance provided that demands of development rate are met, which are considered difficult. Investment analysis shows that the building needs high vacancy rates for it to be profitable to convert the building. Apart from that there is also a resistance in the industry to pay for the additional costs that arises.
|
Page generated in 0.3366 seconds