• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 265
  • 263
  • 2
  • Tagged with
  • 533
  • 300
  • 235
  • 80
  • 79
  • 78
  • 76
  • 69
  • 65
  • 64
  • 59
  • 56
  • 55
  • 54
  • 44
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
101

Modell för optimering av diagnos och felsökning, Volvo Personvagnar AB

Larsson, Johan, Karlsson, Andreas January 2007 (has links)
No description available.
102

Implementering av parametrisk modellering vid fasadutformning / Implementation of parametric modelling in façade forming

Hansson, Agust, Karlsson, Kulchat January 2021 (has links)
Purpose: The construction sector accounts for a large part of the global greenhouse gasemissions and it is therefore a significant part of the 2030’s environmental goals.Swedens green building council works with environmental certification for buildingswhich in turn contribute to reduced emissions. The aim of the study is to develop amethod that will facilitate the fulfilment of requirements in Miljöbyggnad for both solarheat load and daylight which have consequences for working environment. Method: Interview applies with the purpose of increasing understanding of the use oftechniques in the construction industry. While literature study builds basicunderstanding of the subject of parametric design. On the other hand, a case study ispresented to further complement the knowledge of the potential of the parametricmodelling program and to put it in context. Findings: Parametric modelling contributes to a sustainability thinking when designingbuildings at an early stage and reduces working hours. Early in the process, analysescan be performed that generates useful data for the entire process. However, a basicidea and awareness is required of the formability of the geometry. It is possible tooptimize a parametric model to meet the requirements from Miljöbygggnad already inthe design process. Solutions from the optimization are the results from a selection andare only a helping tool for decision making. Implications: The parametric method is only used to a small extent in the constructionindustry due to a lack of knowledge regarding its benefits, especially among customers.The demand from the customer thus does not reach the designers. There is a lot to begained from parametric modelling and it is important that the development in theconstruction industry keeps pace with the technical development in a faster way than atpresent. Limitations: The scope of the study is limited and therefore not possible to make toocomplex analyses in the applied software. Only a few aspects have been included in thecase study. Keywords: Parametric design, parametric modelling, Environmental building,algorithm and optimization.
103

Modell för att utvärdera skärmhanteringsmetoder : Med ett fokus på hållbar utveckling hos stora organisationer

Faradj, Rasti, Habtu, Simon January 2016 (has links)
Den teknologiska framfarten har föranlett dagens situation där datorer med tillhörande datorskärmar utav olika slag är en del utav vardagen. De används i många olika fall, dels då statliga myndigheter och stora organisationer skall utföra diverse ärenden. Hantering av dessa datorskärmar utförs med hjälp utav olika skärmhanteringsmetoder som försätter dessa i viloläge. Att särskilja skärmhanteringsmetoder baserat på dess egenskaper är dock svårt då det idag inte finns någon anpassad utvärderingsmodell för att utvärdera skärmhanteringsmetoder.   Denna studie tillhandahåller en utvärderingsmodell för att med hjälp utav denna kunna välja den mest optimala skärmhanteringsmetoden. Syftet med att välja en optimal skärmhanteringsmetod är att samtidigt kunna minska strömförbrukningen hos datorskärmar. Studien är av kvalitativ karaktär med induktiv ansats. Det har skett ett framtagande av “MUSk”-modellen (Modell för Utvärdering av Skärmhanteringsmetoder). Det gjordes i samband med en litteraturstudie samt intervjuer där data samlades in. De hölls med personer inom statliga myndigheter vars kompetens var relevant för området. MUSk-modellen är resultatet för denna studie och kan tillämpas på skärmhanteringsmetoder för att särskilja dem. För att verifiera MUSk-modellens legitimitet så utvärderades den. Valda skärmhanteringsmetoder utvärderades genom att tillämpa MUSk-modellen för att erhålla en slutsats om vilken metod som är den mest optimal. Baserat på elementen i den framtagan MUSk-modellen erhöll Windows egna Power Management System det bästa utfallet.Denna studie skall tillhandahålla en utvärderingsmodell för att med hjälp utav denna kunna välja den mest optimala skärmhanteringsmetoden. Syftet med att välja en optimal skärmhanteringsmetod är att samtidigt kunna minska strömförbrukningen hos datorskärmar. Studien är av kvalitativ karaktär med induktiv ansats. Det har skett ett framtagande av “MUSk”-modellen (Modell för Utvärdering av Skärmhanteringsmetoder). Det gjordes i samband med en litteraturstudie samt intervjuer där data samlades in. De hölls med personer inom statliga myndigheter vars kompetens var relevant för området. MUSk-modellen är resultatet för denna studie och kan tillämpas på skärmhanteringsmetoder för att särskilja dem. För att verifiera MUSk- modellens legitimitet så utvärderades den. Valda skärmhanteringsmetoder utvärderades genom att tillämpa MUSk-modellen för att erhålla en slutsats om vilken metod som är den mest optimal. Baserat på elementen i den framtagan MUSk-modellen erhöll Windows egna Power Management System det bästa utfallet. / Forward-thinking technology has led to the situation today where computers and belonging computer screens are a part of everyday life. They are used in many different cases, as well as government agencies and organizations to accomplish various assignments. Management of these computer screens are done with the help of screen management methods that put them to sleep mode. Distinguishing these management methods based on their characteristics is difficult and presently there is no custom evaluation model for this.   This study provides an evaluation model that is able to choose an optimal screen management method by applying it. The purpose of choosing an optimal screen management method is to simultaneously decrease the power consumption of computer screens. The study is of qualitative nature with an inductive approach.  This led to the production of an evaluation model "MUSk" (Model for Evaluating Screen management methods). It was created in relation with interviews and litterature studies that were used to collect data. To verify the legitimacy of the MUSk-model it was evaluated. Screen management methods evaluated by applying MUSk-model to then give an opinion on the display management method that was most optimal. The MUSk-model is presented as a result of this study and can be applied to distinguish screen management methods. Based on the elements of the MUSk-model it was determined that Windows Power Management was the most optimal screen management method.
104

Resultatkommunicering av klimatkalkyl inför projektering av byggnader / Communicating Carbon Footprint Calculation Results for Building Design

Bergkvist, Vendela January 2021 (has links)
Den stora majoriteten av forskare värden över är överens om att människan bidrar till uppvärmningen av jorden genom växthuseffekten. Bygg och fastighetsbranschen stod 2018 för 21% av Sveriges totala utsläpp av växthusgaser. Regeringen avser därför införa krav på klimatdeklarationer den första januari 2022 som ett seg i att styra byggsektorn med hjälp av Boverket mot ett hållbart byggande. Klimatdeklarationen omfattar byggskedet i byggnadens livscykel A1-5 och fokuserar på växthusgasutsläpp. Kravet på klimatdeklarationer kommer att kräva att stora delar av byggsektorn tolkar klimatkalkyler trots att branschen i viss mån saknar kunskaper kring LCA metodik. Syftet med arbetet är att undersöka hur resultatet av en klimatkalkyl och klimatdeklaration kan kommuniceras till yrkesverksamma i byggsektorn som inte har tidigare erfarenheter av detta på ett sätt som är lätt att förstå. Målet är att kommunikationen av klimatkalkylens resultat bidrar som verktyg vid utformning av byggnaden. Detta åstadkoms genom att ta fram visuella illustrationer som är användbara i tidiga skeden av projekteringsprocessen för en klimatkalkyl som omfattar livscykelskedena A1-5.  Metoder som används är litteraturstudie, intervjustudie och analys genom ett visualiseringsförslag. Litteraturstudien behandlar teorin bakom klimatkalkylen, en rad visualiseringstekniker samt resultatvisualisering i samband med LCA i byggsektorn. Intervjustudien följer semistrukturerad form där sex respondenter med olika konsultbakgrunder intervjuas. Frågor under intervjuerna handlar om de olika organisationernas resultatkommunikation, svårigheter i att kommunicera klimatkalkyler samt deras utvecklingsarbete av kommunikationsmetoder. Analysens illustrationer bygger på lagförslagets krav om klimatdeklarationer och efterfrågad information från respondenter som illustrerats med hjälp av litteraturstudien. Litteraturstudien omfattar material från vetenskapliga artiklar och böcker som berör ämnena; livscykelanalysens bakgrund, resultatvisualisering, visualiseringstekniker och resultatvisualisering av LCA.  Visualiseringsförslaget kan genomföras i samband med klimatdeklarationen och är uppdelad i två delar; grundläggande information och beskrivande information. Informationen som i och med lagförslaget om klimatdeklarationer blir obligatorisk att tillhandahålla är information om byggnaden, information om byggherren och byggnadens totala utsläpp i kilo koldioxidekvivalenter. I visualiseringsförslagets första del finns den obligatoriska informationens tre punkter med som kompletteras av byggnadens utsläpp i kilo koldioxidekvivalenter per byggandens bruttoarea samt en riktvärdesfigur. Den beskrivande informationen består av projektets status, växthusgasutsläppet i kontext till flygresor och skog samt kilo koldioxidekvivalenter fördelat på; livscykelskeden, byggnadsmaterial och byggnadsdelar. Analysen avslutas med att diskutera framtidens möjliga visualiseringstekniker som; 3D-modelering, redovisning av biogent kol, designjämförelser, kvalitetsgranskningsmetodik, klimatkalkyler som plug-in program och redovisning av samtliga livscykelskeden. / The vast majority of scientists around the world have agreed upon that man contributes to heating of the atmosphere by the greenhouse effect. The construction and real estate industry contributed to 21% of Sweden’s total of greenhouse emissions in 2018. The government intends to legislate requirements for carbon footprint declarations by January 1st 2022 as a step towards a sustainable construction industry. The carbon footprint declaration includes the life cycle stages A1-5 (the construction stage). The carbon footprint declaration entails interpretations of carbon footprint calculations by the industry to a much greater extent even though the industry partially lacks LCA knowledge. The purpose of the work is to investigate how the results of a carbon footprint calculation and carbon footprint declaration can be communicated to professionals in the construction industry who do not have previous experience of this in a way that is easy to understand. The goal is that the communication of the carbon footprint calculation's results contributes as a tool in the design of the building. This is achieved by producing visual illustrations that are useful in the early stages of the design process for a carbon footprint calculation that includes the life cycle stages A1- 5.  The methods used are literature study, interview study and the analysis through a visualization proposal. The literature study processes the theory behind carbon footprint calculations, different visualization techniques, and result visualization in connection to LCA and the construction industry. The interview study is semi structured with six respondents with diverse LCA backgrounds as consultants. The questions were about the various organizations’ result communication, difficulties in communicating carbon footprint calculations and their development work of communication methods. The illustrations in the analysis are based on the bill’s requirements for carbon footprint declarations and requested information by the respondents and are illustrated by knowledge from the literature study. The literature study includes material from scientific articles and books on the subjects; background of the life cycle analysis, result visualization, visualization techniques and result visualization of LCA.  The visualization proposal can be implemented in connection to the carbon footprint declaration and is divided in to two parts: basic information and descriptive information. The information that with the bill on carbon footprint declarations becomes mandatory is information about the building, information about the developer and the building's total emissions in kilograms of carbon dioxide equivalents. The first part of the visualization proposal contains the three points of mandatory information, which are accompanied by the building's emissions in kilos of carbon dioxide equivalents per the building's gross area and a benchmark figure. The descriptive information consists of the project's status, the greenhouse gas emissions in the context of air travel and forest absorption and kilograms of carbon dioxide equivalents distributed on; life cycle stages, building materials and building components. The analysis concludes with a discussion of future possible visualization techniques such as: 3D modeling, display of biogenic carbon, design comparisons, quality examniation methodology, climate calculations as plug-in programs and demonstration of all life cycle stages.
105

Utveckling och optimering av gripmekanism för självcentrerande stöddocka

Olsson, Hannes, Larsson, Martin January 2021 (has links)
Självcentrerande stöddockor används vanligtvis för att öka stabiliteten och således bearbetningsprecisionen vid svarvning. Detta blir extra viktigt när skärkrafterna verkar långt ifrån arbetsstyckets inspänning och eventuell stöddubb. Dagens stöddockor har ett begränsat greppområde vilket leder till att stöddockor finns i många olika storlekar för att täcka in kundernas behov. Genom att utveckla en ny stöddocka med ökat greppområde skulle färre stöddockor krävas för att täcka dessa behov. Syftet med detta arbete är att öka en stöddockas användningsområde och därigenom öka dess konkurrenskraft på världsmarknaden. Målet med arbetet är att utveckla en stöddocka med hjälp av optimering för att uppnå ett ökat greppområde. I arbetet genomfördes en omvärldsanalys som påvisade att stöddockans befintliga greppområde måste ökas med 15 procent för att bli marknadsledande. Den befintliga stöddockans konstruktion optimerades med hjälp av tre olika optimeringsalgoritmer och resulterade i en ökning av greppområdet med åtta procent. Arbetet fortskred med en konceptgenerering i syfte att identifiera alternativa konstruktionslösningar. Konceptgenereringen inleddes med en brainstorming vars resultat användes för att utveckla fyra koncept. Utvecklingen av koncepten fortskred tills dess att en god uppskattning av greppområdet kunde genomföras. Utifrån uppdragsgivarens krav och önskemål genomfördes sedan ett konceptval med hjälp av en beslutsmatris. Det valda konceptet optimerades med samma optimeringsmetodik som för den befintliga stöddockan och resultatet användes sedan vid detaljkonstruktionen i CAD. Det slutgiltiga konceptet har armar med dubbla kamkurvor och ett mittstycke med fyra kamlöpare. Detta möjliggör att kamlöparna kan positioneras för olika delar av greppområdet vilket minskar armens totala storlek och resulterar i ett större greppområde. Det slutgiltiga konceptet har ett 23 procent större greppområde med enbart en marginell ökning i längd, bredd och djup jämfört med den befintliga stöddockan. Optimering visade sig vara ett användbart verktyg för utveckling av komplexa mekaniska produkter. Under optimeringen kunde viktiga lärdomar inhämtas genom att studera vilka parametrar och designvariabler som begränsar greppområdet, således kunde en bättre förståelse för produkten skapas. Att formulera och optimera mekaniska produkter kan dock vara tidskrävande och svårhanterligt för en godtycklig mekanikkonstruktör. Greppområdet hos det slutgiltiga konceptet är så pass hög att flertalet storlekar kan ersättas, vilket gynnar miljön, kunden och tillverkaren. Detta leder till insikten att det finns stora möjligheter att utveckla mer hållbara mekaniska produkter med hjälp av optimering. / Self-centering steady rest are used to increase stability as well as precision during metal turning. This becomes extra important when the cutting operation is present at a long distance from the workpiece holding device. Current steady rests have a limited gripping range which leads to various sizes in order to satisfy customer needs. By developing a steady rest with a larger gripping range, less sizes would be needed to satisfy these needs. The purpose of this work is to increase the gripping range of an existing steady rest and increase its competitiveness on the global market. The aim is to develop a steady rest with market-leading performance by using modern optimization techniques. A market analysis was conducted which led to the conclusion that a 15 percent increase of the current gripping range was needed to be market leading. The current design of the steady rest was optimized with three different optimization algorithms which led to a performance increase of about eight percent. In order to identify alternative designs to the self-centering mechanism, four concepts where developed. These concepts were based on ideas generated through a brainstorming session. One of the four concepts was selected using criterions specified by the project’s client for further optimization and development. The final concept consists of arms with two cam curves and a center piece with four cam followers. By positioning these cam followers for gripping small and large workpieces respectively, a larger gripping range is possible. Further development included a similar optimization as well as implementation and modelling in CAD. The final steady rest resulted in a 23 percent increase in gripping range with a slight increase in length and depth. Optimization has proven to be a useful tool for developing high-performance mechanical products. During the optimization, a better understanding for the product and the problem at hand could be made by studying which design variables limits the performance of the steady rest. The mathematical formulation and optimization of the product can however be time consuming and challenging for mechanical design engineers. The gripping range of the presented steady rest is big enough to replace several sizes which is profitable for the environment, the customer as well as the manufacturer. This leads to the insight that optimization can be a powerful tool to develop more sustainable mechanical products.
106

Effektivisering av ett tillverkande företags produktionsprocess / Streamlining a manufacturing company's production process

Evebring, Alma, Jardelid, Evelina January 2021 (has links)
Konkurrensen ökar bland företag och därmed spelar ledtiden en allt viktigare roll. För att kunna reducera ledtiden och erbjuda en hög leveransförmåga samt behålla konkurrensfördelar kan aktiviteter behöva identifieras som inte tillför värde till processen. Detta görs fördelaktigt genom att först identifiera ett företags flaskhalsar. Syftet med denna rapport har varit att visa hur tillverkande företag kan optimera sina processer genom att identifiera flaskhalsar och argumentera för vilka metodiker som skulle kunna utjämna dessa för att reducera ledtiden. Uppsatsen kommer visa på hur ett effektivare flöde kan skapas genom att identifiera och reducera icke-värdeskapande aktiviteter. För att visualisera hur en tillverkande verksamhet kan optimera sin ledtid har ett fallföretag använts. För denna studie har både en kvantitativ och en kvalitativ metod tillämpats. Den kvantitativa metoden användes i form av en värdeflödesanalys i fallföretagets produktionsprocess medan den kvalitativa datan insamlades med hjälp av intervjuer och egna observationer. Rapportens resultat består av bland annat två delar, en värdeflödeskartläggning följt av teman som är utformade efter intervjuerna som tillsammans identifierade fallföretagets flaskhalsar. Dessa tre flaskhalsar var hissen, avvikelser gällande ritningar samt lagerplatsbrist. Resultatet visade också på att 57% av produktionstiden innehåller aktiviteter som inte är värdeskapande. Sammanfattningsvis finns det flera tillvägagångssätt för att optimera ett tillverkande företags processer och en gemensam utgångspunkt för att påbörja förbättringsarbetet är att genomföra en värdeflödeskartläggning som identifierar utgångsläget. / Competition is increasing among companies and therefore lead time is playing an increasingly important role. In order to be able to reduce the lead time and offer a high delivery capacity as well as retain competitive advantages, activities may need to be identified that do not add value to the process. This is done advantageously by first identifying a company's bottlenecks. The purpose of this report has been to show how manufacturing companies can optimize their processes by identifying bottlenecks and arguing for which methodologies could equalize these out to reduce lead time. The thesis will show how a more efficient flow can be created by identifying and reducing non-value-creating activities. To visualize how a manufacturing business can optimize its lead time, a fall company has been used. For this study, both a quantitative and a qualitative method have been applied. The quantitative method was used in the form of a value flow analysis in the case company's production process while the qualitative data was collected with the help of interviews and own observations. The report's results consist of two parts, one value flow mapping followed by themes that are designed after the interviews that together identified the fall company's bottlenecks. These three bottlenecks were the elevator, deviations regarding drawings and lack of storage space. The results also showed that 57% of production time contains activities that do not create value for the customer. In summary, there are several approaches to optimizing a manufacturing company's processes and a common starting point for beginning the improvement work is to carry out a value flow survey that identifies the starting point.
107

Parameterstudie av L-formad vinkelstödmurskonstruktion av armerad betong: hållbarhet och miljö

Mohamed, Abdi Qani, Perez Guadalupe, Jeffrey January 2023 (has links)
Klimatpåverkan är ett aktuellt ämne i dagens samhälle, och byggindustrin står för över en tredje del av den totala utsläpp i Sverige år 2020. En av de största faktorerna är just betongproduktionen eftersom betong är den mest populära byggmaterial på grund av dess hållfasthetsegenskaper och låg kostnad. Dessutom förväntas en ökning i behovet av bostäder i storstäderna inom de kommande åren vilket innebär ett större behöv av byggmaterial. Samtidigt har Sverige ett mål om noll nettoutsläpp CO2 till åren 2045, vilket gör att ha ett mer hållbar alternativ till betongen avgörande för att nå det uppsatta målet.  Arbetet utförs på L-formade stödmurar av armerad betong vars användningsområde begränsas till torr och ojämn mark i samband med vägar och broar. Huvudsyfte med examensarbetet är att studera hur en ändring i stödmurens dimensioner påverkar dess bärförmåga samt koldioxidutsläpp i förhållande med konstruktionens materialmängder. Vidare skall resultatet av analysen tyda de mest lämpliga konstruktionslösningar för att optimera stödmurens design och påverka dess klimatavtryck. Bland de åtgärder som undersöks är olika tjocklekar för stödmurens bottenplatta och frontmur. Detta kommer i sin tur medföra olika betong- och armeringsbehov. Utöver det är val av bindelsmedel i betongreceptet ett sätt att vidare påverka betongens koldioxidutsläpp och det första steget för att uppnå klimatförbättrad betong. För att utföra analysen krävdes ett litteraturstudie av relevanta område samt de föreskrifter som gäller för konstruktionen. Bland de studerade område kan det nämnas storleksoptimering inom konstruktionsteknik, klimatförbättrad betong, återanvändning och återvinning av byggnadsmaterial. Därtill följdes även Eurokoden, EKS och Trafikverkets krav för stödmursbyggande såsom TK Geo 13 och Krav Brobyggande. Strukturen dimensioneras genom att följa rekommendationerna i de förutnämnda föreskrifter och det utfördes en kontroll av strukturens bärförmåga, armeringsbehov samt glidning och stjälpning. För dessa beräkningar användes datorprogram MathCad och CaeApp. Därefter användes en Excell-mall upprättad av Sweco för att jämföra koldioxidpåverkan från vanlig betong mot klimatförbättrad betong. En jämförelse av resultatet från de utförda beräkningarna visar att en relativt liknande bärförmåga kan uppnås oavsett skillnaden i konstruktionens tjocklek. Däremot blir armerings dimensionering avgörande för att säkerställa strukturens hållfasthet. Detta kommer att reflekteras i material mängden för varje struktur. Till exempel i fallet med en mindre tjocklek visas det en mindre betongmängd men en högre armeringsmängd. Vidare visar studien om klimatpåverkan att strukturen med en mindre tjocklek resulterar i ett mindre koldioxidutsläpp. Anledningen är att betongens utsläpp är mycket större än armerings utsläpp och en minskning av betongmängden är fördelaktig även om det betyder en fördubbling av den original armeringsmängd. En ytterligare minskning av klimatpåverkan kan uppnås genom användningen av klimatförbättrad betong. Det första steget är att använda alternativa bindemedel i betongreceptet och i detta fall bytes en del av klinker, som är det vanliga bindelsmedel, mot masugnsslagg för att minska koldioxidutsläpp med 10 procent. Detta värde kan ökas till 25 procent genom att bearbeta betongreceptet vidare och ersätta ett större andel av klinker. Slutligen är det möjligt att uppnå en minskning av upp till 40 procent genom att ha en översyn av hela produktionsprocessen samt transport av material vid planeringsskede med klimatpåverkan i åtanken.
108

Själv-optimerande dynamisk adaptiv struktur för WebGL-applikationer

Wallin, Hektor January 2013 (has links)
Utvecklingen av datorer och deras förmåga ökar klyftan mellan datorer och skapar en stormångfald av hårdvarutillgänglighet. Kapaciteten som datorer besitter varierar kraftigt ochdärmed även förmågan att hantera komplexa applikationer. Moderna applikationer erbju-der inställningar som användare kan anpassa för datorn, något som kräver att användarenhar tillräcklig kunskap för att förstå inställningarnas e ekt. Att välja ut de optimala in-ställningarna för datorn är en process som är både svår och tidskrävande. Detta arbetegranskar hur ett dynamiskt adaptivt system automatiskt kan anpassa inställningarna förapplikationen medan den kör, utan manuell extern inverkan. Systemet mäter kontinuerligtapplikationen och individuella teknikers prestanda. Baserat på mätresultat anpassar detadaptiva systemet applikationens inställningar. Genom att abstrahera funktionaliteten attjustera applikationen kan datorns kapacitet utnyttjas, utan varken användarens kunskapeller påverkan. Arbetet undersöker hur olika tekniker kan in uera applikationens prestandaoch genomför tester av ett dynamiskt anpassande systems förmåga att skräddarsy appli-kationen för exekveringsmiljön. / The development of computers and their ability increases the gap between computers andcreate a wide variety of hardware availability. The capacity that computers possess varyconsiderably and thus the ability to handle complex applications. Modern applicationsprovides settings that users can customize for the computer, which requires the user tohave su cient knowledge to understand the attitude of the e ect. To select the optimalsettings for your PC is a process that is both di cult and time consuming. This thesisexamines how a dynamically adaptive system can automatically adjust the settings for theapplication while it is running, without manual external impact. The system continuouslymonitors the application and individual technologies performance. Based on measurementsthe adaptive system can customize applications settings. By abstracting the functionalityto adjust the application the computer's capacity is utlizied, without neither the user'sknowledge or in uence. The thesis examines how various technologies can in uence ap-plication performance and conducts tests of a dynamically adaptive system's ability tocustomize the application for execution environment.
109

Optimization and automatization of end-bearing pile groups / Optimering och automatisering av ändbärande pålgrupper

Del Pozo Alarcon, Gabriel Antonio January 2021 (has links)
This thesis consists of the development, trial an application of a computational tool that by the use of the Genetic Algorithm optimization method provides the user with an alternative approach from the traditional trial and error when faced with the challenge of designing end bearing pile groups.The work presents the three main concepts needed for understanding the computational tool as well as the structure of it. The scripting capabilities of a FEM software are exploited in order to automatically generate several design alternatives that are then compared in quality in an iterative way. The developed algorithm succeeds validation against pile group problems with known solutions and is then applied to the analysis of three different real structures with different levels of complexity.The algorithm is suitable for optimizing problems with loading in three directions and several load cases, within a time range consistent with an overnight run, when the density of the pile group is not high. Another potential application is to automatize retaining wall resting on piles type problems within a short amount of computational time. / Denna avhandling består av utveckling och prövning av ett beräkningsverktyg som med hjälp av den genetiska algoritmoptimeringsmetoden ger användaren ett alternativt tillvägagångssätt från den traditionella prövningen när den möter utmaningen att utforma bärande höggrupper.Arbetet presenterar de tre huvudkoncepten som behövs för att förstå beräkningsverktyget och dess struktur. Skriptfunktionerna för en FEM-programvara utnyttjas för att automatiskt generera flera designalternativ som sedan jämförs i kvalitet på ett iterativt sätt. Den utvecklade algoritmen lyckas validera mot höggruppsproblem med kända lösningar och tillämpas sedan för analys av tre olika byggda strukturer med olika nivåer av komplexitet.Algoritmen är lämplig för att optimera problem med belastning i tre riktningar och flera lastfall, inom ett tidsintervall som överensstämmer med en löpning över natten, när täthetsgruppens densitet inte är hög. En annan mycket intressant applikation är att automatisera kvarvarande väggproblem inom en kort tid av beräkningstid.
110

Olika scenarier för ett vattenkraftverk i och med nationella omprövningen av vattenkraft / Different scenarios for a hydro power plant due to the national plan

Sandin, Olov January 2024 (has links)
Det kommer ske omprövning av många av Sveriges vattenkraftverk under de kommande 20 åren. Därför har det undersökts vilken påverkan detta kan resultera i för två av ett kraftbolags vattenkraftverk. Fyra olika fall har undersökts och jämförts med varandra. De undersökta fallen var fall 1 - nuläge, fall 2 - optimering med dygnsreglering, fall 3 - förnyelse samt fall 4 - utrivning.   Under arbetet har tillrinningar samt flöden till kraftverken tagits fram och en elprisprognos har använts. Dessa har inkluderats i de olika fallen förutom utrivningen i fall 4. För att maximera intäkten i fall 2 – optimering användes Excel-tillägget problemlösaren i samband med Visual Basic. En förnyelse av det äldre kraftverket har undersökts där data gällande nya potentiella turbiner inhämtats. Slutligen undersöktes utrivningsfallet där intäkt kopplat till produktionsbortfall från Vattenkraftens Miljöfond har sammanställts.   Denna rapport presenterar att fall 1 - nuläget ej kommer kunna behållas för att det ena kraftverket har nått dess tekniska livslängd. Fall 2 - optimering innebar en medelintäktsökning jämfört med om vattennivåreglering användes på 3,8%. Återbetalningstiden för optimeringen var mellan 1,7 och 2,9 år beroende på vilken kalkylränta som användes, om fiskväg inkluderades eller om intäkten justerades ned. Liknande för livscykelvinsten varierade den stort mellan 308 Mkr och 120 Mkr. Fall 3 - förnyelse hade återbetalningstider mellan 7,1 och 15,7 år beroende på liknande antaganden och förutsättningar likt fall 2 - optimeringsfallet. Livscykelvinsten varierade mellan 55,9 och 5,8 Mkr. Fall 4 – utrivning kan innebära en engångsintäkt på 41,1 Mkr från vattenkraftens miljöfond ifall det döms till åtgärder vid det avsedda kraftverket.   Fall 2 - optimering resulterade i störst ekonomisk lönsamhet men samtidigt resulterade dygnsregleringen i en större ekologisk påverkan än de andra fallen på grund av att ovanliggande sjöns vattennivå ändras mer frekvent. Förnyelsen i fall 3 var mindre lönsam än fall 2 - optimering, vid lägre kalkylräntor var förnyelsen dock mer lönsam än utrivningen i fall 4. Utrivningen behövde inte någon fiskväg eftersom fiskarna kunde passera ned genom den naturliga tröskeln.   Slutsatsen för detta arbete är att det finns lönsamhet med att implementera fall 2 - optimering med dygnsreglering, dock leder både fall 3 - förnyelse och fall 4 - utrivning samtidigt till intäkter. Fall 3 och 4 är samtidigt även mer rimliga scenarion i samband med omprövningen av vattenkraftverk. De två sistnämnda fallen är enklare att genomföra eftersom de inte likt optimeringen i fall 2 behöver beslut om godkännande för att fallet ska kunna implementeras. / In conjunction with the nation plan for hydro power plants in Sweden during the next 20 years, its possible effect on two of a power company’s hydro power plants have been examined. Four different cases have been considered and compared with each other. The considered cases were case 1 – current state, case 2 – optimization with short term regulation, case 3 – renewal and case 4 – demolition.   During the investigation of the cases the inflow of water to the hydropower plants has been estimated. A forecast for the electricity price was used and included. Both the inflow and forecast were used in all cases except case 4 - demolition. Case 2 - optimization utilized an add-in for Excel called Solver. Solver was used in conjunction with Visual Basic to maximize the profit. The renewal of one of the older hydropower plant was investigated in case 3 and data regarding the new turbines were collected. Finally, the demolition in case 4 was investigated were the profit stemmed from loss of production and was collected from “Vattenkraftens Miljöfond”.   This report presents that the case 1 – current state is not possible to keep in the future due to one of the plants exceeding their technical lifespan. Case 2 - optimization resulted in an average profit increase of 3,8% compared to case 1 - current state where water level regulation is used. The payback time for case 2 - optimization was between 1,7 and 2,9 years depending on the discount rate that was used, if a fish passage was implemented as well as if the profit was toned down. Similarly, when the life cycle profit was calculated it also varied, it was calculated to be between 308 and 120 Mkr. Case 3 - renewal had payback times between 7,1 and 15,7 years depending on the same assumptions and conditions as the optimization case. The life cycle profit was calculated to between 55,9 and 5,8 Mkr. Case 4 - demolition could result in a singular revenue of 41,1 Mkr if demolition is deemed as necessary due to the national plan.   Case 2 - optimization resulted in the highest economic profitability while at the same time providing a larger negative ecological impact than the other cases due to the more abrupt changes in the surface level. Case 3 - renewal was less profitable than case 2 – optimization, at lower discount rates it yielded more profit than in case 4 – demolition. The demolition did not require a fish passage since the fish could pass through the natural threshold.    The conclusion for this work was that there is profitability in implementing optimization with short term regulation. The renewal and the demolition also led to profits, albeit lower. However, they are more likely to be approved in connection to the national plan since the two latter mentioned cases are easier to implement because they do not require any additional approval which the optimization in case 2 needs.

Page generated in 0.0872 seconds