• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 415
  • 18
  • 18
  • 18
  • 18
  • 13
  • 13
  • 7
  • 7
  • 7
  • 5
  • 1
  • Tagged with
  • 439
  • 439
  • 196
  • 189
  • 104
  • 94
  • 87
  • 62
  • 60
  • 58
  • 56
  • 48
  • 45
  • 42
  • 41
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
341

Gestão de portfólio de projetos de inovação: análise das práticas adotadas por empresas industriais de grande porte. / Innovation project portfolio management: analysis of the practices adopted by large industrial companies.

Débora Oliveira da Silva 08 June 2016 (has links)
Empresas que se propõem a inovar de modo sistemático, além dos desafios da gestão individual dos projetos, precisam lidar com a gestão agregada dos projetos, ou seja, precisam lidar com a gestão de portfólios de projetos de inovação. O principal desafio da gestão de portfólio é a etapa de seleção de projetos, na qual a empresa precisa decidir, entre uma cesta de possibilidades, quais ideias receberão recursos e serão incluídas no portfólio de projetos da empresa para serem desenvolvidas. Além disso, há necessidade de balanceamento do portfólio, ou seja, qual grupo (ou portfólio) de projetos melhor adere aos interesses da organização. Em um esforço para evidenciar as diferenças entre portfólios de projetos de inovação e portfólios de projetos convencionais diversos autores se dedicaram a caracterizar e desenvolver abordagens gerenciais para estes. Entre as principais diferenças entre projetos convencionais e projetos de inovação está o nível de incerteza inerente aos projetos, o que dificulta a utilização de ferramentas tradicionais de valoração financeira. A presente pesquisa pretende contribuir com a compreensão da especificidade da gestão de portfólio de projetos de inovação, destacando o impacto da incerteza na avaliação e gestão desse portfólio. A literatura aponta questões sobre seleção e balanceamento, mas pouco diz sobre os problemas de considerar projetos de natureza distinta no mesmo portfólio. Nesse sentido, essa pesquisa buscou compreender a segmentação de um portfólio geral em portfólios específicos; captar quais as ferramentas utilizadas para gestão de portfólio de projetos de inovação; bem como analisar as lacunas existentes entre os problemas derivados da incerteza dos projetos previstos pela literatura e os encontrados para a gestão desse processo. A pesquisa foi conduzida por uma abordagem predominantemente indutiva, por meio de três fases distintas, porém complementares: (i) estudo do tipo levantamento, (ii) estudo de casos múltiplos; (iii) estudo de caso profundo. Os resultados sugerem que a separação do portfólio de projetos de inovação segundo o grau de incerteza dos projetos traz benefícios para gestão desse processo, especialmente no tocante a proteção de inovações de maior ruptura. Em relação às ferramentas utilizadas pelas empresas, contrariamente ao que sugere a literatura, as mais utilizadas são as ferramentas financeiras, inclusive para projetos de inovação radical e para as fases de balanceamento do portfólio. Isso sugere desconhecimento dos gestores acerca das práticas mais adequadas para gestão desse processo. Adicionalmente, verificou-se que aspectos que não estão diretamente ligados ao processo de gestão de portfólio de inovação tem grande influência sobre os resultados desse, como o sistema de recompensas das áreas. / Companies that intend to innovate in a systematic way, in addition to the challenges of individual management of projects, have to deal with the aggregate project management, that is have to deal with the management of portfolios of innovation projects. The main challenge of portfolio management is the project selection stage, in which the company needs to decide between a basket of possibilities, ideas that will receive resources and will be included in the company projects portfolio to be develop. Furthermore, there is a need for balancing the portfolio; it is which projects group (or portfolio) better adheres to the organization\'s interests. In an effort to highlight the differences between portfolios of innovation projects and portfolios of conventional projects, several authors have dedicated themselves to characterize and develop management approaches to these. Among the main differences between conventional projects and innovation projects is the level of uncertainty inherent in the project, making it difficult to use traditional tools of financial valuation. This research aims to contribute to the understanding of the specificity of the portfolio management of innovation projects, highlighting the impact of uncertainty in the evaluation and management of this portfolio. The literature suggests questions about selection and balancing, but says little about the issues of considering different nature of projects in the same portfolio. In this sense, this research sought to understand the segmentation of a general portfolio in specific portfolios; to capture which are the tools used for portfolio management of innovation projects; as well as to analyze the gaps between the problems arising from the uncertainty of the projects provided by the literature and found to manage this process. The research was conducted by a predominantly inductive approach through three distinct phases, but complementary: (i) survey study, (ii) multiple case study; (Iii) in-depth case study. The results suggest that the separation of the portfolio of innovation projects according to the degree of uncertainty of the project brings benefits to managing this process, especially regarding the protection of higher disruptive innovations. In relation to the tools used by companies, contrary to what the literature suggests, the most used are the financial tools, including radical innovation projects and for portfolio balancing phases. This suggests lack of managers\' knowledge about the best practices to manage this process. In addition, it was found that aspects that are not directly linked to the innovation portfolio management process have great influence on the results of it, as the reward system of areas.
342

Criando sentido para as incertezas imprevisíveis em projetos inovadores / Sensemaking unforeseeable uncertainty for innovative projects

Rosaria de Fatima Segger Macri Russo 02 August 2012 (has links)
As inovações, motores do desenvolvimento global, viabilizam-se nas organizações por meio dos projetos. Quanto maior for o nível de inovação nesses projetos, maior é a probabilidade de existirem incertezas imprevisíveis. A identificação dos sinais precoces de uma mudança permitiria perceber essas incertezas, porém, para o reconhecimento antecipado desses sinais, é preciso também dar sentido ao que está ocorrendo, pela criação de sentido (sensemaking). Assim, este estudo tem como objetivo principal entender qual é o fator gerador da incerteza imprevisível, quais são os fatores motivadores de sua identificação e quais práticas contribuem para a criação de sentido dessas incertezas em projetos inovadores. Para tal, foi feito um levantamento de campo, de maio a dezembro de 2011, no qual foram utilizados: um questionário para se obterem informações iniciais sobre os projetos que poderiam ser considerados inovadores e, posteriormente, uma entrevista aprofundada, direcionada por um roteiro com perguntas abertas, com um dos participantes do projeto. Foram enviados 152 convites para gestores de projetos, dos quais apenas 16 projetos atenderam aos requisitos exigidos, transformando-se em unidade de análise. A cada uma dessas unidades foram solicitados, também, pelo menos dois eventos imprevistos, materialização da incerteza imprevisível, obtendo-se a quantidade de 35. Esses eventos imprevistos foram considerados unidade de análise incorporada. A análise dos dados foi inicialmente qualitativa, com a geração de variáveis e categorias avaliadas estatisticamente; posteriormente, por meio de provas não paramétricas. Com base nas análises efetuadas, foi possível observar que o nível mais alto de eficiência na identificação da incerteza imprevisível - perceber a incerteza imprevisível previamente e ter menos impacto - ocorre preferencialmente em eventos com a percepção do sinal precoce feita pelo gerente do projeto ou pelo sponsor, no início do projeto; com a existência de um fator facilitador organizacional; com a utilização de um processo de criação coletiva de sentido. O nível mais baixo de eficiência - percepção tardia do evento imprevisto e existência de mais impacto - associa-se, porém, à causa externa da incerteza imprevisível, à ausência da percepção de um sinal precoce, à presença de um fator bloqueador à identificação com origem nas características pessoais, baixo número de atividades coletivas, entre outras. Recomenda-se incorporar o diagnóstico da incerteza na gestão de riscos dos projetos, buscar informações sobre as áreas incertas do projeto e interagir para socializar o conhecimento. Futuros estudos ampliados, para se obter um número maior de eventos e projetos, poderão permitir novas associações, assim como gerar um modelo multivariado. O uso de métodos alternativos de gestão de projetos inovadores também se mostra como um relevante tema de pesquisa. / The organizations enable innovations, engines of global development, through the projects. The more innovative a project, the greater is the probability of occurrence of unforeseeable uncertainties. The identification of early signs of a change would realize this kind of uncertainty, but for the early recognition of these early signs is necessary to give sense to them, sensemaking. Thus, this study aims to understand what the main factor that generates the unforeseeable uncertainty is, what the motivating factors for their identification are and what the practices that contribute to the creation of meaning of these uncertainties are on innovative projects. To this end, a field survey has been done, from May to December 2011, with: a questionnaire to obtain initial information about the projects that could be considered innovative, and subsequently an in-depth interview, guided by a script with open questions, with one of the project participants. 152 invitations were sent to project managers, of which only 16 projects met the requirements, becoming a unit of analysis. Each of these units was also requested at least two unforeseen events, materialization of unforeseeable uncertainty, thus obtaining 35 unanticipated events, which are considered the unit of analysis embedded. Data analysis was qualitative, the generation of categories and variables were evaluated statistically through non-parametric tests. Based on the analysis performed it was observed that the highest level of efficiency in identifying unforeseeable uncertainty - it was notice in advance and it had less impact - occurred preferentially when events have had the perception of early sign made by the project manager or the sponsor at the beginning of the project, with the existence of an organizational facilitator factor, and using a collective sensemaking process. Moreover, the lowest level of efficiency - late perception of the unforeseeable event and existence of more impact - were associated with the external cause of unforeseeable uncertainty, the lack of perception of an early signal, the presence of a blocking factor identification originated from the personal characteristics, low number of collective activities, among others. It is recommended to incorporate the diagnosis of unforseeable in risk management of projects, seeking information about the uncertain areas of the project and interacting to share the knowledge. Further studies extended to obtain a larger number of events and projects may allow new associations as well as generate a multivariate statistical model. The use of alternative methods of management of innovative projects to identify unforeseeable uncertainty also appears as a relevant research topic.
343

As práticas de comunicação em projetos globais de desenvolvimento de produtos em empresas multinacionais brasileiras / The practice of communication in global development projects of products in Brazilian multinational corporations

Franciane Freitas Silveira 27 August 2008 (has links)
Os projetos globais de desenvolvimento de produtos passam pelas áreas de conhecimento da gestão tradicional de projetos e, adicionalmente, demandam maior atenção de diversos aspectos inerentes ao ambiente global, tais como: coordenação e controle; construção de confiança e cooperação entre as equipes dispersas geograficamente. Outro tema especialmente importante nesse contexto é o processo de comunicação que se torna bastante crítico à medida que os recursos tradicionais de comunicação em projetos (reuniões face-a-face, comunicação não-verbal, visualização do trabalho in loco, entre outros) passam a ser limitados e/ ou substituídos por outros baseados em meios eletrônicos (videoconferência, emails, mensagens instantâneas, entre outros). O objetivo desta pesquisa foi o de mapear as práticas de comunicação aplicadas aos projetos globais e analisar se essas práticas variam de acordo com o tipo e com algumas características do modelo de gestão dos projetos. A unidade de análise escolhida foram os projetos globais de desenvolvimento de produtos de empresas multinacionais brasileiras e o método de pesquisa, o estudo de casos múltiplos. Os resultados permitiram verificar que a freqüência da comunicação nos projetos globais diminui com a distância, o que dificulta o controle e a coordenação das equipes. Mas a distância por si só, apesar de impor desafios adicionais, não causa necessariamente problemas de comunicação, pois pode ser contornada pelo apoio das ferramentas eletrônicas de comunicação que formam as bases para os projetos acontecerem de forma dispersa. O estudo permitiu concluir que o uso das práticas de comunicação, bem como a importância dada a elas variam em função do tipo de projeto e de algumas características de gestão deles. Apesar de ter sido possível identificar tais variações, verificou-se que as práticas não ocorrem de forma padronizada nos projetos; ao contrário, são desenvolvidas de forma improvisada e circunstancial e não contam com um planejamento específico no início do projeto. / Global new product development projects go through the traditional knowledge areas of project management, and additionally they demand more attention related to the global environment aspects, such as coordination and control, and trust building and cooperation between geographically dispersed teams. Another important theme in this context is that the communication process becomes critical, as traditional communication resources employed in projects (face-to-face meeting, nonverbal communication, in locus work visualization, among others) undergo constraints or are replaced by those based upon electronic means (video conference, email, instant message). This research aimed to identify the communication practices applied to global projects and analyze whether these practices vary across some project characteristics and its management model. The unit of analysis adopted was the global new product development projects undertaken by Brazilian multinational companies, and the research method employed was the case study. The findings showed that the communication frequency in global projects diminishes as the physical distance increases. Athough it represents additional challenges, the distance itself does not cause communication problems. This is due to the support of electronic communication tools that create the basis over which projects are dispersedly held. This study allowed me to conclude that the use of communication practices along with the importance paid to them, vary according to the project type and some characteristics of its management. In spite of the variations, it has been also identified that communication practices are not used in projects in a standard way. On the contrary, these practices are employed in an improvised and contingent manner, and they are not planned since the beginning of the project.
344

Proposta para uso da corrente crítica no gerenciamento de múltiplos projetos / Proposal for use of the critical chain in multiple projects management

Cooper Ordonez, Robert Eduardo, 1973- 23 July 2013 (has links)
Orientador: Olívio Novaski / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecânica / Made available in DSpace on 2018-08-23T02:56:25Z (GMT). No. of bitstreams: 1 CooperOrdonez_RobertEduardo_D.pdf: 3017595 bytes, checksum: cd030a2dd41c13c03a265b2befebeb50 (MD5) Previous issue date: 2013 / Resumo: O presente trabalho tem por objetivo propor um modelo para usar os conceitos da Corrente Crítica no gerenciamento de sistemas de múltiplos projetos. Para tal, foi desenvolvida uma pesquisa aplicada, de natureza qualitativa, em ambiente real. As variáveis estudadas foram definidas considerando a revisão da literatura científica e um estudo de campo realizado com antecipação à aplicação do modelo, o qual busca, por meio de uma visão sistêmica, gerenciar melhor a incerteza presente na estimativa de tempo das atividades dos projetos. As diretrizes da pesquisa-ação foram usadas para verificar o funcionamento do modelo e para o levantamento dos dados que posteriormente foram analisados por meio da técnica estatística Regressão Logística Binária. Essa técnica possibilitou encontrar o nível de impacto das variáveis de influência sobre a resposta do sistema, assim como as relações entre essas variáveis. Os dados analisados permitem sugerir que o modelo proposto funciona adequadamente e que os resultados obtidos poderiam ser trasladados do contexto estudado para outros contextos, contribuindo desta forma para o aprimoramento do método da Corrente Crítica / Abstract: The present work aims to propose a model for using the Critical Chain concepts for multiple projects management. To this, it developed an applied research in a real environment. Variables were defined considering scientific literature review and a field study carried out in advance of the application model, which seeks, through a systemic view, a better manage of the uncertainty present in the estimated time of project activities. The guidelines of action-research were used to check the performance of the model and the data collection were later analyzed by statistical technique: Binary Logistic Regression. This technique makes possible to find the impact level of influence variables and the relation with de system response, as well the relationships between them. The analyzed data may suggested that the proposed model works properly and that results could be transferred from de studied context to other contexts, thus contributing to the improvement of the Critical Chain method / Doutorado / Materiais e Processos de Fabricação / Doutor em Engenharia Mecânica
345

Desenho de mecanismos para estratégia de inovação corporativa

Rodrigues Junior, Walter 05 June 2012 (has links)
Submitted by Walter Rodrigues (rodrigueswalter@yahoo.com) on 2012-07-03T21:43:42Z No. of bitstreams: 1 Walter Rodrigues Desenho Mecanismos Inovacao Versao Final.pdf: 1606949 bytes, checksum: fbcbd16c8e9552341fbabfa0931acf7e (MD5) / Approved for entry into archive by Suzinei Teles Garcia Garcia (suzinei.garcia@fgv.br) on 2012-07-04T12:50:37Z (GMT) No. of bitstreams: 1 Walter Rodrigues Desenho Mecanismos Inovacao Versao Final.pdf: 1606949 bytes, checksum: fbcbd16c8e9552341fbabfa0931acf7e (MD5) / Made available in DSpace on 2012-07-04T12:53:36Z (GMT). No. of bitstreams: 1 Walter Rodrigues Desenho Mecanismos Inovacao Versao Final.pdf: 1606949 bytes, checksum: fbcbd16c8e9552341fbabfa0931acf7e (MD5) Previous issue date: 2012-06-05 / As empresas que optam pela inovação como estratégia de crescimento desenvolvem projetos para a exploração de oportunidades em novos produtos, serviços e mercados. Tais projetos lidam com situações de alta assimetria de informação e, consequentemente, riscos de conflitos de interesses entre agente e principal. Para viabilizar a alocação de recursos em tal situação, a gestão de projetos dentro das organizações busca minimizar os custos de agência atuando diretamente na causa raiz. Ao financiar o empreendedorismo, o venture capital (VC) e sua versão corporativa, o corporate venturing (CV), lida com a assimetria de informação de uma forma diferente. Ao invés de diminuí-la diretamente, os VCs e os CVs implementam mecanismos que os permitem explorar situações de alta assimetria de informação, e ao mesmo tempo, controlar os custos de agência decorrentes desta. Quando comparado às práticas de gestão de projetos nas organizações, as práticas de seleção, financiamento, contratos, organização e incentivos empregadas na gestão de projetos de VCs e CVs constituem um desenho de mecanismo mais eficiente para o desenvolvimento do empreendedorismo. Ainda que cada um desses cinco componentes do mecanismo empregado pelos VCs e CVs possa ser identificado na gestão de projetos corporativos, nas organizações pesquisadas, não foi possível identificar a integração desses componentes promovendo um mecanismo coeso. A prática de financiamento de projetos é a que apresentou a maior diferença. O entendimento de como as práticas de gestão de projetos podem ser configuradas num desenho de mecanismo que viabiliza o trato da assimetria de informação, ao mesmo tempo em que minimiza seus efeitos indesejáveis em termos de custos de agência, oferece às organizações uma forma gerenciável de promover um ambiente corporativo onde o empreendedorismo possa florescer. Condição necessária para inovações de maior impacto.
346

O gerenciamento de projetos e o planejamento de operações de guerra do Exército brasileiro

Silva, Abner de Oliveira e 20 July 2012 (has links)
Submitted by Abner Silva (abnersilva@uol.com.br) on 2012-09-12T16:43:26Z No. of bitstreams: 1 Dissertação FGV - DEFINITIVA_Final retificada.pdf: 3899073 bytes, checksum: bce15885ae3813b905358032690f931d (MD5) / Approved for entry into archive by ÁUREA CORRÊA DA FONSECA CORRÊA DA FONSECA (aurea.fonseca@fgv.br) on 2012-09-17T15:20:38Z (GMT) No. of bitstreams: 1 Dissertação FGV - DEFINITIVA_Final retificada.pdf: 3899073 bytes, checksum: bce15885ae3813b905358032690f931d (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2012-09-17T19:27:27Z (GMT) No. of bitstreams: 1 Dissertação FGV - DEFINITIVA_Final retificada.pdf: 3899073 bytes, checksum: bce15885ae3813b905358032690f931d (MD5) / Made available in DSpace on 2012-09-17T19:29:00Z (GMT). No. of bitstreams: 1 Dissertação FGV - DEFINITIVA_Final retificada.pdf: 3899073 bytes, checksum: bce15885ae3813b905358032690f931d (MD5) Previous issue date: 2012-07-20 / This research aims at verifying how the project management methodology proposed by the Project Management Institute - PMI can contribute to the modernization of the war operations planning methodology in the Brazilian Army. For this purpose, there is developed a comparative study between the processes of initiation and planning groups settled by PMI in its Project Management Body of Knowledge - PMBOK and the war operations planning methodology in the Brazilian Army, named as 'Estimate of Situation'. This work is based on bibliographic and documentary researches that include renowned authors such as Kerzner, Cleland, Vargas, Lima, Maximiano, Valeriano, Prado and Xavier and also relevant Brazilian Army doctrinal manuals relevant to the topic and the PMKO itself. In order to contextualize this work, it is made equivalence between a military war operation and a civilian project. The Estimate of Situation is characterized as a planning and decision making process similar to the set of processes of the project management from initiation and planning groups. As researches show that the areas of Cost, Human Resources and Acquisition, because of the war operation peculiarities, are treated in such a different manner than in project management, they are not included in this study. Furthermore, it is observed that the military planning process is executed mainly with the intuitiveness gathered in the application of tacit knowledge whereas in project management it is used several tools based on logic and mathematics what gives the planning process projects a greater degree of impartiality and accuracy. It is also verified that the military planning process produces a large number of graphic material allowing a 'graphical view' of various areas and aspects of the problem, facilitating the use of intuition in the decision making. Finally, after identifying the project management processes that concerns to this study and the peculiarities of the planning methodology used in the Brazilian Army, it is concluded, as supposed, that the methodology of project management has features that could effectively contribute to the modernization of the war operations planning in the Brazilian Army, named as Estimate of Situation. These resources are listed at the conclusion of this work. / A presente pesquisa teve como objetivo verificar como a metodologia de gerenciamento de projetos, preconizada pelo Project Management Institute – PMI poderia contribuir para a modernização da metodologia de planejamento das operações de guerra do Exército Brasileiro. Para tanto, desenvolveu-se um estudo comparativo entre os processos dos grupos de iniciação e de planejamento definidos pelo PMI no seu Guia do Conhecimento em Gerenciamento de Projetos – PMBOK e o processo de planejamento de operações de guerra do Exército Brasileiro denominado Estudo de Situação. O trabalho foi desenvolvido com base em pesquisa bibliográfica e documental que contemplou renomados autores como Kerzner, Cleland, Vargas, Lima, Maximiano, Valeriano, Prado e Xavier, além dos manuais doutrinários do Exército Brasileiro pertinentes ao tema abordado e o próprio PMBOK. Contextualizando o trabalho foi feita a equiparação de uma operação militar de guerra a um projeto civil, e a caracterização do Estudo de Situação como um processo de planejamento e tomada de decisão equivalente ao conjunto de processos dos grupos de iniciação e de planejamento do gerenciamento de projetos. No estudo realizado verificou-se que as áreas de Custos, de Recursos Humanos e de Aquisições, em função das peculiaridades que envolvem uma operação de guerra são tratadas de forma tão diferenciadas do gerenciamento de projetos que não poderiam ser incluídas no estudo. Além disso, pôde-se constatar que o processo de planejamento militar é executado com uma grande parcela de intuição decorrente da aplicação de conhecimento tácito por parte dos seus executantes, o que não ocorre no gerenciamento de projetos onde o uso de um grande número de ferramentas de base lógica e matemática dá ao processo de planejamento dos projetos um maior grau de imparcialidade e precisão. Verificou-se também que o processo de planejamento militar produz um grande número de documentos gráficos que permitem uma 'visão gráfica' de várias áreas ou aspectos do problema que, por sua vez, facilitam o uso da intuição na tomada de decisão. Enfim, depois de identificados os processos de gerenciamento de projetos que interessavam ao estudo e as peculiaridades da metodologia de planejamento em uso no Exército Brasileiro, chegou-se a conclusão, como se havia suposto, que a metodologia de gerenciamento de projetos efetivamente possui recursos que podem contribuir para a modernização do processo de planejamento de operações de guerra do Exército Brasileiro denominado Estudo de Situação. Esses recursos estão relacionados na conclusão do trabalho.
347

Desenvolvimento de veículos comerciais no Brasil: um estudo sobre parâmetros de sucesso em gerenciamento de projetos de produtos / Commercial vehicles development in Brazil: a study about success parameters in products projects management

Federico Neto, Paschoal 20 September 2016 (has links)
Esta dissertação tem como objetivo pesquisar a importância de parâmetros de sucesso no processo de gerenciamento do desenvolvimento de veículos comerciais em empresas estabelecidas no Brasil, quarto maior mercado mundial. O referencial teórico tem como base os cinco critérios de avaliação de resultados de projetos descritos no Modelo Diamante de Shenhar e Dvir e os dez fatores críticos de sucesso (FCS) que formam o Modelo de Processo de Implantação de Projetos (PIP) de Pinto e Slevin. Para isto, foi feito um estudo de caso em uma grande montadora tradicional, por meio de um questionário dirigido a participantes de gerenciamento de projetos de produtos. A pesquisa revelou resultados interessantes tais como: (i) o perfil do participante de projetos de veículos comerciais, principalmente engenheiros com grande experiência profissional; (ii) as características principais dos produtos desenvolvidos, como inovação, tecnologia, complexidade e prazo restrito; (iii) a comparação de priorização dos critérios de sucesso segundo as opiniões dos entrevistados e segundo o que pensam ser o que sua empresa adota e (iv) a priorização dos FCS segundo suas próprias opiniões. Nestes dois últimos resultados, obtiveram-se achados que, por um lado, confirmam o referencial teórico e, por outro lado, mostram algumas diferenças como (i) o paradoxo de alguns altos executivos considerarem que a empresa adota critérios diferentes da sua própria priorização e (ii) a relação de importância dos FCS com o perfi do entrevistado e suas principais necessidades próprias para o desenvolvimento de projetos. Por fim, esta pesquisa traz colaborações para a academia, para as empresas e para a sociedade por meio da proposta do Mestrado Profissional em Empreendedorismo da Faculdade de Economia, Administração e Contabilidade da Universidade de São Paulo (FEA-USP), que busca temas de pesquisa baseado no universo profissional, embasa os conceitos teóricos com a metodologia acadêmica e aplica a pesquisa novamente no campo profissional. Isto aproxima a Universidade ao mundo empresarial e colabora com uma melhora sustentável de produtividade da sociedade brasileira / This dissertation aims to research the importance of success parameters in the management process of commercial vehicles\' development in companies established in Brazil, world\'s fourth largest market. The theoretical framework was based on five criteria of project evaluation results, described in the Diamond Model designed by Shenhar and Dvir, and in ten critical success factors (CSF) that integrate the Projects Implementation Process (PIP) modeled by Pinto and Slevin. For this purpose, a case study in a large traditional automaker was done through a questionnaire addressed to participants of product management projects. This research showed interesting results such as: (i) the profile of commercial vehicles projects\' participants, which are mainly engineers with large professional experience; (ii) the developed products main characteristics, as innovation, technology, complexity and limited term; (iii) the comparison of success criteria prioritization according to the their own opinions and what they think their company adopts and (iv) the prioritization of CSF according to their own opinions. In the latter two results, research has gathered interesting findings that, on one hand, confirm the theoretical framework and, on the other hand, show some differences as (i) the paradox of some senior executives who consider that the company adopts different criteria than their own prioritization and (ii) the importance of CSF relationship with the respondents\' profiles and their own main needs for development projects. Finally, this research brings contributions to academy, to business and to society through the proposal of the Professional Master\'s Degree in Entrepreneurship of the School of Economics, Business and Accounting of the University of São Paulo (FEA-USP), which seeks to research themes based on the professional world, underlies theoretical concepts with academic methodology and applies research findings again into the professional field. This brings the University closer to the business world and collaborates with a sustainable improvement of Brazilian society\'s productivity.
348

Os fatores condicionantes da seleção de parceiros nos projetos de alianças estratégicas tecnológicas bilaterais sem participação acionária em empresas industriais do setor químico brasileiro / The contributing factors for selecting partners in bilateral non-equity technological alliances in the Brazilian chemical sector

Garcez, Marcos Paixão 05 July 2010 (has links)
Embora as alianças estratégicas sejam uma das alternativas estratégicas conhecidas desde os anos 70, foi somente vinte anos depois que se iniciou uma rápida aceleração deste tipo de acordo de cooperação, seu escopo e sua coexistência com outras relações organizacionais (HARBISON e PEKAR, 1998). Atualmente, à medida que a complexidade dos projetos aumenta e os prazos de desenvolvimentos de novos produtos e serviços diminuem, as empresas não detém isoladamente as competências necessárias para sua sobrevivência e crescimento. Assim, as empresas são impelidas a buscarem cooperação externa em uma intensidade crescente, com outras empresas, universidades e outros agentes externos, com os objetivos de compartilhamento dos investimentos e riscos, redução dos prazos de desenvolvimento e o acesso a recursos e competências não disponíveis internamente, conforme sugere o novo paradigma da Inovação Aberta. Apesar da relativamente abrangente literatura sobre o tema de alianças tecnológicas, o estado do conhecimento nessa área pode ser considerado ainda incipiente e com poucos estudos que tratem mais especificamente de uma etapa crucial do processo, a seleção do parceiro. Mais que isso, estes poucos estudos existentes, além de não se ocuparem da segmentação mais detalhada dos diferentes tipos de parceiros, ainda tratam do fenômeno somente segundo o nível da empresa, e não segundo o nível do projeto. Esses aspectos são considerados as lacunas teóricas a serem investigadas no presente estudo. Desta forma, o estudo investiga a etapa de seleção do parceiro em projetos de alianças tecnológicas bilaterais sem participação acionária, do ponto de vista da empresa-mãe, levando em conta diversos fatores, tais como o tipo de recursos procurados, os resultados esperados, o tipo de competências procuradas, a duração do projeto, os riscos envolvidos, a experiência prévia em alianças, a confiança entre os parceiros, o nível de convergência de expectativas e o nível de similaridade organizacional, a depender do tipo de parceiro e tipo de projeto. Os dados empíricos advêm de duas etapas sucessivas, uma qualitativa e a outra quantitativa. Na etapa qualitativa é conduzido um estudo de casos na maior empresa petroquímica brasileira, no qual se analisa em profundidade vinte projetos em alianças desenvolvidos com diferentes tipos de parceiros concorrentes, clientes, fornecedores, universidades e institutos tecnológicos, em diferentes tipos de projetos incrementais, plataformas, radicais e de ciência básica. Adotando-se as teorias baseada em recursos (resource based view) e baseada em conhecimento (knowledge based view), em conjunto com os dados empíricos provenientes do estudo de casos, identificaram-se domínios específicos para os tipos de alianças, distribuídos no contínuo explotação - exploração. Estas evidências preliminares permitiram a construção de um conjunto de hipóteses que foram testadas na etapa quantitativa, conduzida junto ao setor químico brasileiro. Os resultados desta etapa apontam um conjunto detalhado de relações, determinando os fatores que mais contribuem em cada situação e o ranking desta contribuição dependendo do tipo de parceiro e tipo de projeto. O presente estudo objetiva trazer reflexões nesse importante campo do conhecimento, bem como contribuições teóricas e práticas, de forma a estabelecer relações que possam levar ao melhor entendimento dos fatores contribuintes da seleção de parceiros em alianças tecnológicas. / Although the strategic alliances are one of the strategic alternatives known since the 1970s, it was only twenty years later that finally started the rapid growth of this kind of cooperation, its scope and its coexistence with other organizational forms (HARBISO8 and PEKAR, 1998). At the present time, as projects complexity increases and products and services development term reduces, companies do not detain by themselves all the necessary competences for their survival and growth. Thus, companies nowadays are required to build more extensively external cooperation agreements with other companies, universities and external agents, aiming for: (i) sharing investments and risks; (ii) accelerating project developments, and (iii) accessing resources and competences not available internally, as suggested by the Open Innovation paradigm. Despite the relatively wide literature concerning strategic alliances, structured knowledge in this area can be considered incipient and it encompasses only few studies dealing with one crucial step of the process, the partner selection. Moreover, besides the fact that these few studies do not address a detailed breakdown structure regarding different typologies of partners, they only investigate the phenomena through the firm level perspective instead of the project level perspective. These aspects are considered the main theoretical gaps to be filled in the present study. Thus, this study addresses partner selection stage in non-equity bilateral technological alliances projects, from the point of view of the parent company, taking into account several factors, such as the kind of resources searched, the expected results, the kind of competences searched, the level of projects investments, the time for completion, the risks involved, the previous experience in alliances, the trust between partners, the convergence level of expected objectives and the level of organizational cultural similarities, depending on the type of the partner and the type of projects. The empirical data come from two successive stages, a qualitative and other quantitative. In the qualitative stage, it was carried out one case study in the biggest Brazilian petrochemical company, where were analyzed in-depth twenty alliances projects performed with different types of partners competitors, customers, suppliers, universities and technological institutes, and different types of projects incremental (derivative), platforms, breakthrough (radical) and basic science. Based on the resource based view and the knowledge based view theories, jointly with the empirical data that have emerged from the case studies, it was possible to identify certain specific domains for the types of alliances, along the exploitationexploration continuum. These preliminary evidences have enabled the building of several hypotheses that were tested in the quantitative research performed within the Brazilian chemical sector. The quantitative study points out one wide array of relations, determining the more contributing selection factors in each situation, and the ranking of this contribution regarding the type of partner and type of project. The study aims to bring reflections, theoretical and practical contributions on this relevant subject, in order to establish basic relationships that could lead to a better understanding of the contributing factors for selecting partners in technological alliances.
349

Avaliação da relação do uso de métodos e treinamentos em gerenciamento de projetos no sucesso dos projetos através de uma perspectiva contingencial: uma análise quantitativa. / Evaluation of the relation of project management use of methods and training in the project success through a contingencial prespective: a quantitative analysis.

Patah, Leandro Alves 22 April 2010 (has links)
O gerenciamento de projetos tem sido cada vez mais estudado, e diferentes abordagens podem ser encontradas na bibliografia gerada pela academia e por praticantes da área, sendo considerado um aspecto estratégico para companhias de sucesso. Por isso, nos últimos anos, muitas empresas têm despendido grandes montas em gerenciamento de projetos, alimentando a controversa discussão sobre os resultados da aplicação de tais métodos em relação ao retorno dos investimentos. Esta tese tem como objetivo analisar os benefícios gerados pelo uso destes métodos de gestão de projetos para as organizações. A abordagem metodológica baseia-se em uma modelagem quantitativa, na qual se busca relacionar o grau de implementação dos métodos de gerenciamento de projetos ao sucesso dos projetos. A pesquisa empírica foi realizada em uma empresa multinacional de grande porte, com atuação diversificada, presente em vários setores industriais. Participaram do estudo dez unidades de negócio, de três países, de dez setores industriais: componentes, energia, indústria, manutenção, medicina, óleo e gás, segurança, tecnologia da informação, telecomunicações e transportes. Apesar de todas as unidades de negócio adotar o mesmo conjunto de métodos de gerenciamento de projetos corporativo, elas apresentam graus de implementação distintos. A base de dados foi coletada ao longo de dois anos e é composta de 1.387 projetos. Os resultados da pesquisa apontam para uma influência positiva no sucesso do projeto, medido pelo cumprimento do prazo e do custo do mesmo, em decorrência do maior grau de utilização de métodos em gerenciamento de projetos e do maior esforço em treinamento de gestores. Por outro lado, verifica-se que quanto mais complexo o projeto, maior a dificuldade em se obter os resultados planejados. Conclui-se que o uso de métodos tem impacto estatisticamente positivo no resultado operacional dos projetos, medido através do cumprimento de orçamento e prazo dos projetos, bem como o esforço em treinamento e capacitação em gerenciamento de projetos tem impacto positivo no resultado operacional dos mesmos. Adicionalmente a complexidade do projeto tem impacto positivo no resultado operacional do mesmo. / Project management has been more studied and different approaches can be found in the literature generated by the researches and by practioners. This subject has been considered a strategic aspect for successful companies. That is the reason for, in the past years, lots of companies have been investing a huge amount of money in project management, feeding the controversial discussion about the results with the application of these methods in relation to the return of investments. This thesis has the objective to analyze the benefits generated by the use of these methods for the organizations. The methodological approach is based on a quantitative model in which the intention is to relate the implementation level of methods and training in project management to the success of the projects. The empirical research was conducted in a large multinational company, with diversified participation in the market, making business in many industrial sectors. Ten different business units took part in this study, from three countries and ten industrial sectors: components, energy, industry, maintenance, medicine, oil and gas, security, information technology, telecommunications and transportation. Although all the business units adopt the same package of corporate project management methods, they present different levels of implementation. The database was collected in a timeframe of two years and is composed by 1387 projects. The research results point out a positive influence in project success measured by the accomplishment of project time and cost, mainly because of the higher utilization level of the project management methods and the higher effort in project management training. In other direction, it was verified that the more complex the project, more difficult is to obtain the planned results. The use of methods has a statistical positive impact in the operational results of projects, measured through the fulfillment of projects budget and time, as the effort in project management training has a statistical positive impact in the operational results of them. Additionally the project complexity has a positive impact in the operational results of it.
350

Fatores comportamentais facilitadores da gestão de projetos / BEHAVIORAL FACTORS THAT FACILITATE PROJECT MANAGEMENT

Mei, Paulo Cesar 14 November 2017 (has links)
Essa dissertação de mestrado busca analisar os aspectos comportamentais que possam contribuir ou facilitar a gestão de projetos e como a ausência desses fatores podem comprometer o sucesso e a realização das estratégias. O objetivo principal deste trabalho é identificar os principais fatores comportamentais facilitadores para a gestão de projetos e propor sugestões para o aprimoramento dos fatores comportamentais mais relevantes. O trabalho contou inicialmente com uma revisão bibliográfica e consulta a especialistas, levando a uma relação não estruturada de fatore comportamentais listados nos principais trabalhos teóricos, mas também vivenciados na prática pelos profissionais entrevistados. A lista final foi submetida a uma avaliação por três grupos: Profissionais diretamente ligados à gestão de projetos, profissionais indiretamente ou esporadicamente ligados à gestão de projetos e instrutores e professores em gestão de projetos. O objetivo foi resgatar os principais elementos comportamentais contributivos para a boa gestão na ótica destes três tipos de profissionais. Para os profissionais diretamente ligados à gestão de projetos, os 2 fatores mais importantes detectados foram a comunicação com 45,6% da preferência e o trabalho em Equipe com 34% da preferência. Os profissionais indiretamente ou esporadicamente ligados à gestão de projetos elegeram também a comunicação e o trabalho em equipe, mas para ampliar a contribuição este trabalho avaliou para esse grupo o 3º e 4º fatores mais citados que foram o gerenciamento de Conflitos com 25,7% da preferência e a liderança com 22,9% da preferência. Já para os profissionais do ensino da gestão de projetos os 2 fatores mais importantes também já haviam sido mencionados e avaliados nos dois grupos anteriores e por isso este trabalho mais uma vez avaliou o 3º e 4º fatores mais citados que foram a moralidade e Ética e a visão holística, que empataram com 27,3% da preferência. Por fim, com base nesses principais fatores, foram mapeadas possíveis soluções para corrigir a carência desses fatores visando o sucesso dos projetos. Os resultados das pesquisas foram compilados em forma de sugestões de aprimoramento visando preparar os envolvidos na gestão de projetos quanto aos fatores comportamentais mais importantes detectados ao longo do trabalho. / This dissertation seeks to analyze the behavioral aspects that can contribute or facilitate the project management and how the absence of these factors can compromise the success and achievement of the strategies. The main objective is to identify the main facilitating behavioral factors for the management of projects and to propose suggestions for the improvement of the most relevant behavioral factors. The work initially counted on a bibliographical revision and consultation to specialists, leading to an unstructured list of behavioral factors listed in the main theoretical works, but also experienced in practice by the professionals interviewed. The final list was submitted to an evaluation by three groupes: Professionals directly linked to project management, professionals indirectly or sporadically linked to project management and instructors or teachers in project management. The objective was to understand the main behavioral elements that contribute to a good management from the perspective of these three types of professionals. For professionals directly involved in project management, the 2 most important factors detected were communication with 45.6% of the preference and Team work with 34% of preference. The professionals indirectly or sporadically linked to the project management also chose communication and teamwork as the most important factors in project management, but to increase the contribution, this work evaluated for this group the 3rd and 4th most cited factors that were Conflicts management with 25.7% of the preference and leadership with 22.9% preference. For the project management teacher group, the 2 most important factors had already been mentioned and evaluated in the two previous groups and so this work once again evaluated the 3rd and 4th most cited factors that were morality and Ethics and holistic view, which tied with 27.3% of preference. Finally, based on these main factors, possible solutions were mapped to correct the lack of these factors aiming the success of the projects. The results of the research were compiled in the form of suggestions for improvement in order to prepare those involved in project management on the most important behavioral factors detected throughout the work.

Page generated in 0.1127 seconds