• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 271
  • 15
  • 11
  • 9
  • 9
  • 8
  • 8
  • 6
  • 6
  • 6
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 302
  • 302
  • 141
  • 106
  • 103
  • 74
  • 62
  • 60
  • 48
  • 42
  • 40
  • 38
  • 33
  • 22
  • 22
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
151

Planejamento de empreendimentos imobiliários: gestão de risco orientada a gestão de prazo com ênfase na identificação de alertas antecipados. / Construction project management: risk management oriented to time management with emphasis on the identification of early warnings.

Navarro, Silvana Sugano 01 August 2007 (has links)
O aprimoramento de processos de gerenciamento de empreendimentos é um fator condicionante para que uma empresa mantenha sua competitividade no mercado de empreendimentos imobiliários de edifícios de apartamentos. O gerenciamento de prazos está entre os processos que concentra maiores esforços durante as fases de planejamento e implantação de um empreendimento, pois desvios de prazo geralmente afetam sensivelmente sua rentabilidade. O objetivo desta pesquisa é apresentar uma abordagem de gerenciamento de riscos orientada ao gerenciamento de prazos com ênfase na identificação de alertas antecipados a condições de risco de cumprimento de prazos. A partir do reconhecimento do estado da arte sobre o tema, um estudo de caso foi conduzido em empresas que atuam no mercado de empreendimentos imobiliários de edifícios de apartamentos na cidade de São Paulo. Este estudo permitiu a exploração do conjunto de práticas de gerenciamento de prazos e riscos e dos alertas utilizados por estas empresas no gerenciamento de seus empreendimentos. A abordagem proposta se baseia na integração entre os processos de gerenciamento de prazos e riscos, possibilitando a utilização de alertas antecipados como suporte ao processo de tomada de decisões, permitindo reagir rapidamente, tão logo um alerta seja identificado. / The improvement of the project management process is a key factor for a company to keep its competitiveness in the real estate market. Time management demands great efforts during the planning and implementation phases of a project, since schedule delays usually affect the project profits in a significant way. The objective of this research is to present an approach to risk management oriented to time management processes with emphasis on the identification of early warnings about risk conditions to time of conclusion. Based on the recognition of the state-of-the-art of this subject, a case study was conducted in companies that act in the apartment building real estate market in the city of São Paulo. This case study enabled us to exploit a set of time and risk management practices and early warnings used by these companies while managing their projects. The approach proposed is based on the integration of time and risk management processes, making possible for us the use of early warning as a support to decision making process, allowing us to react quickly, as soon as a warning is identified.
152

Desenvolvimento de modelo de risco de porfólio para carteiras de crédito a pessoas físicas

Andrade, Fabio Wendling Muniz de 17 August 2004 (has links)
Made available in DSpace on 2010-04-20T20:48:27Z (GMT). No. of bitstreams: 3 98345.PDF.jpg: 15539 bytes, checksum: c691fce421ba6df7652aa2f7fa6738e6 (MD5) 98345.PDF: 2342425 bytes, checksum: 9d0ca2782168d80911cc8e702bca7465 (MD5) 98345.PDF.txt: 277721 bytes, checksum: 94200102d3f23c511522c0a51ea02d21 (MD5) Previous issue date: 2004-08-17T00:00:00Z / Esta tese apresenta o desenvolvimento conceitual, estimação de parâmetros e aplicação empírica de um Modelo de Risco de Portfólio cujo objetivo é realizar previsões da distribuição estatística da perda de crédito em carteiras de crédito ao consumidor. O modelo proposto é adaptado às características do crédito ao consumidor e ao mercado brasileiro, podendo ser aplicado com dados atualmente disponíveis para as Instituições Financeiras no mercado brasileiro. São realizados testes de avaliação da performance de previsão do modelo e uma comparação empírica com resultados da aplicação do Modelo CreditRisk+.
153

Aplicação da teoria de cópulas para o cálculo do value at risk

Cordeiro, Fabio Nunez Barja 30 November 2009 (has links)
Made available in DSpace on 2010-04-20T21:00:03Z (GMT). No. of bitstreams: 4 Fabio Nunes Barja.pdf.jpg: 2268 bytes, checksum: 3ff1d834aa6bf6835efe6dd07835326c (MD5) Fabio Nunes Barja.pdf.txt: 144718 bytes, checksum: 86d161817200706186fc58ff0c7b1cd4 (MD5) license.txt: 4712 bytes, checksum: 4dea6f7333914d9740702a2deb2db217 (MD5) Fabio Nunes Barja.pdf: 920446 bytes, checksum: 547cbd04aa1355d329be524b2fe94b1d (MD5) Previous issue date: 2009-11-30T00:00:00Z / Este trabalho aplica a teoria de cópulas à mensuração do risco de mercado, através do cálculo do Value at Risk (VaR). A função de cópula oferece uma maior flexibilidade para a agregação de riscos quando comparada com abordagens tradicionais de mensuração de risco. A teoria de cópulas permite a utilização de distribuições de probabilidade diferentes da normal para a modelagem individual dos fatores de risco. Além disso, diferentes estruturas de associação entre eles podem ser aplicadas sem que restrições sejam impostas às suas distribuições. Dessa forma, premissas como a normalidade conjunta dos retornos e a linearidade na dependência entre fatores de risco podem ser dispensadas, possibilitando a correta modelagem de eventos conjuntos extremos e de assimetria na relação de dependência. Após a apresentação dos principais conceitos associados ao tema, um modelo de cópula foi desenvolvido para o cálculo do VaR de três carteiras, expostas aos mercados brasileiros cambial e acionário. Em seguida, a sua precisão foi comparada com a das metodologias tradicionais delta-normal e de simulação histórica. Os resultados mostraram que o modelo baseado na teoria de cópulas foi superior aos tradicionais na previsão de eventos extremos, representados pelo VaR 99%. No caso do VaR 95%, o modelo delta-normal apresentou o melhor desempenho. Finalmente, foi possível concluir que o estudo da teoria de cópulas é de grande relevância para a gestão de riscos financeiros. Fica a sugestão de que variações do modelo de VaR desenvolvido neste trabalho sejam testadas, e que esta teoria seja também aplicada à gestão de outros riscos, como o de crédito, operacional, e até mesmo o risco integrado. / This study applies the theory of copulas to the measurement of market risk by doing the Value at Risk (VaR) calculation. The copula function offers a greater flexibility to aggregate the risks as compared to traditional approaches of risk measurement. The theory of copulas enables the use of probability distributions different from the normal to the individual modeling of risk factors. Furthermore, different association structures between them can be applied with no restrictions being imposed to its distributions. Thus, premises such as joint normality of returns and linearity in the dependence between risk factors can be dismissed, what enables the correct modelling of extreme joint events and of asymmetry in the dependence relation. After presenting the main concepts associated to the theme, a copula model was developed in order to calculate the VaR for three portfolios which are exposed to the Brazilian foreign exchange and stock markets. Afterwards, its accuracy was compared with that of traditional methodologies, i.e., delta-normal and historic simulation. The results showed that the model based on the theory of copulas was superior to the traditional ones at forecasting extreme events, which are represented by VaR 99%. When it comes to VaR 95%, the delta-normal model presented the best results. Finally, it was possible to conclude that the theory of copulas study is of great relevance to financial risks management. For further research, a suggestion is testing variations of the VaR model developed in this work, as well as applying this theory to managing other risks, such as credit, operational or even integrated risk.
154

Indicadores de desempenho aplicados à gestão de riscos em cadeias logísticas seguras no comércio exterior. / Performance indicators applied to risk management in safe logistic chains in foreign trade.

Hoeflich, Sergio Luiz 23 April 2018 (has links)
O presente trabalho de pesquisa apresenta uma metodologia para gestão dos riscos em empresas que atuam cadeia de suprimentos internacional. Apresenta-se um roteiro de analise qualitativa de conformidade e de avaliação qualitativa dos riscos, atendendo aos requisitos da habilitação para a certificação de Operadores Econômicos Autorizados (OEA). A metodologia de gestão de riscos foi modelada a partir de aspectos pertinentes, com os indicadores que são relevantes para os operadores no comércio exterior brasileiro, cujos riscos vão além das operações nas aduanas. O gerenciamento da cadeia de suprimentos e o conceito que encerram os seus riscos foram pesquisados na literatura, em busca modelos de gerenciamento adequados às atividades do OEA. O modelo proposto consiste em uma metodologia de analise quantitativa para a gestão dinâmica dos riscos avançando além dos consagrado método qualitativo de gestão de conformidades. É um instrumento que se presta a atender aos mais variados setores das organizações, que estão comprometidas com a gestão dos seus riscos corporativos. / This research presents a methodology for risk management in companies that operate the international supply chain. A roadmap for qualitative analysis of compliance and qualitative risk assessment is presented, taking into account the requirements of the authorization for the certification of Authorized Economic Operators (AEO). The risk management methodology was modeled on pertinent aspects, with the indicators that are relevant for the operators in the Brazilian foreign trade, whose risks go beyond customs operations. Supply chain management and the concept that curtailed its risks were researched in the literature, in search of management models appropriate to AEO activities. The proposed model consists of a methodology of quantitative analysis for the dynamic management of risks, advancing beyond the established qualitative method of compliance management. It is an instrument that serves the most varied sectors of organizations, which are committed to managing their corporate risks.
155

Gestão de incertezas em projetos complexos: quadro conceitual e estudos de caso. / Sem título em inglês

Zheng, Esther Zhi Hong 15 August 2016 (has links)
As metodologias tradicionais de gerenciamento de projetos são caracterizadas como sendo rígidas e adequadas apenas para ambientes de pouca incerteza. No entanto, atualmente cada vez mais projetos são desenvolvidos em ambientes de alta complexidade e maiores incertezas, o que requer formas diferentes de gerenciamento do projeto, menos rígidas e mais flexíveis. Assim, o objetivo deste trabalho é propor um quadro conceitual para o gerenciamento de incertezas em projetos complexos. A abordagem metodológica mescla revisão sistemática da literatura e estudos de caso. O quadro conceitual desenvolvido, baseado na teoria da contingência, sugere que as abordagens de gestão de projetos sob incertezas são, em parte, determinadas pelas características das incertezas existentes. As respostas às incertezas podem ser orientadas à causa ou ao efeito da incerteza, e essas são escolhidas de acordo com a habilidade de influência sobre a causa, que aumenta para incertezas internas e diminui para incertezas externas. Já a flexibilidade da abordagem de gestão de projetos é impactada pelo grau da incerteza. Foram realizados seis estudos de caso, e um caso piloto, em projetos complexos, que mostraram que existe relação entre a origem da incerteza e a habilidade de influência, e entre a habilidade de influência e a orientação das ações. Eles mostraram também como a flexibilidade é importante para o gerenciamento das incertezas do projeto, associando métodos de antecipação, de instrucionismo, como o gerenciamento de riscos e a resiliência, principalmente a capacidade da alta direção assumir a existência de incertezas. Os estudos de caso evidenciaram que quanto maior o nível de incerteza do projeto, maior é a flexibilidade necessária. A dissertação apresenta ainda as limitações do estudo e as sugestões para trabalhos futuros. / Traditional project management methodologies are considered rigid and suitable only for environments of little uncertainty. However nowadays increasing number of projects is being developed in high complexity and uncertainty environment, requiring different approaches for project management: less rigid and more flexible. Thus, the purpose of this paper is to present a framework for managing projects under uncertainties, through a systematic literature review. The developed framework, based on the contingency theory, suggests that approaches for project management under uncertainty are, in part, determined by the characteristics of the existing uncertainties. The responses for uncertainty can be driven by the cause or consequence of the uncertainties and those are chosen according to the ability to influence the cause, which is higher for internal uncertainties and lower for external uncertainties. The flexibility of the project management approach, in its turn, is impacted by the uncertainty degree. Six case studies and a pilot case study were conducted in projects with complexity. The cases showed that there is a relation between the source of the uncertainty and the ability to influence, and between the ability to influence and the orientation of the responses. They also pointed out the importance of flexibility to manage uncertainties, combining prediction methods, the instructionism, such as using risk management, and resilience, especially the ability of the management to admit the existence of uncertainties. The cases also indicated that the highest is the project uncertainty, the highest is the need for flexibility. The paper also presents the limitation of the research, and suggestions for further works.
156

Criando sentido para as incertezas imprevisíveis em projetos inovadores / Sensemaking unforeseeable uncertainty for innovative projects

Russo, Rosaria de Fatima Segger Macri 02 August 2012 (has links)
As inovações, motores do desenvolvimento global, viabilizam-se nas organizações por meio dos projetos. Quanto maior for o nível de inovação nesses projetos, maior é a probabilidade de existirem incertezas imprevisíveis. A identificação dos sinais precoces de uma mudança permitiria perceber essas incertezas, porém, para o reconhecimento antecipado desses sinais, é preciso também dar sentido ao que está ocorrendo, pela criação de sentido (sensemaking). Assim, este estudo tem como objetivo principal entender qual é o fator gerador da incerteza imprevisível, quais são os fatores motivadores de sua identificação e quais práticas contribuem para a criação de sentido dessas incertezas em projetos inovadores. Para tal, foi feito um levantamento de campo, de maio a dezembro de 2011, no qual foram utilizados: um questionário para se obterem informações iniciais sobre os projetos que poderiam ser considerados inovadores e, posteriormente, uma entrevista aprofundada, direcionada por um roteiro com perguntas abertas, com um dos participantes do projeto. Foram enviados 152 convites para gestores de projetos, dos quais apenas 16 projetos atenderam aos requisitos exigidos, transformando-se em unidade de análise. A cada uma dessas unidades foram solicitados, também, pelo menos dois eventos imprevistos, materialização da incerteza imprevisível, obtendo-se a quantidade de 35. Esses eventos imprevistos foram considerados unidade de análise incorporada. A análise dos dados foi inicialmente qualitativa, com a geração de variáveis e categorias avaliadas estatisticamente; posteriormente, por meio de provas não paramétricas. Com base nas análises efetuadas, foi possível observar que o nível mais alto de eficiência na identificação da incerteza imprevisível - perceber a incerteza imprevisível previamente e ter menos impacto - ocorre preferencialmente em eventos com a percepção do sinal precoce feita pelo gerente do projeto ou pelo sponsor, no início do projeto; com a existência de um fator facilitador organizacional; com a utilização de um processo de criação coletiva de sentido. O nível mais baixo de eficiência - percepção tardia do evento imprevisto e existência de mais impacto - associa-se, porém, à causa externa da incerteza imprevisível, à ausência da percepção de um sinal precoce, à presença de um fator bloqueador à identificação com origem nas características pessoais, baixo número de atividades coletivas, entre outras. Recomenda-se incorporar o diagnóstico da incerteza na gestão de riscos dos projetos, buscar informações sobre as áreas incertas do projeto e interagir para socializar o conhecimento. Futuros estudos ampliados, para se obter um número maior de eventos e projetos, poderão permitir novas associações, assim como gerar um modelo multivariado. O uso de métodos alternativos de gestão de projetos inovadores também se mostra como um relevante tema de pesquisa. / The organizations enable innovations, engines of global development, through the projects. The more innovative a project, the greater is the probability of occurrence of unforeseeable uncertainties. The identification of early signs of a change would realize this kind of uncertainty, but for the early recognition of these early signs is necessary to give sense to them, sensemaking. Thus, this study aims to understand what the main factor that generates the unforeseeable uncertainty is, what the motivating factors for their identification are and what the practices that contribute to the creation of meaning of these uncertainties are on innovative projects. To this end, a field survey has been done, from May to December 2011, with: a questionnaire to obtain initial information about the projects that could be considered innovative, and subsequently an in-depth interview, guided by a script with open questions, with one of the project participants. 152 invitations were sent to project managers, of which only 16 projects met the requirements, becoming a unit of analysis. Each of these units was also requested at least two unforeseen events, materialization of unforeseeable uncertainty, thus obtaining 35 unanticipated events, which are considered the unit of analysis embedded. Data analysis was qualitative, the generation of categories and variables were evaluated statistically through non-parametric tests. Based on the analysis performed it was observed that the highest level of efficiency in identifying unforeseeable uncertainty - it was notice in advance and it had less impact - occurred preferentially when events have had the perception of early sign made by the project manager or the sponsor at the beginning of the project, with the existence of an organizational facilitator factor, and using a collective sensemaking process. Moreover, the lowest level of efficiency - late perception of the unforeseeable event and existence of more impact - were associated with the external cause of unforeseeable uncertainty, the lack of perception of an early signal, the presence of a blocking factor identification originated from the personal characteristics, low number of collective activities, among others. It is recommended to incorporate the diagnosis of unforseeable in risk management of projects, seeking information about the uncertain areas of the project and interacting to share the knowledge. Further studies extended to obtain a larger number of events and projects may allow new associations as well as generate a multivariate statistical model. The use of alternative methods of management of innovative projects to identify unforeseeable uncertainty also appears as a relevant research topic.
157

A questão dos riscos em ambientes de computação em nuvem / The risks issue in cloud computing

Chaves, Sidney 24 October 2011 (has links)
Este documento apresenta e descreve o trabalho de pesquisa realizado com vistas a estabelecer recomendações destinadas a auxiliar consumidores de serviços de computação em nuvem a tratar a questão dos riscos inerentes a este ambiente, de modo tal a poder contratar serviços desta natureza com grau aceitável de risco. Para atender a este objetivo e aos demais objetivos secundários definidos, o estudo foi conduzido em cinco fases: revisão da literatura relativa à computação em nuvem, escolha e estruturação do método de pesquisa, aplicação do método de pesquisa, proposição das recomendações para o tratamento dos riscos e elaboração das conclusões. A revisão da literatura compreendeu um amplo levantamento bibliográfico sobre computação em nuvem, com ênfase na sua definição, nos modelos de referência e nos tópicos barreiras, benefícios e riscos. A escolha do método de pesquisa envolveu o processo de seleção do Delphi, acompanhado por outro extenso levantamento bibliográfico, desta feita sobre este método, e foi seguida da definição da sistemática a ser adotada para aplicá-lo especificamente nesta pesquisa; para aplicar o Delphi, foi escolhida a modalidade ranking form, por meio da qual se tornou possível determinar, após a realização de cinco rodadas do painel e contando com a participação de um grupo de especialistas formado por acadêmicos e profissionais de tecnologia da informação, rankings para as barreiras, os benefícios e os riscos associados à computação em nuvem. A partir do ranking dos riscos, foram estabelecidas as recomendações destinadas a satisfazer ao objetivo principal da pesquisa, que se traduzem, em linhas gerais, na indicação de quais riscos potenciais devem ser observados e tratados com maior grau de atenção pelas instituições, organizações e executivos de tecnologia da informação que pretendam dar seus primeiros passos no universo da computação em nuvem, bem como por aqueles que, já devidamente inseridos neste ambiente, queiram ou tenham a necessidade de rever conceitos e posições assumidos. Por fim, as conclusões e considerações finais contemplaram a análise dos resultados obtidos no painel Delphi relativamente às barreiras e aos benefícios. Como contribuição maior, este estudo oferece, acima de tudo, uma visão realista acerca da computação em nuvem e coloca à disposição daqueles que efetivamente por ela se interessam, por vontade própria ou dever de ofício, um rol de observações e recomendações úteis e oportunas. / This report presents and depicts the research carried out in order to find out recommendations that may possibly assist consumers of cloud computing services to deal with risks intrinsic to that architecture, so that consumers can be able to contract those kinds of services within an acceptable level of risk. The research comprised five phases to satisfy this main objective and also the secondary ones set up for it: review the literature related to cloud computing, choose and configure the research method, run the research method, find out the recommendations and make conclusions. The review of the literature consisted of an extensive bibliography research about cloud computing, putting emphasis on its definitions and reference models and on three other connected topics: barriers, benefits and risks. The choice of the research method encompassed the selection of the Delphi method seconded by another wide bibliography research, this time focused on the method itself, and was followed by the configuration of the Delphi method in order to get a script to be adopted to make properly use of the method in this research; to apply the Delphi method, it was chosen its \"ranking form\", that made possible, after five rounds and counting with the involvement of a group comprising academic people and information technology professionals, to establish rankings for barriers, benefits and risks, all related to cloud computing. Based on the ranking of risks, the recommendations destined to satisfy the research\'s main objective were thought up; in general, these recommendations can be viewed as indicatives of which potentials risks must be observed and treated in an upper attention level by institutions, organizations and information technology executives that intend to take their first steps toward cloud computing universe, as long as by those companies and people that, despite by now inserted in that architecture, want to or must review concepts and positions already took on. At last, conclusions and final considerations were written, both derived from the analysis of the results regarding barriers and benefits extracted from the Delphi panel. Above all, this study, as its major contribution, offers a realistic view on the subject of cloud computing and puts a list of useful and timely reflections and recommendations within reach of those who are effectively interested in them, by proper will or due to duties.
158

Risco legal nas instituições financeiras: o impacto da jurisprudência sobre o crédito bancário / Legal risk in the financial institutions: impact of the case law on the bank credit

Sérgio Cipriano dos Santos 11 July 2007 (has links)
O Novo Acordo de Capitais de Basiléia introduz a alocação de capital para a cobertura de riscos operacionais, estando incluídos entre estes os riscos legais. Estes riscos, no cenário brasileiro, apresentam potencial para ocasionar perdas significativas e um exemplo disto é o volume de provisões contábeis para a cobertura de riscos fiscais, trabalhistas e cíveis, que em dezembro de 2006 atingiam o montante de R$ 39 bilhões no Sistema Financeiro. Em muitos casos a origem destas perdas vai ser encontrada em uma falha operacional; contudo perdas podem advir de mudanças na jurisprudência dos tribunais, e estas perdas também podem ser substanciais. Nesta dissertação, será abordado o impacto do ambiente legal sobre o crédito bancário e, em especial, se destacará o impacto da jurisprudência. Para comprovar este impacto utilizamos modelos que associam a redução no volume de operações de arrendamento mercantil, com decisões judiciais descaracterizando os contratos de leasing. Os dados comprovam que as decisões judiciais podem impactar de forma significativa o crédito. Além disso, os dados demonstram que o processo de consolidação da jurisprudência é lento, gerando longos períodos de incerteza jurisprudencial. / The New Basel Capital Accord introduces capital allocation for operational risks (including legal risks). These risks - in the Brazilian scenario -, present potential for significant losses and a good example of this is the amount of provisions related to fiscal, labor and civil litigation risks, which in December 2006 added up to R$ 39 billions. In many cases, the origin of these losses derives from an operational failure; yet losses may have their origin in changes of legal jurisprudence and may involve substantial sums of money. In this dissertation, the focus will be on the impact of the legal environment on bank loans, with an emphasis on legal jurisprudence. In order to prove this impact, we used models that correlate the reduction in the volume of leasing operations with court decisions that strongly affected the interpretation of leasing contracts. Data show that court decisions may impact loans significantly. Besides, data evidence that the process of convergence and maturation of such decisions is low, thus generating long periods of jurisdictional uncertainty.
159

Indicadores de desempenho aplicados à gestão de riscos em cadeias logísticas seguras no comércio exterior. / Performance indicators applied to risk management in safe logistic chains in foreign trade.

Sergio Luiz Hoeflich 23 April 2018 (has links)
O presente trabalho de pesquisa apresenta uma metodologia para gestão dos riscos em empresas que atuam cadeia de suprimentos internacional. Apresenta-se um roteiro de analise qualitativa de conformidade e de avaliação qualitativa dos riscos, atendendo aos requisitos da habilitação para a certificação de Operadores Econômicos Autorizados (OEA). A metodologia de gestão de riscos foi modelada a partir de aspectos pertinentes, com os indicadores que são relevantes para os operadores no comércio exterior brasileiro, cujos riscos vão além das operações nas aduanas. O gerenciamento da cadeia de suprimentos e o conceito que encerram os seus riscos foram pesquisados na literatura, em busca modelos de gerenciamento adequados às atividades do OEA. O modelo proposto consiste em uma metodologia de analise quantitativa para a gestão dinâmica dos riscos avançando além dos consagrado método qualitativo de gestão de conformidades. É um instrumento que se presta a atender aos mais variados setores das organizações, que estão comprometidas com a gestão dos seus riscos corporativos. / This research presents a methodology for risk management in companies that operate the international supply chain. A roadmap for qualitative analysis of compliance and qualitative risk assessment is presented, taking into account the requirements of the authorization for the certification of Authorized Economic Operators (AEO). The risk management methodology was modeled on pertinent aspects, with the indicators that are relevant for the operators in the Brazilian foreign trade, whose risks go beyond customs operations. Supply chain management and the concept that curtailed its risks were researched in the literature, in search of management models appropriate to AEO activities. The proposed model consists of a methodology of quantitative analysis for the dynamic management of risks, advancing beyond the established qualitative method of compliance management. It is an instrument that serves the most varied sectors of organizations, which are committed to managing their corporate risks.
160

Comunicação de risco de inundação: uma análise do conteúdo de jornais de cidades paraenses (2009-2010)

SANTOS, Juliana Lima dos 17 April 2014 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2015-06-11T18:15:12Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ComunicacaoRiscoInundacao.pdf: 5575896 bytes, checksum: a70ce333b81eaf42fd33fd5475344b59 (MD5) / Approved for entry into archive by Ana Rosa Silva (arosa@ufpa.br) on 2015-06-16T13:58:20Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ComunicacaoRiscoInundacao.pdf: 5575896 bytes, checksum: a70ce333b81eaf42fd33fd5475344b59 (MD5) / Made available in DSpace on 2015-06-16T13:58:20Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ComunicacaoRiscoInundacao.pdf: 5575896 bytes, checksum: a70ce333b81eaf42fd33fd5475344b59 (MD5) Previous issue date: 2014 / Esta dissertação tem como intuito a análise do conteúdo noticioso dos jornais impressos (2009-2010) das cidades paraenses de Santarém e Marabá, que anualmente enfrentam inundações no período do inverno amazônico (de Dezembro a Junho). O objetivo é analisar se há Comunicação de Risco e como o risco é comunicado nos jornais locais no decorrer das etapas da Gestão de Risco. Há efetividade na Comunicação de Risco? Para isso, a metodologia foi pautada na análise do conteúdo, tendo em vista investigar a forma, conteúdo, número e memória midiática do Jornal de Santarém e Baixo Amazonas - JSBA (Santarém) e do Jornal Correio do Tocantins - CT (Marabá), na temporalidade estabelecida. O principal referencial teórico que serviu de base para pesquisa está vinculado aos conceitos de Comunicação de Risco, Análise do Conteúdo e Gestão de Risco, encontrados respectivamente nas obras de Di Giulio (2008), Bardin (2009) e Jungles (2012). Na comparação entre os jornais, observou-se que o JSBA apresentou maior quantidade de publicações e um conteúdo mais informativo do que o JCT, porém, a forma mostrou-se mais consistentes no segundo jornal. Quanto à memória midiática, o Correio do Tocantins apresentou o elemento do “esquecimento midiático”, que caracteriza a ausência de publicações sobre o tema por um longo período, enquanto que o JSBA abordou a temática em quase todos os meses. Logo, constatou-se que em 2009, os jornais faziam a comunicação do risco e não a Comunicação de Risco. Porém, após o evento extremo (inundação) vivido em 2009, no ano posterior, a Comunicação de Risco, que alerta a população antes da ocorrência do desastre, passou a ganhar seus primeiros contornos no Jornal de Santarém e Baixo Amazonas, em detrimento do Jornal Correio do Tocantins, que continuou a apresentar os mesmos resultados. / This work has as objective the analysis of journalistic content as printed (2009-2010) of Para cities of Santarém and Maraba, which faces floods annually during the Amazon winter (December to June). The aim is to analyze how risk is communicated in local newspapers throughout the stages of risk management. Is there effective communication of risk? For this, the methodology is based on the content analysis in order to investigate the form, content, number and memory media of newspapers in Gauteng and Lower Amazon (Santarém) and Tocantins Mail (Marabá) established in temporality. The main theoretical framework as a basis for research is linked to the concepts of Risk Communication, Content Analysis and Risk Management, found in the works of Di Giulio (2008), Bardin (2009) and Jungles (2012) respectively. In comparing both papers, it was observed that the JSBA a higher amount of publications and better content than JCT, but the form was more consistent in the second paper. When the memory media, Correio do Tocantins introduced the element of “mediatic oblivion”, featuring the absence of publications on the subject for a long time, while the JSBA addressed the theme in almost every month. Therefore, it was found that in 2009, the newspapers were risk communication and not risk communication. But after the extreme event experienced in 2009, within one year, risk communication, alerting the population before the occurrence of the disaster went on to win their first attempts in the Journal of Santarém and Lower Amazon, to the detriment of the Courier Journal Tocantins, which continued to show the same results.

Page generated in 0.1106 seconds