• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5
  • Tagged with
  • 5
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

UPS-system i SÄS Byggnad 7 / UPS-system in SÄS Buildning 7

Junuzovski, Edib, Yli-Hukka, Jari January 2009 (has links)
Syftet med detta examensarbete var att beräkna vad det kostar att ha UPS-kraft (Uninterruptible Power Supply). Arbetet utfördes för Västfastigheter på Södra Älvsborgs Sjukhus (SÄS) i Borås. Studien utfördes på en UPS i drift i byggnad 7. UPS: en i denna byggnad har 10 kVA kapacitet och är av dubbelkonverterande typ. Batterier av Ni-Cd (Nickel-Kadmium) typ används till backup med UPS: en. UPS av dubbelkonverterande typ är känd för att skapa mycket övertoner, men är fördelaktig för dess skyddande förmåga mot spänningsspikar.Mätningar har gjorts för att beräkna kostnadsberäkningarna. Ytterligare hjälp har fåtts i form av räkningar och UPS-leverantörer (Ups-teknik och Eurotech AB). / Uppsatsnivå: C
2

Samverkan över institutionella gränser : En studie om privatoffentlig krishantering i Kronobergs län

Colliander, Josefine January 2008 (has links)
<p>The purpose of this study is to investigate the conditions for public and privatepartnership (PPP) regarding civil crisesmanagement in the region of Kronoberg and further explain the possibilities and obstacles that can arise from such a partnership.</p><p>The questions of this study are:</p><p>· Which principles constitute todays crisesmanagementsystem?</p><p>· Which factors favour a public private partnership in crisesmanagement?</p><p>· Which possibilities and obstacles can arise from a PPP in crisesmanagement?</p><p>· How are the PPP constructed in crisesmanagement in the region of Kronoberg in the areas regarding electrical energy and telecommunication?</p><p>Field study interviews have been used as method to gather the empirical data. When applying the theoretical framework on the empirical material the main conclusion is that PPP in crisesmangement are predominantly positive for all parties concerned. The possibilities that arise with PPP in crisesmanagement overshadow the obstacles by numbers.</p><p>Keywords: Public Private Partnership. Crisesmanagement</p>
3

Ledningsintrång i enskilt vatten : en studie på djupet / Utility encroachment in private waters : a deep study

Karnström, Fredrik, Johansson, Michael January 2020 (has links)
För att ge fastigheter tillgång till elektricitet kan ledningar behöva förläggas i ett enskilt vattenområde. Rättigheter, skyldigheter och ersättningar mellan ett elnätsföretag och en privat fastighetsägare för denna infrastruktur kan säkerställas med hjälp av olika verktyg med ursprung ur skilda lagrum. Syftet med studien är att kartlägga hur branschen bedömer intrång av allmännyttiga elledningar i enskilt vatten. För att undersöka detta har en enkätundersökning hos landets elnätsföretag genomförts tillsammans med kompletterande intervjuer. Studien visar att de två vanligaste verktygen för att ge sina ledningar ett juridiskt skydd är att upprätta avtalsservitut enligt JB eller att genom en lantmäteriförrättning få ledningsrätt enligt LL. Många elnätsföretag använder sig av avtalsservitut, som efter en inskrivning i fastighetsregistret ger i princip samma skydd som en ledningsrätt men till en mindre kostnad. För att bedöma ersättningarnas storlek är olika normer de dominerande metoderna, detta på grund av de svårigheter som uppstår vid användning av konventionella värderingsmetoder i samband med denna typ av intrång. Det finns riktlinjer i form av värderingshandboken från Lantmäteriet, policys från branschorganisationen Energiföretagen Sverige och praxis från HD både kring hur intrången ska uppfattas och i förlängningen ersättas. Trots detta råder ändå tvivel bland landets elnätsföretag, som agerar olika. Slutsatsen som HD-fallet NJA 2007 s. 695 ger är att den enskilde ska ersättas och erhålla ekonomisk kompensation för den marknadsvärdeminskning som intrånget medfört även om intrånget endast är rättsligt och någon egentlig påverkan av aktuell markanvändningen inte sker. Energiföretagen Sverige har utvecklat en egen metod gällande ersättningen. Denna ersättning ska motsvara marknadsvärdeminskningen på fastigheten trots att många av elnätsföretagen anser att det inte sker något intrång och därmed ingen värdeminskning på den belastade fastigheten. Många tillfrågade aktörer upplever ändå, trots metoden, att ersättningen är svårbedömd vilket pekar på en osäkerhet. Studien visar att ungefär hälften av de elnätsföretagen, vilka besvarade enkäten inte alltid ersätter de intrång de gör i enskilt vatten. Strax under en femtedel anger att de aldrig betalar ut någon ekonomisk kompensation för intrånget trots riktlinjer och praxis som ger vägledning åt motsatt håll. En femtedel tycker att ett juridiskt skydd i enskilt vatten inte alls är nödvändigt och upprättar därmed vare sig ledningsrätt eller någon form av servitut. / To provide property units with access to electricity, utilities may need to be located in a privately owned water area. Rights, obligations and compensation between an electricity network company and a private property owner for this infrastructure can be ensured by means of various tools originating from different statues. The aim of the study is to map how the industry assesses encroachment of utility into private water. To investigate this, a survey of the country's electricity network companies has been carried out with some additional interviews. The study shows that the two most common tools to provide legal protection for the utilities are to establish agreement easements according to Jordabalken or to obtain utility easements through a cadastral procedure according to Ledningsrättslagen. Many electricity network companies use agreement easements, which, after enrolling in the real property register, provide in principle the same protection as a utility easement but at a smaller cost. To assess the amount of compensation, flat rates and templates are the dominant methods, due to the difficulties encountered in the use of conventional appraisal methods in connection with this type of encroachment. There are guidelines in the form of a valuation manual from the cadastral authority, policies from the trade association Energiföretagen Sverige and practices from the Supreme Court both on how the encroachment should be perceived and ultimately compensated. Despite this, there are still doubts among the country's electricity network companies, which act in various ways. The conclusion of the Supreme Court case NJA 2007 p. 695 is that the individual should be compensated and receive financial compensation for the decrease in market value resulting from the encroachment, even if the encroachment is only of legal proportions and no real impact on the ability to use the land in question occurs. Energiföretagen Sverige has developed its own method regarding compensation. This compensation shall correspond to the decrease in the market value of the property, even though many of the electricity network companies consider that there is no encroachment and thus no depreciation of the burdened property. Nevertheless, despite the flat-rate approach, many respondents feel that compensation is difficult to assess, which points to uncertainty.
4

Samverkan över institutionella gränser : En studie om privatoffentlig krishantering i Kronobergs län

Colliander, Josefine January 2008 (has links)
The purpose of this study is to investigate the conditions for public and privatepartnership (PPP) regarding civil crisesmanagement in the region of Kronoberg and further explain the possibilities and obstacles that can arise from such a partnership. The questions of this study are: · Which principles constitute todays crisesmanagementsystem? · Which factors favour a public private partnership in crisesmanagement? · Which possibilities and obstacles can arise from a PPP in crisesmanagement? · How are the PPP constructed in crisesmanagement in the region of Kronoberg in the areas regarding electrical energy and telecommunication? Field study interviews have been used as method to gather the empirical data. When applying the theoretical framework on the empirical material the main conclusion is that PPP in crisesmangement are predominantly positive for all parties concerned. The possibilities that arise with PPP in crisesmanagement overshadow the obstacles by numbers. Keywords: Public Private Partnership. Crisesmanagement
5

Förbikoppling av stationer vid reinvesteringsprojekt i transmissionsnätet / Bypassing substations during reinvestment projects in the Swedish national grid

Johanson, Aron January 2023 (has links)
Svenska kraftnät is responsible for the operation and development of the Swedish transmission grid. A large number of substations in the transmission grid are approaching their expected service lifetime and must be renewed in the coming years. When renewing substations, total and partial outages in operation are often unavoidable. These outages may cause downtime for any party connected to the substation, whether it be an electricity generation or consumption. A solution is to build a new substation while the old is still in operation. Upon completion, a transfer of operation can be done from the old to the new substation. This however requires laying claim to new land, which affects the local environment and can be a time-consuming process. In an effort to minimise the need for planned outages during substation renewals, Svenska kraftnät wants to investigate techniques for bypassing substations while also allowing the connected party to remain in operation. This thesis has evaluated two differing techniques that allow for substations and any connecting parties to remain mostly in full operation during station renewals. One technique involves constructing a temporary switchgear compartment using air-insulated apparatuses to bypass the station and connect the third party. The other technique uses a mobile gas-insulated switchgear to achieve essentially the same arrangement.  After studying cases where either technique has been employed in station renewals, it was concluded that a solution utilising air-insulated apparatuses is better in several aspects. While the two technologies achieved similar results, the air-insulated technology did so at a lower cost, offered more flexibility, and was easier to integrate into pre-existing stations. Furthermore, the gas-insulated technology required more specialised competence, possibly limiting the availability of qualified contractors. It was concluded that bypassing stations during renewal projects could provide several benefits in terms of less downtime and economical losses, while also minimising the need to claim new land. In order to optimise the method a supply of air-insulated apparatuses and construction materials necessary for the bypassing of a station should be established by Svenska kraftnät. This, mostly reusable, equipment would then be on stand-by, ready to use in future station renewals.

Page generated in 0.0787 seconds