371 |
Timber-steel hybrid structures with shear-key connectionsWang, Tianxiang, Wang, Yue January 2019 (has links)
Large-dimensional wooden products are highly demanded within the construction sector. Theprimary motive of the thesis is to find a solution to connect small timber elements by meansof special steel devices. It is auspicable that the resulting hybrid structure could match theload-carrying capacity of a corresponding homogenous timber element with the same size.The focus in this thesis is to study one type of shear-key connection. Three types of beams(pure glulam beam, hybrid beam either with or without the splice connection at mid-span) arestudied regarding their structural behaviours by means of theoretical analysis, numericalmodelling and experimental tests.Hybrid beam without the splice connection shows higher bearing capacity and higher stiffnessthan pure glulam beam no matter which method is used. The structural behaviours for hybridbeam without the splice connection obtained from each method are more or less similarexcept the failure mode.Hybrid beam with the splice connection shows the bearing capacity higher than pure glulambeam but lower than hybrid beam without the splice connection. The stiffness for hybrid beamwith the splice connection is approximately the same as that of the pure glulam beam basedon analytical and numerical calculation. However, around 30% - 40% lower stiffness isachieved in experiment. Factors that might influence the result are discussed in the main text.Two analytical methods (Partial composite action (PCA) Method and Gamma Method) areutilized for hybrid beam without the splice connection. Although Gamma method is asimplified method, the results are similar with that from PCA method. Therefore, GammaMethod is reliable to be used for the hybrid beam without the splice connection in this thesisproject.In addition, it is found that the alignment of shear-key connectors, slip modulus betweenshear-key and notch, diameter of rod and the vertical distance between glulam and rod areconsidered as the main sensitivity parameters that would influence the structural behaviours for hybrid beams a lot.
|
372 |
On the use of routing engines for dynamic travel time calculation within emergency vehicle transport simulationJuninger, Marcus, Narvell, Nicholas January 2023 (has links)
Traditional methods for constructing simulation models can involve severalsteps that require manual pre-processing of large data sets. This process maybe time-consuming and prone to human errors, while also leading to modelsthat are inconvenient to customize for varying simulation scenarios. In thisthesis, we propose an alternate data preparation methodology in emergencyvehicle transport simulation, which aims to eliminate parts of the manualpre-processing. Our research is based on a previous case study using datafrom Sweden’s Southern Healthcare Region. The methodology we propose isinstantiated through a proof-of-concept software module that replacespreviously used static input sets by introducing dynamic runtime calculationsof ambulance travel times. This was done in two steps where we first evaluatedseveral routing engines according to needs extracted from the studied case.Secondly, we implemented and integrated the chosen routing engine into thepreviously mentioned module. Testing of the module showed feasible andconsistent performance, demonstrating the potential usage of our proposedmethodology in emergency vehicle transport simulation.
|
373 |
Implementering av drönarteknik i byggprocessen / Implementation of drones in the construction processDaoud, Abraham, Andric, Nikola January 2017 (has links)
Byggbranschen genomgår en digitalisering där drönartekniken ingår som en del av moderniseringen. Företag inom branschen strävar efter att tids- och kostnadseffektivisera sin byggprocess samtidigt som arbetsmiljön ska förbättras. Drönare används av allt fler byggföretag och syftet med den här rapporten är att jämföra hur implementering av drönare påverkar arbetsmiljö, kostnad och tidsåtgång vid utvändig besiktning och inspektion av byggnader samt volymberäkning. För att samla in relevant information har undersökningen bestått av litteraturstudier, intervjuer, frågeformulär samt fallstudier där drönare som verktyg har testats i praktiken. Resultatet av undersökningen har visat på fördelar med att implementera drönare som arbetsverktyg sett till arbetsmiljö, ekonomi, och tid. Jämfört med traditionella arbetsmetoder visar resultaten på att drönaren är ett billigare och smidigare verktyg att använda, dessutom förbättras arbetsmiljön då drönaren kan styras från marknivå. Baserat på rapportens resultat har slutsatsen varit att vinningar kan göras genom att implementera drönare hos byggföretag. Rekommendationen är således att inköp av drönare ska ses som en god investering för byggföretag. / The construction industry is undergoing a digitalization, where drone technology is part of the modernization of working methods. Drones are used by an increasing number of companies. Construction companies aim to make cost and time effective solutions while improving the working environment. The purpose of this report is to compare how implementation of drone technology affects economy, time and work environment during external inspection of buildings and volume calculations. In order to collect relevant information, the survey consisted of literature studies, interviews, questionnaires and case studies in which a drone as a tool has been tested in practice. The results of the survey have demonstrated the benefits of implementing drones as a work tool in terms of economy, time and work environment. Compared to traditional working methods, the results show that the drone is a cheaper and more flexible tool to use, as well as improving the working environment since the drone can be operated from ground level. Based on the results of the report, the conclusion has been that profits can be made by implementing drones at construction companies. The recommendation is that the purchase of drones should be regarded as a good investment for construction companies.
|
374 |
Lönsamhetsanalys av hållbara energiförsörjningssystem : En fallstudie / Profitability Analysis of Sustainable Energy Supply Systems : A case studyAmouri, Thia, Akkurt, Lukas January 2022 (has links)
Världens energianvändning är ohållbar, en omställning till förnybara energikällor måste skeom de globala hållbarhetsmålen ska uppnås. Styrmedel som skattereduktioner och grönabidrag har införts i syfte att främja förnybar elproduktion genom att öka lönsamheten förinvesteringar i förnybara energikällor. Huvudsyftet med denna uppsats är att analyseralönsamheten för en investering av två hållbara energiförsörjningssystem. De två hållbarasystemen är elförsörjning via solceller och elförsörjning via solceller kopplade till batteri.Lönsamhetsbedömningen av dessa sätts sedan i relation med lönsamheten av den traditionellaelförsörjningsmetoden, inköp av el via elnätet. Uppsatsen är avgränsad till en fallstudie där lönsamhetsbedömningen görs utifrån specifikaförutsättningar direkt anpassade till fastigheten Einar Mattsson, KTH. Därmed kan resultatetinte generaliseras för alla typer av investeringar som görs avseende de två hållbaraenergiförsörjningssystemen. Metoden bestod av kvalitativa och kvantitativa undersökningar. Den kvantitativaundersökningen bestod av en lönsamhetsbedömning i form av investeringskalkyler därnuvärdesmetoden tillämpades. De kvalitativa undersökningarna grundade sig idatainsamlingar i form av marknadsundersökningar, samt semistrukturerade intervjuer.Vidare så utfördes en känslighetsanalys för att stärka tillförlitligheten av resultatet frånlönsamhetsbedömningen. Slutsatsen av arbetet är att en större lönsamhet påvisades för energiförsörjningssystemetsolceller än för energiförsörjningssytemet solceller kopplade till ett batteri under den 30-årigakalkylperioden. Ytterligare visade resultatet att energiförsörjning via elnätet var det minstlönsamma energiförsörjningsalternativet. / The world's energy use is unsustainable, a transition to renewable energy sources must takeplace if the global sustainability goals are to be achieved. Instruments such as tax reductionsand green grants have been introduced with the aim of promoting renewable electricityproduction by increasing the profitability of these investments. The main purpose of thisthesis is to analyze the profitability of an investment in two different sustainable energysupply systems. The two sustainable systems are electricity supply via solar cells andelectricity supply via solar cells connected to a battery. The profitability assessments of theseare then put in relation to the profitability of the traditional electricity supply method,purchasing electricity via the electricity grid. The thesis is limited to a case study where the profitability assessment is made based onspecific conditions directly adapted to the property Einar Mattsson, KTH. Thus, the resultcannot be generalized for all types of investments made regarding the two energy supplysystems. The method that was used consisted of qualitative and quantitative studies applied in the casestudy. The quantitative study consisted of a profitability assessment in the form of investmentcalculations where the net present value method is applied. The qualitative study was basedon data collections in the form of investigating market values, as well as semi-structuredinterviews. Furthermore, a sensitivity analysis was performed to strengthen the reliability ofthe results from the profitability assessment. The conclusion of the thesis is that a greater profitability was demonstrated for the energysupply system consisting of solar cells than for the energy supply system consisting of solarcells connected to a battery during the 30-year calculation period. Furthermore, the resultshowed that energy supply via the electricity grid was the least profitable energy supplyalternative.
|
375 |
Produktutveckling av skyddshuv till tiltrotator : Produktutvecklingsprocess och konceptframtagningBorg, Daniel January 2022 (has links)
engcon® är ett företag som arbetar med produktutveckling. Företagets mest lönsamma produkter är tiltrotatorer, vilket kan beskrivas som en handled för grävmaskiner. Syftet med detta arbete var att ta fram ett alternativt koncept för skyddshuv till tiltrotator EC209, då den nuvarande lösningen erhållit klagomål kring variationer och inre spänningar till följd av tillverkningsmetoden. Företaget är även intresserad av en reducerad kostnad och mer slimmad design. Målet var att ta fram ett mer användarvänligt och kostnadseffektivt koncept samt testa mot produktion. Produktutvecklingsprocessen bestod av en nulägesanalys, där kartläggning av nuläget genomfördes. Datainsamling från intressenter som bestod av tillfällighetsurval och deltagande observation. Genomförandet av en litteratursökning för att erhålla information om stål- och polymermaterial samt tillverkningsmetoderna formsprutning och bockning. Datainsamlingen användes för att samla relevanta kriterier och upprätta en produktspecifikation. Utifrån funktionella kriterier generera koncept med en kreativ och systematisk metod där syftet var att erhålla en mängd dellösningsalternativ. Därefter med en morfologisk matris skapa totallösningsalternativ. Val av koncept med hjälp av elimineringsmatris och relativ beslutsmatris. Avslutningsvis genomgå processfasen konfiguration och detaljkonstruktion för framtagning av iterationer och slutgiltigt koncept. Resultatet av detta arbete utmynnades i framtagning och presentation av ett koncept som erhåller delfunktion för att underlätta montage tillsammans med en design avsedd för tillverkningsmetoden, vilken möjliggör minimerade variationer vid tillverkning. Additivt tillverkade iterationer för att testa mot produktion tillsammans med en kompletterande kostnadskalkyl för framtagning av dessa och uppskattad kostnadskalkyl för formsprutning utifrån tät dialog med leverantör Målet med arbetet kunde uppfyllas då studien resulterade i ett slutgiltigt koncept med delfunktion för att underlätta montering och ett reducerat styckpris mot den nuvarande lösningen. / engcon® is a company that works with product development. The company’s most profitable products are tiltrotators, which can be described as a working arm for excavators. The purpose of this work was to develop an alternative concept for a protective hood for tiltrotator EC209, as the current solution has received complaints about variations and internal stresses because of the existing manufacturing method. The company is also interested in a reduced cost and slimmer design. The goal was to develop a more user-friendly and cost-effective concept and test it against production. The product development process consisted of a current situation analysis, where mapping of the current status was carried out. A data collection from stakeholders consisted of opportunity sampling and participant observation. Literature search was carried out to obtain information on steel and polymer materials as well as the manufacturing methods including injection molding and bending. Data collection was implemented to gather relevant criteria and establish a product specification. Based on functional criteria, concepts were generated using a creative and systematic method with the aim of obtaining a number of particular solution alternatives. Then with a morphological matrix good solution alternatives were suggested. Choice of concept was done using elimination matrix and relative decision matrix. Finally, the suggested final concept was configured and detailed construction of final concept was reached through few iterations. Present work resulted in the development and presentation of a concept that facilitates assembly together with a design intended for the manufacturing method, which enables minimized variations in manufacturing. Additively manufactured iterations to test against production together with a supplementary cost calculation for the production of these designs and estimated cost calculation for injection molding based on close dialogue with the supplier were carried out. The goals of the work are met and a final concept helping easier assembly and having a reduced unit price compared to the current solution is presented.
|
376 |
Automatiserad process för mängdavtagning och kalkylering : En jämförelse mellan traditionell mängdavtagning och kalkylering mot BIM för BTH Bygg AB / Automated process for takeoff and calculation : A comparison between traditional quantity takeoff and calculation against BIM for BTH Bygg ABPihlvang, Alexander, Svorono, Pierre January 2019 (has links)
Att byta ut en redan fungerande men gammal process kan vara tidskrävande och kostsamt. Detta har påvisats speciellt i byggbranschen där digitaliseringen sakta går framåt. Denna studie kommer att undersöka vilka aspekter i den traditionella mängdavtagnings- och kalkylprocessen på BTH Bygg AB som kommer att påverkas vid byte till en process byggd på modellering och BIM. Syftet med studien är att jämföra den traditionella mängdavtagningen och kalkyleringen med hjälp av Bluebeam och MAP mot en process som genomförs med modellering i programvaran ArchiCAD och en koppling till Vico Office för mängdavtagning och kalkylering. Skillnaden från den traditionella processen kommer vara att övergå från 2D-underlag med manuell mängdavtagning till att använda sig av 3D-modeller, BIM-modeller, och utföra automatiska beräkningar via Vico Office. Studien är en kvalitativ undersökning med inslag av en kvantitativ enkätundersökning. Där fokuseringen var på att få fram den mest arbetseffektiva och minst kostsamma lösningen för BTH Bygg. Jämförelser har gjorts på två olika byggprojekt med liknande storlek och förutsättningar, och avgränsats till att beräkna golv, innerväggar och undertak. Underlaget för studien har varit personliga intervjuer med personer från kalkylavdelningen på BTH Bygg för att samla in kunskap om deras process för mängdavtagning och kalkylering. Även intervjuer med anställda på företagen för programvarorna Bluebeam, ArchiCAD och Vico Office har utförts för att få en objektiv bild av samtliga programvaror. Att implementera informationsrika BIM-modeller i mängdavtagningen och kalkylering har visat sig vara lönsamt när det kommer till kvalitet genom minskat manuellt arbete vid koppling mellan programvarorna. Dessutom finns det stora möjligheter till tidsbesparing i övriga skeden genom att arbeta i en integrerad process där samtliga delar av byggprocessen är kopplade till varandra. / Replacing an already functioning but old process can be time consuming and unprofitable. This has been demonstrated especially in the construction industry, where digitization is progressing slowly. This study examines what aspects of the traditional process of quantity takeoff as well as calculation process at the company BTH Bygg AB will be affected when changing to a process based on modeling and BIM, Building Information Modeling. The purpose of the study is to compare the traditional quantity takeoff and calculation with the aid of Bluebeam and MAP against a process that is carried out with modeling in the software ArchiCAD with a connection to Vico Office for quantity takeoff and calculation. The difference from the traditional process will be to move from 2D manual quantity takeoff to using 3D models, BIM models, and performing automatic calculations via Vico Office. The study is a qualitative study with elements of a quantitative survey where the focus on getting the most work-efficient and profitable solution for BTH Bygg. Comparisons between two different construction projects has been made. The projects comprises similar size and conditions as well as limited to calculations of floors, interior walls and ceilings. The basis for the study has been personal interviews with people from the calculation section at BTH Bygg to gather knowledge about their process for quantity takeoff and calculation. Interviews with employees of the companies for the software Bluebeam, ArchiCAD and Vico Office have also been carried out to obtain an objective picture of all the software. The conclusion is that implementing information-rich BIM models in the quantity takeoff and calculation has proved to be profitable when it comes to quality through reduced manual work when connecting between software. In addition, there are great opportunities for saving time in other stages by working in an integrated process where all parts of the con- struction process are linked to each other.
|
377 |
Avstämningsmetod för installatörer kopplat till slutkostnadsprognos / Reconciliation method for installers linked to final cost forecastLöfgren, Kim, Hannula Virving, Lisa January 2019 (has links)
This master thesis has mainly been built on interviews with interested parties at Arcona and the installer, Nymans Elektriska, since it was decided to limit the study only to the project Glömstaskolan. The aim of the study is that Arcona should be able to report a more accurate final cost forecast to the client regarding the installer and to simplify the reconciliation for both the construction company and the installer. The background is based on the fact that installers do not calculate components and activities such as other building production, which makes it difficult to reconcile if an activity has been carried out in accordance with budget. Both parties agree that it is working hours that need to be checked, as this is where the difficulty of control lies. To be able to check real hours, knowledge of the planned number of hours is needed. The time schedule is an important tool in the project and should be included in reconciliation. Arcona and Nymans Elektriska are recommended to use existing control documents with certain appendixes for the measuring progress. / Detta examensarbete har mestadels byggts av intervjuer med berörda parter hos Arcona samt installatören Nymans Elektriska då avgränsning gjorts till att endast omfatta projekt Glömstaskolan. Syftet med studien är att Arcona ska kunna redovisa en träffsäkrare slutkostnadsprognos gentemot kunden/beställaren gällande installatören samt att underlätta för både byggföretaget och installatören kring avstämningen. Bakgrunden ligger i att installatörerna ej kalkylerar på byggdelar och aktiviteter som övrig byggproduktion, vilket då gör det svårt att stämma av om en aktivitet har genomförts i enlighet med budget. Båda parter är överens om att det är arbetstimmar som önskas följas upp, då det är där svårigheten till kontroll ligger. För att kunna följa upp verkliga timmar behövs kunskap om planerade antal timmar. Tidplanen är ett viktigt verktyg i projekt och bör involveras i avstämningen. Arcona och Nymans Elektriska rekommenderas att nyttja befintliga styrdokument med visst tillägg för mätning av framdrift.
|
378 |
Beräkningsmall för vindlast enligt Eurokod baserad på väggar och olika taktyper / Calculation model for wind load according to Eurocode based on walls and different roof typesKhoshdel, Tomaj January 2014 (has links)
Detta examensarbete har genomförts på begäran av byggnadstekniska byrån i Uppsala. Företaget behöver en ny beräkningsmall med vindlastberäkning för väggar och olika taktyper enligt Eurokod. I dagsläget använder företaget en beräkningsmall som är baserad på gamla normer enligt BKR. Dessa normer kan dock inte användas längre enligt nya bestämmelser inom branschen. Enligt de nya bestämmelserna bör dessa vindlastberäkningar genomföras med hänsyn till Eurokod i framtiden. För att kunna beräkna vindlasten enligt Eurokod och effektivisera beräkningsgången har man utvecklat en beräkningsmall baserad på Eurokod. Alla nödvändiga parameterar enligt standarder har använts i beräkningsmallen och användaren tillåts genomföra en snabb och enkel inmatning av projektmått för att på ett automatiserat sätt genomföra belastningsanalysen. Detta program har skrivits och utvecklats i beräkningsprogrammet, Excel. / This bachelor thesis has been carried out at the request of an engineering company located in Uppsala. The company is aiming for a new computation template developed for wind load computations for walls and different ceiling types according to Euro-codes. In the current situation, the company uses a computation template that is based on old standards namely, BKR. These standards are not allowed to be used anymore due to new regulations within this market. Within the computational framework of the new regulations, these wind load computations have to be performed based on the methods presented in the Euro-codes in future. In order to compute the wind load according to Euro-code, an automated program has been developed for computational purpose according to the methods based on Euro-code. All the necessary parameters according to the standards have been inserted as input data in the program. The program has been developed with the purpose to be very user friendly for faster load analysis. The user is allowed to input project metrics to perform a quick load analysis in an automated manner. This program has been written and developed in the computational software, Excel.
|
379 |
Hydrogen diffusion in α-Al₂O₃ and α-Ga₂O₃ by first principles calculation / α-Al₂O₃およびα-Ga₂O₃中の水素拡散についての第一原理計算Lee, Gyeongseo 23 March 2023 (has links)
京都大学 / 新制・課程博士 / 博士(工学) / 甲第24616号 / 工博第5122号 / 新制||工||1979(附属図書館) / 京都大学大学院工学研究科材料工学専攻 / (主査)教授 田中 功, 教授 奥田 浩司, 教授 中村 裕之 / 学位規則第4条第1項該当 / Doctor of Philosophy (Engineering) / Kyoto University / DGAM
|
380 |
Characterizing triplet azo biradical and corannulene- halogen complexes by laser flash photolysisLi, Qian January 2012 (has links)
No description available.
|
Page generated in 0.0293 seconds