• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 140
  • 72
  • 42
  • 26
  • 8
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 5
  • 2
  • 2
  • Tagged with
  • 326
  • 113
  • 112
  • 108
  • 60
  • 56
  • 51
  • 50
  • 49
  • 47
  • 46
  • 45
  • 44
  • 44
  • 43
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
161

Kulturně vzdělávací centrum / Cultural and educational center

Hemza, Jakub January 2017 (has links)
My diploma thesis deals with newly-built cultural and educational centre in the city of Velké Bílovice. The project is conducted at the level of documentation for construction. Building has the Z-shaped construction plan and contains a basement with two common floors. Cultural and educational centre is based on the basement walls of concrete formwork with concrete grout. The basement masonry is followed by concrete prefabricated skeleton with a lining of ceramic fittings of therm type. Horizontal structures are made of prestressed concrete panels Spiroll. The roof is flat with extensive greenery. The main entrance is oriented to the southwest side. Entryway to the lobby is through the hall where is access to all parts of the building. In the lobby there is a reception and main staircase with an elevator. Bar, library, reading room and an office adjoins the hall on the east side. On the west side there are sanitary facilities, dressing room and multipurpose hall. Technical facilities (including room of technology) are placed in the basement. Hall with gallery and sanitary facilities are situated in the central part of the second floor. House offices are functionally separated from the rest of the floor and located on the eastern side. There are also two lecture halls which can be combined into the one single hall on the west side of the building.
162

Production Development : Layout Project at Lundqvist Trävaru AB

Berglund, Andreas January 2019 (has links)
The purpose of the master thesis has been to examine the production system at the company Lundqvist Trävaru AB and use the gathered information to create a layout suggestion together with a couple of improvement ideas. The thesis is the final part of the Industrial Design Engineering programme at Luleå University of Technology (LTU). Lundqvist Trävaru AB is a manufacturing company that specializes in producing prefabricated building kits out of wood, but the insufficient size of their current factory located in the industrial area of Öjebyn on the outskirts of Piteå, have created a need to relocate to alarger site. This new site is located at Haraholmen south of Piteå. The aim and objective have therefore been to develop a layout suggestion as well as a couple of improvement ideas, with the purpose of solving the identified problems at the current factory, thereby making sure that they do not reappear at the new site. Methods in the form of interviews, observations and documentation reviews were performed to identify potential problems with the production system and the work organization. To aid the investigation of the current factory, literature reviews of scientific books and articles were also performed during the project, with the purpose of giving the thesis a solid scientific foundation. After an overview of the production system had been created, the next step was to analyze the identified problems. These affected many different aspects of the company, for instance the material handling, work organization, flow ofinformation, production flexibility, inventory capacity and production flow. The main problem that in turn caused many of the identified problems was the insufficient inventory capacity, which led to problems with overflowing inventories and long delivery times for materials. This in turn affected thematerial handling negatively and made it hard to keep track of materials in the factory.  Additional problems that were identified was divided workstations, scattered areas for material storage, an increasing amount of special orders with dimension outside of the ordinary size range, a lack of standardized working methods and lack of communication between the office and the production team. After the problems had been identified, the next part of the project was dedicated to performing creative methods with the purpose of developing layout concepts as well as improvement ideas. The methods that were used to fulfill this task was brainstorming, mind map, requirement specification, proximity chart and workshop. After these methods had been performed the result was four layout concepts and several improvement ideas.  The next step was to evaluate the layouts and the ideas with the help of the requirements that had been specified together with the management at Lundqvist. The evaluations resulted in a final layout together with the most promising improvement ideas. These ideas were to standardized drawings and working methods, increase the work with creating manuals for the different stations and machines, adapt the workstations for special orders, purchase tablet computers for each workstation thereby allowing better information sharing and contact between the production team and the office, create a digital map of the factory, use markings and colors at inventories to facilitate identification of specific materials, better routines for the disposal of production waste and larger passages for trucks and wheel loaders. The result of the last part of the project was a 3D-model of the factory and the site, which showed the placement of the different machines, workstations and inventories used during the production of the prefabricated building kits. The benefits of the suggested layout and improvement ideas are bettermaterial handling, increased inventory capacity, better information sharing, standardized working methods and drawings, a straighter production flow and an increased production flexibility, which gives a better ability to produce special orders. If it turns out that it is hard to implement the layout at thepresent, the recommendation for Lundqvist Trävaru AB is to start with implementing the improvement ideas and then successively implement the layout. The suggested ideas and layout will make the company more prepared for the future and increase their ability to handle the planned productionincrease, while also making sure that they are able to better keep production deadlines, attract more customers and successfully establish themselves at Haraholmen. Which in turn will lead to reduced unemployment and increased tax revenue for Piteå municipality / Syftet med examensarbete har varit att undersöka produktionssystemet hos företaget Lundqvist Trävaru AB, samt använda den insamlade informationen för att skapa ett layoutförslag tillsammans med ett par förbättringsidéer. Detta examensarbete är sista delen av programmet Teknisk Design vid Luleå Tekniska Universitet (LTU). Lundqvist Trävaru AB är ett tillverkningsföretag som är specialiserade på att producera prefabricerade byggsatser gjorda av trä, men otillräckligt utrymme vid deras nuvarandefabriken belagd i industriområdet Öjebyn i utkanten av Piteå, har skapat ett behov av att flytta till en större anläggning. Denna nya anläggning är placerad i Haraholmen söder om Piteå. Syftet och målet har därför varit att utveckla ett layoutförslag, såväl som ett antal förbättringsförslag, med syftet att lösa de identifierade problemen vid den nuvarande fabriken och därmed se till att de inte dyker upp igen vid den nya anläggningen. Metoder i form av intervjuer, observationer och dokumentgranskningar utfördes för att identifiera potentiella problem med produktionssystemet och arbetsorganisationen. För att underlätta undersökningen av den nuvarande fabriken utfördes också litteraturgranskningar av vetenskapliga böcker och artiklar under projektets gång, i syfte att ge examensarbetet en stabil vetenskaplig grund. Efter att en översikt av produktionssystemet hade skapats var nästa steg att analysera de identifierade problemen, vilket påverkade många olika aspekter av företaget, bland annat materialhanteringen, arbetsorganisationen, informationsflödet, produktionsflexibiliteten, lagerkapaciteten och produktionsflödet. Huvudproblemet som i sin tur orsakade många av de identifierade problemen, var den otillräckliga lagerkapaciteten, som lede till problem med överfyllda lager och långa leveranstider för material. Detta påverkade i sin tur materialhanteringen negativt och gjorde det svårt att hålla reda på material i fabriken. Ytterligare problem som identifierades var uppdelade arbetsstationer, utspridda områden för materiallagring, en ökande mängd specialbeställningar med dimensioner utanför det vanliga storleksområdet, brist på standardiserade arbetsmetoder samt brist på kommunikation mellan kontoret och produktionsteamet. Efter att problemen hade identifierats ägnades nästa del av projektet åt att utföra kreativa metoder i syfte att utveckla layoutkoncept och förbättringsidéer. Metoderna som användes föratt utföra denna uppgift var brainstorming, mind map, kravspecifikation, närhetsanalys och workshop. Efter att dessa metoder hade utförts blev resultatet fyra layoutkoncept och flera förbättringsidéer. Nästa steg var att utvärdera layouterna och idéerna med hjälp av de krav som hade specificerats tillsammans med ledningen hos Lundqvist. Utvärderingen resulterade i en slutlig layout tillsammans med de mest lovande förbättringsidéerna. Dessa idéer var att standardisera ritningar och arbetsmetoder, öka arbetet med att skapa manualer för de olika stationerna och maskinerna, anpassa arbetsstationerna för specialbeställningar, köpa surfplattor för varje arbetsstation och därmed möjliggör bättre informationsdelning och kontakt mellan produktionsteamet och kontoret, skapa en digital karta över fabriken, använda markeringar och färger vid lager för att underlätta identifiering av specifikt material, bättre rutiner för hantering av produktionsavfall och större passager för truckar och traktorer. Resultatet av projektets sista del var en 3D-modell av fabriken och tomten, som visade placeringen av de olika maskinerna, arbetsstationerna och lagren som används under produktionen av de prefabricerade byggsatserna. Fördelarna med den förslagna layouten och förbättringsidéerna är bättre materialhantering, ökad lagerkapacitet, bättre informationsdelning, standardiserade arbetsmetoder och ritningar, ett rakare produktionsflöde samt ökad produktionsflexibilitet, vilket ger en bättre förmåga att producera specialbeställningar. Om det visar sig vara svårt att implementera layouten i nuläget är rekommendationen för Lundqvist Trävaru AB att börja med att implementera förbättringsidéerna och sedan succesivt implementera layouten. De förslagna idéerna samt layouten kommer att göra företaget mer förberett för framtiden och öka deras förmåga att hantera den planerade produktionsökningen, samtidigt som de ser till att de kan hålla produktionsdeadlines bättre, locka fler kunder och framgångsrikt etablera sig på Haraholmen. Vilket i sin tur kommer att leda till minskad arbetslöshet och ökade skatteintäkter för Piteå kommun.
163

Incremento de la resistencia al corte en viviendas de albañilería confinada autoconstruidas con placas de concreto prefabricado

Ramos Guadalupe, Jerson Napoleon, Villagaray Camposano, Leonardo André 20 January 2021 (has links)
En el presente artículo científico se establece una estimación del incremento de rigideces de 3 viviendas autoconstruidas en la ciudad de Lima-Perú. Para el análisis de estas 3 edificaciones, se recopiló información de un estudio realizado por SENCICO en el año 2016, el cual brinda las condiciones actuales de las viviendas. [1] Posteriormente, se modelo las edificaciones en Etabs 2016 y se cuantificó el incremento de la resistencia al corte que genera el correcto uso de placas de concreto prefabricadas como refuerzo estructural. Finalmente, como resultados más importantes se obtuvo que el uso de estos elementos en la primera vivienda incrementó las rigideces en el eje más crítico en máximo 93.34%, en la segunda vivienda en 24.14 % y en la tercera vivienda 36.36%, factores que son más elevados en el eje X, ya que las viviendas analizadas tienen poca densidad de muros en este eje. / This scientific article establishes an estimate of the increase in rigidities of 3 self-built houses in the city of Lima, in the district of Villa el Salvador, in Peru. For the correct analysis of these 3 buildings, information was collected from a study carried out by SENCICO in 2016 of the current conditions of the homes. Subsequently, the increase in shear resistance generated by the correct use of precast concrete plates as structural reinforcement was quantified. Finally, as the most important results, it was obtained that the use of these elements in the first home increased the rigidities in the most critical axis by a maximum of 93.34%, in the second home by 24.14% and in the third home by 36.36%, factors that They are higher on the X axis, since the houses analyzed have a low density of walls on this axis. / Trabajo de investigación
164

[pt] ESTUDO TEÓRICO-EXPERIMENTAL DO COMPORTAMENTO À FLEXÃO DE VIGAS MISTAS COM PERFIL ASSIMÉTRICO PARCIALMENTE EMBUTIDO / [en] THEORETICAL AND EXPERIMENTAL STUDY OF FLEXURAL BEHAVIOUR OF COMPOSITE BEAMS USING ASYMETRIC STEEL SECTION PARTIALLY ENCASED

CESAR AUGUSTO DE OLIVEIRA FERRANTE 11 May 2016 (has links)
[pt] Nesta dissertação, foi desenvolvido um estudo teórico-experimental de um sistema pré-fabricado de vigamentos mistos de pisos de edificações. O modelo estrutural consiste em vigas mistas do tipo duplo T, onde as nervuras são constituídas por uma viga celular formada a partir de um perfil I laminado, parcialmente embutido na laje de concreto. Após a montagem das vigas-mistas na obra, é feito um capeamento de concreto armado para solidarização do conjunto. Uma grande vantagem deste sistema é proporcionar a integração do piso com o sistema de instalações prediais, por meio da passagem de dutos pelas aberturas do perfil metálico. São apresentados os detalhes do sistema construtivo, bem como as recomendações de projeto. Foi executada uma análise paramétrica para avaliação do comportamento estrutural em termos de eficiência estrutural, visando-se principalmente a redução de custos de fabricação e velocidade de montagem. Com base neste estudo, foi desenvolvido um programa experimental no Laboratório de Estruturas e Materiais da PUC-Rio, para análise do comportamento carga/deformação e da resistência última à flexão dos protótipos submetidos a um carregamento estático. Com os dados obtidos, fez-se uma comparação com os resultados previstos. Os resultados experimentais confirmaram as previsões de resistência fornecidas pelas recomendações de projeto. / [en] In this research, is present a theoretical and experimental study of the prefabricated composite beams system. The structural model consists of composite beams of double T type where the ribs are constituted by an asymmetric I-section cellular beam, partially embedded in the concrete slab. After installation of the beams in the work, it is made a reinforced concrete capping for solidarity assembly. A great advantage of this system is integrate the floor with the building installations system, by passing ducts through the openings of the metal profile. This dissertation presents the system with the general details of construction and design. A parametric analysis was performed to assess the structural behavior in terms of structural efficiency. It is mainly aimed at reducing manufacturing costs and speed of assembly. Based on this study, was developed an experimental program in the Structure and Materials Laboratory at PUC-Rio, to analyze the behavior load / deformation and ultimate flexural strength of prototypes subjected to a static loading. With the obtained data, a comparison is made with the expected results analytically. The experimental results confirmed the estimated strength given by the design recommendations.
165

Våningspåbyggnad av miljonprogrammets flerbostadshus : Förutsättningar och kontroller för genomförandet av våningspåbyggnader / Storey extension of the ‘Million Programme’ apartment buildings : Prerequisites and controls for implementation of storey extensions

Lindgren, Aron, Larsson, Daniel January 2012 (has links)
Under de så kallade rekordåren mellan 1961-1975 byggdes det totalt 920,000 lägenheter i flerbostadshus i Sverige, och idag finns omkring 850,000 av dessa kvar. Den vanligaste byggnadstekniken under perioden var med byggande av förtillverkade våningshöga fasadelement tillsammans med en platsbyggd bokhyllestomme med tvärgående bärande innerväggar och gavlar. Syftet med arbetet är att kontrollera om en våningspåbyggnad på ett referenshus från miljonprogrammet med bokhyllestomme är möjlig för att skapa nya lägenheter som medför ökade hyresintäkter för fastighetsägaren, och kan medverka till ökad variation i området arkitektonisk och öka lägenhetsutbudet. Arbetet ger information om vad som behöver kontrolleras och utredas vid uppstarten av ett påbyggnadsprojekt. Arbetet jämför och beskriver tre olika stomförslag på en våningspåbyggnad. Alternativen som tas upp är massivträstomme med bärande flerskiktskiva, prefabricerad betong – och stålstomme bestående av HD/F-plattor och VKR-pelare, och ett alternativ bestående av volymelement. Inventering av konstruktionen och bärförmågan hos den befintliga stommen visar att det finns bärförmåga kvar att utnyttja. Utförda kontroller undersöker bl.a. bärförmågan hos väggar, grundsulor, samt det befintliga vindsbjälklaget. Kontroller utförs även med hänsyn till stabilitet då byggnaden betraktas som en stel enhet med en fiktiv påbyggnad. Slutsatsen av detta arbete är att en våningspåbyggnad är fullt möjlig på referenshuset. Alternativet med massivträ klarar en fiktiv påbyggnad om tre våningar som valts som exempel i arbetet. Alternativet med en prefabricerad betong och-stålstomme kan maximalt byggas på med två extra våningar, sedan blir grundtrycket dimensionerande och begränsar antalet våningar för påbyggnaden till två. / During the so called ‘record years’ between 1961-1975 a total of 920,000 apartments were built in apartment buildings in Sweden. Today about 850.000 of these are still in use. The most common method of building during this period was by using prefabricated one-storey high façade units together with load-bearing interior cross walls and gable walls which were built on site. The purpose of this degree project is to find out if a storey extension on a reference-building from the so called ‘Million Programme’ with load-bearing interior cross walls is possible in order to create new apartments. If this is possible it would give an increase of income of rents to the owner of the apartment building and it could also contribute to an increase of variation in the area as regards both architecture and supply of apartments. This degree project gives information about what has to be checked and investigated before a storey extension project begins. This degree project compares and describes three different suggestions of structural construction systems for storey extensions. The alternatives dealt with are solid timber structural construction consisting of cross-laminated boards, a prefabricated concrete – and steel structural construction consisting of HD/F-elements and tube steel framing, and finally an alternative consisting of prefabricated building modules. The study of the structural construction and the load-bearing capacity of the existing building show that there is enough load-bearing capacity left to make use of. Performed checks investigate for example the load-bearing capacity of load-bearing walls, strip foundations as well as the existing loft floor. Checks are also performed with regard to the stability as the building is considered a stiff unit with a fictitious storey extension. The conclusion from this degree project is that a storey extension is fully possible on the reference-building. The alternative with a solid timber structural construction allows a fictitious storey extension with three additional storeys, which has been chosen as an example in this degree project. The alternative with the prefabricated concrete – and steel structural construction allows a fictitious storey extension of maximum two additional storeys, and then the ground pressure was dimensioning and limited the amount of additional storeys for the storey extension.
166

En första stomresning i KL-trä : En analys av ett entreprenadföretags erfarenheter från sitt första projekt med KL-trästomme / A first mounting of a CLT-frame : An analysis of a contractor’s experience from their first project with a CLT frame

Funck, Olle, Ek, Olle January 2021 (has links)
Syfte:  Produktionsvolymen av KL-trä har de senaste åren ökat i Sverige, vilket ligger till grund för ett ökat kunskapsbehov hos entreprenörer. Ett svenskt entreprenadföretag genomför våren 2021 sitt första projekt med KL-trästomme. Studiens mål är därför att identifiera nyckelfaktorer och förbättringsmöjligheter för ett entreprenadföretags första monteringsprocess i KL-trä. Genom det ska studien bidra till ökade kunskaper för framtida projekt i KL-trä. Metod: Studien är en fallstudie med litteraturstudier, intervjuer och observationer av ett referensprojekt. Litteraturstudier av befintlig forskning ger en förklaringsansats för erhållen empiri från intervjuer och observationer. Erhållen empiri analyseras tematiskt utifrån förklaringsansatsen och studiens frågeställningar. Resultat:  Studien visar främst på sju nyckelfaktorer och förbättringsmöjligheter vilka av studien anses relevanta att beakta vid en monteringsprocess i KL-trä. Dessa punkter är platstillverkade innerväggar, erfarenhetsåterföring, infästning, monteringsledare, personal, projektering och väderskydd. Konsekvenser:  Med hjälp av genomförd studie ska entreprenadföretag vilka genomför sina första totalentreprenader med KL-trästomme kunna ta lärdom från referensprojektets monteringsprocess. Studiens mål är att erhållna erfarenheter ska ge företag bättre förutsättningar inför framtida projekt i KL-trä. Vidare rekommenderas fler studier inom ämnet för ökade kunskaper för entreprenörer kring monteringsprocessen i KL-trä. Begränsningar:  Slutsatser och resultat rör främst totalentreprenörer vid byggnation av KL-trästomme liknande studiens referensprojekt. Eftersom studien endast rör ett referensprojekt med åtta respondenter anses resultatet inte generaliserbart. I syfte att åstadkomma ett generaliserbart resultat bör fler liknande studier i samarbete med andra företag genomföras. / Purpose:  Sweden’s production of cross laminated timber (CLT) has increased over the recent years which creates a demand of knowledge for contractors. A Swedish contactor implement their first project with a CLT-frame the spring of 2021. This study strives to identify key factors and improvements for a contractors first mounting process with CLT. Through this strives the study to contribute to increased knowledge for future projects with CLT. Method:  The study is a case-study with interviews and observations of a reference project. Document studies of existing science provides an explanatory approach for collected empirical data from interviews and observations. Collected empirical data is thematical analyzed based on the explanatory approach and the studies issues. Findings:  This study concludes mainly seven key factors and improvements who is considered relevant when implementing a mounting process with CLT. These findings are on-site manufactured indoor walls, experience feedback, fastener, mounting conductor, staff, design, and weather protection. Implications:  With this study, contractors who implement their first design and& build contracts with a CLT-frame could learn from the mounting process of the reference project. The aim of this study is that gained experiences provides contractors better prerequisites before future CLT-projects. Complementary studies regarding the subject are recommended for contractors increased knowledge of the mounting process with CLT. Limitations:  Conclusions and results from this study mainly concerns design and& build contractors mounting a CLT-frame similar with the reference project. Since the study solely concern one reference project with eight respondents, the result is not considered generalizable. To gain a generalizable result, more studies similar with this and in corporation with other companies could be done.
167

KL-trä som stommaterial : En analys av utvecklingsmöjligheter i projekteringsskedet för en ökad användning av KL-trä / CLT as frame material : An analysis of development opportunities in the design phase for an increased use of CLT

Gustafsson, Nathalie, Mattsson, Ida January 2021 (has links)
Syfte: Att bygga i ett högt tempo med hänsyn till Sveriges klimatmål är en utmaning och det krävs åtgärder i byggsektorn för att uppnå målen. Material som stål och betong har en energikrävande tillverkningsprocess och släpper ut en stor del av de totala växthusgaser som byggsektorn orsakar. Enligt forskning har tillverkningsprocessen för KL-trä en betydligt mindre påverkan på klimatet och anses som ett hållbart material i jämförelse med stål och betong. Rapporten syftar till att undersöka möjligheterna för en ökad användning av korslimmat trä (KL-trä) som stommaterial i Sverige. Metod: För att uppnå studiens mål har en kvalitativ fallstudie genomförts. Metoder som har använts är en litteraturstudie för att kartlägga forskningsfronten inom området, vilket bidrar till datainsamling. Semistrukturerade intervjuer bidrar till primärdata, där respondenternas erfarenheter, värderingar, kunskap och tillvägagångssätt inom området beaktas för att besvara studiens frågeställningar.   Resultat: KL-trä har i jämförelse med Prefabricerad betong ett 34–86 procent mindre koldioxidutsläpp under hela sin livscykelanalys (LCA). Materialkostnaderna skiljer inte mellan stommaterialen, däremot blir riskpåslaget större för KL-trä vid kalkylering och anbud på grund av bristande erfarenhet och kunskap. Kompetens om KL-trä behöver utvecklas inom företag genom utbildningar samt genom samarbete och nära dialog med olika aktörer under hela processen, där beställare behöver sätta tydliga mål och krav. Kunskapen behöver öka för att förbättra processer, planering och kostnad under projekteringsskedet, där hjälpmedel behöver utvecklas för att underlätta stomval.För att skapa lönsamhet och konkurrensfördel bör företag ligga i framkant i utvecklingen av klimatfrågan där kunskapen om KL-träs förutsättningar kan bidra till komplexa projekt med hybridlösningar där materials förutsättningar utnyttjas.  Konsekvenser: För att öka användandet av KL-trä som stommaterial kan utbildningar om KL-trä införas för medarbetare, vilket ökar den interna kompetensen gällande materialet. För att möjliggöra ökad användning av KL-trä kan en alternativ kalkyl och LCA presenteras för kund. Det kan även uppnås genom utveckling av hjälpmedel för att underlätta val av stomme. Byggföretag måste våga satsa på KL-trä för att skapa referenser och kompetens, vilket kan ske genom att implementera KL-trä i små steg genom hybridlösningar. Begränsningar: Studien fokuserar på den svenska byggsektorn, där aspekterna klimatpåverkan och kostnad studeras mellan KL-trä, platsgjuten betong och prefabricerad betong. Resultatet är generellt giltigt. / Purpose: To build at a high pace with regards to Sweden’s climate goals is a challenge and actions are required in the construction sector to achieve the goal. Materials such as steel and concrete have an energy-intense manufacturing process and emit a large part of the total greenhouse gases caused by the construction sector. According to research, the manufacturing process for CLT has a significantly small impact on the climate and is considered a more sustainable material compared to steel and concrete. This report aims to explore the possibilities of an increased use of cross laminated wood (CLT) asload-bearing material in buildings in Sweden a frame material in Sweden.  Method: To achieve the goals of the study, a qualitative case study has been conducted. Methods that have been used are a literature study to map the research front which contributes with data. Semi-structured interviews contribute with primary data where the respondents’ experiences, values, knowledge and approaches are analysed to answer the research questions of the study.  Findings: CLT has a 34-86 percent lower climate impact compared to prefabricated concrete during the Life Cycle Analysis (LCA). The material cost does not differ between the load-bearing frame materials. However, the risk premium is higher for CLT due to the lack of experience and knowledge. The competence needs to be developed within the companies through educations and close collaboration and discussions with actors during the whole process where customers need to set clear goals and requirements. The knowledge needs to increase in order to improve processes, planning, costs and tools to facilitate the choice of load-bearingframe material. To achieve profitability and a competitive advantage, companies need to be at the forefront of the development of the climate issue, where knowledge of CLT contribute to complex projects with hybrid solutions where material conditions are utilized.         Implications: To increase the use of CLT as a load-bearing frame material, educations can be introduced about CLT for employees. To enable increased use of CLT, an alternative calculation and LCA can be presented to the costumer. It can also be achieved by developing tools to facilitate the choice of load-bearing frame materials. Construction companies needs to invest in CLT to create new references and more competence. Companies can achieve it by implementing CLT in small steps and use hybrid solutions.  Limitations: The study focuses on the Swedish construction sector where the aspects of climate impact and cost are studied between CLT, cast-in-place concrete and prefabricated concrete. The result is generally valid.
168

Diseño metodológico de procedimiento constructivo de viviendas a base de elementos prefabricados de concreto utilizando la técnica Block Fast para optimizar la productividad de la construcción de viviendas en San Juan de Miraflores / Methodological design of the construction procedure of houses based on precast concrete elements using the Block Fast technique to optimize the productivity of its construction in San Juan de Miraflores

De la Calle Contreras, Mijhail Moisés, Trujillo Fernández, Eyleen Irisel 02 February 2022 (has links)
La creciente demanda adquisitiva de viviendas en el Perú exige que haya una mayor oferta en el rubro constructivo. Sin embargo, ello no se satisface, ya que muchas de las viviendas existentes se encuentran fuera del alcance de la población. Por lo que, en el presente trabajo, se busca proponer un diseño metodológico de procedimiento constructivo en seco Block Fast como una alternativa más para potenciar el desarrollo constructivo nacional empleando elementos prefabricados de concreto. Asimismo, se pretende por medio de esta técnica reducir la utilización de recursos, costos y mano de obra proponiendo un sistema constructivo rápido, seguro, reutilizable y que cumpla con la normativa peruana optimizando así la productividad en los proyectos que sean ejecutados bajo esta metodología. Posteriormente, se busca mediante resultados fehacientes el demostrar el aumento de productividad frente a métodos constructivos convencionales predominantes en la zona de estudio. Los resultados muestran que la productividad obtenida para Block Fast fue de 2.8125 m2/(h-h) frente a la de albañilería confinada con 0.788 m2/(h-h) y albañilería armada 0.563 m2/(h-h) demostrando amplia superioridad en términos de productividad. Además, el diseño metodológico propuesto consta de 20 actividades mostradas en un flujograma abordando: trabajos preliminares, cimentación, construcción con mampostería Block Fast, IIEE, IISS y acabados arquitectónicos. En adición a ello, para la gestión en el área de calidad se desarrolló un protocolo para el procedimiento de control de los bloques de concreto. Para finalmente, con la aceptación mediante juicio de expertos de la técnica poder rescatar las buenas prácticas y potenciar la técnica. / The growing demand for home purchases in Peru requires that there be a greater supply in the construction sector. However, this is not satisfied, as many of the existing houses are out of reach of the population. Therefore, in the present work we seek to propose a methodological design of a Block Fast dry construction procedure as one more alternative to promote national construction development using precast concrete elements. Likewise, it is intended through this technique to reduce the use of resources, costs, and labor, proposing a fast, safe, reusable construction system that complies with Peruvian regulations, thus optimizing productivity in projects that are executed under this methodology. Subsequently, it is sought through reliable results to demonstrate the increase in productivity compared to the predominant conventional construction methods in the study area. The results show that the productivity obtained for Block Fast was 2.8125 m2/(h-h)compared to the confined masonry with 0.788 m2/(h-h) and the reinforced masonry 0.563 m2/(h-h) ,demonstrating a broad superiority in terms of productivity. In addition to this, the proposed methodological design consists of 20 activities that are shown in a flow diagram that address: preliminary works, foundations, construction with Block Fast masonry, IIEE, IISS and architectural finishes. Likewise, for management in the quality area, a protocol for the concrete block control procedure was developed. Finally, with the acceptance through the expert judgment of the technique, it is possible to rescue good practices and enhance the technique. / Tesis
169

Novostavba mateřské školy / Kindergarten

Hylišová, Alena January 2022 (has links)
The diploma thesis project deals with a new kindergarten with a café in the inner town of Humpolec. It is a single-storey building, with a flat vegetation roof and parts of a green façade. The layout of the building is divided into kindergarten and café, designed for parents with children. The kindergarten has classes on its sides with facilities for children and employees, the central part consists of common areas, preparatory meals, warehouses, principal's office, technical rooms, facilities for employees. The load-bearing vertical structural system is masonry, horizontal load-bearing ceiling structures made of prefabricated prestressed panels, ceramic system lintels. The technological equipment of the building includes an air/water heat pump for obtaining thermal energy, an air-conditioning unit with heat recovery to ensure forced ventilation. The project is solved at the level of implementation documentation, with the help of graphic systems ArchiCAD, Artlantis, building physics programs Svoboda software and program Light+.
170

Sportovní hala Staré Město / Sport Hall Staré Město

Kolísek, Aleš January 2022 (has links)
The master's thesis deals with the project of the new building of the Sports Hall in the Staré Město at the stage of project documentation for the construction on plots 2420/1, 2420/41, 2420/42, 2420/43, 2420/44, 4568/38, 6277/2, 6277/3 , 2517/4. The plots on which the construction is proposed are flat or slightly sloping. The building has no basement, has two floors. The perimeter structures in the locker rooms are designed from ceramic blocks of the POROTHERM system, including the thermal insulation system according to the principles of ETICS, and in the gym from the curtain walling of the KINGSPAN system. Horizontal structures are folded prestressed ceiling panels SPIROLL. The cloakroom building is covered by a warm flat roof, and the gymnasium by barrel roof made of glued laminated girder. In the sports hall, 5 changing rooms are designed, including sanitary facilities, then facilities for the operation of the hall and refreshments for spectators.

Page generated in 0.0698 seconds