• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 110
  • 8
  • Tagged with
  • 118
  • 54
  • 25
  • 23
  • 21
  • 20
  • 17
  • 16
  • 14
  • 14
  • 13
  • 13
  • 13
  • 12
  • 12
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Grundvattenskydd och markanvändning i tre olika länder- effekter för miljö och samhälle

Johansson, Helena January 2007 (has links)
Abstract Drinking water is an important resource on Earth both for humans and animals. Although most of the surface is covered by water only a small quantity is available as drinking water. Our manner of living creates a lot of pollution which has an environmental impact. Groundwater has a protracted turnover time in the soil and it can take many years before the effects of human impact are detected. The Swedish environmental object is “Good groundwater quality” which aims to provide a safe and sustainable supply of drinking water today and in the future. In Sweden and in other member states of EU the Water Framework Direktive 2000/60 is implemented. According to this act groundwater intended for drinking water supply has to comply with the quality standards of nitrate and pesticides. The purpose of this exam project is to describe how Denmark, England and Sweden are working with groundwater protection and land use. The examination paper is delimited to groundwater sources used for public drinking water supply. The method comprises a literature study and a case study from each country. The information has been supplemented by interviews. The effects of groundwater protection is described in a consequential analysis of each country. The natural conditions to keep the nitrate levels low in groundwater differ in Denmark, England and Sweden. These are of considerable importance to the choice of protection methods. In Denmark the natural ground conditions combined with intense agriculture result in high nitrate levels. The whole area of Denmark has been designated as nitrate sensitive area according to The Nitrate Directive. Conformed groundwater protection plans and agreements of appropriate land use are examples of measures applied. In England increasing nitrate concentrations have been confirmed in a majority of controlled groundwater sources. A great part of the land area has been designated as Nitrate Vulnerable Zones. Many voluntary environmental programmes for best agricultural practice intend to decrease the leakage of nitrate to ground water. In Sweden mainly the coastal areas have been designated as nitrate sensitive areas. Water protection areas are established around the groundwater sources with restrictions for hazardous activities. The Swedish legislation Miljöbalken with regulations, directions and demands is governing the groundwater protection. The possibilities to improve groundwater quality depend on the efficiency of the measures as well as the engagement and participation in environmental control. Information about the importance of groundwater protection is crucial to enhance the general awareness. Laws and regulations need to be sufficiently efficient to protect groundwater. Local commitment and responsibility are important in all kinds of environmental work. Land use must be adjusted appropriately in order to allow a sustainable development to occur.
12

Avfallshantering i Västerbottens inland : En utredning om hur kommunerna i Region 8 i Västerbotten arbetar för att minska mängden hushållsavfall

Sparrfeldt, Sofia January 2014 (has links)
Household waste management in Västerbotten, Sweden - investigating how small municipalities aim for waste reduction Author: Sofia Sparrfeldt Abstract The aim of the study is to investigate how small municipalities in Västerbotten County (Northern Sweden) manage household waste. Eight municipalities have established a cooperation, including a joint plan to handle waste management in order to lower the amount of waste. The goal was to interview all eight municipalities, but only six of them answered. Based on the interview results, the municipalities had accepted the plan aiming to lower the amount of household waste, but not all of them had initiated the implementation of the plan. According to data from the joint waste management plan, the amount of waste did not decrease between the years 2008-2011. However, the data was collected during a time period before the plan was finally ready to be implemented. Some of the interviewed municipalities expect that the load of waste will decrease in their municipality, but this was not always directly related to implementation of the joint waste management plan. Municipalities rather assume that the reduction is related to a general population decrease, or that a tense economic situation of the citizens affected their consumption. In general, the civil servants in most of the investigated municipalities have many different tasks in addition to coordinating the waste management. Therefore, they appreciated a joint effort among small municipalities. However, they also identified disadvantages with the cooperation, such as for example that it can take very long time to get something happening when many municipalities are involved. Keywords: household waste, waste management, Sweden
13

Målkonflikt vid kreditbedömning : Bankens vinst- och miljömål

Lättman, Martin, Blomstrand, Carl Wilhelm January 2015 (has links)
För att skapa hållbar utveckling krävs ett samspel mellan ekonomisk tillväxt och miljöpåverkan. Banker har genom kreditverksamheten möjligheten att påverka hur ett företag arbetar med miljöfrågor. Corporate Social Responsibility (CSR) innefattar hur ett företag kan ta ansvar för miljön. Genom att införliva miljöfrågor i kreditverksamheten kan en bank bedriva CSR. Huruvida CSR som nettoeffekt är en kostnad eller intäkt råder det delade meningar om. Syftet med studien var att undersöka om det föreligger en konflikt mellan Swedbanks miljömål i kreditverksamheten och bankens övergripande finansiella målsättning, det vill säga vinstmålen. För att undersöka närvaron av en potentiell konflikt valde författarna en kvalitativ metod. En serie intervjuer utfördes med företagsrådgivare som sedan kompletterades med kommentarer från Swedbanks hållbarhetschef. Studien antyder att det inte föreligger en konflikt mellan Swedbanks vinstmål och miljömålet i kreditverksamheten. Målet med kreditbedömningen är inte att förbättra miljön, utan att att minimera den finansiella risken. Dock sammanfaller dessa emellanåt.
14

Förvaltning av biodiversitet : En studie om natur- och parkområdet Tantolunden i Stockholm

Åslin, Evelina January 2014 (has links)
I denna studie undersöks hur parken Tantolunden på Södermalm i Stockholm förvaltas ur ett biodiversitetsperspektiv. Syftet är att undersöka hur Stockholms stadsdelsförvaltning hanterar grönområdet, beskriva dess förvaltningsmässiga planer och åtgärder, samt väga biodiversitetens betydelse gentemot andra intressen. Detta för att kunna koppla till Sveriges miljöarbete samt diskutera ifall parkområdet tillhandahåller en hög ekologisk status. En fältundersökning gjordes där tre inventerade naturytor på 100 kvm har studerats utifrån antalet växtarter, i koppling till ett större delområde där det söktes efter fyra utvalda biodiversitetsindikatorer. Dessa tre områden har benämnts som Berghällsområde, Traditionellt skött park samt Trädgårdsodlingsområde, efter hur de förvaltas. Enligt resultatet av studien har Berghällsområdet den rikaste biodiversiteten när det gäller de utvalda biodiversitetsindikatorerna, men inte gällande antalet växtarter. Trädgårdsodlingsområdet hade flest växtarter men inte många biodiversitetsindikatorer. Den traditionellt skötta parken hade lägre biodiversitet än de andra två delområdena och även lägst antal växtarter, vilket talar för att denna del förvaltas utan hänsyn till biodiversitet. Resultaten kopplas till teorin om Förvaltningens rationalitet samt de två miljömålen Ett rikt växt och djurliv och En god bebyggd miljö. Studien indikerar på att parkförvaltningen inte följer miljömålsarbetet. / My study addresses how the park Tantolunden in Södermalm, Stockholm, is administrated from a perspective directly concerning biodiversity. The purpose of my research is to understand how the Stockholm Municipal District administration handels the green area and the ways in which the stewardship and enviromental arrangements of the area relate to its genral biodiversity and environmental status. I conducted field research in which three inventory spaces, 100 squared metres each, were examined in an attempt to discern the amount of plant species within the area and in connection to the larger area in which the search for four chosen biodiversity indicators were also done. These three areas were given the names Rocky area, Traditionally managed park area, and Gardening area, after the way they’re administrated. According to the results of this study the Rocky area has the richest biodiversity in regards to the chosen biodiversity indicators, but not the amount of plant species. The Gardering area had the most plant species but not many biodiversity indicators. The Traditionally managed park area had a lower biodiversity than the other two areas and also the lowest amount of species, which indicates that this part is administrated without significant deference to biodiversity. The results are connected to the theories accosiated with the Administration’s rationality and the two swedish environmental objectives A rich plant and animal life and A good building  environment. My study indicates that the Stockholm Municipal District administration do not fully uphold Sweden’s greater environmental objectives.
15

Biobränsle från jordbruket : En implementeringsstudie av ett regionalt miljömål

Ek, Moa January 2009 (has links)
<p>Minskad klimatpåverkan genom mindre användning av fossila bränslen är centralt i miljöpolitiken. För Jämtlands län finns ett regionalt miljömål om en ökad produktion av klimatneutral energi med delmålet att biobränsleproduktionen inom jordbruket ska öka från 0 TWh år 2005 till minst 0,2 TWh år 2015. Syftet med uppsatsen är att ge en bild av vilka hinder som kan finnas för uppfyllandet av delmålet. Åtta intervjuer har genomförts och beskrivna hinder har identifierats och delats in i kategorier. Resultaten har därefter diskuterats mot bakgrund av villkoren för jordbruk och energiproduktion och ur ett systemteoretiskt perspektiv, där implementeringen beskrivs som mötespunkten för tre system: klimatpolitik, jordbruk och energisystem. Slutsatser som dras är att problem med lönsamhet samt en riskovilja är centrala hinder, möjligen kan de minskas genom ekonomiska stöd. En möjlig konflikt mellan livsmedels- och bränsleproduktion framträder också tydligt. Ur ett systemperspektiv betonas interaktionen mellan systemen som den struktur där implementeringshindren uppstår och implementeringen bör därför integrera flera perspektiv.</p>
16

Betydelsen av motstridiga intressen vid framtagandet av åtgärder för att sänka halterna av partiklar (PM10) : – en intervjustudie med involverade aktörer i Norrköpings kommun

Cederberg, Anna, Nilsson, Elin January 2006 (has links)
<p>Norrköpings kommun befinner sig i en snabb utvecklingsfas, då strävan finns att möjliggöra för fler företag att etablera sig. Detta är nödvändigt då Norrköping drabbats av flera nedläggningar och hög arbetslöshet. Det finns dock en baksida då de befintliga fysiska strukturerna inte är anpassade till den ökade trafikmängd som tillväxten ger upphov till. De stora trafikmängderna genererar höga halter av luftföroreningar, däribland hälsoskadliga partiklar som strider mot uppsatta miljökvalitetsnormer. Det nationella miljökvalitetsmålet Frisk luft blir därmed svårt att nå. Då Norrköpings innerstad har höga halter av partiklar blev kommunen ålagd av regeringen att arbeta fram ett åtgärdsprogram för att komma tillrätta med problemet. En arbetsgrupp bestående av aktörer från olika delar av kommunen tog under hösten 2005 och våren 2006 fram förslag på åtgärder. Denna studie bygger på en kvalitativ intervjumetodik där aktörer från den aktuella arbetsgruppen intervjuats för att få en djupare förståelse för problematiken kring den snabba utvecklingstakten och uppfyllelsen av miljömålet Frisk luft. Det empiriska materialet kopplas i analysen ihop med de teoretiska utgångspunkterna i form av samhällsplanering och kommunikationsteori. I denna studie har vi kommit fram till att de ekonomiska aspekterna får större betydelse än de sociala och ekologiska dimensionerna när utveckling står högt på agendan i en kommun. På vilket sätt en stad utvecklas och utformas får stor betydelse för vilken möjlighet det finns att nå uppsatta miljömål. Har man väl byggt in sig i en fast samhällstruktur, begränsar det chanserna att nå ett långsiktigt hållbart samhälle.</p>
17

Implementering av miljökvalitetsmål i mindre kommuner : - En fallstudie av Torsby kommuns arbete med att implementera delmålet Planeringsunderlag / Implementation of environmental objectives in smaller municipalities : - A case study of the implementation of the interim target Programs and Strategies for Planning in Torsby municipality.

Stålhammar, Anja January 2009 (has links)
<p>The aim of this dissertation is to examine why smaller municipalities[1] in Sweden experience difficulties when implementing the 16 environmental objectives that are designed to solve Sweden's environmental problems.</p><p>The theoretical framework used for this dissertation is implementation theory which provides three conditions that need to be met in order to have a successful implementation.  These three conditions have shaped the research questions that examine if Torsby municipality has the "understanding," "ability" and "will" needed to implement the decision correctly.  </p><p>The dissertation employs a case study method to examine why Torsby municipality has experienced difficulties implementating the target: <em>programmes and strategies</em> <em>for planning,</em> which is an interim target to environmental objective number 15: A good built environment.  Qualitative text analysis and interviews with politicians and civil servants from Torsby municipality and the county administration board of Värmland have been conducted in order to answer the research questions.   </p><p>The material used for this dissertation is mostly from the government bills that are the foundation of the Swedish environmental policy and the documents and reports about the environmental objectives that the National Board of Housing, Building and Planning (Boverket), the Swedish Environmental protection agency (Naturvårdsverket), and the Environmental objectives council (Miljörådet) have released.</p><p>The result of this dissertation supports previous research which has shown that smaller municipalities have problems implementating the environmental objectives due to a lack of financial resources. This dissertation also shows that the problems can be due to a lack of understanding the purpose of the objectives.  This leads to a lack of political will to implement the objectives.  Since the municipalities do not have the political will to implement the objectives the appropriate resources needed for a successful implementation are not appointed and therefore the municipalities are not able to fully implement the environmental objectives.</p><p> </p><p>[1] Municipalities with less than 20 000 inhabitants.</p>
18

En fallstudie över miljömålsarbetet på fyra länsstyrelser : Beskrivning och analys av det regionala miljömålsarbetet i Mellansverige.

Wredh, Gustav, Kohlin, John January 2013 (has links)
The Swedish system of environmental quality objectives is a so-called MBO, Management By Objective and has the purpose to guide the Swedish society towards sustainable ecological development. The system involves the whole society from the parliament and the government down to individual citizens. At the regional level, it is the county administrative boards that are responsible for the work with the system of environmental objectives. At the County Administrative Board of Västmanland County, it is the environmental unit who is in charge of work with the environmental objectives and they want input for how to improve their work with the environmental objectives, both internally at the Administrative Board and externally with external parties. The main purpose and goal of the study is to present the work of four other county administrative boards regarding their work with the environmental quality objectives and to identify external parties’ opinions of how they want the County Board of Västmanland county to work with them in this matter. The work is designed as a case study of four county councils, where the environmental objectives coordinators at the four county administrative boards were interviewed about their work with environmental quality objectives. External parties were also interviewed to explore their view on how they want the county administrative board to operate in a coordinating role in the system of environmental quality objectives. The interviews were recorded, transcribed and analyzed using the template-based model.  The case study of the four selected county administrative boards shows that the county administrative boards have developed their own systems using various methods and procedures for their work with the environmental quality objectives, although, the study comes to some conclusions: The number of people involved in the work with the environmental quality objectives varies between the county administrative boards It is not enough of time to work with the environmental quality objectives The numbers of environmental objectives coordinators have reduced over the past years The priority of the work with the environmental quality objectives varies between the county administrative boards None of the county administrative boards have updated regional environmental quality objectives     Currently do the external parties not have so much contact with the county administrative board of Västmanland concerning the work with the environmental quality objectives and they want to have more collaboration with county administrative board in this matter. / Miljömålssystemet är något som involverar hela samhället, från riksdag och regering, till den medborgare som via sina vardagsbeslut kan påverka om miljökvalitetsmålen nås. Länsstyrelserna är de som ansvarar för det regionala arbetet med miljömålssystemet och de ska verka för att målen nås i respektive län och svara för regional uppföljning. Länsstyrelsen har i sin roll som regional miljömyndighet även en övergripande och samordnade funktion i miljömålsarbetet, tillsammans med kommuner, näringsliv och frivilliga organisationer. På Länsstyrelsen Västmanlands län är det miljöenheten som har hand om miljömålsarbetet och de har önskat undersöka hur miljömålsarbetet kan effektiviseras och förbättras internt och externt. För närvarande arbetar inte länsstyrelsen efter någon arbetsplanering. För att underlätta för Länsstyrelsen Västmanlands läns arbete att ta fram förslag till förbättringar och effektiviseringar i sitt interna och externa miljömålsarbete har studiens huvudsakliga syften och mål varit att presentera arbetsmetoder samt situationer på andra län i Mellansverige samt att kartlägga externa intressenters meningar om hur Länsstyrelsen Västmanlands län bör verka i sin samordnande roll. Detta genomfördes som en fallstudie över fyra länsstyrelsers miljömålsarbete, där miljömålssamordnarna på respektive länsstyrelse fick svara på frågor utifrån fyra problemkategorier; resurser, prioritet, struktur och målsättning. De externa intressenterna, (kommuner, företag och en intresseorganisation) blev även de intervjuade för att undersöka deras åsikter om hur de vill att länsstyrelsen bör verka i sin samordnande roll. En övergripande inblick över Sveriges miljöbudget utfördes där effekter av budgetnedskärningar belystes. Sveriges miljöbudget för år 2013 ligger på 4,9 miljarder kronor vilket är en minskning mot det föregående året. Miljöbudgeten beräknas även bli lägre i framtiden än beräknat. Vissa projekt som syftar till att förbättra kvaliteten på den svenska miljön har drabbats negativt av detta på grund av minskade finansiella resurser. För att få en fördjupad förståelse i miljömålssystemet och dess möjliga brister genomfördes även en litteraturstudie. Denna visade att miljömålssystemet är ett så kallat MBO, Management By Objective, eller på svenska, målstyrning. Det är ett system som bygger på målsättning för att styra en organisation åt en önskad riktning, eller som i detta fall samhället, mot en hållbar ekologisk utveckling. Miljömålssystemet är uppbyggd som en hierarki, där generationsmålet befinner sig i toppen och har en övergripande vision och de 16 miljökvalitetsmålen befinner sig på botten och har en mer specifik utformning. För att kunna uppnå generationsmålet och miljökvalitetsmålen finns etappmål som anger steg på vägen till måluppfyllelsen av dessa. Systemet involverar hela samhället, där några särskilt viktiga aktörer, förutom riksdag och regering, beslutar om målen, bland annat Naturvårdsverket, länsstyrelserna, kommunerna samt näringslivet. MBO eller målstyrning anses ha en rad positiva effekter, men kräver emellertid att vissa villkor är uppfyllda för att tekniken ska fungera ändamålsenligt. Enligt litteraturen så tycks dessa villkor inte vara uppfyllda och därmed är fallet så att målstyrning inte att kan anses vara att föredra som ett sätt att styra. Även vid formulering av miljömål finns det särskilda krav som bör uppfyllas för att målen ska verka önskvärda. Dessa ska heller inte krocka med andra mål. När det gäller svenska miljökvalitetsmål anses vissa inte uppfylla kraven. Vid uppföljning av miljökvalitetsmålen används en rad indikatorer för att kontinuerligt undersöka och följa tillståndet i miljön. Dock har fokus legat på kvantifierbar data och gör det därmed svårt att mäta estetiska värden som vissa av miljökvalitetsmålen uttrycker, exempelvis storslagenheten i miljökvalitetsmålet ”Storslagen fjällmiljö”. Det finns även en rad målkonflikter kopplat till miljömålssystemet, både externa konflikter som är de mest vanliga och allvarligast förekommande, samt interna målkonflikter som är mer sällsynta. Antalet personer som är direkt involverade i miljömålsarbete varierar mellan länsstyrelserna. Två av länsstyrelserna har en heltidstjänst, medan de två andra har en halvtidstjänst för miljömålssamordning. Även antalet miljömålsansvariga samt dagar avsatta för miljömålsarbete varierar mellan länsstyrelserna. Men tiden för miljömålssamordnare eller miljömålsansvariga uppges som otillräcklig för ålagda uppgifter.  Även de neddragningar som sker i miljöbudgeten kan märkas av på länsstyrelserna både i det allmänna miljöarbetet och i direkta miljömålsmedel. Det är ett fåtal av miljömålssamordnarna som upplever att miljömålsarbetet är klart prioriterat på sin respektive länsstyrelse och detta kan bero på att ledningen på länsstyrelserna inte anser att det är en del av den ordinarie verksamheten utan en aktivitet på sidan, som i och med detta lätt kan bli nedprioriterat. Just ledningen, anser samtliga miljösamordnare, spelar en stor roll för hur miljömålsarbetet prioriteras.  Om miljömålsarbetet nedprioriteras kan det bli svårare att nå miljömålen. För att undvika detta och istället få miljömålsarbetet prioriterat krävs det, enligt miljömålssamordnarna, klara riktlinjer, politiska åtgärder, ständig förnyelse och nya idéer.  Men för detta behövs det resurser och detta verkar det vara brist på inom miljöområdet i stort, förutom i vissa prioriterade områden, som exempelvis klimatarbete. Gällande strukturen för länsstyrelserna, så uppger ingen av de fyra miljösamordnarna att det bedrivs någon form av utbildning om miljömålssystemet för länsstyrelsernas anställda, dock finns planer på att införa det hos några. Samtliga miljösamordnare uppger att det sker samordning med externa intressenter inom deras län, men att det är mer indirekt kopplat mot miljömålen. Någon uppföljning av åtgärdsprogrammen förekommer inte eftersom länsstyrelserna eftersom de antingen inte har några aktuella åtgärdsprogram eller att det inte är fastställt hur programmen ska följas upp. Miljömålssamordnarna anser att målsättningen rörande de nationella miljökvalitetsmålen är för visionära och behövs konkretiseras mer, men de täcker in relevanta områden där miljöproblemen finns. Alla länsstyrelser har kommit i kontakt med målkonflikter i sitt arbete, bland annat när områdena jakt och biologisk mångfald ställs mot varandra. Ingen av länsstyrelserna har uppdaterade regionala mål då det anses vara för tidskrävande att regionalisera de nationella målen och samtidigt hålla dem uppdaterade. Samtliga av de externa intressenter vi intervjuat i denna studie arbetar på något sätt med miljöfrågor. Samverkan mellan Länsstyrelsen Västmanlands län och intressenterna gällande miljömålsarbete sker, även om det mestadels är indirekt. De externa intressenterna anser inte att länsstyrelsens samordning är märkbar och önskar en förbättring inom detta område, även att länsstyrelsen ska etablera en större kontakt utåt mot både kommuner och företag.
19

Utveckling av regler för bedömning av Energisparutmaningen / Development of rules for assessment of the Energysavingchallenge

Karlsson, Ida, Kelemit, Malin January 2012 (has links)
Människan påverkar klimatet på ett negativt sätt. Därför har EU satt upp vissa mål som har påverkat Sveriges och kommunernas miljöarbete. För att få tillbaka Växjö på kartan som Europas grönaste stad formades en idé inom föreningen GodaHus att starta en energisparutmaning för Växjös kommun och näringsliv. För att utreda olika synpunkter på tävlingen efterlystes ett examensarbete där olika aktörer som kan vara intressanta för tävlingen intervjuades. Svaren sammanställdes i en sammanhängande text med tillhörande diagram från vilken fyra olika förslag till bedömning formades.
20

Betydelsen av motstridiga intressen vid framtagandet av åtgärder för att sänka halterna av partiklar (PM10) : en intervjustudie med involverade aktörer i Norrköpings kommun

Cederberg, Anna, Nilsson, Elin January 2006 (has links)
Norrköpings kommun befinner sig i en snabb utvecklingsfas, då strävan finns att möjliggöra för fler företag att etablera sig. Detta är nödvändigt då Norrköping drabbats av flera nedläggningar och hög arbetslöshet. Det finns dock en baksida då de befintliga fysiska strukturerna inte är anpassade till den ökade trafikmängd som tillväxten ger upphov till. De stora trafikmängderna genererar höga halter av luftföroreningar, däribland hälsoskadliga partiklar som strider mot uppsatta miljökvalitetsnormer. Det nationella miljökvalitetsmålet Frisk luft blir därmed svårt att nå. Då Norrköpings innerstad har höga halter av partiklar blev kommunen ålagd av regeringen att arbeta fram ett åtgärdsprogram för att komma tillrätta med problemet. En arbetsgrupp bestående av aktörer från olika delar av kommunen tog under hösten 2005 och våren 2006 fram förslag på åtgärder. Denna studie bygger på en kvalitativ intervjumetodik där aktörer från den aktuella arbetsgruppen intervjuats för att få en djupare förståelse för problematiken kring den snabba utvecklingstakten och uppfyllelsen av miljömålet Frisk luft. Det empiriska materialet kopplas i analysen ihop med de teoretiska utgångspunkterna i form av samhällsplanering och kommunikationsteori. I denna studie har vi kommit fram till att de ekonomiska aspekterna får större betydelse än de sociala och ekologiska dimensionerna när utveckling står högt på agendan i en kommun. På vilket sätt en stad utvecklas och utformas får stor betydelse för vilken möjlighet det finns att nå uppsatta miljömål. Har man väl byggt in sig i en fast samhällstruktur, begränsar det chanserna att nå ett långsiktigt hållbart samhälle.

Page generated in 0.0357 seconds