• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 37
  • 8
  • 1
  • Tagged with
  • 46
  • 23
  • 23
  • 16
  • 16
  • 13
  • 12
  • 9
  • 9
  • 8
  • 8
  • 8
  • 8
  • 7
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Grundläggning på lera : Inför exploatering av Södra Lödöse

Ekdahl, Malin January 2009 (has links)
Rapporten är en sammanställning av de vanligaste grundläggningsmetoderna samt pålning och hur de kan användas vid grundläggning på lera i Sverige. Examensarbetet är utfört som en del i ett forskningsprojekt . Handledare har varit Yvonne Andersson Sköld på SGI samt Kaj Granath på Tekniska Högskolan i Jönköping. Fallstudieområdet är i Lödöse som ligger i Lilla Edets kommun. Samhället har idag 1 300 invånare och är beläget 10 km söder om Lilla Edet samt 30 km norr om Göteborg, längs med Göta Älv. Vid den nya sträckningen av Norge- Vänerbanan samt utbyggnaden av E45 kommer det att bli en knutpunkt ca 1 km söder om Lödöse samhälle. Kommunen planerar att placera ca 500 nya bostäder mellan samhället och den nya pendeltågsstationen. Intervjuer har gjorts av tre tjänstemän på Lilla Edets kommuns avdelningar Samhällsplanering, Plan- och Bygg samt Miljö. En litteraturstudie är genomförd där tillgänglig forskning har studerats. Området ligger på lera och Banverket har i sina utredningar konstaterat att det även finns kvicklera på området. Kvicklera har konstaterats vid medparten av de undersökta skreden i Göta Älvdalen. Vid byggnation på lera krävs omfattande geotekniska undersökningar för att fastställa markens sammansättning. Framtidens klimatförändringar ställer ökade krav på nya byggnader. De byggs i dagens klimat men ska klara av morgondagens. Den forskning och de rapporter inom området, grundläggning på lera, som jag har tagit del av förordar platta på mark. De förordar även pålning vid högre och tyngre byggnader än ett enfamiljshus. Dock så krävs det mer forskning inom området då kopplingen mellan grundläggning och markförhållandena är otillräckligt undersökt. / This thesis is a summary of the most common footings and pole-work found in Sweden and how they apply in buildings on clay. The thesis is a part of a research project. Supervisors have been Yvonne Andersson Sköld at SGI and Kaj Granath at the School of Engineering, Jönköping University. Place of study is located at Lödöse in the municipality of Lilla Edet. Lödöse has 1 300 citizens and is placed 10 km south of Lilla Edet and 30 km north of Göteborg, along Göta Älv. The intersection of the new two-track railway from Göteborg to Trollhättan and the enhanced highway E 45 is 1 km south of Lödöse. The municipality is planning to build approximately 500 new buildings in the area next to the new station. I have interviewed three civil servants at the municipality of Lilla Edet for the Department of Urban Planning, Civil Planning and Building and the Department of Environment. I have also made a study of literature where I have read relevant research. The site of study has a ground consisting of clay. The National Rail Administration has through research at the area found that the ground also contains quick clay. The threat of landslides due to the quick clay is considerable. Quick clay has been found in the ground after examined landslides in the region of Göta Älv. In the process of building new houses an extended research of the ground is necessary to establish the components and the composition of the ground. Due to the climate changes of the future we need to change the way we build our houses so they manage to stay intact for more extreme weather.
22

Grundläggning på lera : Inför exploatering av Södra Lödöse

Ekdahl, Malin January 2009 (has links)
<p>Rapporten är en sammanställning av de vanligaste grundläggningsmetoderna samt pålning och hur de kan användas vid grundläggning på lera i Sverige.</p><p>Examensarbetet är utfört som en del i ett forskningsprojekt . Handledare har varit Yvonne Andersson Sköld på SGI samt Kaj Granath på Tekniska Högskolan i Jönköping.</p><p>Fallstudieområdet är i Lödöse som ligger i Lilla Edets kommun. Samhället har idag 1 300 invånare och är beläget 10 km söder om Lilla Edet samt 30 km norr om Göteborg, längs med Göta Älv. Vid den nya sträckningen av Norge- Vänerbanan samt utbyggnaden av E45 kommer det att bli en knutpunkt ca 1 km söder om Lödöse samhälle. Kommunen planerar att placera ca 500 nya bostäder mellan samhället och den nya pendeltågsstationen.</p><p>Intervjuer har gjorts av tre tjänstemän på Lilla Edets kommuns avdelningar Samhällsplanering, Plan- och Bygg samt Miljö. En litteraturstudie är genomförd där tillgänglig forskning har studerats.</p><p>Området ligger på lera och Banverket har i sina utredningar konstaterat att det även finns kvicklera på området. Kvicklera har konstaterats vid medparten av de undersökta skreden i Göta Älvdalen. Vid byggnation på lera krävs omfattande geotekniska undersökningar för att fastställa markens sammansättning. Framtidens klimatförändringar ställer ökade krav på nya byggnader. De byggs i dagens klimat men ska klara av morgondagens.</p><p>Den forskning och de rapporter inom området, grundläggning på lera, som jag har tagit del av förordar platta på mark. De förordar även pålning vid högre och tyngre byggnader än ett enfamiljshus. Dock så krävs det mer forskning inom området då kopplingen mellan grundläggning och markförhållandena är otillräckligt undersökt.</p> / <p>This thesis is a summary of the most common footings and pole-work found in Sweden and how they apply in buildings on clay.</p><p>The thesis is a part of a research project. Supervisors have been Yvonne Andersson Sköld at SGI and Kaj Granath at the School of Engineering, Jönköping University.</p><p>Place of study is located at Lödöse in the municipality of Lilla Edet. Lödöse has 1 300 citizens and is placed 10 km south of Lilla Edet and 30 km north of Göteborg, along Göta Älv. The intersection of the new two-track railway from Göteborg to Trollhättan and the enhanced highway E 45 is 1 km south of Lödöse. The municipality is planning to build approximately 500 new buildings in the area next to the new station.</p><p>I have interviewed three civil servants at the municipality of Lilla Edet for the Department of Urban Planning, Civil Planning and Building and the Department of Environment. I have also made a study of literature where I have read relevant research.</p><p>The site of study has a ground consisting of clay. The National Rail Administration has through research at the area found that the ground also contains quick clay. The threat of landslides due to the quick clay is considerable. Quick clay has been found in the ground after examined landslides in the region of Göta Älv. In the process of building new houses an extended research of the ground is necessary to establish the components and the composition of the ground. Due to the climate changes of the future we need to change the way we build our houses so they manage to stay intact for more extreme weather.</p>
23

Tilläggsisolering och fuktproblem i grundkonstruktionen platta på mark : En fallstudie i flerbostadshus inom stadsdelen Sätra i Gävle

Blom, Linus, Hedlund, Dan January 2014 (has links)
Between 1965 and 1974, the Swedish Parliament decided to build one million dwellings, called Million Program. The million program buildings were erected with new, untried design solutions, in a short range of time, and at low cost. The residential buildings from that time are now greatly in need of renovation. The municipal housing company, Gavlegårdarna, renovates and improves the energy efficiency at some of it’s apartment buildings in the district Sätra, Gävle. One problem is how to make the basic design of the slab on ground more energy efficiency and moisture proof. The study covers four representative flooring types in the Gavlegårdarnas million program area in Sätra. This study aims to investigate and evaluate proven methods for adding insulation in the four floor types. Also to look for solutions by designing additional insulation to treat damp problems and improve energy efficiency in an economical way. Existing flooring types are to be examined to check for new solutions as well. The aim is to produce a number of measures to provide property owners with different energy efficiency solutions. Results of calculations show that the perimeter area of the slab is exposed to moisture problems, while the centre of it does not have any notable problems. According to calculations, improved floor types have U-values reduced by 31% – 40% depending on the insulation thickness and design. However, investments have a long payback period and this is sometimes not economically viable. When a redevelopment project is performed, it is beneficial to simultaneously add insulation. If investors promote sustainable development, reduced energy consumption by the proposed measures is viable, as advocated by the environmental goals set by Sweden and the EU. / Sveriges riksdag beslutade att det skulle byggas en miljon bostäder, så kallade miljonprogramshus, mellan åren 1965 och 1974. Miljonprogramshusen uppfördes med nya och obeprövade konstruktionslösningar, på kort tid och till låga kostnader. Idag är bostadshusen från den tiden i stort behov av renovering. Det kommunalägda bostadsbolaget Gavlegårdarna håller på att renovera och energieffektivisera några av sina flerbostadshus i stadsdelen Sätra, Gävle. Ett problem är hur grundkonstruktionen, platta på mark i flerbostadshusen ska energieffektiviseras och fuktsäkras. Denna undersökning behandlar fyra representativa golvkonstruktioner som förekommer i Gavlegårdarnas miljonprogramsområde i Sätra. Syftet med undersökningen är att studera och utvärdera beprövade metoder för tilläggsisolering på de fyra utvalda golvtyperna. Lösningsförslagen på tilläggsisoleringsåtgärderna ska behandla fuktproblem, ekonomi och energieffektivisering. Resultaten från undersökningen visar att markplattans kantbalk är utsatt för fuktproblem medan plattans mitt inte har några anmärkningsvärda problem. Enligt U- värdesberäkningarna förbättras golvtypernas U-värde med 31 % - 40 % beroende på isoleringstjocklek och utförande, dock har investeringarna långa återbetalningstider. Utförs ett renoveringsarbete är det fördelaktigt att samtidigt tilläggsisolera. Satsar investerarna på en hållbar utveckling med minskad energianvändning rekommenderas förslagna åtgärderna, vilket förespråkas i miljömål uppsatta av Sverige och EU.
24

Samarbete, autonomi och stora personalgrupper : En personalvetenskaplig fallstudie om förutsättningar för medarbetare i en grundskola / Collaboration, Autonomy and Large Personnel Groups

Staiger, Maria, Rönndahl, Åsa January 2014 (has links)
The study is based on a human science perspective in which we are interested in the school as a workplace for adults and work with personnel issues. The aim is to contribute with new knowledge about what conditions an employee considers important to carry out their work, and employees' experiences of working in large personnel groups. We have made a case study in a Swedish local primary school for students in lower ages, with between 60-70 employees. We conducted nine semi- structured interviews with a hand-picked selection of employees from different occupational groups in the school. The study is empirical data -driven qualitative with abductive approach. To analyze the collected datamaterial, we have used the empirical data -driven thematic analysis. From the results of the study some aspects appear clearly; employees need to be seen by his/her boss, importance of employee autonomy and employee experience of stress. Some employees feel to a greater extent than others that they are seen by their boss and have the opportunity to influence their work situation. This appears to be linked to the type of relationship the employee has to school management.
25

Fuktberäkningar i fogbetongen mellan håldäcksplattor : En analys av det ekvivalenta mätdjupet

Akhlaqi, Rohollah, Momqvist, Jon January 2021 (has links)
This thesis covers calculations of the equivalent measuring depth in the joint concrete between hollow-core slabs performed using the calculation and simulation program WUFI Pro. The calculations are based on input data from field measurements performed by Polygon|AK in Uppsala. Input from the company has been combined with a moisture profile from the calculation program Torka S to construct a basic model in WUFI. Simulations have been made based on the basic model with constant water-cement ratio in joint concrete, three varying parameters in terms of relative humidity in spackle, leveling height for spackle and vapor resistance in carpets. In order to get a broader result basis, 18 different typical cases for further analysis have been studied.  The calculation results indicate that the industry standard according to RBK, which states the equivalent measuring depth to 50 % of the hollow-core slabs joint height, does not correspond to the calculation basis for this work. The result of this work indicates that the actual equivalent measuring depth is about 15-18 % of the height of the joint, depending on the selected parameters. The difference between the industry standard and the result of this work can be explained by the fact that in the previous calculations of the equivalent measuring depth assumes a completely dense surface layer and no drying downwards and moisture from glue has not been taken into account. The assumption that the water contained in the cross section does not dry out and only redistributes leads to results that do not correspond to today's real conditions in terms of more diffusion-open carpets, moisture from carpet glue and different moisture conditions in spackle.
26

En jämförelse mellan platta på mark i betong och Koljerngrund : Utifrån aspekterna klimatpåverkan, kostnad och tid / A comparison of concreate slab on ground and Koljernfoundation

Larsson, Marika, Sandström, Agnes January 2023 (has links)
The purpose of this study is to compare a concrete slab on ground with a Koljernfoundation based on the given aspects of climate impact, cost, and time. The goal of the study is to identify obstacles and opportunities for the construction industry to use alternatives to concrete slab in new construction of low-rise buildings. Currently, the construction and real estate sector account for 20 % of Sweden's greenhouse gas emissions. Concrete and steel contribute significantly to emissions and are materials that are included in concrete slabs, which is why the Koljernfoundation which consists of cellular glas and steel studs could be one of the solutions required to achieve climate neutrality. To achieve the purpose, a literature study has been conducted to create an overview of the foundation’s structures. A case study has been made to investigate the three aspects, and interviews have been held. The results showed that a concrete slab has about twice the emissions of a Koljernfoundation for the A1-A3 product stage. Therefore, the conclusion is that the Koljernfoundation is the most suitable option for the foundation of a low-rise building from a climate perspective. The time aspect is investigated for the first time in this study and the results show that the Koljernfoundation can make the building process more time-efficient if there is no problem during the installation of the foundation. The results also show that for concreate slabs, the material cost is significantly lower than for the Koljernfoundation.
27

Låglutande tak i fjällmiljö : Branschverksammas perspektiv på konstruktionens problem och lösningar

Olosson, Alexander January 2023 (has links)
Låglutande tak har alltid varit utpekade som en riskfylld konstruktion med många följande problem. Speciellt utpekade nationellt är de i nordligare breddgrader och fjällmiljöer. Konstruktionen är väldigt hårt ansatt av väder och vind och många byggnader får vattenskador till följd av läckage. Trots alla rapporterade problem med det låglutande taket i fjällmiljö så fortsätter dessa att byggas kontinuerligt. Studien har som syfte att analysera branschverksammas perspektiv på konstruktionstypen, dess problem och hur de arbetar för att skapa så goda förutsättningar som möjligt. En kvalitativ metod användes genom semistrukturerade intervjuer som sedan sammanställdes och kodades. Intervjuerna var riktade mot yrkesverksamma inom den utförande parten av takets konstruktion. Resultatet kunde identifiera problemfaktorer till olika delar inom takets livscykel. Tidigt som utformningsfel eller utförande fel och i ett senare skede som underhållsfel. Skador uppkomna i tätskiktet är vad som utpekas där läckage är följden. Dock har studien inte kunnat påvisa under vilken fas av takets livscykel som bidrar mest till uppkomna problem. Under samtliga kategorier har tidsbrist och kompetensbrist styrkts som de mest bidragande faktorerna till skadeproblematiken. / Low pitching roof systems has always been seen as a construction method full of risk. The design of the roof makes it vulnerable for winds and snow and could therefore be considered not suited for mountainous environments. Many of these roofs end up with water damages as a result from leakage trough the outermost layer of the roof. Despite all known problem factors with this type of construction they are continuously being built. The purpose of this study has been to analyze the perspectives from professionals in the Swedish building sector. How the experienced field think of the problems regarding the construction method and how they work around them. A qualitative method has been used to answer the studies purpose by using semi-structured interviews that were compiled and coded. In the results of these interviews, it was found that the problems could be coded in three categories throughout the roofs life cycle. Early in the life cycle as design flaws and poorly executed assembly and later with faulty maintenance. In all these categories lack of time and competent personnel is seen as leading causes to the problems. / <p>2023-06-23</p>
28

Control of the ball and plate system : A comparative study of controllers / Styrning av boll och platta systemet : En jämförande studie av regulatorer

Strand, Filip, Wahlund, Martin January 2022 (has links)
This paper presents a comparison of controllers, specifically between conventional PID controllers with different structures and a Fuzzy Logic Controller. The performance has been evaluated by conducting experiments with the Ball and plate system, which is a system that is used to balance a ball on a plate. Furthermore, a large part of this work has been to assess how intuitive and straightforward the controllers are to design and implement. The results show that a PD controller with a proportional-on-error structure performs well for the Ball and plate system. Still, proportional-on-measurement is a viable alternative if a conservative controller is required. At the same time, the Fuzzy Logic Controller is a good alternative if you want more control over the system. Furthermore, the Fuzzy Logic Controller provides a design process that is easier to understand and closer to how we naturally think. However, it is more time-consuming than designing a conventional PID controller. Future work in the field should focus on optimizing this process to reduce the time required. / Denna studie består av en jämförelse mellan ett antal regulatorer. Dessa är olika strukturer av PID-regulatorer och en Suddig logik regulator. Prestandan har utvärderats genom att utföra experiment med Boll och platta systemet vilket är ett system som används för att balansera en boll på en platta. Vidare har en stor del av detta arbete handlat om hur intuitivt och enkelt det är att designa och implementera respektive regulator. Resultatet visar att en PD regulator med en proportionell-på-felet struktur presterar bra för Boll och platta systemet. Även proportionell-på-mätvärdet fungerar bra som ett mer konservativt alternativ. Dessutom är Suddig logik regulatorn ett bra alternativ om man vill ha mer kontroll över systemet. Designprocessen av denna är lättare att förstå och efterliknar hur man naturligt tänker i högre grad än de andra regulatorerna. Dock är denna mer tidskrävande att designa i jämförelse med de traditionella PID-regulatorerna. Framtida arbete bör fokusera på att optimera designprocessen så att den blir mindre tidskrävande.
29

Ledarskapsstrategier, Organisationsstrukturer och Bolagsstyrning inom Byggindustrin : En fallstudie av anpassningar och strategier under ekonomiska kriser

Andersson, Albin, Häggmark, Felix January 2024 (has links)
SAMMANFATTNING Bakgrund- Samhället i stort och byggindustrin specifikt står idag inför stora utmaningar med projekt som skjuts upp eller stannar av helt på grund av den ekonomiska kris vi idag upplever. Både privatpersoner och företagen märker kraftigt av höga räntor, hög inflation och dyra varupriser. För att organisationer inom byggindustrin ska klara denna utmaning krävs det aktiva ledare som är beredda på förändringar inom deras organisation, vilket exempelvis handlar om att implementera strategier i styrningen av organisationen. Detta ger organisationerna möjligheter att klara av kriser på ett så lindrigt sätt som möjligt. Genom att intervjua företagsledare inom byggindustrin lyfter studien aspekter som anses vara viktiga för att styra bolaget mot så bra resultat som möjligt i tider av ekonomiska kriser.  Syfte- Syftet med denna magisteruppsats är att öka den befintliga förståelsen kring hur organisationsstrukturer, bolagsstyrning och ledarskapsstrategier påverkar och förändras i den valda branschen genom ekonomiska kriser. Metod- Magisteruppsatsen bygger på en fallstudie av företag inom byggindustrin i Sverige. Utöver tidigare forskning i ämnet, baseras studien främst på kvalitativa data som samlats in genom semistrukturerade intervjuer. Totalt har 12 intervjuer utförts, där det empiriska materialet analyserats med hjälp av en tematisk analys. Resultat- Resultatet från denna studie har gjort en rad intressanta fynd som både bekräftar och utmanar tidigare litteratur och teorier. De resultat som utmärker sig mest är bland annat de platta organisationernas snabba anpassning till ekonomiska kriser. Även ledarens roll har fått en ökad förståelse då flertalet aktörer delat med sig av sina erfarenheter. Slutligen har nya insikter tillkommit till hur bolagsstyrning inom byggindustrin kan hjälpa ledare navigera genom ekonomiska kriser med hjälp av bland annat mångfald och externa ledamöter. Forskningsbegränsningar/implikationer- Studien begränsas då den endast bygger på företag inom byggindustrin i Sverige, vilket bör tas i hänsyn även vad gäller resultatets tolkning. Fallstudien ökar förståelsen och bidrar med insyn kring hur bolagsstyrning och ledarskap förändras inom den valda branschen genom ekonomiska kristider. Originalitet/värde- Studiens bidrag är till de redan befintliga teorierna kring ledarskapsstrategier och bolagsstyrning. Studien bidrar med en ökad förståelse samt fördjupning i hur organisationer och ledare betraktar samt agerar i tider av ekonomiska kriser. / Background- Society in general and the construction industry specifically are currently facing significant challenges with projects being postponed or coming to a complete halt due to the economic crisis we are experiencing today. Both individuals and companies are strongly affected by high interest rates, inflation, and expensive commodity prices. To cope with this challenge, organizations within the construction industry requires proactive leaders who are prepared for changes within their organization, such as implementing strategies in organizational governance. This provides organizations with opportunities to navigate crises as smoothly as possible. By interviewing business leaders in the construction industry, the study highlights aspects that are considered as important for steering the company towards the best possible outcomes in times of economic crisis. Purpose- The purpose of this master’s thesis is to increase the existing understanding of how organizational structures, corporate governance, and leadership strategies affect and change in the chosen industry through economic crisis. Method- The master’s thesis is based on a case study of companies in the construction industry in Sweden. In addition to previous research on the subject, the study is primarily based on qualitative data collected through semi-structured interviews. A total of 12 interviews have been conducted, where the empirical material has been analyzed using a thematic analysis. Findings- The results of this study have yielded a range of interesting findings that both confirm and challenge previous literature and theories. The most notable result includes the rapid adaption of flat organizations to economic crises. Additionally, there has been an increase understanding of the leader’s role as multiple stakeholders have shared their experiences. Finally, new insights have emerged on how corporate governance within the construction industry can assist leaders in navigating economic crises, with the help of diversity and external board members, among other factors. Research limitations/ implications- The study is limited as it is only based on companies within the construction industry in Sweden. This should also be considered when interpreting the results. The case study increases understanding and contributes with insight into how corporate governance and leadership change within the chosen industry, in times of economic crisis. Originality/value- The study’s contribution is to the already existing theories around leadership strategies and corporate governance. The study contributes to an increased understanding and deepening of how organizations and leaders considers and act in times of economic crisis.
30

Minimiarmering i grundplattor : En studie om hur konstruktörsföretag väljer armering och hur valet påverkar den färdiga konstruktionen / Minimum reinforcement in ground slabs : A study of how structural engineering companies choose minimum reinforcement and how the choice affects the finished construction

Nurro, Matti, Jönsson, Emanuel January 2019 (has links)
Purpose: Concrete is a widely used construction material for mainly buildingfoundations. In Sweden Eurocode is used to dimension the minimum reinforcement that is supposed to limit the cracking of the concrete after casting, but cracking is nevertheless a common problem. The aim of this paper is to investigate how structural engineers choose the reinforcement in slabs on ground and how the construction is affected by the choice of reinforcement. Method: In the study, a literature study is made with articles within minimum reinforcement and cracking problems. A document analysis is made of how the Eurocode should be interpreted and used to calculate the minimum reinforcement amounts and crack widths. There are structured interviews with five design companies to investigate how minimum reinforcement is chosen for three different types of slabon ground. Findings: The results of the study show that the final construction might be both physically and economically affected in a negative way due to the fact that the wanted minimum reinforcement levels and crack widths are not always reached. Implications: The findings implicate that the choice of minimum reinforcement is done in different ways among engineers, and a significant difference in the levels could be seen. The recommendations are that the formula for crack width limitation should be used first, lower rebar dimensions should be used and that the communication between building construction engineer and builder should beimproved. Limitations: The study was limited to five interviews with building construction engineers, only three different slab examples were given to the interviewees for calculation of crack limitation reinforcement. Hence the results are not generally useful for all types of slab on ground. Keywords: Crack width, eurocode, eurokod, minimum reinforcement, slab on ground

Page generated in 0.0302 seconds