• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 26
  • 7
  • 2
  • Tagged with
  • 38
  • 28
  • 22
  • 20
  • 14
  • 14
  • 14
  • 9
  • 9
  • 9
  • 7
  • 7
  • 6
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Building Information Modeling – In the production phase of civil works / Building Information Modeling – I produktionsfasen av väg- och anläggningsprojekt

Krantz, Frida January 2012 (has links)
Building Information Modeling, abbreviated BIM, is a process of information sharing which enhances communication and which helps in visualizing complex problems in the building industry. BIM has not been used in a larger extent in the production phase of civil works. The purpose of the study is therefore to investigate driving forces behind the use of BIM and the resistors against it and to investigate in what ways BIM could be used in the production phase.The theoretical framework is based on one licentiate thesis, two degree projects, three research papers and three books. A qualitative method with semi-structured interviews was used. The interviews were made with a calculator, a supervisor and a CAD planner from Skanska, a constructor and project manager from ELU, a Project Information Officer from Tyréns and a VDC coordinator and VDC business developer from Veidekke who all have been working with BIM. This was to get a good representation from different actors and people with different professional roles.The study shows that the driving forces behind a use of BIM are that it enhances collaboration and communication between the actors, it makes it easier to visualize the project and the scope, and it provides a higher degree of accuracy of coordination’s. BIM also makes the work more effective and results in fewer errors. Above all, BIM give a possibility for a shorter production phase, shorter total project duration and a lower total cost. The study also shows that the resistors against the use of BIM are employee’s negative attitude against administrative work, that it is hard to measure profitability of using BIM, the uncertainty of who has the legal ownership of the data, and who has the responsibility of the accuracy of it. That the implementation cost and the design phase are more expensive is also a resistor against a use of BIM.BIM could be used in visualization with 3D models in collision controls and co-reviews in meetings, work preparations and at site. A workplace outline could also be printed from the 3D model to be placed on the site for visualization. 4D scheduling and 4D animations could be used for visualization in meetings, work preparations and at site. The study showed that quantity takeoff and cost estimation with 5D is only reconciled in the meetings in the production phase and that the programs for it are not needed in this phase. RFID tags could be used at site for logistics and tracking materials, and field verifications could be used to verify that a work task is executed according to exact coordination’s in the 3D model. Furthermore tablet computers could be used for bringing the technique of BIM to the site which enables a better understanding of complex work tasks for the workers. A BIM coordinator who understands the process of working with BIM and who could work as a bridge between the users and the technical development team is important in a successful implementation.The study also shows that the focus of BIM should lie on how to make use of the technique. The examples of how BIM could be used in the production phase of civil works have to be useful and meet the needs and demands of the users. The processes of using 3D models, 4D scheduling, 4D animations, RFID tags, field verifications and tablet computers should therefore be studied thoroughly to find how the technique could be applicable at site, in meetings and work preparations and how it could enhance the daily activities and work tasks. If the demands are met it will be accepted by both the user and the organization. Further research should therefore lie on how 3D models, 4D scheduling, 4D animations, RFID tags, field verifications and tablet computers could be useful in the production phase. These BIM techniques should then be tested on a real project to investigate how the processes could be useful at site, in meetings and in work preparations. Further research should also be made on how countries like Norway, Finland and USA have made use of BIM in the production of civil works. / Bygginformationsmodellering, förkortat BIM, är en process för informationsutbyte som förbättrar kommunikation samt förståelsen för komplexa problem inom byggbranschen. BIM har inte använts i en större utsträckning i produktionen av väg- och anläggningsprojekt. Syftet med studien är därför att undersöka drivkrafter bakom ett större användande av BIM och motstånd mot det, samt att undersöka på vilket sätt BIM skulle kunna vara användbart i produktionen.Den teoretiska grunden bygger på en licentiathandling, två examensarbeten, tre forskningsrapporter samt tre böcker. För intervjuerna användes en kvantitativ semistrukturerad metod. Intervjuerna gjordes med en kalkylator, en arbetsledare från Skanska, en CAD planerare från ELU, en Project Information Officer från Tyréns samt en VDC samordnare och VDC affärsutvecklare från Veidekke, som alla har arbetat med BIM. Detta var för att få en bra representation från olika aktörer och personer med skilda yrkesroller.Studien visar att drivkrafterna bakom en användning av BIM är att det förbättrar samarbetet och kommunikationen mellan aktörerna, gör det lättare att visualisera projektet, dess omfattning samt att det ger mer korrekta data. BIM gör också arbetet mer effektivt och resulterar i färre fel. Framförallt möjliggör BIM en kortare produktionsfas, kortare projekttid och lägre totalkostnad. Studien visar också att anställdas negativa attityd mot administrativt arbete är ett av motstånden mot en större användning av BIM, att det är svårt att mäta lönsamheten med det och att det är osäkert om vem som har äganderätten till informationen samt vem som har ansvaret över att den är korrekt. Att implementeringskostnaden och designfasen blir dyrare är också ett problem med BIM. BIM kan användas för visualisering med 3D-modeller i kollisionskontroller och samgranskning i möten, arbetsberedningar och på byggarbetsplatsen. En APD-plan kan även skrivas ut från 3D-modellen för att visualisera byggarbetsplatsen. Tidsplanering och animationer med 4D skulle också kunna användas till visualisering i möten, arbetsberedningar och på byggarbetsplatsen. Studien visar att mängd- och kostnadsberäkningar med 5D endast stäms av i produktionsfasen och att programmen inte behövs i produktionsfasen. RFID-taggar kan användas på byggarbetsplatsen för logistikplanering och för att spåra material.5Fältkontroller kan vara användbart för att verifiera att ett arbete utförts exakt enligt 3D-modellens koordineringsdata. Handdatorer kan användas för att få ut tekniken för BIM på byggarbetsplatsen vilket möjliggör för en bättre förståelse för komplexa arbetsuppgifter för yrkesarbetarna. En BIM samordnare som förstår processen att arbeta med BIM och som kan överbrygga kommunikationssvårigheter mellan användarna och teknikutvecklingsgruppen är en mycket viktig aktör för ett framgångsrikt införande av BIM i ett projekt.Studien visar också att fokus bör ligga på hur man utnyttjar tekniken med fokus på nytta och användbarhet. De arbetsuppgifter som BIM skulle kunna användas till i produktionsfasen måste vara användbara och tillgodose användarnas krav och behov. Processen med att använda 3D-modeller, tidsplanering och animationer med 4D, RFID-taggar, fältkontroller och handdatorer måste därför studeras noggrant för att hitta hur tekniken kan tillämpas på byggarbetsplatsen, i möten, i arbetsberedningar samt hur den skulle kunna förbättra dagliga aktiviteter och arbetsuppgifter. Om användarnas krav är uppfyllda kommer tekniken att accepteras av både användaren och organisationen. Ytterligare forskning bör därför ligga på hur 3D-modeller, tidsplanering och animationer med 4D, RFID-taggar, fältkontroller och handdatorer kan vara användbara i produktionsfasen. Dessa tekniker bör sedan testas på ett verkligt projekt för att undersöka hur processerna för BIM skulle kunna vara användbara på byggarbetsplatsen, i möten och arbetsberedningar. Ytterligare forskning bör också göras på hur länder som Norge, Finland och USA har använt BIM i produktionsfasen i väg- och anläggningsprojekt.
32

Integrerade arbetsmetoder med Virtual Design and Construction / Integrated working methods with Virtual Design and Construction

Ahlbäck, Moa January 2018 (has links)
Virtual Design and Construction (VDC) introducerades tidigt på 2000-talet för att främja ett arbete med datorbaserade modeller samt involvering av produktionsplanering i designfasen. VDC är ett koncept som idag har anammats inom många bygg- och konsultföretag för att utveckla arbetet med Building Information Model (BIM), innovationer och samverkan inom byggprojekt. Konceptet VDC förändras ständigt och omdefinieras av enskilda individer och företag. Det här resulterar i att det råder en begreppsförvirring hur VDC ska definieras och hur arbete med VDC ska genomföras. Vidare tenderar många byggprojekt att vara fragmenterade med projektmedlemmar som främst fokuserar på sitt eget teknikområde. För att minska fragmentering mellan projektmedlemmar kan integrerade arbetsmetoder tillämpas. Syftet med examensarbetet är därför dels att undersöka innebörden av VDC som koncept och även hur VDC kan stimulera integrerade arbetsmetoder. Ämnet utforskas kvalitativt med vetenskaplig litteratur och intervjustudie. Den vetenskapliga litteraturen definierar konceptuellt VDC och två integrerade arbetsmetoder Integrated Concurrent Engineering (ICE) och Integrated Project Delivery (IPD). Varvid intervjustudien inkluderar respondenter från byggsektorn vars reflektioner om det studerade ämnet presenteras. Studien är geografiskt avgränsad till Sverige.  I resultatet påvisas den rådande tvetydigheten huruvida VDC definieras. För att undvika begreppsförvirring kan det vara behövligt med en gemensam definition av VDC i byggbranschen och även nationella riktlinjer vilka beskriver hur arbete med VDC ska utföras. Vidare kan VDC stimulera ett integrerat arbetssätt genom en ökad samhörighet inom byggprojekt med bland annat gemensamma formuleringar av projektmål och gemensam problemlösning mellan projektmedlemmar. / Virtual Design and Construction (VDC) was introduced early in the 21st century in order to encourage work with computer based models and construction planning in the design phase. VDC is a concept that has been embraced by several construction and consulting companies in order to develop their work with Building Information Model (BIM), innovations and cooperation within construction projects. VDC is a concept that keeps evolving and is being redefined by individuals and companies. This has contributed to a conceptual confusion within the construction sector about the definition of VDC. Furthermore, construction projects tend to be fragmented with project members that are working in silos and primarily focusing on their own discipline. In order to decrease the fragmentation within construction projects integrated working methods can be applied. Therefor the purpose of this master thesis is to explore the concept VDC and how it can stimulate integrated working methods.  The study is examined using qualitative methods based on scientific literature and an interview study. The scientific literature is defining VDC conceptually and two integrated working methods Integrated Concurrent Engineering (ICE) and Integrated Project Delivery (IPD). Furthermore, the interview study includes respondents from the construction industry whose reflections and thoughts about the subject are being presented. The study is geographically limited to Sweden.  The result shows the current ambiguity of how VDC is defined. In order to avoid a conceptual confusion a common definition should be formulated with national guidelines that describe how work with VDC should be conducted. Furthermore, VDC can stimulate an integrated approach through increased cohesion within construction projects, including common objectives within the project and joint problem solving between project members.
33

3D-visualisering i mark- och anläggningsprojekt. : En studie utifrån Veidekkes förutsättningar att implementera 3D-modeller i produktion.

Radtke, Oliver, Kellgren, Markus January 2019 (has links)
Samhällsdigitaliseringen har lett till att byggbranschen mer och mer strävar efter att digitalisera verktyg och arbetssätt. Att presentera projekt i 3D har därför blivit ett hett ämne där flera aktörer strävar efter att både projektera och nyttja 3D ute i produktionen. Tidigare forskning inom ämnet har till största del valt att lägga fokus på byggskedet och belyser de fördelar som går att utvinna genom nyttjandet av så kallade VDC- eller BIM verktyg. Samtidigt belyser andra vetenskapliga rapporter mark och anläggning som ett betydelsefullt skede inom hela byggprocessen. Ett flertal menar också att mark- och anläggningsskedet spelar en huvudroll i huruvida ett byggprojekt når framgång eller inte. Med detta i åtanke upplever författarna att 3D-modeller i mark- och anläggningsprojekt inte utforskats till den grad som känns nödvändig för att belysa fördelarna, men även de olika hinder som står i vägen för en lyckad implementeringsprocess. Det råder inte heller några tvivel om att byggskedet kommit längre i digitala utvecklingsaspekter, så som att visualisera projekt i 3D, vid en jämförelse med mark och anläggning. I denna studie belyser därför författarna de fördelar som går att utvinna genom att visualisera mark- och anläggningsprojekt i 3D. Studien visar upp bevis på varför verktyget bör implementeras och vad aktörer bör tänka på vid en eventuell implementering av 3Dvisualisering i projekt. Syftet med studien är därav att utreda hur det undersökta fallföretaget kan integrera 3D-modeller i mark- och anläggningsprojekt, samt belysa vilka krav fallföretagets anställda ställer på en 3D-modell för att främja utvecklingen av ett verktyg som passar och leder till en hög nyttjandegrad ute i produktionen. Vidare sker en identifiering av vilka förutsättningar ute i mark och anläggningsprojekt som spelar en nyckelroll i huruvida en implementerad 3D-modell skall kunna figurera och verka så som det är tänkt. Studien utförs med en kvalitativ metod där granskning av befintlig litteratur lyfter fram de problemområden som författarna identifierat. Vidare utförs semistrukturerade intervjuer med tjänstemän och yrkesarbetare på fallföretaget Veidekke Entreprenad AB. Intervjuerna genomförs i syfte att identifiera aktuella problem ute i produktionen, undersöka respondenternas syn på 3D-modeller samt belysa verktygets potentiella inverkan på deras vardagliga arbete.  En tydligt övergripande slutsats är att 3D-modeller i allra högsta grad behövs ute i produktionen på mark- och anläggningsprojekt. Mycket pekar på att verktyget bland annat skulle bidra med en ökad förståelse kring utförandet av projekten, men också förbättra kommunikation och produktionsledande. Verktyget kan också enligt studien minimera problemområden gällande tekniska lösningar, förbättra planering, samt genom att digitalisera moment även tillfredsställa arbetsglädjen för produktionsteamet. / Due to the digitalization the construction business is increasingly striving against more digitized tools and working methods. Presenting projects in 3D has therefore become a hot topic where several actors are trying to implement 3D not only in the design phase but also in the production phase. Earlier research dealing with the subject largely chooses to focus on the building construction process and highlights the advantages that can be extracted using so called VDC- or BIM tools. Some of the scientific reports reviewed during this study on the other hand, highlights the importance of the infrastructure and earthworks stages as a part of the entire construction process. Many also believe that the infrastructure and earthworks stage play a key role in whether a construction project achieve success or not. With that in mind, the authors feel that 3D-models for infrastructure and earthworks, have not yet been explored to the extent that feels necessary, meaning that the advantages and the various obstacles that stand in the way of a successful implementation process needs to be investigated. There is no doubt that building construction has come further in a digital development aspect of visualizing projects in 3D, compared to infrastructure and earthworks. In this study the authors have highlighted the benefits that can be gained by visualizing infrastructure and earthworks projects in 3D. The study also shows evidence of why the application of such should take place and what companies should be considering when implementing 3D visualization into such projects. The purpose of the study is therefore to investigate how the company researched by the authors can integrate 3D models into their infrastructure and earthworks projects. This in addition to identifying the requirements that the employees have on a 3D model to facilitate development of a tool that fulfils these requirements and is usable in production. In addition, the conditions and requirements that play a main role in infrastructure and earthworks projects have been investigated to identify the most suitable conditions to allow the model to work in the most efficient way as possible. The study is conducted with a qualitative method including an examination of existing literature that highlights the problem areas identified by the authors. In addition, semi structured interviews are carried out with employees from the work-site leadership and the skilled workers at the company Veidekke Entreprenad AB. This to identify the current problem areas in the production of infrastructure and earthworks projects and to examine employees’ view about how 3D models would impact on their everyday work. A clear overall conclusion is that 3D-models are truly needed in infrastructure and earthworks projects out in production. A lot of factors indicate that the tool would, among other things, contribute to an increased understanding of the scope of projects and thus contribute to an improved communication and production process leading. Such a tool can according to this study, also minimize problem areas regarding technical solutions, contribute to a better planning, and by digitizing processes, increase job satisfaction for the site team.
34

The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors

Tagg, Morgan Christian 01 November 2017 (has links)
Building Information Modeling (BIM) plays an important role in today's construction industry. Models are tools that help stakeholders communicate, visualize building geometry, perform trade coordination and clash detection among others. A less popular aspect of BIM that shows high potential is the quantity take-off (QTO) feature. Yet, its implementation among commercial general contractors (GC) has not received as much attention. The purpose of this study was to identify how the BIM QTO features were being implemented among commercial general contractors, what challenges they faced and how they worked to overcome those challenges. Through a three-step process including semi structured interviews with estimators, preconstruction, BIM and Virtual Design Construction (VDC) managers, valuable insights on the BIM QTO implementation state among general contractors were gathered and analyzed. Links between BIM QTO benefits, project design phases and delivery methods, software, training, leadership and jurisdictions were discussed. The data indicated that BIM QTO's benefits were best leveraged through early general contractor involvement, the adequate contract framework, trained BIM QTO estimators, and early and strategic communication between owners, designers and estimators. The conditions for increased efficiency were discussed along with the solutions to the common BIM-based QTO challenges.
35

Implementación de la metodología Virtual Design and construction (VDC) a la construcción del edificio José Gonzales 685 en Miraflores, Lima – Perú, 2020 / Implementation of the methodology Virtual Design and construction (VDC) in the building construction of the José Gonzales 685 in Miraflores, Lima – Perú, 2020

Abad Alvarado, Alan Christopher, Lastra Arce, Mery Marilda, Márquez Frías, Walter Francisco, Siguas Alvarez, Jorge Luis, Zárate Jiménez, Katherine 16 August 2021 (has links)
Actualmente , el sector de la construcción esta creciendo de una forma acelerada en todo el mundo desarrollando construcciones cada vez más complejas, exigiendo el uso de nuevas tecnologías y herramientas que faciliten la ejecución, marcando la diferencia entre proyectos constructivos tradicionales y las nuevas propuestas de mejora, aún más en retadores proyectos. Hoy en día contamos con nuevas herramientas, como “la metodología del Diseño Virtual y Construcción (VDC)” , la cual se viene aplicando como la forma más apropiada para obtener excelentes proyectos que cumplan con los tiempos establecidos, el menor costo del previsto y con una mayor calidad a lo deseado. En Perú observamos un paulatino crecimiento y reactivación en el sector de la construcción, los proyectos de edificaciones en general continúan con el sistema constructivo tradicional sin tener una ingeniería totalmente definida y sin implementar mejoras de tecnologías de gestión. La presente tesis demuestra que, logrando una gestión colaborativa en el proyecto utilizando herramientas como el BIM , involucrando a las subcontratas, especialistas y proyectistas en la etapa contructiva mediante sesiones ICE , se puede lograr una mejor productividad en procesos constructivos , menor desperdicio, optimizando el plazo de proyecto y reduciendo costos. / Currently, the construction sector is growing at an accelerated rate around the world, developing increasingly complex constructions, demanding the use of new technologies and tools that facilitate execution, making the difference between traditional construction projects and new improvement proposals. , even more in challenging projects. Today we have new tools such as the Virtual Design and Construction (VDC) methodology, which for some years has been imposing itself as the most appropriate way to obtain better projects in time and at a lower cost than expected, also with higher quality than expected. expected. (ESAN, 2016). In Peru, we observe a gradual growth and reactivation in the construction sector, building projects in general continue with the traditional construction system without having fully defined engineering and without implementing improvements in management technologies. This thesis shows that, by achieving a collaborative management in the project using tools such as BIM, involving subcontractors, specialists and designers in the construction stage through ICE sessions, it is possible to achieve better productivity in construction processes, less waste, optimizing the project time and reducing costs. / Tesis
36

Virtual Design and Construction och dess roll för hållbar utveckling hos svenska byggentreprenadföretag / Virtual Design and Construction and its Role in Sustainable Development in Swedish Construction Contractors

Husain, Ali, Zian, Elias January 2023 (has links)
Byggentreprenörer med projekterings- och utförandeansvar utgör en viktig roll när det gäller att främja hållbar utveckling inom byggbranschen. Genom att integrera hållbarhetsaspekter i sina arbetsprocesser och sitt beslutsfattande kan de bidra till att minska miljöpåverkan samt effektivisera projekt- och produktionsplanering. Virtual Design and Construction (VDC) har gjort det möjligt för byggentreprenörer att använda modellering och visualisering av slutprodukter för att göra projekt- och produktionsplanering mer effektiv. Litteraturen visar på att VDC kan användas för ekonomisk lönsamhet men kvar återfinns frågeställningen om VDC kan användas för att främja hållbar utveckling.  Denna studie grundar sig i en intervjubaserad kvalitativ studie och undersöker hur VDC används bland svenska byggföretag med projekterings- och utförandeansvar för att främja hållbar utveckling. Detta genom att undersöka hur byggentreprenörernas användning av VDC påverkar social-, ekonomisk- och miljömässig hållbarhet. Studien tar även upp hur VDC används för att uppnå miljö- och hållbarhetskrav, samt för att byggnader ska kunna miljöcertifieras. Arbetet utgörs av en litteraturstudie och en intervjustudie som innefattar uppfattningar från svenska byggentreprenörer som arbetar med totalentreprenader. För att samla in data genomfördes semistrukturerade intervjuer med respondenter från byggentreprenadföretag i Sverige. En tematisk analys genomfördes sedan utifrån befintlig forskning och teorier. Resultaten tyder på att implementeringen av VDC bidrar till främjandet av hållbar utveckling hos byggentreprenörer. Genom att involvera flera aktörer i byggprojekt främjar VDC kommunikation, samarbete och en inkluderande arbetsmiljö. Det erbjuder också snabbare och mer effektiva lösningar jämfört med traditionella planeringsmetoder, vilket leder till kostnadsbesparingar och förbättrade projektresultat. Dessutom kan VDC användas för att optimera design och planering av byggnader, resurshantering och underlätta miljöcertifieringsprocessen. Resultaten visar att trots de fördelar som VDC erbjuder för hållbar utveckling, utnyttjas inte dess fulla potential inom den svenska byggbranschen. Utmaningar såsom kompetensbrist och interoperabilitetsproblem fortsätter att hindra en framgångsrik användning av VDC. / Construction contractors with design and building responsibilities play an important role in promoting sustainable development in the construction industry. By integrating sustainability considerations into their work processes and decision-making, they can help reduce environmental impact and streamline project and production planning. Virtual Design and Construction (VDC) has enabled design-build contractors to use modelling and visualization of final products to make project and production planning more efficient. The literature shows that VDC can be used for economic profitability, but the question remains whether VDC can be used to promote sustainable development.  This study is based on an interview-based qualitative study and examines how VDC is used among Swedish construction companies with design and building responsibilities to promote sustainable development. This is done by examining how the use of VDC by construction contractors affects social, economic, and environmental sustainability. The study also addresses how VDC is used to achieve environmental and sustainability requirements, and for buildings to be environmentally certified. The work consists of a literature study and an interview study that includes perceptions from Swedish design-build contractors. To collect data, semi-structured interviews were conducted with respondents from construction companies in Sweden. A thematic analysis was then conducted based on existing research and theories. The results indicate that the implementation of VDC contributes to the promotion of sustainable development among construction contractors. By involving multiple stakeholders in construction projects, VDC promotes communication, collaboration, and an inclusive work environment. It also offers faster, and more efficient solutions compared to traditional planning methods, leading to cost savings and improved project performance. Furthermore, VDC can be used to optimize building design and planning, resource management and facilitate the environmental certification process. The results show that despite the benefits that VDC offers for sustainable development, its full potential is not being utilized in the Swedish construction industry. Challenges such as skills shortages and interoperability issues continue to hinder the successful use of VDC.
37

Mätetal inom Virtuell Design och Konstruktion / Measurement figures for Virtual Design and Construction.

Nilsson Ebers, Rasmus January 2019 (has links)
Bakgrunden till studien grundar sig i att mätetal är en viktig del i projekt där VDC, Virtual Design andConstruction, används som metod för projektledning. Det skiljer sig hur företag väljer att arbeta medmätetal och vilka resurser som finns tillgängliga. Denna studie genomförs på uppdrag av Tyréns somär i uppstarten med att använda denna metod i utvalda projekt. De vill med denna studie ta fram enmetod för att visa projektorganisationen och beställaren hur de arbetar med VDC. Studien är därfören inledande studie för att undersöka ett lämpligt sätt att arbeta med mätetal och genomförs genomatt svara på frågeställningarna: • Vilka mätetal, med avseende på BIM, är relevanta att mäta för att uppnå kundens ochprojektets mål? • Hur presenteras dessa mätetal gentemot projektdeltagarna på ett pedagogiskt sätt? Studien har genomförts på Tyréns kontor i Stockholm tillsammans med personal från Tyréns egen BIMavdelning.Materialet i denna studie har tagits fram genom en intervju med avdelningschef JakobBerggren och genom två workshoppar där deltagarna har fått möjlighet till att diskutera ett lämpligttillvägagångssätt gemensamt. Detta material har tillsammans med tidigare studier analyserats för attslutligen presentera två mätetal och hur dessa kan presenteras. Utifrån studiens resultat framkom att tydliga BIM-relaterade mål saknas i dagsläget, vilket är enförutsättning för att mätetal ska kunna vara till nytta för projektet. Trots detta, ansåg deltagarna istudien att, antalet kollisioner i en BIM-modell samt tiden som sparas tack vare automatiska processeranses som lämpliga mätetal att påbörja ett arbete med. Utgångspunkten för dessa mätetal bör dåhandla om att bygga upp en historik av mätetal för att sedan kunna sätta lämpliga mål samt få kundoch projektledning att förstå nyttan med BIM. Genom att förstå nyttan med BIM är förhoppningen attBIM-relaterade mål ska utformas tidigt i projekt. Mätetalen bör presenteras på projektets projektsida där Tyréns använder Microsofts programSharePoint. Presentationen sker lämpligast i form av en dashboard och den visuella utformningen ärav stor vikt för att ge projektdeltagarna en tydlig och konkret bild av mätetalen utan att vilseleda.Slutligen presenteras ett lämpligt förslag på utformningen av denna dashboard med hänsyn tilllämpliga riktlinjer som framkommit under studien. / The background of this study is that the measurement figures are an important part of projects which use VDC, Virtual Design and Construction, as a method for the project. How companies choose to work with the measurement figures and which resources they have available differ. This study is carried out on behalf of Tyréns, which is a company that is at the beginning of using this method in selected projects. Together with this study, they want to bring forth a method to show the project organization and the client how they work with VDC. This study is, therefore, an initial study to examine a suitable way to work with measurement figures and is accomplished by answering the questions: • Which measurement figures are relevant to measure, concerning to BIM, to achieve the customer's and the project's goals? • How can these measurements be presented to the project participants in an educational way? The study has been conducted at Tyrén's office in Stockholm together with staff from Tyrén's own BIM department. The material in this study has been produced through an interview with Jakob Berggren, who is the Head of the Department, and through two workshops where participants were allowed to discuss an appropriate approach in common. This material has been analyzed together with previous studies to finally present two measurement figures and how these can be presented. Based on the results of the study, it was found that clear BIM-related goals are currently lacking, which is essential for measuring figures to be useful in the project. Despite this, the participants in the study considered that the number of collisions in a BIM model and the time saved thanks to automatic processes are considered as appropriate metrics, to begin with. The initial work should then be to build up a history of these two metrics to set appropriate goals and get the customer and project management to understand the benefits of BIM. By understanding the benefits of BIM, the expectation is that BIM-related goals will be formulated earlier in projects. Furthermore, the metrics should be presented, according to the participants of the study, on the project's project page which is SharePoint, developed by Microsoft. The presentation of the metrics is most suitable in the form of a dashboard. The visual design is of great importance to give the project participants a clear and concrete picture of the metrics without being misled. Finally, an appropriate proposal for the design of this dashboard is presented at the end of the report and taking into account the appropriate guidelines that emerged during the study.
38

Den juridiska statusen för 3D-modeller som bygghandlingar / The legal status and impact on 3D-models as construction documents

Aasa, Emma, Rosell, Michaela January 2023 (has links)
Introduction – This thesis in Building Engineering at Jönköping University, in collaboration with Tyréns Sweden AB, examines the issues surrounding 3D models as construction documents from a legal perspective and investigates how digitization affects stakeholders in the construction industry. The goal of the study is to explore a relevant and interesting research area in order to contribute to knowledge development and the advancement of new theories or methods in the field. Method – The study will employ qualitative research, including primary data collection through interviews, to address the research questions posed in the report. The authors have chosen this method to achieve a comprehensive understanding of the respondents' perspectives and identify important themes and patterns. The interviews were conducted with participants from various sectors of the construction industry to obtain a broader picture of the subject. Results – The study revealed that there are certain legal barriers to the use of 3D models as drawing documentation. These barriers are related to a lack of knowledge and uncertainty in handling the models. This includes issues of copyright, liability, and evidential value. There is a need to update current regulations to facilitate the management of digital models. Analysis – The analysis of the results clarifies that industry standards and clearer guidelines would prevent uncertainties and address knowledge gaps in the use of BIM and 3D models. An industry standard could have facilitated a smoother transition to a more digitized construction industry. There is also a need for education in the field for professionals and decision-making stakeholders. Discussion – The discussion focuses on possible solutions to the identified problems, such as the development of standards and guidelines, education, and regulatory updates. There is also a need to raise awareness about the legal aspects of using 3D models in the construction industry, as the uncertainty regarding their legal status is high. Legally, it is possible to use 3D models as contractual documents, but the study shows that concerns about the legal aspects are a reason for the weak implementation. Keywords – 3D model, 3D design, BIM, Building Information Modeling, construction documents, contractual law, and copyright. / Introduktion – Detta examensarbete inom Byggnadsteknik vid Jönköpings Tekniska högskola i samarbete med Tyréns Sverige AB undersöker problematiken med 3D-modeller (tredimensionell modell) som bygghandlingar ur ett juridiskt perspektiv och undersöker hur digitaliseringen påverkar aktörer inom konstruktion. Studiens mål är att undersöka ett relevant och intressant forskningsområde för att bidra till kunskapsutveckling och utveckling av nya teorier eller metoder inom området. Metod – Studien kommer att använda kvalitativ forskning som inkluderar primärdatainsamling genom intervjuer för att besvara frågeställningarna i rapporten. Författarna har valt denna metod för att uppnå en omfattande förståelse av respondenternas perspektiv och identifiera viktiga teman och mönster. Intervjuerna genomfördes med respondenter från olika delar av byggbranschen för att få en bredare bild av ämnet. Resultat – Studien visade att det fanns vissa juridiska hinder för användningen av 3D-modeller som ritningsunderlag. Dessa hinder kopplas till bristande kunskap och osäkerhet i hantering av modellerna. Detta inkluderar frågor om upphovsrätt, ansvar och bevisvärde. Det finns ett behov att uppdatera dagens regelverk för att lättare hantera digitala modeller. Analys – I analys av resultatet klargörs det att en branschstandard och tydligare riktlinjer skulle förebygga osäkerheterna och förebygga kunskapsluckor för användandet av BIM och 3D-modeller. En branschstandard hade kunnat leda till en säkrare övergång till en mer digitaliserad byggbransch. Det finns också ett behov av utbildning inom området för yrkesverksamma och beslutsfattande aktörer. Diskussion – Diskussionen fokuserar på möjliga lösningar på de identifierade problemen, så som utveckling av standarder och riktlinjer, utbildning och uppdatering av regelverk. Det finns också ett behov av att öka medvetenheten om de juridiska aspekterna av användningen av 3D-modeller inom byggbranschen då osäkerheten av den juridiska statusen är hög. Juridiskt sett går det att använda sig av 3D- modeller som kontraktshandling, men studien visar att oron för det juridiska är en anledning till den svaga implementeringen. Nyckelord – 3D-modell, 3D-projektering, BIM, Building Information Modeling,, bygghandling, kontraktsha juridik och upphovsrätt

Page generated in 0.0186 seconds