• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 216
  • 42
  • Tagged with
  • 258
  • 139
  • 114
  • 113
  • 111
  • 72
  • 53
  • 53
  • 45
  • 37
  • 36
  • 29
  • 28
  • 27
  • 23
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
121

Miljökonsekvenserna av Växjö kommuns energikrav på bostäder på Östra Lugnet

Johansson, Martina, Petersson, Johanna January 2013 (has links)
I detta examensarbete studeras miljökonsekvenser av Växjö kommuns ställda energikrav på bostadsområdet Östra Lugnet i Växjö. Dessutom studeras hur väl Växjö kommuns och BBRs (Boverkets byggregler) krav på specifik energianvändning efterlevs. Växjö kommuns krav ställs på både företag och privatpersoner där kravet innefattar anslutning till Växjös fjärrvärmenät. Kommunen ställer också krav på företag gällande specifik energianvändning.   Denna studie uppvisar skillnader, både mellan företag och privatpersoner men även mellan företags olika kvarter, i hur väl ställda energikrav efterlevs. Där lyckas företagen sämst, trots att de haft strängare krav.   Studien visar också att fjärrvärme bidrar till en minskning av koldioxidutsläpp, vilket stöder Växjö kommuns kravställande på fjärrvärmeanslutning.
122

Ersättning av fossilt bränsle i värmeproduktion: Pulverbrännare till befintliga oljepannor / Replacement of fossil fuels in heat production: Powder burner to existing oil boilers

Bengtsson, Conny January 2013 (has links)
Vi står inför en förändring, att minska vårt beroende av fossil energi till förmån för en ökad användning av förnybar energi. Incitament i form av ökade punktskatter på fossilt bränsle påskyndar omställningen för företag till förnybar energi och- eller energieffektivisering av sin produktion. Konsekvensen blir en successivt fördyrad kostnad för produktion av fjärrvärme med eldningsolja till tillverkningsindustrin. Punktskatt på eldningsolja stiger med 41 procent, från 2010 till 2015 för företagen. Att konvertera befintliga oljepannor med träpulverbrännare är en lösning för att hålla produktionskostnaden nere och behålla sin konkurrenskraft. I detta examensarbete utreds möjligheten att konvertera oljepannor i storleksklassen 5-10 MW. Studien tar ett helhetsgrepp om RMT´s fjärrvärmeproduktion för att söka svaret på, om det är möjligt att göra en konvertering ur ett tekniskt, hållbarhets och ekonomiskt perspektiv. Det kända behovet av spetslast från oljepannorna vid -3°C visade sig inte stämma utan brytpunkten hamnade vid -6°C. Resultatet pekar på att en 10 MW oljepanna kan konverteras till 5 MW träpulver men ändå behålla sin ursprungliga effekt genom en kombibrännare. Tidigare problem som fanns med träpulveranläggningar är åtgärdade och referensanläggningar i den aktuella storleksklassen finns i drift. Ett förfrågningsunderlag skickades ut för att få in budgetpris på konvertering av 5 och 10 MW oljepannor för utvärdering. Trots att alla leverantörer gavs samma förutsättningar så varierade budgetpriserna väldigt mycket. En stor överraskning var den korta payoff tid på konverteringar med liten värmeeffekt. Att en konvertering av en 10 MW OP har en återbetalningstid på 20 månader var rätt osannolikt innan studien utfördes. Denna studie kan även ses som en inspirationskälla till andra företag som har mindre spetslastpannor och vill fasa ut sitt fossila beroende med förnybar energi, samtidigt behålla sin konkurrenskraft. I fjärrvärmebranschen är dessa 5 och 10 MW oljepannor vanliga som spetslastpannor. Det finns ca 1000 oljepannor i storleken 5-10 MW i Sverige så det bör finnas en stor potential i att konvertera oljepannor till träpulver. / We are facing a change, to reduce our dependency on fossil fuels in favor of increased use of renewable energy. Incentives in the form of increased excise taxes on fossil fuels for companies accelerate the conversion to renewable energy or energy efficiency of its production. The consequence is a progressively more expensive cost for district heating with fuel oil to manufacturing industry. Excise tax on fuel oil rises by 41 percent, from 2010 to 2015 for those companies. To convert existing oil boilers with woodpowderburner is a solution to keep production costs down and remain competitive. In this thesis studied the possibility of converting oil boilers in the size range of 5 to 10 MW. The study takes a holistic approach to RMT's district heating to search the answer, if it is possible to do a conversion from a technical, sustainability and economic perspective. The felt need for peak load from oil boilers at -3° C appeared not to sue; it ended up at -6° C. The results indicate that a 10 MW oil boiler can be converted to 5 MW wood powder and while retaining its original power through a combination burner. Previously problems with woodpowderplant are taken care of and reference facilities in the current magnitude are in operation. An inquiry was sent out to get budget prices at a conversion of 5 and 10 MW oil boilers for evaluation. Even though all the suppliers was given the same opportunities so varied budget prices very much. A big surprise was the short payoff time on conversions of small oil boilers. The conversion of a 10 MW OP has a payback period of 20 months and that was rather unlikely before the study was performed. This study can also be seen as a source of inspiration to other companies that have small peak load boilers and want to phase out their fossil fuel dependence with renewable energy, and retain their competitiveness. In the district heating sector, these 5 and 10 MW oil boilers are ordinary peak load boilers. There are about 1000 oil boilers in the size from 5 to 10 MW in Sweden so it should be a large potential in converting oil boilers to wood powder
123

Uppvärmning av småhus i stadsdelen Djurgården - Linköping / Heating of detached houses in city district Djurgården - Linköping

Ågren, Per, Wimble, Peter January 2009 (has links)
Syftet med detta examensarbete är att genomföra en energi- och systemanalys av den planerade stadsdelen Djurgården i Linköping. Den ska ge svar på vilket uppvärmningssystem kombinerat med hustyp som är mest systemriktigt. Att bygga så miljövänligt som möjligt för att mildra den globala uppvärmningen är i fokus för alla parter. Slutsatsen är att passivhus inte är miljövänligast när det byggs i ett fjärrvärmenät med kraftvärme.1 Det miljövänligaste och förmodligen det billigaste alternativet för alla parter är att bygga BBR2008 hus med fjärrvärme.2 Examensarbetet utreder en alternativ anslutning av passivhus till fjärrvärme. Resultatet visar att anslutningen med EPS PEX och ackumulator i ett sekundärnät lönar sig jämfört med en traditionell anslutning med Twin-stålrör i primärnät.3 Den alternativa anslutningens främsta egenskap är minskade värmeförluster med en bättre isolering. 1 Passivhus är ett hus med bra och tät isolering som gör hela konstruktionen energisnål 2 BBR2008 är hus med gällande energispecifikation från Boverket. 3 EPS PEX är plaströr med frigolit isolering / The purpose of the Master Thesis is to conduct an energy- and system analysis of the planed city district Djurgården in Linköping, Sweden. From a system perspective the thesis provides an answer to suitable combinations of heating system and house types. The focus of everyone in society today is to build as environment friendly as possible, in purpose to prevent global warming. The conclusion is that a passivehouse is not the best environment friendly solution to combine with a district heating system which includes a heating and power plant.1 The best solution would be a BBR2008 house both from an environmental and probably also economical perspective.2 The Master Thesis investigates an alternative solution for how to connect passivehouses to district heating. The result shows that EPS PEX with accumulator in a secondary system is more economical than a traditional Twinpipe in a primary system.3 The best aspect of the alternative solution is the reduced heat losses due to better isolation. 1 Passivehouse is a house with extremely god isolation that makes the whole construction energy efficient. 2 BBR2008 is a house with Swedish regulations for energy efficient year 2008 3 EPS PEX is a culvert system with plastic pipes and an isolation of cellular plastic
124

Fjärrstyrning av fjärrvärmeventiler : Analys och utvärdering / Distance control of district heating valves : Analysis and evaluation

Myrendal, Patrik, Olgemar, Jonas January 2010 (has links)
I detta examensarbete analyseras och utvärderas påverkan av ett system som gör det möjligt att fjärrstyra fjärrvärmeventiler. Principen för systemet är att fastighetens energitillförsel reduceras under kortare stunder, vilket ska åstadkomma vinster för både fjärrvärmeleverantören och fastighetsägaren utan att ha negativ påverkan på inomhuskomforten. Tyngdpunkten i rapporten är att påvisa vilka vinster som kan åstadkommas med en sådan typ av applikation, främst dess påverkan på kundernas fjärrvärmeanvändning och deras effektbehov har studerats. Initiativet till examensarbetet är taget av Tekniska Verken i Linköping AB som under hösten 2009 till våren 2010 har haft ett fjärrstyrningssystem från NODA Intelligent Systems i drift. Systemet har varit installerat på nio större fjärrvärmecentraler i Linköping, sammanlagt cirka 65 000m2 boarea. Systemet har varit i drift veckolånga perioder varvat med opåverkade veckor, detta för att skapa referensdata att jämföra med. All fakta i resultatdelen är hämtade från detta projekt och arbetet med denna rapport har även till en viss del påverkat projektets gång. Utvärderingen visar att systemet ger upphov till en årlig energibesparing på i genomsnitt 5% i de deltagande fastigheterna. Spridningen i resultatet är dock stor, för en av fastigheterna kan ingen energibesparing alls garanteras medan den fastighet som uppvisar bäst resultat uppnår en besparing på drygt 9% av årsanvändningen. Huruvida inomhuskomforten påverkas utav laststyrningen går inte att fastställa av denna utvärdering då antalet mätpunkter för inomhustemperaturen varit begränsat. Möjligheten finns att tillfälligt reducera effektbehovet i fastigheter som fjärrstyrs. En effektreducering på medel 20-30% är möjlig att göra under en tretimmarsperiod. Resultaten från de flesta fastigheterna visar på att reduceringens storlek är som störst den första timmen som fjärrstyrs och avtar under styrningens gång. Efter styrningstillfällen uppkommer det i de flesta fallen ett ökat effektuttag, detta kan uppgå till 13% och risken finns att det ökade behovet kan inverka negativt på fjärrvärmeleverantören. Utvärderingen tyder också på att systemet tillfälligt sänker returledningstemperaturen på primärsidan från de fastigheter som laststyrs, vilket är positivt för fjärrvärmeleverantörer som Tekniska Verken. Om systemet installeras i stor skala i Linköpings fjärrvärmesystem så visar beräkningar att Tekniska Verken skulle göra en mindre vinst. Detta genom att fjärrstyrningen innebär systemövergripande fördelar så som sänkta returledningstemperaturer, minskade produktionskostnader och en möjlighet att tillfälligt reducera effektbehovet hos kund och därmed skulle Tekniska Verken i en viss mån ha möjlighet att styra sin produktion.
125

Effect on district heating systems in Dalarna County from energy efficiency measures in buildings - a scenario study to 2050

Larsson, Josefine January 2012 (has links)
Energi Intelligent is a program in Dalarna County with the purpose of finding ways of enhancing the efficiency of energy use and thereby be able to reach a more sustainable use of energy resources[1]. The basis of this program is the energy goal that has been prepared for Dalarna County published in Dalarnas miljömål[2].  The energy goal is divided into a number of intermediate goals, the sixth, Delmål 6, is to reduce energy consumption in buildings with 50 percent until 2050, and with 30 percent until 2025[3].   There are often a large number of different sectors involved that have got differing opinions and intentions. This makes the task far more complex than simply reducing energy consumption, because energy efficiency is one goal and that would mean that power companies would not be able to continue increasing their profit.   The aim of this project was to analyze the effects on energy production when reducing the use of heat demand in buildings until 2050. The district heating systems constitutes the main part of heating of buildings in the county and that is why it has been analyzed in this project.  The simulation tool that was suggested in the declaration of the thesis work was LEAP, the Long range energy alternative planning system tool for simulating different scenarios over years from the base year of the model.  The idea was to build energy models of Falun district heating system and Borlänge district heating system in LEAP. Scenarios were defined for the energy goals and then simulated in a model of district heating system. Simulation of the district heating systems were made from the scenarios; reducing the district heating production with 30 percent until 2025 and 50 percent until 2050. The results from the analysis showed that for Falun district heating system the reduction of district heat demand will lead to decreased heat and electricity production and there will be no need for further investment. In Borlänge district heating system capacity is lower than the total capacity of all the available waste resources and there have been discussions about investing in a third municipal waste incineration boiler that would increase the total capacity so Borlänge district heating system could have waste incineration that covers the resources of the fuel cost favorable municipal and industrial waste.
126

Vindkraftens påverkan på svensk elproduktion : Förändringar av vatten-, kärn- och värmekraftsproduktion vid ökad andel vindkraft / Wind power’s effect on Swedish electric production : Change in operation for hydro, nuclear and thermal power generation plants with increased wind power penetration

Häggström, Anton January 2012 (has links)
Vindkraften har de senaste åren ökat kraftigt, både i antal verk och i producerad mängd energi. Mycket tyder på att denna utveckling kommer att fortsätta i och med att elcertifikatssystemet och vindpilotstödet förlängts respektive förnyats. Riksdagen har också beslutat efter utredning av Statens Energimyndighet att det i samhällsplaneringen skall skapas förutsättningar för en årlig produktion av 30 TWh el från vindkraft år 2020. Detta kan jämföras med de 6,2 TWh som producerades under 2011. Tidigare studier har visat att en större andel vindkraft tillför ökat reglerbehov hos övriga produktionskällor. Ingen av dessa studier har dock undersökt hur Sveriges produktionskällor kan samverka för att klara detta ökade reglerbehov. Detta är således vad denna studie undersökt. Studien baseras på en steg-för-steg modell som simulerar hur samverkan mellan de tre största produktionskällorna i Sverige, vattenkraft, kärnkraft och värmekraft förändras vid en ökad andel vindkraft. Resultatet från studien bekräftar att en större andel vindkraft ökar regleringarna av samtliga produktionskällor. Studien visar också att vattenkraftens reglerförmåga oftast är tillräcklig för att täcka det primära reglerbehovet. Reglerförmågan inskränks dock med större andel vindkraft till följd av att vattenkraften då oftare producerar nära maximal och minimal produktionsnivå. För värme- och kärnkraft visar resultatet att de nyttjas i större utsträckning för reglering vid ökad vindkraft. Deras totala produktion minskar men full produktionskapacitet kan fortfarande tillfälligt behövas. / In recent years, wind power has significantly increased in prevalence and in production of energy. Indications have been made, that this trend will continue as the funding through the Swedish “elcertifikatssystemet” and “vindpilotstödet” has been extended and renewed respectively. The Swedish parliament has also decided after an investigation by the National Energy Agency (Statens Energimyndighet) that in the urban and regional planning there should be prerequisites made for an annual output of 30 TWh of electricity from wind by 2020. This can be compared to the 6.2 TWh that was produced last year (2011). Previous studies have shown that an increase in wind power penetration increases the need for adjustments in other power generation plants. Of these studies, none have examined how Swedish power generation plants can work together to cope with this change in operation. Therefor this is what this study was chosen to investigate. The study is based on a step-by-step model that simulates the interaction between the three main production sources in Sweden, hydro, nuclear and thermal power generation plants, and how their operation cope with an increased share of wind power. The results from the study confirm that a higher penetration of wind power increases the amount of adjustments in every plant. The study also shows that the hydropower adjustment capability is often sufficient to cover the primary adjustment needed. However the adjustment capability is curtailed with a high penetration of wind power because the water power more often produces near maximal and minimal production levels. For thermal and nuclear power, the results show that they are used more extensively for adjustments with higher penetration of wind power. Their total production decreases, but full production may still be needed temporarily.
127

Verktyg för att analysera Karlstad Centralsjukhus värme & kylproduktion / A tool for analyzing Karlstad Central Hospital heating & cooling production

Hammar, Martin January 2012 (has links)
Världens energipriser har ökat drastiskt sedan 1970-talet. Detta skapar incitament för investeringar för att sänka sina energikostnader, vilket det satsas på inom industri-, transport- och bebyggelsesektorn. Karlstad Centralsjukhus är inget undantag gällande dessa investeringar och med en lokalyta motsvarande 26 fotbollsplaner med aktivitet dygnen runt förbrukas här stora mängder energi, om inte annat bara för att värma och kyla sjukhuset till ett behagligt klimat. För tillfället sker ombyggnationer över hela sjukhuset för att minska dess energianvändning. Efter ombyggnationer som färdigställdes september 2010 ändrades sjukhusets energiproduktion. Det installerades då sex värmepumpar, två kopplade mot sjukhusets kylsystem för återvinna värme och fyra stycken mot 81 nya borrhål och Klarälven, som rinner förbi sjukhuset. Fjärrvärme används som reserv- och spetskraft när inte värmepumparna klarar leverera hela värmebehovet. Sjukhusets kyla produceras genom de två värmepumparna, kylmaskiner samt frikyla från berget. I projekteringen av anläggningen var värmepumparna dimensionerade att lösa värmeenergibehovet till -4°C resten skulle täckas upp av fjärrvärme. Berget skulle ge möjlighet att säsongslagra energi mellan årstiderna. Drift av anläggningen har dock visat att verkligheten skiljer sig från projekteringen. Värmepumparna har inte kunnat användas fullt ut vintertid då varken berg eller älv har fungerat sig som tänkt. Den driftstrategi som togs fram vid projekteringen stämmer därmed inte utan en ny måste tas fram. Detta examensarbete är ett steg i detta arbete, projektets mål var att i samarbete med Centralsjukhusets driftpersonal ta fram ett verktyg för att kunna analysera sjukhusets drifthistorik. Verktygets målgrupp är sjukhusets driftpersonal så dess utformning måste vara lättförstådd för dessa varför en testperiod gjordes av dessa innan slutgiltig överlämning. Verktyget som togs fram gjordes i Microsoft Exel och det skapar fyra stycken varaktighetsdiagram av drifthistoriken för varje år. Två som visar värme- respektive kyleffekten i kW under ett år och vad som producerat denna effekt. De andra två visar kostnaden per månad i tusen kronor för dessa effekter. Detta gör verktyget genom att bearbeta data som samlas in effekt och temperaturmätare som finns installerade i anläggningen och samlas in genom övervakningsprogrammet Citec och statistikprogrammet WebEss. Genom att jämföra effektdiagrammet för värme och kostnadsdiagrammet går det då att se exempelvis vad värmepumparna producerat och hur mycket denna produktion kostat. Ett ledord i arbetet har varit enkelhet för de senare användarna. Verktyget skulle vara smidigt och snabbt att uppdatera och enkelt att förstå. Vilket även uppnåddes. Efter en veckas testperiod hade driftgruppen inga önskade ändringar varav verktyget lämnades över slutgiltigt. Det överlämnades även fyra rekommendationer till landstinget för att få bättre kontroll på sina energikostnader. / The Worlds energy usage has dramatically increased since the 1970's and as a consequence also the prices for energy. This creates incentives for investments with the purpose to decrease energy costs, which is a development you can see in the industry, transport and building sectors. Karlstad Central Hospital is no exception with a floorspace equivalent of 26 football fields and activity around the clock. Just to heat and cool the hospital to a pleasant climate consumes a large amount of energy. Currently the parts of the hospital is being rebuilt to reduce its energy consumption. In September 2010 the hospital's energy production changed . When six heatpumps were installed, two linked to hospital cooling system to recover heat and four to geothermal heat by 81 boreholes and the river Klarälven, which runs past the hospital. Long-distance heating is used for peak loads and in reserve when the heat pumps cannot supply all heating needs. The hospital's cooling is produced by the two heat pumps, three cooling machines and free cooling from the geothermal connection. When designing the new energy production it was meant that the heat pumps should produce the heat required to -4 ° C, the rest would be covered by long-distance heating. The boreholes would make possible to storage energy between seasons. But operation of the plant has shown that reality differs from the theory. The heatpumps have not been fully utilized during the winter when neither the geothermal or the river behaved as intended. The operating strategy that was developed during project planning valid and therefore needs to be revised. This thesis is a step in that effort. The project's objectives was to produce a tool to analyze the hospital's operating history in cooperation with the Central Hospital's engineering staff. The tools users is meant to be the same staff so its design must be easily understood for those. A trialperiod took place therefore before the final handover. The tool was developed in Microsoft Excel and it creates four graphs showing the operational history of each year. Two of them are showing the heat- or cold-output in kilowatts for a year and what produces this output. The other two shows the cost in thousand swedish crowns to produce these effects. The tool calculates thus by collecting data from power and temperatur gauges installed in the hospitol and is collected by the monitoring program Citec och statistics program WebEss. By comparing the power and cost graph for heat it can be seen for example what heat pumps produced and how much the production cost. A key word in the development of the tool has been simplicity for the users. The tool should be easy and fast to update and simple to understand, which was achieved. After a week's trial had been running the staff had no wanted changes so the tool was handed over.
128

Dokumentationssystem för fjärrvärmenät

Wiberg, Björn January 2006 (has links)
The Work has been performed to, and in cooperation with Vetlanda Energi och teknik AB. District heating for commercial purpose started in the USA in 1877. Today the network has grown into big and complex systems, which demand maintenance and service to keep up the security of the delivery. When a district heating network expand, it becomes difficult to perform reliable calculations. For this purposes there are a few suppliers who design and deliver systems for documentation and calculation of district heating networks. Vetlanda Energi och Teknik AB is in the position where they must get a system for documentation and calculation for district heating, and therefore they need a basis to get a system. The target is to write a requirement specification that will follow the basis. The Swedish market has been inventoried, and suitable systems have been selected. There is very little information printed about documentation and calculation for district heating networks. Mostly information, in this issue, comes from suppliers and users. The systems and their functions have been compared to each other. Together with the demands from Vetlanda Energi och Teknik AB the specification has been written. The biggest and the most visible difference between the systems, is the structure. The systems are built on different platforms like AutoCad and MapInfo. The systems also make a difference in what way the functions are settled up. Some systems have all their functions in the same program and some other systems split up their functions and create different modules. This is affecting the user friendlyness and the design of the functions. The amount and kind of information that can be documented is about the same, yet with some important differences. Which system to choose is much depended on the size of the organisation. A bigger company with more staff and more competence can choose a more difficult system while a smaller company maybe have to pick an easier system so that the system really come in use.
129

Småskalig elproduktion i Arvika

Pettersson, Niklas, Eriksson, Nils January 2006 (has links)
Arvika Fjärrvärme AB, a district heating company from Arvika, today cover 74 % of their total energy production with biofuel wich runs a 16 MW bioler giving process water at saturated liquid state. In recent years Vaporel AB has introduced a new tecnique that gives an external generation of steam after boilers. The concept is built on an adiabatic pressure drop of the saturated liquid in a so called Flashbox which makes a small part of the liquid to evaporate. The generated steam is lead into a turbine where electricity is in a conventional manner. The purpose with this rapport was to do a basic study for the specific system at Arvika where it’s possible to see the potential production of electricity that follows an installation of a flasbox. The final goal was to introduce an economic analysis of a flashox installation at given conditions. To reach our goals we have created a model in Excel where we used the given conditions at Arvika Fjärrvärme to do our calculations. The model has been tested at three different states, of process water returning to potboiler, to be able to decide the optimal operation for the system at present. The studies have resulted in a pressure of the processwater at 14,5 bar (at) and a pressuredrop to 9,5 bar (at) in the flashbox. The condenser pressure is set to 0,5 bar (at) what is equal to 81 ˚C. Energy to the district heating net is produced in the condenser and heat exchanger. The result of our calculations clearly shows that to reach the highest turbine-efficiency as possible and gain the largest profit the highest process-waterflow possible should be used. That means 70 kg/s after present conditions. At the highest boiler efficiency the turbine will produce 694 kW. At this state the water that returns to the boiler will be at temperature 148 ˚C (14, 5 bar). Totally during a year the production of electric energy could reach 2, 47 GWh/year. The energy used by the pumps will increase with 0,21 GWh over the year at that state. Included all economic factors this will generate a profit of 0, 97 million (SEK)/year. To make an installation of a flashbox system more profitable an increased generation of electricity have to be made. This could be done by an installation of new pumps to be able to run the process-water at a larger flow to increase the amount of steam made in the flashbox. / Arvika fjärrvärme producerar idag 74% av sitt värmeunderlag via en hetvattenpanna som drivs med biobränsle och har en maxeffekt på 16 MW. På senare år har företaget Vaporel AB introducerat en ny teknik på marknaden som ger en extern ångproduktion efter hetvattenpannor. Konceptet är byggt på en trycksänkning som medför att delar av det mättade vattnet förångas efter att ha letts in i en så kallad flashbox. Efter flashboxen äntrar ångan en turbin där el produceras på konventionellt vis. Syftet med denna rapport har varit att ta fram en grundläggande studie för Arvikas specifika system där det är möjligt att se den potentiella elproduktionen vid en flashboxinstallation. Det slutgiltiga målet med rapporten har varit att kunna presentera en lönsamhetsbedömning för en flashboxinstallation vid givna driftfall. För att kunna uppfylla uppsatta mål har en Excelmodell konstruerats där beräkningar utförts efter givna förutsättningar, detta utefter tre olika driftfall för att kunna fastställa den mest optimala driften för systemet i dagsläget. Studierna har lett fram till att vi har kunnat fastställa ett maximalt tryck efter pannan på 14,5 bar (at) samt en trycksänkning över flashboxen till 9,5 bar. Kondensortryck efter turbinen har satts till 0,5 bar(a) vilket ger en kondensations temperatur motsvarande 81 ˚C. Energi till att värma fjärrvärmevattnet tas via kondensorn samt en värmeväxlare. Resultatet av våra beräkningar visar tydligt att vi för att nå en så hög turbineffekt som möjligt och därmed en större lönsamhet skall ha ett så högt processvattenflöde som tillåts, enligt dagens förutsättningar 70 l/s. Vid högsta panneffekten kommer turbinen att ge 694 kW, enligt Excelmodellen, vid en returtemperatur till pannan satt till 148 ˚C. Sammanlagt under året, med Arvikas varaktighetsdiagram som grund, kommer vi att kunna producera 2,47 GWh el/år varav pumparna kommer att kräva 0,21 GWh el extra per år. Med alla ekonomiska faktorer inräknade så kommer detta att ge en vinstkalkyl på 0,97 miljoner /år. För att kunna göra dessa installationer lönsamma krävs att vi ökar elproduktionen och därmed den årliga vinsten, detta skulle kunna göras i och med installation av nya pumpar för att uppnå ett större flöde i pannkretsen. Vidare bör en studie göras för att bedöma lönsamheten gällande en ombyggnad av rökgaskondenseringen för att kunna klara en större effekt och därmed kunna använda högre returtemperaturer till biopannan. Detta skulle generera ett högre genomsnittligt flöde över året.
130

Inventering av värmelager för kraftvärmesystem

Sandborg, Daniel January 2006 (has links)
When a combined heat and power plant produces heat and power it often faces a deficit of heat load during the summer or other periods of time. This heat is often unnecessarily cooled away or the power production has to be reduced or shut off. If it is possible to store heat from periods with low heat demand to periods with high heat demand one can get many benefits. Among these benefits are: increased power production, decreased operation with partial load, uniformly distributed load. To be able to store heat in situations like this long-term thermal heat storages are needed. In this thesis five different types of stores are presented: rock cavern storage, tank storage, pit water storage, borehole storage and aquifer storage. In this thesis the principles of the different storages is presented and experiences from operation in Sweden, Germany and Denmark are also presented. The thesis contains a calculation of costs for the types of thermal heat storages that are suitable for use in a combined heat and power plant. To be able to function in a combined heat and power plant, a long-term thermal heat storage must be able to handle a high charge and discharge output. Storages that can meet these demands use water as store medium. The conclusion is: Pit storages are interesting if the capacity is below 20 000 m^3. For capacities between 20 000 to 50 000 m^3, tank storages are most suitable. Rock cavern storages are interesting if the capacity is larger than 100 000 m^3. For capacities between 50 000 to 100 000 m^3, either rock cavern storages or connected tank storages are appropriate.

Page generated in 0.0454 seconds