Produktkalkylering i mindre hantverksföretag : En fallstudie på Gemla Fabrikers AB / Product Costing in Small Craft Companies : A Case Study at Gemla Fabrikers ABLundgren, Marcus, Tobias, Nilsson January 2016 (has links)
Course: Degree project in Logistics, the Business Administration and Economics Programme, 4FE19E, VT16 Authors: Marcus Lundgren and Tobias Nilsson Supervisor: Peter Berling Examiner: Helena Forslund Title: Product Costing in Small Craft Companies – A Case Study at Gemla Fabrikers AB Background: Today a competitive price is no guarantee to keep a company profitable. Cost control has become more central and especially cost control considering work put in to the product and tradeoffs connected to the product in question has become central to secure the company’s competitiveness. A useful tool to secure the competitiveness is product costing when making profit analysis, setting price levels as well as other decision making. The challenge is to find a product costing method which fits right and distribute the direct and indirect costs in a fair manner. Purpose: The purpose of this study is by constructing a flowchart over the production process adapt a model for product costing that supports pricing and decision making of the product assortment at Gemla Fabrikers AB, and theoretically raise the discussion of the adapted models suitability in a context of small time manufacturers that is characterized by an artisan production. Method: The study is conducted as a case study at Gemla Fabrikers AB and uses a research strategy containing both qualitative and quantitative approaches. Collected data is mainly obtained via unstructured interviews, direct observations and time studies. A process mapping was made as a start to serve as a foundation for other parts of the study. A product costing method was later adapted to fit the parameters and way of working in a company with high levels of craftsmanship. Conclusions: After mapping the process of the company it was clear that the production was characterized by a time-consuming manufacturing process with a large number of activities. This resulted in an adapted product costing method, which origins from the activity based costing model, in order to distribute the costs in a more correct way based v on the actual time consumption. The adapted model is designed with a distinct activity based distribution on product level where every activity cost is established at a given volume of production, resulting in guidance and basis for cost control and when setting prices. Based on the company in the case study the conclusion was made that this way of working with product costing can be used in other companies with similar production and high level of craftsmanship, merging support activities together and focus on the value adding activities. The cost allocation is made using cause and effect based on the actual time put into the activities where a smaller number of time related cost drivers are used. The model is therefore to consider suitable for increased cost control as well as serving as a foundation for product pricing and decision making. / Kurs: Examensarbete i logistik för Civilekonomprogrammet, 4FE19E, VT16 Författare: Marcus Lundgren och Tobias Nilsson Handledare: Peter Berling Examinator: Helena Forslund Titel: Produktkalkylering i mindre hantverksföretag – En fallstudie på Gemla Fabrikers AB Bakgrund: Ett konkurrenskraftigt pris är i dagsläget inte tillräckligt då även en noggrann kostnadskontroll som tar hänsyn till arbetskraftsinsatsen och produktrelaterade avvägningar krävs för att säkerställa konkurrensförmågan. Ett användbart verktyg för detta är upprättandet av produktkalkyler som grund för lönsamhetsanalyser, prissättningsstrategi och beslutsunderlag. Svårigheten ligger dock i att finna rätt kalkyleringsmetod gällande detaljeringsnivån som fördelar en verksamhets direkta och indirekta kostnader på ett rättvisande sätt. Syfte: Syftet med studien är att genom en kartläggning av tillverkningsprocessen anpassa en produktkalkyl för prissättning och beslutsfattande av produktsortimentet på Gemla Fabrikers AB, samt teoretiskt lyfta diskussionen om anpassad modells lämplighet i en kontext för mindre tillverkande företag som karaktäriseras av en hantverksmässig produktion. Metod: Studien utförs enligt en fallstudie på Gemla Fabrikers AB med en flerfaldig forskningsstrategi av kvalitativ art med kvantitativa inslag. Datainsamlingen bygger främst på ostrukturerade intervjuer, direkta observationer och tidsstudier. En processkartläggning genomfördes till en början för att utgöra ett underlag för resterande delar. Vidare anpassades en produktkalkyl utifrån företaget och tillverkningens karaktär vilket slutligen utgjorde ett underlag för modellens lämplighet i en hantverksmässig tillverkningskontext. Slutsatser: Efter genomförd kartläggning av tillverkningsprocessen på fallföretaget framgick det att tillverkningen karaktäriseras av en tidskrävande process med ett stort antal ingående aktiviteter. Detta resulterade i att anpassad produktkalkyl utformades enligt en ABC-modell då slutsatsen blev att fördelningen av kostnaderna skulle göras iii mer rättvisande om dessa fördelades till respektive aktivitet baserat på det faktiska tidsutnyttjandet. Anpassad modell utformades genom en tydlig aktivitetsfördelning utifrån produktnivå där varje aktivitets kostnad fastställs vid en given produktionsvolym vilket möjliggör underlag för en ökad kostnadskontroll, prissättningsstrategi och beslutsunderlag. Baserat på studerat fallföretag drogs slutsatsen att anpassad modell görs lämplig för andra företag i en liknande hantverksmässig kontext utifrån att i högre grad göra sammanslagningar av aktiviteter med ett större fokus på de värdeadderande aktiviteterna. Kostnadsfördelningen sker via ett orsak-verkan samband utifrån det faktiska tidsutnyttjandet där ett mindre antal tidsrelaterade kostnadsdrivare används. Modellen blir då lämplig för ökad kostnadskontroll samt underlag för prissättning och beslutsfattande.
|
12 |
Kalkylverktyg För SågklingorDohlmar, Gustaf, Åstrand, Emma, Johnsson, Jimmie January 2007 (has links)
<p>The purpose of this report is to survey Swedex AB’s production costs and to gather all info into a manageable calculation tool. This was made by time and motion studies, interviews of the personnel. All factors were gathered into an Excel chart.</p><p>The calculation was made according to an additional-charge-method that was considered to satisfy Swedex AB’s goal. This makes a complete-cost-estimate which is important when the selling price should cover the production costs. The blades were divided into different populations to facilitate the calculation work. The division was made with the production cost in consideration to minimize the risk of losing parameters.</p><p>The time and motion study, which is the basis of the calculation, was obtained by the group and gave insight of the saw blade production. Here it was discovered, what was said to be a bottleneck was not the case.</p><p>Swedex AB has a great amount of products in labour, this in opposite to the “just in time”-philosophy, but Swedex AB see’s this as a resource. This is seen as a utilization increaser, to keep up the production rate.</p><p>Swedex AB has a lot of old machines, but these have to be part of the calculation while they in a near future will be reinvested with new machines. An adjustment has been done to consider purchase price, second hand price and service/repair costs.</p>
|
13 |
Kostnadskalkylering på en förpackningsavdelningFhager, Emmy, Agang, Mina January 2008 (has links)
<p>This degree project is based on identifying and allocation of costs in a packaging section at Electrolux Distriparts in Torsvik.</p><p>The purpose of this thesis is to identify the costs that emerge when packaging different articles and show how the costs are allocated. The report also contains improvement suggestions about how the company can use the current computer system more efficient.</p><p>The methods that have been used in order to approach the problem and the collection of information have mainly been literature study, interviews and observation.</p><p>The work started with answering the questions; which expenditure cost and direct cost exist in the section, how can they be allocated, if improvement can be done and how the flow of information is supposed to happen.</p><p>In order to answer the questions we used our former experience and the knowledge we achieved by reading literature, interview relevant persons in the company and observations carried out in the section.</p><p>Through our studies, we came up with an Excel file, which is the groundwork for a template that can be used by the company in different occasions depending on the situation and need. It is important to remember to modify the template if the presumptions change. In the template, we have identified the different kind of costs that emerge when packaging different articles and we have also allocated the costs. In addition formulas and estimations that are necessary for the cost calculation are presented.</p><p>The work consisted in making the groundwork for a template. That means there is a lot of work for the company left to do until the template is ready to be used in working routine.</p><p>The template includes estimations that are not tested with real figures and therefore can contain hidden defects. The company could not supply us with the figures on the relevant costs, because of secrecy reason. Therefore it is very difficult to eliminate the risk for hidden defects in the template. In order to distinguish obvious defects, made up figures were used. These can differ essential from the real figures, but the purpose is to minimise the defects and help the company to see how the template works.</p><p>An improvement suggestion is that the company should use the proposed flow of information in order to save time and therefore be able to spend more time with the main operations. The flow of information saves time by:</p><p>• Using more the current computer system</p><p>• Being simple</p><p>• Identifying unnecessary activities, so that it can be removed or modified</p>
|
14 |
Kalkylverktyg För SågklingorDohlmar, Gustaf, Åstrand, Emma, Johnsson, Jimmie January 2007 (has links)
The purpose of this report is to survey Swedex AB’s production costs and to gather all info into a manageable calculation tool. This was made by time and motion studies, interviews of the personnel. All factors were gathered into an Excel chart. The calculation was made according to an additional-charge-method that was considered to satisfy Swedex AB’s goal. This makes a complete-cost-estimate which is important when the selling price should cover the production costs. The blades were divided into different populations to facilitate the calculation work. The division was made with the production cost in consideration to minimize the risk of losing parameters. The time and motion study, which is the basis of the calculation, was obtained by the group and gave insight of the saw blade production. Here it was discovered, what was said to be a bottleneck was not the case. Swedex AB has a great amount of products in labour, this in opposite to the “just in time”-philosophy, but Swedex AB see’s this as a resource. This is seen as a utilization increaser, to keep up the production rate. Swedex AB has a lot of old machines, but these have to be part of the calculation while they in a near future will be reinvested with new machines. An adjustment has been done to consider purchase price, second hand price and service/repair costs.
|
15 |
Kostnadskalkylering på en förpackningsavdelningFhager, Emmy, Agang, Mina January 2008 (has links)
This degree project is based on identifying and allocation of costs in a packaging section at Electrolux Distriparts in Torsvik. The purpose of this thesis is to identify the costs that emerge when packaging different articles and show how the costs are allocated. The report also contains improvement suggestions about how the company can use the current computer system more efficient. The methods that have been used in order to approach the problem and the collection of information have mainly been literature study, interviews and observation. The work started with answering the questions; which expenditure cost and direct cost exist in the section, how can they be allocated, if improvement can be done and how the flow of information is supposed to happen. In order to answer the questions we used our former experience and the knowledge we achieved by reading literature, interview relevant persons in the company and observations carried out in the section. Through our studies, we came up with an Excel file, which is the groundwork for a template that can be used by the company in different occasions depending on the situation and need. It is important to remember to modify the template if the presumptions change. In the template, we have identified the different kind of costs that emerge when packaging different articles and we have also allocated the costs. In addition formulas and estimations that are necessary for the cost calculation are presented. The work consisted in making the groundwork for a template. That means there is a lot of work for the company left to do until the template is ready to be used in working routine. The template includes estimations that are not tested with real figures and therefore can contain hidden defects. The company could not supply us with the figures on the relevant costs, because of secrecy reason. Therefore it is very difficult to eliminate the risk for hidden defects in the template. In order to distinguish obvious defects, made up figures were used. These can differ essential from the real figures, but the purpose is to minimise the defects and help the company to see how the template works. An improvement suggestion is that the company should use the proposed flow of information in order to save time and therefore be able to spend more time with the main operations. The flow of information saves time by: • Using more the current computer system • Being simple • Identifying unnecessary activities, so that it can be removed or modified
|
16 |
Circular Economy : Reuse of packaging / Cirkulär Ekonomi : Återanvänding av emballageTürk, Ferhat, Zandi, Roman January 2019 (has links)
This study is about finding methods for reusing of packaging from Elekta's product "Leksell Gamma Knife ICON" with Circular Economy as the focus. There is no process for this today. The important thing is the analysis of the entire supply chain from Suppliers to customer and then back to Suppliers to get general ideas about what the problems are and then to draw conclusions for the opportunities that exists. The methods used are analyzes if it is cost-effective and environmentally efficient to transport back packaging to the Suppliers who handle these packaging. Costs for the return process have been calculated, which is Supplier work, packaging costs, packaging costs and transport costs. Transport emission in the form of carbon dioxide equivalents have been calculated in the return process. Carbon dioxide equivalents have been calculated for the manufacturing of new packaging and transport by road and ship. The calculated values in the return process are compared with how Elekta is doing today during the process of packing LGK as well as delivering to customers to identify if it is effective to implement a new return process. A solution proposal that fulfils the requirements from an environmental and economic perspective is reported. Environmentally, it is reduced by 459 CO2eq number of carbon dioxide equivalents with transport from the US, 457 CO2eq from China and 1185 CO2eq from Europe. Financially, the company saves 17 190 SEK with transport from the USA, 19327 SEK from China and 18 126 SEK from Europe. / Denna studie handlar att om att hitta metoder för återanvändning av emballagen från Elektasprodukt ”Leksell Gamma Knife ICON” med Cirkulär ekonomi som fokus. Det finns ingen process för detta i dagsläget. Den viktiga är analysen av hela försörjningskedjan från leverantör till kund och sedan tillbaka till leverantörer för att få generella uppfattningar om vad problemen befinner sig och där ifrån dra slutsatser för möjligheterna som finns. De metoder som används är analyser om det är kostnads- och miljöeffektivt att transportera tillbaka emballage till de leverantörer som hanterar dessa emballage. Kostnader för returprocessen har beräknats vilket är leverantörsarbete, emballagekostnader, arbetskostnader och transportkostnader. Transportutsläpp i form av koldioxidekvivalenter har beräknats i returprocessen. Koldioxidekvivalenter har beräknats för tillverkning av nya emballage samt transport med lastbil och fartyg. De beräknade värden i returprocessen jämförs med hur Elekta gör idag under processen att packa LGK samt leverera till kund för att identifiera om det är effektivt att implementera en ny returprocess. Ett lösningsförslag där kraven uppfylls ur ett miljömässigt och ekonomisk perspektiv redovisas. Miljömässigt minskas det med 459 CO2eq antal koldioxidekvivalenter med transport från USA, 457 CO2eq från Kina och 1185 CO2eq från Europa. Ekonomiskt sparar företaget på 17 190 SEK med transport från USA, 19327 SEK från Kina och 18 126 SEK från Europa.
|
17 |
Process mapping for the implementation of a fixed pricing model at AGNA Logistik i Norrköping AB / En flödeskartläggning för implementering av en fast prismodell hos AGNA Logistik ABBrkic, Anel, Magnusson, Albin January 2024 (has links)
The study was conducted with the goal of designing a new pricing model for one of AGNA Logistik AB's customer projects through a detailed flow mapping and cost analysis. The existing pricing model that AGNA Logistik applies in the studied customer project is based on time and material billing, which entails significant risks in terms of unnoticed resource wastage and inefficiency in forecasting an estimated price effectively. To address these issues, a combination of literature reviews, field studies, and Activity Based Costing was used to identify and analyze the costs and time of activities in the logistics flow. This methodology has enabled a precise mapping of the actual costs for each individual activity, for all the studied products. The study resulted in a proposal for a new pricing model based on fixed prices per item. This model is expected to eliminate resource wastage and inefficiency, as well as contribute to more fair and predictable pricing. By introducing fixed prices per item, AGNA Logistik can not only increase efficiency in its internal processes but also improve financial predictability and customer satisfaction. The implementation of the new pricing model has the potential to reduce administrative inefficiency and ensure that pricing includes all costs of the logistics operations. In the long term, this is expected to lead to increased economic benefits for AGNA Logistik, both through improved margins and increased attractiveness of the company's services in the market. / Studien har genomförts med målet att utforma ett underlag för implementeringen av en ny fast prismodell för ett av kunduppdragen hos AGNA Logistik AB genom en detaljerad flödeskartläggning och kostnadsanalys. Den befintliga prismodellen som AGNA Logistik tillämpar i det studerade kunduppdraget bygger på löpande räkning, vilket medför betydande risker i form av resursslöserier som inte fångas upp och ineffektivitet med att prognostisera hanteringskostnader på ett effektivt sätt. För att åtgärda dessa problem har en kombination av litteraturstudier, fältstudier och ABC-kalkylering (Activity Based Costing) använts för att identifiera och analysera kostnader och tidsåtgången för aktiviteterna i logistikflödet. Denna metodik har möjliggjort en noggrann kartläggning av de faktiska kostnaderna för varje enskild aktivitet, för varje enskild studerad produkttyp från inleverans till utleverans. Studien har resulterat i ett förslag på en ny prismodell som baseras på fasta priser per plockad artikel. Denna modell förväntas eliminera identifierade resursslöserier och ineffektivitet, samt bidra till en mer rättvis och förutsägbar prissättning. Genom att införa fasta priser per artikel kan AGNA Logistik inte bara öka effektiviteten i sina interna processer utan också förbättra den ekonomiska förutsägbarheten och kundnöjdheten. Implementeringen av den fasta prismodellen har potential att minska den administrativa ineffektiviteten och säkerställa att prissättningen inkluderar samtliga kostnader för logistikverksamheten. På lång sikt förväntas detta leda till ökade ekonomiska fördelar för AGNA Logistik, både genom förbättrade marginaler och genom ökad attraktivitet för företagets tjänster på marknaden.
|
18 |
Kvalitetssäkring av objektsbaserade IFC-filer för mängdavtagningar och kostnadskalkyler : En fallstudie av levererade konstruktionsmodeller, vid Tyréns AB Stockholm / Quality assurance of object-based IFC-files for quantity takeoff and cost estimating : A case study of delivered construction models, at Tyréns AB StockholmGustavsson, Sam, Johansson, Filip January 2013 (has links)
Att utföra kostnadskalkyler och mängdavtagningar utifrån objektbaserade 3D-modeller har visat sig vara problematiskt då modellerna inte uppfyller de förväntade kraven på informationsnivå. De bristande modellerna leder till en större osäkerhet då kalkylatorn skall upprätta kostnadskalkyler, vilket utgör bakgrunden till de frågeställningar som rapporten utgörs av. Projektet Biomedicum, som skall bli det toppmoderna laboratoriet åt Karolinska Institutet bedrivs som ett fullskaligt BIM-projekt, där de objektbaserade 3D-modellerna utgör underlaget för bland annat kostnadskalkyler i systemhandlingsskedet. Kalkylatorn i projektet, har uttryckt ett missnöje gällande kvaliteten i modellerna, och menar på att det finns stora brister som leder till att risken för att osäkra kalkyler upprättas ökar. Denna rapport kommer således att se över hur det är möjligt att kvalitetssäkra en objektbaserad 3D-modell i IFC-format i programvaran Solibri Model Checker, utifrån de projektspecifika kraven som råder i projektet. Rapporten utgörs av en fallstudie och en litteraturstudie, och till viss del även av intervjuer. I fallstudien undersöks det om Solibri Model Checker är kapabel till att kontrollera modellerna utifrån de projektspecifika krav som råder i projektet, samt att analysera resultatet av kontrollerna som har utförts. Intervjuerna i sin tur har legat till grund för ett antal problem som har ansetts vara relevanta för rapporten. Problem som kan härledas till juridiska svårigheter, avsaknad av en gemensam branschstandard, meningsskiljaktigheter kring innehållet i en objektbaserad 3D-modell etc. I fallstudien har det visat sig att 3D-modellerna är bristande ur kalkylsynpunkt. Detta leder till svårigheter och osäkerheter då Skanska upprättar kalkylerna. Anledningarna till detta är flera. Det handlar bland annat om att konstruktören använder sig av en modelleringsteknik som inte är anpassad för kalkylering, men även att det inte finns tydliga riktlinjer om vilken information som bör finnas i objekten i systemhandlingsskedet, vilket har framgått under intervjuerna. Det har även framgått under intervjuerna, att ett avgörande problem som kan anknytas till att modellerna är av bristande kvalitet ur kalkylsynpunkt, är på grund av att det inte har ställts krav tillräckligt tidigt i processen. Vad som är viktigt för att få en fungerande process där de objektbaserade 3D-modellerna skall användas för mängdavtagningar och kostnadskalkyler, är att i ett tidigt skede fastslå vilken information som behövs i objekten för att trovärdiga kalkyler skall vara möjliga att upprätta. Vikten av att det finns en tydlig IT-handledning är även stor, då det är handledningen som ligger till underlag om vilken information som skall finnas med i modellerna. / To perform quantity takeoffs and cost estimates based on 3D models is problematic, if the models do not meet the expected demands of information. The weaknesses of the models leads to uncertainty when the calculator will establish cost estimates, which forms the background to the issues that the thesis constitutes. The project Biomedicum is conducted as a full-fledged BIM project, where the object based 3D models are the basis for cost estimates in the system phase. The calculator in the project has expressed dissatisfaction regarding the quality of the models, and believes that there are major flaws that lead to the risk of uncertain calculations increasing. Of this reason, this thesis will analyze the possibilities about ensuring the quality of an object based 3D model in IFC format, by using the software Solibri Model Checker. This thesis consists of a literature review, interviews and a case study. The case study examines whether Solibri Model Checker is capable of checking the models based on the project specific requirements, and to analyze the results of the checks that have carried out in the case study. The interviews have been the basis for the number of problems that have been considered relevant for the thesis. Problems that can be traced to legal difficulties, lack of a common set requirements, disagreements about the content of an object based 3D model etc. The case study has shown that the 3D models are inadequate to perform cost estimates, which leads to difficulties and uncertainties in the calculation process. There are several reasons for this. The designers of the project have used wrong modeling technique for quantity takeoff and cost estimating. But also that there are no clear guidelines as to what information should be included in the items in the document stage system, which has emerged during the interviews. It has also emerged during the interviews that crucial problems that may be linked to the models are of poor quality, because it has not been required early enough in the process. What is important to get a working process in which the object-based 3D models to be used for quantity takeoffs and cost estimates, is that in the early stages determine what information is needed in the objects to credible estimates will be possible to establish. The importance of a clear IT manual is also great, as it is the manual who serves as the basis of the information to be included in the models.
|
19 |
Implementering av RFID i tredjepartslogistik (TPL) : En fallstudie av RFID inom lagerverksamhet i TPL med fokus på implementering och kostnadskalkyler i in- och utleveransprocessen på PostNord TPL / Implementation of RFID in third-party logistics (TPL) : A case study of RFID in warehousing operations in TPL with a focus on implementation and cost calculations in the inbound and outbound process at PostNord TPLHolm, Jacob, Basic, Amer January 2021 (has links)
Titel: Implementering av RFID i tredjepartslogistik (TPL) - En fallstudie av RFID inom lagerverksamhet i TPL med fokus på implementering och kostnadskalkyler i in- och utleveransprocessen på PostNord TPL Kurs: 4FE19E Examensarbete i Supply Chain Management för Civilekonomprogrammet, 30 hp. Författare: Jacob Holm & Amer Basic Examinator: Helena Forslund Handledare: Hana Hulthén Bakgrund: PostNord TPL i Ljungby är en av de aktörer som har fått upp ett intresse för RFID och det hela började med ett önskemål om RFID-tekniken från deras största kund (Kund X). Kund X efterfrågar en RFID-märkning på artikelnivå för att bland annat dra fördelar av en sådan teknik vid lagerinventering. För att PostNord TPL:s största kund ska kunna ta steget mot att implementera en RFID-lösning ute i butikerna, så krävs det att lagret i Ljungby implementerar tekniken först. PostNord TPL:s tanke, utefter kundens önskan att erbjuda dem denna tjänst, är att all RFID- märkning av Kund X artiklar sker på lagret i Ljungby. Denna studie är unik i sitt slag dels för att det förekommer ett stort forskningsgap i den existerande forskningsteorin med användning av RFID-teknik inom TPL, men att studien också fokuserar på RFID-märkning på artikelnivå. Syfte: Syftet med studien är att föreslå riktlinjer för en implementering av RFID inom TPL i in- och utleveransprocessen. Riktlinjerna innehåller kategorisering av relevanta variabler för RFID-implementering samt implementeringsprocessen och kostnadskalkyl. Metod: Denna studie är en fallstudie på företaget PostNord TPL i Ljungby. Forskarna har tillämpat en mönsterjämförelse där teorin och empirin har jämförts. Empirin har samlats in genom målstyrt urval och snöbollsurval, där semistrukturerade och ostrukturerade intervjuer med ett flertal olika aktörer har genomförts. Studien grundar sig i en kvalitativ forskningsmetod med ett deduktivt angreppssätt. Slutsats: Studien har analyserat tre forskningsfrågor, där den första är mer generell inom TPL och de andra två riktar sig mot PostNord TPL förutsättningar. Studien har tagit fram förslag på vilka variabler som är relevanta vid implementering av RFID inom lagerverksamhet i TPL och hur de kan kategoriseras. Vidare har studien visat i vilken lagerhanteringsprocess RFID kan implementeras hos PostNord TPL och hur en sådan implementeringsprocess kan se ut. Slutligen har även tre olika kostnadskalkyler utvecklats för en RFID-implementering i in- och utleveransprocessen hos PostNord TPL. / Title: Implementation of RFID in third-party logistics (TPL) - A case study of RFID in warehousing operations in TPL with a focus on implementation and cost calculations in the inbound and outbound process at PostNord TPL Course: 4FE19E Degree Project in Supply Chain Management for the Master of Business Administration Program, 30 hp. Authors: Jacob Holm & Amer Basic Examiner: Helena Forslund Tutor: Hana Hulthén Background: PostNord TPL in Ljungby is one of the actors that has developed an interest in RFID, and it all started with a request for RFID technology from their largest customer (Customer X). Customer X requests an RFID tag at the item level, among other things, to take advantage of such technology during stock inventory. In order for PostNord TPL:s largest customer to be able to take the step towards implementing an RFID solution in the stores, it is required that the warehouse in Ljungby implements the technology first. PostNord TPL:s idea, according to the customer's desire to offer them this service, is that all RFID labeling of Customer X items takes place at the warehouse in Ljungby. This study is unique in its kind, partly because there is a large research gap in the existing research theory using RFID technology within TPL, but also because the study focuses on RFID labeling at article level. Purpose: The purpose of the study is to propose guidelines for an implementation of RFID within TPL in the inbound and outbound process. The guidelines contain a categorization of relevant variables for RFID implementation as well as the implementation process and cost calculation. Methodology: This study is a case study at the company PostNord TPL in Ljungby. The researchers have applied a pattern comparison where the theory and empiricism have been compared. The empirics have been collected through goal-directed selection and snowball selection, where semi-structured and unstructured interviews with a number of different actors have been conducted. The study is based on a qualitative research method with a deductive approach. Conclusion: The study has analyzed three research questions, where the first is more general within TPL and the other two focus on PostNord TPL conditions. The study has produced suggestions on which variables are relevant when implementing RFID within warehousing operations in TPL and how they can be categorized. Furthermore, the study has developed in which inventory management process RFID can be implemented at PostNord TPL and what such an implementation process can look like. Finally, three different cost calculations have also been produced for an RFID implementation in the inbound and outbound process at PostNord TPL.
|
20 |
Analys av nyckeltal på produktionskostnader i tidiga skeden : För säkrare kalkyler i egenregiprojekt / Keynote analysis of production costs in early calculation phases : To create more correct calculations in internal construction contractsFolkesson, Linda January 2014 (has links)
Syftet med detta examensarbete är att analysera nyckeltalen för produktionskostnaden som nyttjas vid investeringsbeslut i flerbostadsprojekt. För att kartlägga osäkerheterna innan investering sker tas kostnadskalkyler fram. Dessa kalkyler innehåller ofta flertalet osäkra poster då projekten är till stor del fortfarande på idéstadium och uppskattningar blir ett måste. Rapporten inleds med att riskerna, utifrån risknivå och konsekvenserna utav dem, definieras och analyseras. Följande presenteras Veidekkes önskade hantering av kostnadsriskerna och slutligen vilka möjligheter och hinder det finns inom dagens organisation för att uppnå dessa arbetsmetoder. Studien har baserats på kvalitativa intervjuer med representanter från olika yrkesroller, i olika projektskeden och från de tre olika svenska regionerna. Dessa intervjuer har visat på att de största osäkerheterna ligger i entreprenadkostnaderna, markkostnaderna och konjunkturens påverkan på bostadsmarknaden. Vidare visar studien på att en ökad detaljeringsgrad av produktionskostnaden per kvadratmeter skulle öka säkerheten i kostnadsuppskattningarna vid rätt hantering av dem. Detaljeringen måste framför allt ta hänsyn till typ av hus, val av grundläggning, garagelösning, antal våningar och snittstorlek på lägenheterna. I rapportens slutsats och diskussion utvecklingen resonemang kring olika arbetssätt. Betoningen är lagd på samarbetet mellan affärsområdena då informanterna lyft det som viktigaste redskapet för säkra kalkyler. / This thesis aims to analyze the key figures of production costs in multi-family housing projects. Before committing to an investment these risks need to be identified and production calculations presented. These calculations often contain uncertain items as projects are largely undefined and still at the idea stage and estimations are required. In the introduction of the report the risks are identified and analyzed based on their severity and the effect of them. Followed by a presentation of Veidekke's desired risk management practices and concluded with the opportunities and barriers that exists within the current organization. The study based on interviews with representatives from various professions, in different phases of projects and from the three different Swedish regions. These interviews have shown that the greatest uncertainty lies in construction costs, land costs and the economy's effect on the housing market. The study also shows that an increased level of detail of the production cost per square meter would enhance the security of these cost estimates if handled correctly. The details need to especially consider the type of house, choice of foundation, garage solution, number of floors and the average size of the apartments. The thesis is concluded by presenting and analyzing new working methods with key figures There is a focus on the cooperation between the business areas as the informants lift it as the main tool for secure calculations.
|