預售屋相關問題之研究 / The study of pre-sale housing

胡慧滿 Unknown Date (has links)
「家」,是每一個人安身立命之所,很多人打拼了一輩子,充其量不過是希望有一個舒服的安樂窩,所以,「買房子」也就成為許多人一生追求的目標。傳統的房屋契約是採所謂「先建後售」之方式,也就是由建商先將房屋蓋好,再將之出售。但由於近幾十年來經濟發展快速,房屋需求量不斷增加,傳統的「先建後售」模式不僅曠日費時,而且一般建商在一開始興建時並無太多金錢以資因應,所以「先售後建」之預售型態的交易方式逐漸興起。雖然預售屋之興起有其背景,但其與傳統的成屋交易畢竟不同,也存在著多種風險,故使得實務上眾多預售屋糾紛益彰棘手。本論文欲討論預售屋契約交易中產生之法律問題作一詳盡的探討,希冀對法律問題的解決及日後預售屋相關法律之修訂有所助益。
2

工程驗收前爭議問題研究-以風險分配為中心

薛全晉, Hsueh, Chuan Chin Unknown Date (has links)
工程契約係具特殊性質之承攬契約,而工程契約之開工、完工、驗收進程中,可能遭遇不同之風險事件,故本文先於第二章對工程契約之開工、完工、驗收及後續保固期間之意義及相關爭議為概略性之論述。 其次,於第三章先以一般承攬契約之風險分配為出發,就承攬契約之危險負擔、瑕疵擔保責任及定作人協力義務為概述,而在工程契約之風險分配原則上,採用「優勢風險承擔人原則」作為立論基礎,認為工程契約之風險應由對風險較具「預見能力」、「控制能力」及「規避能力」者承擔;進而就工程進程中不同階段可能遭遇之風險事件,建構可能之風險分配原則,並探究工程契約中常見「棄權條款」,包含工期展延、物價調整及權利行使期間等棄權條款,是否與合理之工程風險分配原則相符;另本文就工程保險契約制度為簡要之說明,並論述工程保險在工程實務中之地位,而將工程保險契約認定為工程契約分散風險之重要機制。 於第四章,特別針對國內論者甚少討論之「完工後驗收前」期間之實務爭議為判決整理及評析,而以本文建構之風險分配藍圖,對包含完工後驗收前之先行使用、減價驗收、部分驗收、試運轉及第三人侵權等爭議問題為分析。
3

工程契約中承包商瑕疵擔保責任相關問題之研究 / A study on The Undertaker's Defect Warranty of The Construction Contract

蔡育英 Unknown Date (has links)
工程契約中當事人間之權利義務關係為民法之承攬契約。而依民法第492條之規定,承攬人就所完成之工作物負有瑕疵擔保責任。本文係以承攬人之瑕疵擔保責任為中心,並就工程契約中可能涉及之相關問題為探討。本文之重點為:首先就承攬契約之瑕疵擔保責任為論述,並於其中輔以工程契約中相關爭議,以求就瑕疵擔保責任為整體性之認識;次就工程契約履約標的之瑕疵存在時點分別討論,區分各個工程履約階段,認為工作物之瑕疵於工程完工、工程驗收階段,及驗收合格後之法律效果應分別而論。其中主要涉及工程瑕疵與完工之認定,本文認為二者應分別而論,工作之暇疵與完工係屬二事,應採用英美法中實質完工之見解;而就工程驗收合格後對瑕疵擔保責任之影響,則認為工程驗收合格並不會因此而免除承包商之瑕疵擔保責任,在工程驗收期間潛在不易察覺之部分,或必須經過一段時間之運作始能發現之瑕疵,在瑕疵發見期間內發現,承包商仍應依民法負瑕疵擔保責任。另關於工作物存有瑕疵時,定作人可否以承攬人尚未修補瑕疵而拒付報酬之問題,本文認為,工程契約之業主於驗收合格後即應依規定及契約約定給付報酬,業主就工作物之瑕疵應主張瑕疵擔保請求權或保固之相關約定,不得逕予拒付報酬。後就承攬人之瑕疵擔保責任與工程保固責任間為比較,本文從二者之差異及工程契約之實務,認為二者屬不同之請求權,採自由競合之方式,業主得採有利者或併同行使。最後為本文之結論。
4

政府採購法減價收受制度之研究 / The study of the acceptance with price-reduction of the government procurement act

許增如, Hsu, Tseng-Ju Unknown Date (has links)
摘要 政府採購法72條第2項減價收受規定,可說是機關處理驗收之例外規定,關係機關採購後續使用情形及廠商權益甚鉅。本文以工程採購為研究對象,以工程採購著眼於工作之完成,來探討採購法驗收之法律效果,以釐清減價收受之效力。 依採購法72條第2項規定,明定減價收受之要件,包括驗收結果與規定不符、不妨礙安全及使用需求、通常效用或契約預定效用,經機關檢討不必拆換或拆換卻有困難、得於必要時,機關得採減價收受,因此機關驗收時,發現與規定不符,仍須滿足前開之要件,方得採減價收受,否則應依採購法72條第1項規定,請廠商限期改善。 從民法概念來看,減價收受無所謂過失責任,基本上肇因於廠商債務不履行,債務不履行可分為給付不能或不完全給付,二者區分實益在於給付是否可能,亦關係機關評估是否辦理減價收受及後續損害賠償問題。此外,減價收受亦關係工程承攬契約之瑕疵擔保責任與保固責任,以及減價收受之額度與違約金等相關問題。本論文希望藉由理論探討,及法院判決、調解建議及仲裁等相關實務案例,以釐清減價收受所遭遇之相關問題。 / The acceptance with price-reduction under Article 72, paragraph 2 of the “Government Procurement Act”, could be said an exceptional part of the inspection and acceptance under the Act. It is regulated to the interests and duties between the two parties of governmental purchasement. This study intentioally analyzes the “construction work”, which is used to focus on the completeness of definit work and to cope with the contract requirements. When it happens to be accepted with price reduction, what is the reason and what will be going on? According to the Article 72, paragraph 2 of the “Government Procurement Act”, where the result of inspection indicates any non-conformity with the contractual requirements, but the non-conformity neither hinders the safety or use required nor decreases the general function or the function designated by the contract, an acceptance with price-reduction may be conducted under conditions that the entity has determined that there is no need or it is difficult to make replacement. Otherwise, the entity should require the suppliers make improvement within a time-limit according to the paragraph 1 of Article 72. Based on the concepts of the Civil Code, the acceptance with the price-reduction does not depend on responsibility for intentional or gross negligent acts. It is caused by the suppliers’ non-performance, when the performance becomes impossible or imcomplete. The governmental entity will also transfer to claim conpensation for the injury. This issue also involves the obligation of suppliers to repair the defects within the specified period, not only after the inspection and acceptance. The reasonable amount of price-reduction and the penalties are also important to be disscussed. This study wants to clarify all the issues and the effects of the acceptance with price-reduction through the theory discussion and the reviewing of juridical cases, mediations and arbitrations.
5

工程契約中定作人協力問題之研究 / A study of employers' duty to co-operate in construction contracts

蘇珈漪 Unknown Date (has links)
於雙務、有償之營建施工契約中,承包商依約應設法實現業主所擬定之工程計畫並完成約定工作,而業主則相對地負有支付等值對價之給付義務,此種當事人間主要義務之建構,實與民法上承攬契約之典型狀態相似,然營建工程契約通常牽涉之標的金額相當龐大,且因履約期較長,工程推動期間可能面臨之風險亦與傳統承攬契約有別;此外,工程契約隨著當事人需求之變動,致使工作內容千變萬化,且工程契約之進行受到外界經濟或客觀環境影響甚鉅,具體工作項目為因應實際施作之需要而有隨時修正或補充之可能,而此亦或多或少影響當事人得否依原訂時程順利履約。是以,多數實務及學說見解固然肯認於解釋工程契約或處理相關紛爭時,可參考或援引承攬契約之概念或規範,然考量營建工程契約之特殊性,於探討工程履約爭議時,仍不可忽略當事人真意及利益狀態之評估,並應審慎兼顧經濟效率及契約目的之追求,對法律規範為最妥適之解釋與適用。 在工程契約之主給付義務外,是否當事人亦負有其他從給付義務或附隨義務,此問題向來較少被著墨,然由於承攬契約之給付內容涉及一定工作結果之提出,承攬人對工程之進行固然需具備專業技術與能力,惟工程進行中,若干工作內容之施作,常有待定作人積極配合,方能順利完成,是以,若承攬人於施作過程遭受阻礙而有賴定作人協助,此時定作人提供必要之協力並與承攬人合作履行契約給付,對於工程整體能否如期如質之推動,通常即具有舉足輕重之關鍵地位。 惟長久以來,定作人協力行為之性質及其相應適用之法律效果為何,由於現有法令規範之不完備,再加上各式不公平定型化約款之擬定及傳統保守見解之採行,以致學理及實務上對於相關議題之處理,未能進一步突破並跟隨工程實務運作上當事人實際之需求。基於此課題攸關工程實務上當事人義務及責任關係之釐清,具有探討之重要實益,是以本文乃分別以工程契約之性質與工程契約風險分配之概念為研究之出發點,嘗試推導出當事人間較為合理之風險分配原則,同時就工程契約中定作人協力行為之內容、性質及法律效果,分析比較我國與德國法制及契約實務運作中相關規範與制度之異同或優劣,藉以釐清定作人協力義務相關規定與其他法律制度間之關係,而透過此種分析與思辨之過程,應可進一步證立工程契約中當事人合作概念之重要性。 其次,本文將整合學理上相關論述,為定作人協力行為之案例類型提供一較為合適之檢驗標準,並以實務上常見之紛爭類型作為討論依據,針對案例事實予以類型化,釐清主要爭點,同時佐以本文之研究成果,逐一檢視個案中法院對於協力義務之定性是否妥適,並分析當事人間可能主張之請求權基礎或條款之約定,是否呼應本文對於工程契約風險分配及法律效果部分闡述之原則,進而引入定型化約款管制理論,對於個案中當事人間偏離之權利義務或風險分配約定予以調整,以期作為未來實務處理相關爭議之參考。最末,本文將綜合全篇之說明,嘗試對現行規範提出可行之修正建議,期能不僅有助於當事人間紛爭之解決,更希冀我國工程契約法制得以朝向更健全的方向邁進。
6

自國際規範FIDIC標準契約條款論我國工程保險—以保險責任期間為重心

林幸頎, Lin, Hsing Chi Unknown Date (has links)
本論文係以工程風險及我國工程保險之現況與發展作為基礎,先予敘明目前當代工程保險的起源與趨勢,鑒古知今,推論出工程保險應回歸以安全檢查與損害防阻作為思考核心,並強調工程風險管理的重要性,進而有發展工程界與保險界聯合行動模式之可能性,使工程從策劃階段即獲得風險管理,而保險人亦得依保險法第九十六條以下之規定,於施工過程中介入安全檢查措施,共同防範出險。 再者,就工程保險之本質以言,應強調工程保險係屬於損失填補保險,故於處理相關實務爭議時,必須考量到工程保險應受到損失填補原則之限制。且因工程保險係採取全險保單的方式為之,是以,本文認為應得參酌美國立法例,而特別強調保險利益有無之判斷。 此外,現今工程保險實務上所面臨之諸多爭議,實得以「保險責任期間」作為軸心而貫穿之。即本文認為,應辨明保險期間並非完全等同於保險責任期間,而於探究保險人是否應負理賠責任時,其重點之一應係在於保險責任期間是否開始、終止或延長。對此,本文認為,應可從下列幾個主要之面向加以觀察:一者,若自工程契約之關係以論,首須探討者,係民法相關概念(如交付、受領)與工程實務上所使用之「啟用」、「接管」、「驗收」之概念是否相同?有無歧異之處?更為重要者,係工程風險究應如何合理分配?二者,若自工程保險契約之角度以觀,則需分析保險契約所承保的危險是否增加?保險利益是否變動?具權威性之地位,而被譽為工程契約「聖經」的國際規範FIDIC標準契約條款之相關內容為何? 本文認為,由於判斷工程保險契約時往往將受到工程契約內容之影響,而工程契約又多係由定作人一方所主導擬定,故而在判定保險人是否應依工程保險契約負擔理賠責任時,毋寧應本著公平合理之精神,配合工程慣例,從工程契約、工程保險契約所關涉之定作人、承攬人,以及保險人三方關係而為綜合審酌認定。換言之,不應使業主人有機會利用工程契約之約定,而將本應由業主承擔之風險移轉至承包商一方,進而間接地影響保險人應否理賠之判斷。 歸納以言,本文認為,我國工程保險實務爭議的解決方向,應以保險責任期間作為保險人是否需予理賠的主要判斷基準之一;再者,並應認知到工程保險本質上係屬於損失填補保險,而需受到損失填補原則之限制;另參酌美國立法例,需強調工程保險之保險利益有無之判斷;又於配合我國國情之前提下,應得適時適度地引進國際規範FIDIC標準契約條款之相關內容,以使我國與國際之接軌能更為緊密切實。