• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 42
  • 4
  • Tagged with
  • 46
  • 31
  • 19
  • 19
  • 15
  • 13
  • 11
  • 10
  • 9
  • 8
  • 8
  • 8
  • 8
  • 8
  • 8
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Hantering av utjämningsbuffert / Management of leveling buffer

Nordberg, David, Ljungberg, Göran January 2010 (has links)
Detta projekt gick ut på studera huruvida Outokumpu, Degerfors, kunde använda sig av modeller som representerar strategier från Lean production med tillhörande flödesverktyg och hur dessa kunde appliceras i företaget. Outokumpu, Degerfors, är specialister inom rostfritt stål och levererar produkter till slutanvändare världen över. Uppgiftens utgångspunkt är att försöka få en bättre och smidigare hantering av materialet och samtidigt sänka kostnaderna för produkter i arbete.   Modellen som användes kallas ”lära sig att se” och baseras på att kartlägga flöden inom produktionen. Syftet med detta var dels att skapa sig en bild av ett nuvarande produktionsflöde men också fastställa eventuella slöserier i värdekedjan. Detta kartläggningsarbete var tyngdpunkten i projektet, eftersom det fortsatta arbetet med att konstruera ett framtida flöde innehållande en utjämningsbuffert krävde en djup förståelse kring det nuvarande styrsättet i produktionen. Arbetet med flödeskartläggningar samt förståelse kring produktionen benämndes internt av projektmedlemmarna som en förstudie, vilket var nödvändigt för att förstå och börja bearbeta projektuppgiften, som bestod av att skapa ett ”rakare” flöde nedströms emot kunden.   Genom att skapa ett ”nytt” framtida flöde i produktionen med hänsyn till JIT-filosofin, rätt mängd material vid rätt tidpunkt, krävdes det ett nytt framtagande av regelverk mellan de olika operationerna i produktionen. Detta på grund av att rätt mängd material vid rätt tidpunkt skulle dras framåt i värdekedjan för att skapa ett jämnare flöde. Tidigare trycktes materialet framåt i kedjan oberoende av när materialet skulle levereras till kund. Regelverket bygger på sortering av olika slags material så det krävdes en utredning om hur mycket material det rörde sig om vid olika veckor för att kunna fastställa hur mycket som skulle lagras i en buffert. Dessa beräkningar baserades på faktiska veckor med tillhörande mängd (styck) och tonnage (vikt) för att konstatera hur stor bufferten skulle bli. Det konstruerades även en beräkningsmodell för att fastställa om det framtagna regelverket och placeringen av bufferten stoppade för ett högre kundbehov.   Resultatet av vårt projekt blev ett nytt regelverk samt ett förslag på en eventuell placering av utjämningsbufferten. I rapporten framkommer även resultat på hur olika slags material baserat på regelverket kommer att delas upp på olika sorteringsrutor för att detta styrsätt ska kunna fungera ute i verket. Det visar sig att med de förändringar som detta innebär kommer kostnaderna för produkter i arbete att minska, vilket är ett effektivt argument för företaget att försöka införliva detta förslag.   Sammanfattningsvis måste nämnas att det kvarstår en del arbete för att detta förslag ska kunna fungera smärtfritt ute i verket. Som ett exempel måste det befintliga styrsystemet uppdateras med vissa styrbegrepp som inte funnits tidigare och samtidigt måste operatörerna ute i produktionen börja arbeta efter nya rutiner vilket måste beaktas i införandet av detta förslag. / This project went on to study how Outokumpu, Degerfors, could make use of models that represents strategies of Lean production and related flow tools and how these could be applied in the company. Outokumpu, Degerfors, are specialists in stainless steel and deliver products to end users worldwide. The task starting point is to try to get a better and smoother handling of the material while lowering the cost of work in progress.   The model used is called "Learning to See" and based on the identification of flows in production. The purpose of this exercise was to create an image of a current production flow, but also identify any wastage in the value chain. This mapping work was the heavy thing in the project as it continued efforts to construct a future flow containing a smoothing buffer required a deep understanding of the current control mode of production. Work Stream Mapping and to understand the production naming internally by project members that a feasibility study, which was necessary to understand and begin to process the project task, which consisted of creating a "straighter" flow downstream to the customer.   By creating a "new" future flow of production with regards to JIT philosophy, right amount of material at the right time, it took a new development of regulatory frameworks between the various operations of production. This is because the right amount of material at the right time would be pulled forward in the value chain to create a smoother flow. Previously the materials push forward in the chain irrespective of where the material was delivered to the customer. Framework is based on the sorting of different types of materials so it took an investigation on how much material they were on at different weeks in order to determine how much that would be stored in a buffer. These calculations were based on actual weeks with the associated quantity (pc) and tonnage (weight) to ascertain how much the buffer would be. There were also constructed a computational model to determine if they developed the regulatory framework and the location of the buffer stopped for a higher customer need.   The results of our project were a new framework and a proposal for a possible placement of equalization buffer. The report will also result in the different types of materials based on the regulatory framework will be split into various sorting boxes to the control mode to work around the plant. It turns out that with the changes that this entails, the cost of work in progress to reduce, which is a powerful argument for the company to try to implement this proposal.   In summary, must be mentioned that there remains some work to this proposal to function painless in the work plant. As an example, the existing control system is updated with some control concept did not exist before and at the same time, operators must be out of production start working for new procedures which must be taken into account in the implementation of this proposal.
42

Genetic analysis of the otter population (Lutra lutra) in Kristianstad’s Vattenrike Biosphere Reserve, Sweden / Genetisk analys av utterpopulationen (Lutra lutra) i Biosfärområde Kristianstads Vattenrike

Bergman, Sanne January 2017 (has links)
During the past century the Swedish otter (Lutra lutra) population showed a rapid decline in abundance and genetic diversity. Among the most affected areas was the southern province of Skåne. After prohibiting hunting of otters and banning harmful pollutants like PCB, Swedish populations slowly recovered. To some areas the otter returned late, like Kristianstad in north-eastern Skåne. Here, the River Helge å enters Kristianstad’s Vattenrike, Biosphere Reserve and forms a biodiverse wetland. By 2011, otters had established once more along the river. In recent years, a female otter with cubs have appeared outside Vattenriket visitor’s centre “naturum”, to the joy of inhabitants and visitors. In Kristianstad, otters have become a recurring winter attraction. However, not much is known about this new population. For assessment of abundance and genetic diversity, microsatellite variation was investigated among now-living individuals from eleven sites in the Biosphere reserve, and stored museum samples from ten otters with origins in North-eastern Skåne. Using a non-invasive methodology, investigated DNA was extracted from faeces and muscle tissue from dead individuals. Multiple replicate screening was performed to detect errors in genotyping procedures. Results show the presence of three now-living individuals (two males and one female). Now-living otters and museum specimens from north-eastern Skåne were not closely related. Sampled individuals show Hardy-Weinberg Equilibrium, but their heterozygosity is very low. Results suggest that, even though some individuals may remain undetected, low admixture of new genes may be a cause for concern. For long-term protection and management in Kristianstad’s Vattenrike, Biosphere Reserve, further knowledge is needed about our new and precious otter population. / Den svenska utterstammen (Lutra lutra) genomgick drastiska populationsminskningar under mitten av 1900-talet. Minskningen ledde till en förlust av genetisk diversitet i många områden, och bland de värst drabbade var Skåne. Uttern blev fredad från jakt och ett förbud mot det skadliga miljögiftet PCB infördes, vilket skapade förutsättningar för utterpopulationen i Sverige att långsamt återhämta sig i antal. Men uttern återvände sent till vissa områden, som Kristianstad i Nordöstra Skåne. Genom staden Kristianstad rinner Helge å, som formar vidsträckta, artrika våtmarker i Biosfärområde Kristianstads Vattenrike. Uttern visade inga tecken på återkomst till området förrän 2011. De senaste åren har en utterhona med ungar regelbundet visat sig vid besökscentret ”naturum”, till glädje för stadens invånare och besökare. Uttrarna har blivit en återkommande vinterattraktion i Kristianstad. Men kunskapen om den nya populationen är begränsad. För uppskattning av antal och genetisk diversitet, undersöktes mikrosatellitvariationer hos nu levande individer från elva lokaler i Vattenriket. För jämförelse inkluderades arkiverade prover från Naturhistoriska Riksmuseets ”Miljöprovbank”, från tio döda uttrar med ursprung i Nordöstra Skåne. Med icke-invasiva metoder undersöktes DNA som extraherats från avföring- och muskelvävnad. Multipel replikatanalys gjordes för detektering av eventuella fel i genotypningsproceduren. Resultaten visar förekomsten av tre nu levande individer i Vattenriket (två hanar och en hona). Det är dock troligt att en- eller flera nu levande individer kan ha undkommit identifiering. Individerna var inte nära släkt med museiexemplaren från Nordöstra Skåne. Studerade individer är i Hardy-Weinberg jämvikt, men heterozygositeten är låg. Låg heterozygositet kan bero på en låg genomblandning i populationen, vilket kan vara en anledning till oro och bör undersökas närmre. Det behövs ytterligare kunskap och studier för att långsiktigt skydda och förvalta den nya, värdefulla utterpopulationen i Kristianstads Vattenrike.
43

Optimering av produktionslina på tillverkande enhet i Sverige / Optimization of production line in manufacturing unit in Sweden

Hyldéen, Jonathan January 2020 (has links)
Denna studies syfte är att leverera ett förslag på hur ett tillverkande företag i Sverige kan öka sin kapacitet, sitt genomflöde och flexibilitet i en manuell produktionslina. Produktionsgolvet är trångt för de anställda på grund av stora lagernivåer intill produktionslinan. Det finns fem arbetsstationer, tre flaskhalsar i produktionen och antalet PIA (Produkter I Arbete) är högt. Studien genomför mätningar för att kartlägga nuläget, hur den aktuella layouten och prestandan ser ut. För att mäta nuläget samlar studien in data genom observationer, en processpromenad, informella intervjuer och genomför egna mätningar. Datainsamlingen analyseras med hjälp av teorier och metoder från Lean, TOC (Theory of Constrains), linjebalansering och produktionsledning. Studien använder sig av 5s som angreppssätt för att systematiskt uppnå genomgående renhet av arbetsplatsen och en standardisering av påfyllnads- och prognostiseringsprocessen. Studien finner att för att öka produktionslinans kapacitet kan bemanningen på produktionslinan ökas, med detta som utgångspungspunkt föreslås en ny layout som tillåter två extra anställda att arbeta på produktionslinan. Detta uppnås genom att dela upp nuvarande delmoment i produktionslinan och skapa två extra stationer. Detta ändrar antalet arbetsstationer från fem till sju och tillåter två extra anställda att arbeta i produktionslinan. Detta eliminerar också två mindre flaskhalsar i produktions flödet. Vidare innefattar förslaget en ny rutin för påfyllnad- och prognostiseringsprocessen som bestämmer hur många artiklar som ska lagerföras vid produktionslinan. Till sist föreslås att den nu enda flaskhalsen ska styra takten, vilket gör processen till ett dragande system styrt av efterfråga istället för ett styrt av generell tillgång. Detta innefattar också att produktionslinan ska börja tillverka ett säkerhetslager med färdiga produkter, detta säkerhetslager ska bytas ut kontinuerligt för att hindra produkterna passerar utgångsdatum. Resterande majoritet av produktionen ska endast ske mot kundorder istället för mot ett lager. För att implementera förslaget bör organisationen utbilda sig och dess anställda i teorierna studien använder sig av. Både ledning och anställda i produktionslinan måste förstå teorierna och varför de används för att implementeringen ska lyckas. / The purpose of this study is to deliver a proposition on how a Swedish manufacturing company can improve its’ capacity, flow and flexibility in a manual production line. The production floor is crowded as a result of large quantities of articles adjacent to the production line. The production line has five workstations, three bottlenecks and has a high number of WIP (Work-In-Progress). The study collects data to assess the situation, the production lines performance and how the current layout is planned. To measure the current situation the study collects data through observations, a process tour, informal interviews and conducts its own measurements. The collected data is analysed using theories and methods from lean, TOC (Theory of Constrains), line balancing and production management. The study is approaching the problems using 5s to systematically achieve pervading cleanness in the workplace and a standardisation of the refilling- and prognostication process. The study finds that to increase the capacity of the production line, the staffing can be increased. Using this as a standing point, the study proposes a new production layout that allows two extra employees to work on the production line. This is achieved by creating two additional workstations in the production line. Changing the number of stations from five to seven and allowing two extra employees to work in the production line. This layout change also eliminates two smaller bottlenecks in the production flow. Furthermore, the propositions suggest a new routine for the refilling- and prognostication process that determines how many articles to store within the production floor. Lastly the proposition suggests that the now single bottleneck in the production flow decides the production rate. Making the production line a pulling system set by the demand of the bottleneck, rather than a system set by general assets. This also includes that the production line is going to start producing safety stock of completed products, this safety stock will continuously be replaced to prevent the products from passing expiration date. The remaining majority of the production should only be done by customer order, rather than producing to store complete products. In order to implement the proposition, the organization need to educate itself and its employees, both management and workers need to understand the concepts the proposition uses and why the concepts are used in order for the implementation to be successful. / <p>Sekretess</p>
44

Improving management of patient flow at Radiology Department using Simulation Models / Förbättra hanteringen av patientflödet på radiologiska avdelningen med hjälp av simuleringsmodeller

Agasteen Anantharaj, Kingsly Anand January 2021 (has links)
The Swedish healthcare system is considered to have good healthcare productivity and efficiency with moderate cost but seems to have some future challenges. Sweden is moving towards the aging population as it requires development in medical care techniques and technologies to provide care to elderly patients. This increases the pressure on the healthcare system. Hence, the number of patients in the hospital increase, as a result, the flow of patients within the wards are increased. Furthermore, the pandemic has increased the number of people admitted to hospitals. As a consequence, even for high-priority cases, the wait times are rising. The Skaraborg Hospital Group, SHG, and other general hospitals, in particular, are focusing on how to handle patient flow at various levels within departments and clinics by improving patient flow quality. Production and capacity preparation (PCP) is a commonly used industry tool for resolving bottlenecks. Hence, this method needs to be adopted within the hospital and by the healthcare sector to a larger extent. Since many patients from different specialty departments use the Radiology department's facilities, it is often a "bottleneck" in inpatient traffic at hospitals. Furthermore, the influx of patients with covid-19 has increased the department's workload. This master's thesis aims to assist the Radiology department in improving their production and capacity planning to increase unit flow performance. The project involves supporting key staff in the department in estimating demand to align different patient movements with equipment and personnel services. Improving radiology department flow efficiency can lead to more even and healthy patient flows around the hospital, reducing "buffers" of patients and longer stays at different specialist clinics. / Det svenska sjukvården anses ha god hälsovårdsproduktivitet och effektivitet till måttliga kostnader men verkar ha några framtida utmaningar. Sverige går mot den åldrande befolkningen eftersom det kräver utveckling av tekniker och tekniker för medicinsk vård för att ge äldre patienter vård. Detta ökar trycket på sjukvården. Därför ökar antalet patienter på sjukhuset, vilket leder till att patientflödet inom avdelningarna ökar. Dessutom har pandemin ökat antalet personer som läggs in på sjukhus. Som en konsekvens ökar väntetiderna även för fall med hög prioritet. Skaraborg sjukhusgrupp, SHG och andra allmänna sjukhus fokuserar särskilt på hur man hanterar patientflöde på olika nivåer inom avdelningar och kliniker genom att förbättra patientflödeskvaliteten. Produktion och kapacitetsberedning (PCP) är ett vanligt branschverktyg för att lösa flaskhalsar. Därför måste denna metod i större utsträckning antas inom sjukhuset och inom sjukvården. Eftersom många patienter från olika specialavdelningar använder Radiologiavdelningens anläggningar är det ofta en "flaskhals" i slutenvården på sjukhus. Dessutom har inflödet av patienter med covid-19 ökat avdelningens arbetsbelastning. Detta examensarbete syftar till att hjälpa Radiologiavdelningen att förbättra sin produktionsoch kapacitetsplanering för att öka enhetsflödesprestanda. Projektet innebär att stödja nyckelpersoner på avdelningen för att uppskatta efterfrågan för att anpassa olika patientrörelser till utrustning och personal. Förbättrad radiologisk avdelnings flödeseffektivitet kan leda till jämnare och hälsosammare patientflöden runt sjukhuset, vilket minskar "buffertar" hos patienter och längre vistelser på olika specialistkliniker.
45

Processflödesanalys av tillverkningsprocessen i syfte att minska leveranstiden / Process flow analysis of the manufacturing process in order to reduce delivery time

Salazar Diaz, Frank, Pakdaman, Hannaneh Hanna January 2021 (has links)
LKAB Mekaniska i Kiruna, Sverige är en ståltillverkare som bland annat producerar avropsartikeln lingenomföring till moderbolaget LKAB. Målet med detta examensarbete är att minska på leveranstiden för sistnämnda artikel. För att åstadkomma detta undersöktes produktionsflödet i affärssystemet Monitor. Därtill genomfördes en litteraturstudie och intervjuer hölls med avdelningschefer och operatörer från LKAB Mekaniska. Utifrån detta identifierades tre faktorer som påverkar leveranstiden negativt. Dessa är kötiderna mellan operationerna, den bristfälliga planeringen som skedde vid skär- och maskinavdelningen, samt begränsningarna som höll upp produktionen i maskinavdelningen Vi hävdar att leveranstiden minskar om följande åtgärder genomförs: eliminera kötiderna mellan tillverkningsprocesserna, öka beläggningen och kapaciteten på tillverkningsmaskinen, implementera ett kanbansystem, ändra ordningsföljden i tillverkningsprocessen och slutligen införa ett säkerhetslager med färdigsvarvade stänger. / LKAB Mekaniska in Kiruna, Sweden is a steel-manufacturer that, among other things, produces lingenomföring for its parent company LKAB. The aim of this thesis is to decrease the delivery time of the aforementioned product. In order to achieve this, production flow in the business system Monitor ERP (Enterprise Resource Planning) was examined. In addition to this a literature study was conducted and interviews were held with department heads and machine operators from LKAB Mekaniska. Based on data collected, three factors were identified as negatively affecting the delivery time. These are queue times between operations, inadequate planning for the cutting and machinery department, as well as the limitations that kept the production back in the machinery department. We claim that the delivery time decreases if the following measures are realized: eliminate queue times between stages in the manufacturing process, increase personnel capacity related to the manufacturing machine, implement a kanban system, change the order of the manufacturing process and lastly to introduce a storage of ready-turned bars.
46

Högtempererat borrhålslager för fjärrvärme / High Temperature Borehole Thermal Energy Storage for District Heating

Hallqvist, Karl January 2014 (has links)
The district heating load is seasonally dependent, with a low load during periods of high ambient temperature. Thermal energy storage (TES) has the potential to shift heating loads from winter to summer, thus reducing cost and environmental impact of District Heat production. In this study, a concept of high temperature borehole thermal energy storage (HT-BTES) together with a pellet heating plant for temperature boost, is presented and evaluated by its technical limitations, its ability to supply heat, its function within the district heating system, as well as its environmental impact and economic viability in Gothenburg, Sweden, a city with access to high quantities of waste heat. The concept has proven potentially environmentally friendly and potentially profitable if its design is balanced to achieve a good enough supply temperature from the HT-BTES. The size of the heat storage, the distance between boreholes and low borehole thermal resistance are key parameters to achieve high temperature. Profitability increases if a location with lower temperature demand, as well as risk of future shortage of supply, can be met. Feasibility also increases if existing pellet heating plant and district heating connection can be used and if lower rate of return on investment can be accepted. Access to HT-BTES in the district heating network enables greater flexibility and availability of production of District Heating, thereby facilitating readjustments to different strategies and policies. However, concerns for the durability of feasible borehole heat exchangers (BHE) exist in high temperature application. / Värmebehovet är starkt säsongsberoende, med låg last under perioder av högre omgivningstemperatur och hög last under perioder av lägre omgivningstemperaturer. I Göteborg finns en stor mängd spillvärme tillgängligt för fjärrvärmeproduktion sommartid när behovet av värme är lågt. Tillgång till säsongsvärmelager möjliggör att fjärrvärmeproduktion flyttas från vinterhalvår till sommarhalvår, vilket kan ge såväl lönsamhet som miljönytta. Borrhålsvärmelager är ett förhållandevis billigt sätt att lagra värme, och innebär att berggrunden värms upp under sommaren genom att varmt vatten flödar i borrhål, för att under vinterhalvåret användas genom att låta kallt vatten flöda i borrhålen och värmas upp. I traditionella borrhålsvärmelager används ofta värmepump för att höja värmelagrets urladdade temperatur, men på grund av höga temperaturkrav för fjärrvärme kan kostnaden för värmepump bli hög. I denna rapport föreslås ett system för att klara av att nå höga temperaturer till en lägre kostnad. Systemet består av ett borrhålsvärmelager anpassat för högre temperaturer (HT-BTES) samt pelletspannor för att spetsa lagrets utgående fluid för att nå hög temperatur. Syftet med rapporten är att undersöka potentialen för detta HT-BTES-system med avseende på dess tekniska begränsningar, förmåga till fjärrvärmeleverans, konsekvenser för fjärrvärmesystemet, samt lönsamhet och miljöpåverkan. För att garantera att inlagringen av värme inte är så stor att priset för inlagrad värme ökar väsentligt, utgår inlagringen från hur mycket värme som kyls bort i fjärrvärmenätet sommartid. I verkligheten finns betydligt mer värme tillgänglig till låg kostnad. När HT-BTES-systemet producerar fjärrvärme, ersätts fjärrvärmeproduktion från andra produktionsenheter, förutsatt att HT-BTES-systemets rörliga kostnader är lägre. I Göteborg ersätts främst naturgas från kraftvärme, men också en del flis. Kostnadsbesparingen beror på differensen för total fjärrvärmeproduktionskostnad med och utan HT-BTES-systemet. Undersökningen visar att besparingen är större om HT-BTES-systemet placeras i ett område där det är möjligt att mata ut fjärrvärme med lägre temperatur. Om urladdning från HT-BTES kan ske med hög temperatur ökar också besparingen. Detta sker om lagrets volym ökar, om avståndet mellan borrhål minskar eller om värmeöverföringen mellan det flödande vattnet i borrhålen och berggrunden ökar. Dessa egenskaper för lagret leder också till minskade koldioxidutsläpp. Storleken på besparingen beror dock i hög grad på hur bränslepriser utvecklas i framtiden. Strategiska fördelar med HT-BTES-systemet inkluderar; minskad miljöpåverkan, robust system med lång teknisk livslängd (för delar av HT-BTES-systemet), samt att inlagring av värme kan ske från många olika produktionsenheter. Dessutom kan positiva bieffekter identifieras. Undersökningen visar att HT-BTES-systemet har god potential att ge lönsamhet och minskad miljöpåverkan, och att anläggning och drift av lagret kan ske utan omfattande lokal miljöpåverkan. Det har också visats att de geologiska förutsättningarna för HT-BTES är goda på många platser i Göteborg, även om lokala förhållanden kan skilja sig åt. För att nå lönsamhet för HT-BTES-systemet krävs en avvägning på utformning av lagret för att nå hög urladdad temperatur utan att investeringskostnaden blir för stor. Undersökningen visar att om anslutning av HT-BTES-systemet kan ske mot befintlig anslutningspunkt eller till befintlig värmepanna kan investeringskostnaden minska och därmed lönsamheten öka. Placering av HT-BTES-systemet i områden med risk för överföringsbegränsningar kan också minska behovet av att förstärka fjärrvärmenätet, och således bidra till att minska de kostnader som förstärkning av nätet innebär. Betydelsefulla parametrar för att nå lönsamhet för HT-BTES-system inkluderar dessutom kostnaden för inlagrad värme liksom vilket vinstkrav som kan accepteras. Tillgång till HT-BTES möjliggör ökad nyttjandegrad och flexibilitet för fjärrvärmeproduktionsenheter, och därmed ökad anpassningsmöjlighet till förändrade förutsättningar på värmemarknaden. Dock återstår att visa att komponenter som klarar de höga temperaturkraven kan tillverkas till acceptabel kostnad.

Page generated in 0.0288 seconds