41 |
Optimering av förnybar energi : En fallstudie av integrering av solenergi i befintliga vindkraftsparker med batterilagringBlückert, Siri, Eliassi, Nawzad January 2023 (has links)
Hybridparks combines two or more energy sources. In this thesis in partnership with Arise AB case studies have been conducted in combined photovoltaic power in their existing windparks. Wind and photovoltaic have productionpatterns that compelemts the other. Which in turn gives a more stable production. Four windparks was chosen to be studied and tested as hybridparks: Fröslida, Häradsbo, Råbelöv och Idhult. The size of the hybridpark was based on an earlier study from Arise. One conclusion from that study was that it is possible to install photovoltaics with 2/3 of the installed windpower. The photovoltaic plant was simulated in the program Polysun. Polysun can make simulations and give insight on the possible photovoltaic yield. The data from the simulation was combined with the windpower yield data from Arise to analyse how the hybridpark would function. Energy storage with lithium batteries have been calculated and tested in Excel. The results show the impact the energy storage have on production and delivery to the grid. A simple control scheme with on/off method with a schedule gave the best results in a daily battery cycle. The energy sources seldom overlap and with a controlled energy storage it is possible to deliver power to the grid during power lacking periods such as winter.
|
42 |
Högskoleutbildning - och sedan? En studie av arbetslöshetsproblematiken bland yngre akademikerPripp Moser, Malin January 2005 (has links)
I studien undersöks situationen för de yngre akademiskt utbildade - som enligt min definition är högst 35 år – vad gäller utsikterna på arbetsmarknaden. Det gör jag dels genom att studera arbetsmarknadsläget för dessa akademiker i riket dels genom att undersöka hur tre unga akademiker upplevt/upplever sin arbetslöshet. Resultat I bygger på utredningar och statistik som gäller yngre akademikers etablering på arbetsmarknaden, i vilken utsträckning de drabbas av arbetslöshet samt skillnader mellan män/kvinnor och mellan olika yrkesgrupper. Hur myndigheterna behandlar frågor om dimensionering av den högre utbildningen tas också upp. Högskoleverket har visat att år 2002 etablerade sig läkare, sjuksköterskor och apotekare snabbt, de hade en etableringsgrad på 90 procent ett och ett halvt år efter examen. Hög etableringsgrad hade också civilingenjörer, högskoleingenjörer och lärare, dock sjönk den för ingenjörer jämfört med året innan. För ekonomer syntes en tydlig nedgång, medan det för lärare och vårdutbildade syntes en uppgång. Examinerade med konstnärlig inriktning hade låg etableringsgrad, likaså humanister med kandidat- eller magisterexamen. Generellt är kvinnliga akademiker något mer drabbade av arbetslöshet än män. Av resultaten framgår att det i maj 2005 var 15 630 personer i åldersgruppen 25 – 35 år med minst tvåårig akademisk utbildning som var helt arbetslösa, av dem var 8 073 kvinnor och 7 557 män. Svårast var situationen för samhällsvetarna. I mars 2005 fick 3.9 procent av SACO:s: medlemmar i åldern 25 – 34 år ersättning från arbetslöshetskassan. Kvinnornas arbetslöshet var 4,4 procent och männens var 3,3 procent. I resultat II redovisas de tre unga akademikernas tankar och åsikter kring hur de upplevt studietiden, att vara arbetssökande och arbetslös samt deras syn på framtiden. Mina intervjupersoner efterfrågar alla specialistförmedlingar inom arbetsförmedlingen, de anser inte att de blivit bemötta med tillräcklig förståelse. Specialistförmedlingar är något som även SACO efterfrågar. De intervjuade har alla upplevt sviktande självförtroende under arbetslösheten. Vidare lyfter de fram den dubbla problematiken i att vara överutbildad och samtidigt sakna arbetslivserfarenhet, båda faktorer som varit hinder i arbetssökandet. Oron inför framtiden är stor hos yngre akademiker, något som framkommer både hos mina intervjupersoner och i utredningar. / Higher Education – and then what?A study of the Unemploymentsituation for Young Academics.
|
43 |
Pålfundament : Jämförelse mellan fackverksmodellen och balkmodellen / Pile Caps : Comparison between strut-and-tie model and flexural modelForell, Jesper, Hamada, Khaled January 2018 (has links)
Fackverksmodellen är idag den modell som vid dimensionering av pålfundament är vanligast att använda. Det kan finnas tillfällen där en fackverksmodell inte är fördelaktig att dimensionera ett fundament efter, till exempel vid stora pålavstånd då det leder till höga fundament. Pålfundament kan även dimensioneras enligt balkmodellen. Detta examensarbete kommer att undersöka fördelarna och nackdelarna med respektive beräkningsmodell. Med hjälp av två konstruerade beräkningsmallar för respektive modell dimensioneras ett fundament med fyra pålar. Fallstudien kommer att bli grunden för jämförelsen. Båda beräkningsmallarna kommer att följa SS-EN-1992-1-1:2005 Eurokod 2 dimensionering av betongkonstruktioner. De ekvationer som används vid dimensionering med respektive modell kommer att redovisas för att förtydliga genomförandet för detta arbete. Jämförelsen kommer att göras för följande parametrar; armerings- och betongmängd sprickfördelande armering förankring av längsgående stänger fundamentets geometri påverkan av felslagning Utifrån resultatet från fallstudien blir fundament dimensionerande enligt fackverksmodellen högre än fundament dimensionerat enligt balkmodellen. Balkmodellen kräver mer huvudarmering och är mer känslig för felslagning. Sprickarmering krävs inte i lika stor utsträckning för fundament dimensionerande enligt balkmodell. Fackverksmodellen kräver större förankringslängd. Vilken modell som är bäst lämpad beror på fundamentets utformning och vilka förutsättningar som finns på arbetsplatsen. Finns det krav på hur högt fundamentet får vara är balkmodellen bättre lämpad. Där pålarna kan placeras inom minimiavstånd och där ingen begränsning på hur högt fundamentet får vara är det lämpligt att använda sig av fackverksmodellen. / The strut-and-tie model is today the model that is most commonly used for designing pile caps. There may be occasions where a strut-and-tie model is not that beneficial to design a pile cap after, for example big distances between piles will lead to high pile caps. Pile caps can also be designed according to the so-called flexural model. This thesis will investigate the pros and cons that comes with each model. This will be done by constructing two calculation templates for each model to design a four-pillar foundation. Both calculation templates will follow SS-EN-1992-1-1: 2005 Eurocode 2 design of concrete structures. The equations that will be used for designing each model will be explained to clarify the implementation of this work. The comparison will be made for the following parameters; reinforcement and concrete amount crack reinforcement anchorage of longitudinal reinforcement the height of the pile cap impact of miss-piling Based on the outcome of the case study, a pile cap designed according to the strut-and-tie model results in higher caps than a cap designed according to the flexural model. The flexural model requires more longitudinal reinforcement and is more vulnerable to miss-piling. Crack reinforcement is not required to the same extent for the flexural model compared to caps designed according to the strut-and-tie model. The strut-and-tie model requires longer anchoring length for the longitudinal reinforcement. The model that is best suited depends on the preconditions where the foundation is going to be placed and the formation of the pile cap. If there is a limit for how high the pile cap can be, the flexural model can be better suited. Where the piles can be placed within minimum distances and there is no limitation on the height of the foundation, it is advisable to use the ‘strut-and-tie model.
|
44 |
Parameterstudie av L-formad vinkelstödmurskonstruktion av armerad betong: hållbarhet och miljöMohamed, Abdi Qani, Perez Guadalupe, Jeffrey January 2023 (has links)
Klimatpåverkan är ett aktuellt ämne i dagens samhälle, och byggindustrin står för över en tredje del av den totala utsläpp i Sverige år 2020. En av de största faktorerna är just betongproduktionen eftersom betong är den mest populära byggmaterial på grund av dess hållfasthetsegenskaper och låg kostnad. Dessutom förväntas en ökning i behovet av bostäder i storstäderna inom de kommande åren vilket innebär ett större behöv av byggmaterial. Samtidigt har Sverige ett mål om noll nettoutsläpp CO2 till åren 2045, vilket gör att ha ett mer hållbar alternativ till betongen avgörande för att nå det uppsatta målet. Arbetet utförs på L-formade stödmurar av armerad betong vars användningsområde begränsas till torr och ojämn mark i samband med vägar och broar. Huvudsyfte med examensarbetet är att studera hur en ändring i stödmurens dimensioner påverkar dess bärförmåga samt koldioxidutsläpp i förhållande med konstruktionens materialmängder. Vidare skall resultatet av analysen tyda de mest lämpliga konstruktionslösningar för att optimera stödmurens design och påverka dess klimatavtryck. Bland de åtgärder som undersöks är olika tjocklekar för stödmurens bottenplatta och frontmur. Detta kommer i sin tur medföra olika betong- och armeringsbehov. Utöver det är val av bindelsmedel i betongreceptet ett sätt att vidare påverka betongens koldioxidutsläpp och det första steget för att uppnå klimatförbättrad betong. För att utföra analysen krävdes ett litteraturstudie av relevanta område samt de föreskrifter som gäller för konstruktionen. Bland de studerade område kan det nämnas storleksoptimering inom konstruktionsteknik, klimatförbättrad betong, återanvändning och återvinning av byggnadsmaterial. Därtill följdes även Eurokoden, EKS och Trafikverkets krav för stödmursbyggande såsom TK Geo 13 och Krav Brobyggande. Strukturen dimensioneras genom att följa rekommendationerna i de förutnämnda föreskrifter och det utfördes en kontroll av strukturens bärförmåga, armeringsbehov samt glidning och stjälpning. För dessa beräkningar användes datorprogram MathCad och CaeApp. Därefter användes en Excell-mall upprättad av Sweco för att jämföra koldioxidpåverkan från vanlig betong mot klimatförbättrad betong. En jämförelse av resultatet från de utförda beräkningarna visar att en relativt liknande bärförmåga kan uppnås oavsett skillnaden i konstruktionens tjocklek. Däremot blir armerings dimensionering avgörande för att säkerställa strukturens hållfasthet. Detta kommer att reflekteras i material mängden för varje struktur. Till exempel i fallet med en mindre tjocklek visas det en mindre betongmängd men en högre armeringsmängd. Vidare visar studien om klimatpåverkan att strukturen med en mindre tjocklek resulterar i ett mindre koldioxidutsläpp. Anledningen är att betongens utsläpp är mycket större än armerings utsläpp och en minskning av betongmängden är fördelaktig även om det betyder en fördubbling av den original armeringsmängd. En ytterligare minskning av klimatpåverkan kan uppnås genom användningen av klimatförbättrad betong. Det första steget är att använda alternativa bindemedel i betongreceptet och i detta fall bytes en del av klinker, som är det vanliga bindelsmedel, mot masugnsslagg för att minska koldioxidutsläpp med 10 procent. Detta värde kan ökas till 25 procent genom att bearbeta betongreceptet vidare och ersätta ett större andel av klinker. Slutligen är det möjligt att uppnå en minskning av upp till 40 procent genom att ha en översyn av hela produktionsprocessen samt transport av material vid planeringsskede med klimatpåverkan i åtanken.
|
45 |
Dimensionering av gymnasial utbildning : En kvalitativ studie utifrån studie- och yrkesvägledares perspektiv / Dimensioning of upper secondary education : A qualitative study based on the perspective of guidancecounselorsBorgshammar, Wilma, Bauman Bohlin, Jonna January 2024 (has links)
Flera studier visar att det råder en matchningsproblematik mellan elevers gymnasieval och arbetsmarknadens behov. Från år 2025 införs en komplettering av skollagen som innebär att planering och dimensionering av gymnasial utbildning ska ta hänsyn till både elevernas efterfrågan och arbetsmarknadens behov. Syftet med studien är att undersöka hur studie- och yrkesvägledare på grundskolan resonerar kring kompletteringen av skollagen (som har sitt ursprung i SOU 2020:33) och hur de tror att kompletteringen kan komma att påverka deras arbete med vägledning. Mot den bakgrunden undersöks även vad studie- och yrkesvägledare anser att kompletteringen av skollagen kan ge för effekter både ur ett individ- och samhällsperspektiv. Studien utgår från Patton & McMahons teori The Systems Theory Framework of Career Development och Hodkinson & Sparkes teori Careership: a sociological theory of career decision making samt begreppen habitus, handlingshorisont och brytpunkt. Empirin samlas in med en kvalitativ metod i form av sex semistrukturerade intervjuer med studie- och yrkesvägledare på grundskolan. Resultatet visar att studiens informanter har sparsam information om kompletteringen av skollagen och resonerar kring att det finns flera utmaningar med vägledningsarbetet i övergången mellan grundskola och gymnasieskola. Studie- och yrkesvägledare erhålleren viktig funktion i elevers valprocess och har en betydande roll i arbetet med att förbättra matchningen mellan elevers utbildningsval och arbetsmarknadens behov.
|
46 |
Brandteknisk dimensionering av limträkonstruktioner : En jämförelse mellan förenklad och analytisk dimensionering med avseende på materialåtgång / Fire design of glued laminated timber structures : A comparison between the simplified and analytical design approach considering material useHögås, Gabriel, Kuhail, Rami January 2021 (has links)
This thesis examines the possibility of saving material by using analytical design of fire protection of glued laminated timber structures instead of the standard simplified design approach. The thesis is based on an existing store building (building class Br2 and occupancy class 2B) where Tyréns AB has determined a fire exposure specific for the store building, which is used to simulate 30 minutes of fire. The result from the simulation is then used in this thesis to evaluate the effects of said fire on a glued laminated timber structure. The analysis results in the assumption of a laterignition, since the temperature development varies from the standard fire curve used in thesimplified design approach. The thesis consists of several steps. First a glued laminated timber structure consisting of a column and beam system is designed for load bearing capacity in the ultimate and service limit state according to Eurocode. The structure is then verified for accidental actions with fire as the main action according to Eurocode using simplified design. Subsequently the same verification is carried out using the analytical design approach with the specific fire exposure. The columns are not verified since they are assumed to be exposed to direct flame impact and immediate ignition. The columns are also required to be covered with ignition retardant protection according to BBR. The result shows that no saving in material can be obtained for lower fire classes. The main reason for this is the fact that the structure design for load bearing capacity in the ultimate and service limit state is large enough to resist fire for up to 90 minutes without structural failure. For higher fire classes than R90, a potential saving in material can be achieved by using the analytical design approach. This is however deemed irrelevant, since fire classes above R30 are uncommon for these types of buildings. / I detta examensarbete undersöks möjligheten att minska materialåtgången för limträkonstruktioner genom att utföra en analytisk i stället för en förenklad brandteknisk dimensionering. Arbetet baseras på en existerande butikslokal (byggnadsklass Br2 och verksamhetsklass 2B) där Tyréns AB har tagit fram ett troligt brandförlopp i byggnaden som sedan simuleras i 30 minuter. Resultatet används i detta arbete för att utvärdera hur en limträstomme skulle påverkas vid brand i byggnaden. Analysen medför att en senare antändning för limträet kan antas, då temperaturutvecklingen ser annorlunda ut jämfört med standardbrandkurvan som används vid förenklad brandteknisk dimensionering. Arbetet består av flera steg. Först dimensioneras en limträstomme bestående av ett pelar-balksystem för butikslokalen för bärighet i brott- och bruksgränstillståndet enligt Eurokod. Sedan kontrolleras konstruktionen för ett brandlastfall med ett standardiserat brandförlopp, varpå samma kontroll utförs för balkarna enligt analytisk dimensionering med det specifika brandförloppet. Pelarna kontrolleras inte enligt det specifika brandförloppet eftersom dessa antas utsättas för direkt flampåverkan med momentan antändning. Dessutom innefattas de av ytskiktskrav enligt BBR, som kräver att de skyddas med tändskyddande beklädnad. Resultatet visar att materialåtgången inte kan minskas för lägre brandklasser. Detta beror på att dimensionerna som krävs i brott- och bruksgränstillståndet är tillräckligt stora för att konstruktionen ska klara över 90 minuters brandpåverkan utan brott. För högre brandklasser än R90 finns potential för minskning av materialåtgången genom analytisk dimensionering med ett specifikt brandförlopp. Detta anses dock inte relevant då högre brandklasser än R30 sällan förekommer i denna typ av byggnad.
|
47 |
Dimensionering av träbjälklag enligt Eurokod med hänsyn till svikt och vibrationerMirzai, Jamo January 2014 (has links)
SammanfattningSvikt och vibrationer i bjälklag har sedan länge varit en vanlig orsak till klagomål frånbrukaren. Klagomålen kommer främst i samband med byggnader som är konstruerade medlätta bjälklag, alltså byggnader som har en stomme av stål eller trä. [6]Examensarbetet behandlar svikt och vibrationer i ett kassettbjälklag av massivträ som ärdimensionerad enligt gamla normen, det vill säga BKR. Arbetet omfattar litteraturstudier ochberäkningar i ett eget utvecklat beräkningsprogram för dimensionering av träbjälklag baseradpå Eurokod i MathCad. Det genomförs även en undersökning med hjälp av enkäter sombesvaras av boenden på Flintyxan i Uppsala.Resultaten av undersökningen och beräkningarna redovisas i form av tabell och diagram. Detgenomförs även en djupare analys av de två studierna i slutet av arbetet.Syftet med arbetet är att jämföra brukarens upplevelse av svikt och vibrationer som uppstår ibjälklaget med dagens dimensioneringskrav. Dessutom bedöma omdimensioneringsprinciperna och kraven verkligen fungerar i dagens samhälle.Enligt utförda beräkningar och litteraturstudier med avseende på svikt och vibrationerklassificeras bjälklaget som ”godtagbar”. Men däremot visar enkätundersökningen olika svarsom redovisas senare i arbetet.Nyckelord: svikt och vibrationer, träbjälklag, MathCad, kassettbjälklag, dimensionering,Eurokod. / AbstractSpring and vibrations in the frame has long been a common cause of complaint from theusers. The complaints will be mainly in connection with the buildings that are built withlightweight frame; this means buildings that have a framework of steel or wood. [6]This thesis will focus on spring and vibrations only in cassette joists of solid wood as isdimensioned according to old standard, BKR. This thesis covers literature studies on,calculations in computing applications for the dimensioning of wood joists based on Eurocodein MathCad. Studies will be made with the help of surveys that will be answered by residentat Flintyxan in Uppsala, Sweden.The results of the studies and calculations will be reported in the form of tables and charts.The aim is to compare users' interpretation of spring and vibrations that occur in the framewith today's dimensioning requirements and see if the dimensioning principles andrequirements actually work in today's society.The calculations and literature studies shows that the selected frame is classified as"acceptable". But at the same time the survey will show different answers that are reportedlater in the work.Keywords: spring and vibration, wood joists, Mathcad, cassette joists, dimensioning,Eurocode
|
48 |
Beredning av landsbygdsnät Restenäs-Andorra i Uddevalla kommun / Preparation work of the rural network Restenäs-Andorra in UddevallaBeyrouti, Magdalena, Larsson, Patrik January 2016 (has links)
Detta examensarbete handlar om hur ett beredningsarbete genomförs från avtal och tillståndssökning till nätplanering och dimensionering av ett landsbygdsnät. Kraven på bra driftsäkerhet ökar eftersom elanvändning är en såpass viktig del av vårt samhälle. Stora störningar medför omfattande kostnader för eldistributionsföretag och kunder. För att öka driftsäkerheten och vädersäkra distributionsnät strävar eldistributionsföretagen att förlägga luftledningsnät till markkabel i landsbygden. Beredningen på ledningsnätet utförs i området Restenäs-Andorra utanför Ljungskile i Uddevalla kommun. Arbetet kommer att genomföras i samband med utbyggnation av kommunalt vatten- och avloppsnät för att minska kostnaderna på schakt samt påverkan på kund. Resultatet av beredningen omfattar en ny 10/0,4 kV nätstation, fyra nya kabelskåp samt 1200 meter 10 kV högspänningskabel och cirka 800 meter 400 V lågspänningskabel. Ledningsnätet har till största delen planerats så att samförläggning i samma schakt för vatten och avlopp sker så långt det har varit möjligt. Kabelskåp och nätstation är strategiskt utsatta för att skapa en bra nätstruktur och för att vara lättåtkomliga vid underhåll. En P2 kalkyl är upprättad för att få en överskådlig kostnad av projektet. / This thesis is about how preparation work is accomplished by contracts and permit search to network planning and dimensions. The requirement for reliable electric power increases because electricity is such an important part of our society. Large disruptions cause significant costs for electric distribution companies and customers. . To increase reliability and make the power grid weather secured, overhead lines are replaced with underground power cable. The preparation work is preformed to weatherproof the electric power grid in Restenäs-Andorra outside Ljungskile in the municipality of Uddevalla, by placing power cable in the ground instead of overhead power lines. The project will be implemented in connection with the development of communal water and sewer to reduce the cost of excavation. The result of this preparation work includes a new 10/0,4 kV substation, four cable boxes together with 1200 m of high voltage power cable and 800 m of low voltage power cable. The electric transmission network has been placed in the same excavation as water and sewer as long as possible. The substation and cable boxes are placed for easy access and to create a good mesh. A P2-calculation has been created to get an overview of the costs of the project.
|
49 |
Utredning av igensättningsproblematik i markfilter av sorbtionstyp vid Gräfsåsens avfallsanläggningSöderberg, Karolina January 2016 (has links)
Markfilter för rening av vatten har utvecklats under årens lopp till att besitta skräddarsydda egenskaper anpassade för rening av lakvatten. Lakvatten innehåller en rad olika föroreningar, vilka beror på det deponerade materialets beskaffenhet. I sorptionsfilter kombineras ett traditionellt filters mekaniska förmåga att avskilja partiklar och biologiska förmåga att bryta ner organiskt material, med en eller flera sorbenter, vilka verkar för att fastlägga eller fälla föroreningar. Inte sällan drabbas dock denna typ av filter av igensättningar, vilket reducerar filtrets kapacitet och livslängd. Vid deponin i Gräfsåsen, tillhörande Östersunds kommun, installerades 2013 ett markfilter av sorptionstyp framtaget av konsult, vilket uppgavs ha en livslängd på 10-15 år. Efter installering av filtret visar sig kapaciteten vara sämre än förväntat och dessutom snabbt sjunkande över tid. Justeringar i filtermaterialets sammansättning sker efter ett par månades drift, men problemet med igensättningar/låg kapacitet kvarstår. Detta examensarbete utformades i syfte att utreda igensättningsproblematiken med sorptionsfiltret vid Gräfsåsen och att föreslå förbättringsåtgärder. Den andra delen bestod av att kontrollera konsultens dimensioneringsberäkningar och jämföra med olika beräkningsmodeller för markfilter. Analysresultaten och beräkningarna kompletterades med ett praktiskt försök att filtrera lakvatten och kranvatten i varsin filterkolonn som utformades med samma proportioner och material som det aktuella filtret. Avsikten med kolonnfiltreringen var att bedöma materialets hydrauliska kapacitet och undersöka om det fanns eventuella skillnader i rinntider för lak- respektive kranvatten. Filtreringen visade att packningsgraden av filtermaterialet är av stor betydelse för genomsläppligheten, inga slutsatser om vattenkvaliténs påverkan kunde dock dras. Karaktäriseringen visade att lakvattnet i Gräfsåsen innehöll höga halter BOD, POC, aluminium, svavel, kalcium och fosfor. Analyserna och jämförelserna sammantaget indikerade att metalloxider och karbonater fälldes i filtret. Beräkningarna visade att filtret dimensionerats för ett genomsnittligt mindre flöde än vad som bedömdes vara lämpligt. Den hydrauliska konduktiviteten för filtermaterialet var lägre än konsultens rekommendationer, vilket i praktiken innebar att kapaciteten för filtret var en tredjedel av flödet man avsett att dimensionera för.. / Filters for treatment of leachate have been developed over the years to hold tailor-made properties for the treatment of leachate. Leachate contains a variety of pollutants, which depends on the waste upon the landfill. In sorption-filters the traditional filter’s mechanical ability to remove particles and biological ability to break down organic material, is combined with one or several sorbents which act to precipitate or trap contaminants. However, it is rather common that these types of filters suffer from clogging which result in reduction of the filter’s capacity and lifetime. At the landfill in Gräfsåsen, belonging to the municipality of Östersund, a sorption filter developed by a consultant was installed in 2013, which was estimated to have a lifespan of 10-15 years. When installed, the capacity of the filter was lower than expected and also decreased rapidly over time. The filter media had to be redesigned after a couple of months in operation, but the problem with clogging/low capacity remained. This thesis was shaped to investigate the causes of the clogging problem of the filter at Gräfsåsen and to suggest improvements. The study consisted mainly of two parts, one part consisted of interpreting and comparing test results and characterize the leachate from a study of leachate from IVL (Swedish Environmental Research Institute). The second part consisted of controlling the consultant’s sizing and compare with other models for sizing filters. The analytical results and calculations were supplemented with a practical test to filter leachate and tap water in separate filter columns, designed with the same proportions and materials as the existing filter. The purpose of the filtering columns was to assess the material's hydraulic capacity and to examine whether there were any differences in the flow times of the leachate and tap water. The filtering showed that the degree of compaction of the filter material is of great importance for the permeability, no conclusions regarding the water quality’s impact could be drawn. The characterization indicated that the leachate in Gräfsåsen contained high concentrations of BOD, POC, aluminum, sulfur, calcium and phosphorus. Analyzes and comparisons collectively indicated that metal oxides and carbonates precipitated in the filter. The calculations showed that the filter is dimensioned for an average flow rate less than what was assessed appropriate. The hydraulic conductivity of the filter material was lower than the consultant's recommendations, which in practice meant that the capacity of the filter was a third of the flow it intended to be designed for.
|
50 |
Materialoptimering för kulvertelement i betong / Material optimization for culvert element made of concreteWallin, Johan, Karlsson Bäcklund, Filip January 2017 (has links)
I detta arbete undersöks prefabricerade kulvertelement som främst används i djurstall. Arbetet utgår från Abetongs befintliga kulvertelement och elementet kontrolleras enligt dagen dimensioneringsregler. Materialoptimering av elementet beräknas och materialbesparing tas fram. Resultatet visar att det befintliga elementet uppfyller alla kontrollera normkrav. Optimeringen visar att det finns stora möjligheter att minska materialåtgången och samtidigt följa dagens dimensioneringsregler.
|
Page generated in 0.1164 seconds