• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 25
  • 2
  • Tagged with
  • 27
  • 11
  • 9
  • 7
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Vertikal påbyggnad av ett flerbostadshus i Gävle.

Deniz, Suleyman, Moalin, Hassan January 2021 (has links)
The global population is estimated to rise by 89 million people annually and for this reason there is a need for more housing and buildings worldwide. As cities grow outwards and buildable land becomes scarce, it is necessary to increase the height of buildings in cities, especially where the height of existing buildings is low. For crowded cities, story extensions are an increasingly popular measure that could meet market’s demand for centrally located homes.The main focus of this study is to clarify how a specific existing building handles the addition of a story. The existing building that was used as a starting point is located in Styrmansgatan in Gävle, the district Brynäs. The building has totally three storiesand is a youth residence where HBS is the property owner. The study presents the approach to validate and simulate the existing building.The method of the work is modelling in StruSoft FEM-Design which is a program used for modelling, analysis and design of load-bearing elements of buildings according to Eurocode. With the help of the program, it is investigated whether the existing building can handle an extension and which reinforcements should be made. It is suitable for all different types of design tasks from the entire stability analysis in a building to individual elements. The work is carried out in 3 steps where first the reference building to be used as a starting point is modelled, analyzed and designed. The next step is to add a story and then analyze any additional measures in connection with the extension of the story. The building must be approved according to standards as a starting point with regard to degree of utilization and deflection. Then, a comparison is made between the existing building structure and the superstructure with respect to degree of utilization, deflection, stress, and the base reaction.Results obtained from this study show that if an extension is to be possible, reinforcement solutions should take place for building elements that receive an unacceptable degree of utilization. The reinforcement solutions are resulted with the help of beams, columns, wind brace and changed reinforcement contents in reinforced concrete elements for the load-bearing structure. The study concludes that the story extension is possible with added reinforcement measures / Den globala befolkningsmängden beräknas stiga med 89 miljoner människor årligen och av den anledningen finns det ett behov av fler bostäder och byggnader över hela världen. När städer växer utåt och expanderar blir byggbar mark en bristvara, där kan påbyggnad vertikalt vara ett alternativ då man ökar höjden på byggnader. För trånga städer är våningspåbyggnader en alltmer populär åtgärd som skulle kunna möta marknadens efterfrågan av centralt placerade bostäder. Huvudfokus i denna studie är att klargöra hur en specifik befintlig byggnad klarar påbyggnad av ett våningsplan. Den befintliga byggnaden som användes som utgångspunkt ligger på Styrmansgatan i Gävle, stadsdelen Brynäs. Byggnaden har totalt tre våningar och är ett ungdomsboende där HSB står som fastighetsägare. Studien presenterar tillvägagångssättet för validering och simulering av en befintlig byggnad.Arbetet utfördes med StruSoft FEM-Design som används för modellering, analys och design för bärande element i byggnader baserade på Eurokod. Med hjälp utav StruSoftFEM-Design ska det undersökas om den befintliga byggnaden klarar av en utökning och huruvida vilka förstärkningar som eventuellt bör ske. Den passar för alla olika typer utav konstruktionsuppgifter från hela stabilitetsanalysen i en byggnad till enskilda element. Arbetet kommer genomföras i 3 steg där först den referensbyggnad som skall användas som utgångsläge modelleras, analyseras och designas. Nästa steg är att lägga till ett våningsplan för att sedan analysera eventuella tilläggsåtgärder i samband med utökning av ett våningsplan. Byggnaden skall vara godkänd enligt standarder som utgångspunkt med avseende på utnyttjandegrad och nedböjning. Därefter sker det en jämförelse mellan den befintliga bygganden och påbyggnaden med avseende på utnyttjandegrad, nedböjning, spänning och grundreaktionen.Resultat som har erhållits från denna studie påvisade att om en påbyggnad ska vara möjlig bör förstärkningslösningar äga rum för byggnadselement som fick en oacceptabel utnyttjandegrad. Förstärkningslösningen resulterade med hjälp av balkar, pelare, vindstage och ändrat armeringsinnehåll för armerad betong element för den bärande konstruktionen. Studiens slutsats är att våningspåbyggnad är möjlig vid tillagda förstärkningsåtgärder.
22

Flödesoptimering i begränsande resurs / Flow optimization in constraining resource

Bergström, Jesper, Karlsson, Rickard January 2012 (has links)
Most companies have a bottleneck in their production, that is a constraining re-source. When the demand is higher than the capacity in the constraining resource it is impossible to produce the demanded output. This problem leads to delayed deliveries, unhappy customers and ultimately to decreased revenue. Bottlenecks therefore has a significant role in production and must be handled thereof.MW Power in Sävsjö, Sweden designs and manufactures water and steam boilers for the customer's unique needs. MW Power invested in a new plasma cutting ma-chine but the machine has not reached the expected capacity. The capacity prob-lem is due to time consuming set-up times, machine care and material supply which makes the plasma cutting machines utilization rate 37.5 %.The study’s purpose aims to maximize the material flow through the plasma cut-ting machine. In order to answer the purpose, two thesis questions are used: “How can increased machine time in the plasma cutting machine be achieved?” and “How can the ma-terial flow to and from the plasma cutting machine be improved so that the actual capacity can be increased?”To answer the thesis questions, the study had a deductive approach in which ex-isting theories has been applied to real life case.In order to streamline the plasma cutting machine and the processes directly re-lated to it, the material flow upstream, the material flow through and the material flow downstream of the plasma cutting machine has been mapped and analyzed. In order to maximize the flow of material through the plasma cutting machine, setup times must be reduced to increase the capacity.The plasma cutting machine requires maintenance by the operator at regular basis where the nozzles and other consumables in the plasma cutting machine burner must be replaced. A SMED-analysis has been undertaken which shows that the internal set-up operations should be converted to external set-up operations. Re-placement of nozzles and consumables should be an external set-up operation and this can be achieved by purchasing more burners.The plasma cutting machine also has access to unmanned production which will be able to increase the capacity, since it can be running after hours.The material flow upstream and downstream must be improved through better planning of cutting orders and with a more efficient return flow. Prioritizing mate-rial supply to the constraining resource is crucial to secure that material shortages do not occur in the plasma cutting machine.If the study proposed measures are implemented, the material flow through the plasma cutting machine will be maximized. / De flesta företag har en flaskhals i sin produktion, alltså en begränsande resurs. När efterfrågan är större än kapaciteten hos den begränsande resursen kan den mängd output som efterfrågas ej levereras. Detta leder till försenade leveranser, missnöjda kunder och i förlängningen till minskade intäkter. Flaskhalsar har därför en betydande roll inom produktion och måste därför hanteras.Företaget MW Power i Sävsjö konstruerar och tillverkar kundanpassade ång- och hetvattenpannor. Företaget har investerat i en ny plasmaskärmaskin som inte har nått förväntad kapacitet. Problemen är bl.a. att ställ, maskinvård och materialtill-försel tar lång tid vilket gör att plasmaskärmaskinens utnyttjandegrad endast är 37,5 %.Syftet med studien är att maximera materialflödet genom plasmaskärmaskinen. För att uppfylla syftet kan detta brytas ner i två problemfrågor. Dessa är; Hur kan maskintiden i plasmaskärmaskinen ökas? samt Hur kan materialflödet till och från plasma-skärmaskinen förbättras så att utnyttjandet av den verkliga kapaciteten ökas?För att svara på problemfrågorna har studien haft en deduktiv ansats där befintliga teorier genom litteraturstudier tagits fram för att sedan applicerats på verkligheten.För att kunna effektivisera plasmaskärmaskinen och processer direkt anknutna till denna har materialflödet uppströms, materialflödet genom och materialflödet ned-ströms från plasmaskärmaskinen kartlagts och analyserats.För att maximera materialflödet genom plasmaskärmaskinen måste ställtider minskas för att kunna öka utnyttjandegraden och därmed nyttokapaciteten.Plasmaskärmaskinen kräver underhåll av operatören vid jämna mellanrum där munstycken och andra slitagedelar i plasmaskärmaskinens brännare måste bytas ut. En SMED-analys har genomförts där det framgår att interna ställ bör göras om till externa ställ. Byte av munstycken och andra slitagedelar är idag ett internt ställ vilket kan göras om till ett externt ställ genom att köpa in fler brännare.Plasmaskärmaskinen har även tillgång till obemannad styrning vilket kommer kunna öka nyttokapaciteten eftersom den då kan vara igång utanför ordinarie ar-betstid.Materialflödet uppströms och nedströms måste effektiviseras genom bättre plane-ring av skärordrar och ett effektivare och minskat returflöde samt genom att prio-ritera materialtillförseln så att materialbrist ej uppstår i plasmaskärmaskinen.Om studien föreslagna åtgärder genomförs kommer materialflödet genom plasma-skärmaskinen att maximeras.
23

Produktionsoptimering : Identifiering av flaskhalsar och förbättringsförslagi en industri med hög produktvariation / Production Optimization

Edler, Fabian, Frerdrikson, Karl January 2020 (has links)
I en konfigurerbar produktion med hög produktvariation förändras förutsättningarna och karaktären i produktionen när olika varor ska tillverkas. Hög produktvariation medför dock vissa utmaningar. Skiftande flaskhalsar är ett exempel på vanligt förekommande problem. När det dessutom handlar om en kapitalintensiv produktion med dyra maskiner är det viktigt att störningar och stopp minimeras för att ej förlora intäkter. Den här rapportens syfte är att kartlägga produktionen, identifiera dess flaskhalsar och baserat på den informationen lägga fram förbättringsförslag. Rapporten bygger på en blandning av kvantitativa och kvalitativa metoder. Den kvantitativa delen utgörs av insamlad data från företagets interna databas samt egna tidsstudier. Det används för att grunda förslag och beslut på fakta. I den kvalitativa delen genomförs intervjuer, samtal samt observationer. Den kvalitativa delen används för att få en överblick över produktionens problemområden samt tidigare implementerade åtgärder som slutligen landar i idéer till förbättringar. Resultaten visade på att två olika flaskhalsar i produktionen förekommer, såglinjen och paketläggaren. Dessa skiftar beroende på vad som tillverkas och gör att buffertar i produktionen påverkas. Paketläggaren beräknas vara den största flaskhalsen baserat på att den kräver längst total produktionstid över aktuell tidsperiod. Ett antal förbättringsförslag har tagits fram där exempelvis sekvensering av ordrar och standardiserat arbetsflöde tas upp. Delar av arbetet kan användas för en grund i vidare forskning, då mycket av datasamlingen är utförd och sammanställd, samt att beräkningsprogram har utformats som kan användas för att teoretiskt validera förbättringsförslag. / In a configurable production with high product variability the conditions and character of the production change when different products are manufactured. However, high product variation presents some challenges. Shifting bottlenecks are for example one common problem. In addition, when it comes to capital intensive production with expensive machines it is important that disruptions and stops are minimized to not lose revenue. The purpose of this report is to map the production, identify its bottlenecks and based on this information suggest improvements. The report is based on a mixture of quantitative and qualitative methods. The quantitative part consist of data from the company and time studies. This part is used to base suggestion and decisions on facts. The qualitative part consist of interviews, conversations and observations. The qualitative part is used to get an overview of production problems as well as previously implemented changes and based on this provide ideas for improvement. The results showed that two different bottlenecks in the production exist, the saw line and the stacking line. These shifts depending on what is manufactured and affects buffers in the production. The stacking-line is estimated to be the largest bottleneck based on the fact that it requires the longest total production time over a specific period. A number of improvement suggestions have been proposed, for example, sequencing of orders and standardized workflow.
24

The impact of snow loads on snow galleries : An initial evaluation of the snow galleries on the Iron Ore Line in Northern Sweden

Björnlinger, Karin January 2022 (has links)
The snow galleries along the Iron ore railway line in northern Sweden have had major problems in recent years due to increasingly large snow loads. Despite great efforts reducing the loads by shoveling off the snow, several of the galleries have been damaged. Due to these incidents, the Swedish Transport Administration (TRA) has asked Luleå University of Technology (LTU) to make an evaluation of galleries 4, 9 and 13A in the neighborhood of Vassijauri. TRA has asked for a way to monitor the load on these galleries with a trigger system that gives a warning message when the galleries are exposed to a critical load. Measurement systems have been installed in galleries 9 and 13A during the autumn of 2021 such that the snow load in one mainframe per gallery could be monitored. In this thesis, work has been performed by assessing how much snow load each gallery can handle before it collapses. The restrictions for the project are set based on the drawings that is available from the TRA's information database, BaTMan. A literature study is performed on snow load, how it was changing over the years, both back and forth, how snow load is calculated according to today’s regulations and how the density of the snow affects the intensity of the snow load. The distribution of the snow on the galleries has been performed based on the Eurocodes and National Standards. Models of the galleries in two- dimensional have been created for all frames in all the galleries to find the weakest frame in order to compute the critical load. Some of the frames are not stable when they are analyzed as individual members, therefore the decision was made to also construct 3D models to see how the cobweb effect influenced the galleries' capacity. Before the main frames have reached their full capacity, the secondary construction elements (roof beams) have been damaged and therefore has no major collapse taken place. From the 3D model, it is clear that the secondary construction that lacks capacity. The critical frames are completely different in the 3D model as compared to the 2D model as the stability of the entire gallery changes due to the cobweb effect (the load re-distribution between the neighboring elements, due to both the 3D interaction and the cable link effect) and, as a result, the capacity of the main frames is increased significantly. The study visits to gallery 9 and 13A have been made to gain an understanding on how snow accumulates on and around the galleries and how well the Eurocodes correspond to reality. The pattern shows that the snow drifts from the mountains towards the valley over the galleries, which forms accumulations against the walls. The snow accumulates to a large extent where the galleries geometry changes from high to low angled walls. At locations where the gallery has a wide roof between the grounds, the snow accumulates to a much greater degree compared to the locations with narrow roofs on high-angle walls, see, Figure 73. To be able to improve the model and to obtain more accurate critical loads, it is necessary to review the structures to obtain more precise dimensions, attachments, geometry and exact distances. In the current state, the design plans and descriptions of the galleries are incomplete as modifications and repairs have been made without proper documentation. Hence difficulty arises in the accurate evaluation of their exact capacity. / Snögallerierna längs malmbanan har haft stora problem de senaste åren på grund av stora snölaster. Flera snögallerier har skadats och behövt repareras trots stora insatser av skottning, i samband med snöfall. Trafikverket har efter dessa händelser bett LTU att göra en grundlig utvärdering av gallerierna 4, 9 och 13A. De har efterfrågat ett sätt att följa belastningen av dessa gallerier med ett triggersystem som gör att Trafikverket får ett varningsmeddelande innan gallerierna utsätts för större laster än vad de klarar. Mätsystem har monterats i galleri 9 och 13A under hösten 2021 för att kunna följa snöbelastningen på en huvudram per galleri. I detta examensarbete har ett arbete med att göra en utvärdering av hur mycket snölast varje galleri klarar innan det går sönder. Begränsningarna för projektet är satta utifrån hur mycket information som fanns tillgänglig i Trafikverkets informationsbas BaTMan. En litteraturstudie är gjord på snölast, dess förändring i tid både bakåt och framåt, hur snölasten beräknas enligt regler idag och hur densiteten av snön påverkar för snölastens intensitet. Antaganden om hur mycket snölast varje del av galleriet upptog och dess fördelning gjordes utifrån eurokoder och de nationella standarderna. Modeller av gallerierna i 2D har gjorts för alla ramar i alla gallerierna för att hitta den svagaste ramen och utifrån den ta fram den kritiska lasten. När insikten om att några av ramarna inte är stabila vid enskild analys och att kapaciteten av dessa är extremt låg bestämdes det att modeller i 3D skulle göras för att se om spindelnätseffekten påverkade galleriernas kapacitet. De sekundära konstruktionerna har gett vika innan huvudramarna nått upp till sin fulla kapacitet och därför har hittills har ingen större kollaps skett. I 3D modellen syns det tydligt att det är främst den sekundära konstruktionen som saknar kapacitet. Den kritiska ramen blir en helt annan i 3D modellen än för 2D modellen då stabiliteten för hela galleriet förändras på grund av spindelnätseffekten. Det är tydligt att kapaciteten på ramarna för alla gallerierna ökar på grund av spindelnätseffekten. Studiebesök vid galleri 9 och 13A har genomförts för att få en förståelse för hur snön ackumuleras på och kring gallerierna och hur väl eurokoderna stämmer överens med verkligheten. Det visade sig att snön driver från bergen ner mot dalen över gallerierna vilket bildar driver upp mot väggarna. Snön ansamlas till stor grad där gallerierna ändrar geometriskt form från hög till låg vinkel på väggar. Där galleriet har ett brett tak samlas snön i mycket högre grad än vid smala tak på väggar med hög vinkel, se Figure 73. För att i framtiden kunna göra en bra modell och få fram mer exakta kritiska laster krävs det en noggrann genomgång av alla konstruktioner för att få fram dimensioner, infästningar och exakta avstånd. Den dokumentation som finns på gallerierna idag är ofullständiga, på grund av att reparationer och modifikationer ej har dokumenterats. Detta gör det svårt att göra en noggrann och tillförlitlig utvärdering.
25

Kartläggning & analysering av interna transportflöden / Mapping & analysis of internal transportation flows

Nilsson, Isak, Sjöquist, Dennis January 2024 (has links)
Global supply chains are facing significant challenges due to the changes in supply and demand. This will increase the need for flexible and sustainable management. Lean production is a widely adopted methodology that companies use to enhance efficiency, reduce costs, and shorten lead times by optimizing internal logistics systems. Mapping and visualization tools are essential for understanding and improving transportation processes within companies while minimizing waste.The objective of this study is to provide companies with clearer insights into theirinternal transport flows through lean production and facility planning. By mappingtheir structures, companies can enhance their decision-making processes. This studyaims to achieve an understanding of the need for internal transport flow mappingthrough various methods and analyses. It also seeks to increase knowledge ofdifferent tools within lean production and facility planning to visualize the currentstate of internal transportation between buildings.The study was conducted through interviews, observations, and GPS measurements to map the transport processes at Xylem. Data were analyzed both qualitatively and quantitatively to ensure high scientific quality. The results and current state analysiswere based on these methods, leading to reliable conclusions about Xylem's current state.By using various lean tools and facility planning techniques, it is possible to create a mapping that provides companies with insights into their current situation. Several improvement suggestions for the current structure and work methods can potentially create faster flows with fewer misunderstandings in the work process. The study concludes that flow mapping functions as a tool to create a simplified simulation model. By interviewing and observing drivers and using diagrams to show utilization and time distribution, it is possible to analyze and examine internal transport planning and identify unnecessary waste.
26

Framtidens elnät : – Förändringar i landsbygdsnät vid olika framtidsscenarier / The future power grid : – Changes in rural electricitygrids in future scenarios

Roslund, Anna-Maria January 2017 (has links)
The purpose of this thesis was to examine how futureinvestments in new techniques such as solar cellsystems, electric vehicle chargers and energy storageat end costumers would affect the rural electricitygrid based on two future scenarios. The main issuepredicted with investments in this new technology atend users are over utilization of the electricitygrid if the new technique is not used in a proper wayin order to avoid high power peaks. By studying real electricity consumption as it appearstoday and adding charging of an electric vehicleaccording to the two scenarios (with our withoutenergy storage and solar cell electricity production)new usage patterns could be determined. Theseusage patterns could then be inserted insimulations of three real electricity grids for studiesof the effect on the electricity grids. The conclusion is that the electricity grids ingeneral are oversized regarding thermal loading whilstthe fuses at the end costumer need to be reinforced inorder to not get over utilized in the scenario where noenergy storage was implemented. Only one of the gridswas shown to be over utilized when all customers wasequipped with the new techniques and the grid wasdensified. Otherwise, in the other grids and scenariosonly some conductors were over utilized. However, whatwas shown to be a problem was the voltage drop at theend customer’s facilities which was higher than theallowed value of 5%.According to this the grid was shownto be over utilized. As a final conclusion it can be shown that the voltagedrop decides the design of the grids and that thepower grid companies probably should consider newpossible business strategies.
27

Mönsterkonstruktionens roll i arbete med materialoptimering : En studie i hur mönsterkonstruktion kan användas för att förbättra effektiviteten hos läggbilder. / Pattern makings role in improving fabric utilization in lay plans

Ekstrand, Karin January 2021 (has links)
Dagens textil- och modeindustri producerar stora mängder avfall och i produktionsfasen uppstår merparten av det vid tillskärning av mönsterdelar. FN har satt upp 17 globala mål för att främja en hållbar utveckling och mål nummer 12 fokuserar på att främja hållbar konsumtion och produktion. För att uppnå det är det därav relevant att utforska alternativ för att höja utnyttjandegraden av tyg vid tillskärningsstadiet inom konfektion. Studien utförs i samarbete med ett svenskt företag och undersöker hur enklare mönsterförändringar på en jacka kan påverka effektiviteten hos plaggets läggbild. Studien dokumenterar och analyserar resultatet av olika mönsterförändringar utförda på en jacka samtidigt som plaggets design behålls snarlik och sammanställer dess effekt på läggbildseffektiviteten samt tygåtgången. Tidigare forskning har fokuserat på effektivisering av läggbilder utan mönsterförändring alternativt mönsterkonstruktion baserad på idén om zero-waste pattern cutting vilket ämnat ett eliminera materialspill men inte minska tygåtgång. Rapportens fokus ligger vid effektivisering av läggbilder med hjälp av mönsterkonstruktion utifrån studiens aktuella plagg med ambitionen att uppnå materialbesparing. Studien presenterar åtta olika mönsterförändringar, dess effekter på tygåtgång och läggbildseffektivitet samt vilka parameter som bör tas hänsyn till vid omvandling av mönster för läggbildseffektivisering. / Today's textile and fashion industry produces large amounts of waste and in the production phase most of it arises when cutting pattern pieces. Goal number 12 of the UN's 17 Global Goals for Sustainable Development stands to promote sustainable consumption and production, and in order to achieve this, it is therefore relevant to explore alternatives for increasing the degree of utilization of fabric at the cutting stage in clothing production. The study is carried out in collaboration with a Swedish company and examines how simpler pattern changes on a jacket can affect the efficiency of the garment's lay plan. The study documents and analyzes the results of various pattern changes performed on a jacket while maintaining a similar design to that of the original garment and compiling its effect on the lay plans efficiency and fabric consumption. Previous research has focused on bettering the efficiency of lay plans without pattern change or pattern design based on the idea of zero-waste pattern cutting which aims to eliminate fabric waste but not cut down on fabric consumption. Focus of the report is on how to achieve higher efficiency in lay plans using pattern construction based on the study's chosen garment with the aim of saving fabric waste. The study presents eight different pattern changes, its effects on fabric consumption and lay plan efficiency and which parameters should be considered when transforming patterns for the purpose of increasing lay plan efficiency.

Page generated in 0.0481 seconds