• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 36
  • 13
  • 6
  • 1
  • 1
  • Tagged with
  • 57
  • 57
  • 31
  • 17
  • 13
  • 12
  • 10
  • 9
  • 7
  • 7
  • 7
  • 7
  • 7
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

Parametrisk Design / Parametric Design

Zakhoy, Solin, Safeen Butros, Diana January 2019 (has links)
I samband med digitaliseringens intåg har nya förbättrade BIM-verktyg börjat användas för att effektivisera konstruktörens arbete. Med hjälp av implementering av grafiska tredjepartsprogram kan BIM verktygen bidra med ökat funktionalitet. Ett exempel på ett sådant program är tredjepartsprogrammet Grasshopper kopplat till BIM-verktygen Tekla Structures som skapar parameterstyrning, vilket innebär att modellens data styrs och nås av de externa programmen. På Rambolls Bro- och Tunnelavdelning vill man idag, som många andra konsultföretag bli mer BIMorienterade. Dock saknas en uppskattning av den totala tidsbesparingen och nyttjande av tredjepartsprogrammen. Syftet med detta examensarbete har varit att komma fram till en slutsats som ger stöd i beslutsfattande kring vilka typer av projekt som parameterstyrda modeller kan vara lämpliga för. Genom uppbyggnad av ett automatiserat skript för en stödmur har denna studie visat kopplingen mellan programvarorna Microsoft Excel, Rhinoceros-Grasshopper och Tekla Structures. Med denna tillämpning har man lyckats skapa ett lätthanterligt användargränssnitt. Vidare har man jämfört det färdiga skriptet i Grasshopper med en modellering i Civil 3D där man har kommit fram till att man kan vinna tid på att ha ett optimalt skript. Man har även kunnat dra slutsatser under vilka förhållanden det lämpar sig att använda parametrisk modellering och automatisering som pekar mot tidiga skeden i projektering och standardkonstruktioner. / In connection with the digitalization's entry, the companies has begun to apply new improved BIMtools to streamline the constructor's work. With the help of the implementation of graphical thirdparty applications, the BIM-tools can achieve increased functionality. An example of such a program is the third party applications Grasshopper linked to the Tekla Structure, which creates so called computational design, which means that the model's data is controlled and accessed by the external programs. The Bridge and Tunnel department at Ramboll wants to become, like many other consulting firms, more BIM oriented. However, there is no estimate of total timesaving and utilization of the implementation today. The purpose of this thesis project has been to come at a conclusion that provides support in decision-making regarding which types of projects that parameter-controlled models may be suitable for. By building an automated script for a retaining wall, this study has shown the connection between the software Microsoft Excel, Rhinoceros-Grasshopper and Tekla Structures. With this application, one has succeeded in creating an easy-to-use interface. Furthermore, one has compared the finished script in Grasshopper with a model in Civil 3D where the assumption that one can gain time by having a finished script. It has also been possible to draw conclusions under which conditions it is suitable to use parametric modeling and automation that points to early stages in design and standard constructions.
52

Modellbaserade leveranser : Fallstudie av modellbaserade leveransers inverkan i produktionen av ett anläggningsprojekt / Model-based Deliveries : Case study of the impact of modelbased deliveries in the production phase on a civilworks project

Tillberg, Hampus January 2020 (has links)
Forskning visar på att dålig integration av byggprocessens skeden, samarbetsproblem och byggbranschens organisatoriska egenskaper begränsar utvecklingen av teknisk innovation inom byggbranschen. Framgångsrik implementering av innovativ teknik har visats bero av fler faktorer än teknikens egenskaper. Tekniken påverkas bland annat av teknikens omgivning, användarens kompetens och hur den upplevs av användaren. Forskning visar att organisatoriska förändringar och anpassningar är nödvändiga för att tillgå teknikens fördelar. Byggbranschens organisatoriska egenskaper är väsentliga för att studera implementering av teknisk innovation. En fallstudie har genomförts på ett anläggningsprojekt och undersökt implementeringen av modellbaserade leveranser och hur den nya teknologin har tagits emot och påverkat entreprenören. Fallstudien utfördes på en utförandeentreprenad varpå implementeringen av modellbaserade leveranser var beslutad av beställaren. Studien genomförde 14 semistrukturerade intervjuer med entreprenörens personal i projektet för att samla information om upplevelser av arbetet med modellbaserade leveranser. Intervjuerna analyserades för att kartlägga och identifiera entreprenörens uppfattningar av modellbaserade leveranser. En viktig utgångspunkt i analysen av modellbaserade leveranser är att handlingarnas informationsbärare tillsammans bildar en komplett bygghandling. Undersökningen visar att implementeringen av modellbaserade leveranser påverkar produktionen i anläggningsprojektet och organisatoriska förändringar hos entreprenören. Resultatet förser insikter om organisatoriska och produktionsmässiga omställningar entreprenörer kan ställas inför vid implementering av modellbaserade leveranser. Entreprenören har digitaliserat produktionsmetoder och anpassat organisationen på grund av implementeringen. Modellbaserade leveranser har också inneburit en digitalisering för entreprenören med digitala verktyg och mjukvaror. Entreprenören har tillfört upportfunktioner i organisationen för omställningen till den modellbaserade informationsleveransen. Nya tjänster har skapats för att stödja och utbilda projektorganisationen, centrala roller har påverkats med förändrade arbetsrutiner och ansvarsområden och kompetens har behövt tillföras i projektet. Förändringar har varit utmanande för entreprenören som upplever en kontinuerlig utveckling i arbetet med modellbaserade leveranser. Informationshanteringen av handlingarna har varit den största hindret medan 3D-modellers visuella egenskaper ansågs som största möjligheten för entreprenören. / Research shows that poor integration of the building process stages, collaboration problems and organizational characteristics restricts the development of technological innovation in the construction industry. Successful implementation of technology has previously been shown to depend on more factors than just the technology's properties, for example the implementation of technology is influenced by the environment of the technology, the users competence, for whom it is developed and adapted by and how it is perceived by the user. Research also shown that organizational changes and adaptations may be necessary to access the benefits of technology. The characteristics of the construction industry are essential for studying the implementation of technology innovation. The study has therefore carried out a case study on a construction project and examined the implementation of model-based deliveries and how the technology has been adapted and influenced the contractor. The case study was carried out on a project with design-bid-build contract, whereupon the implementation of model-based deliveries was decided by the client. Fourteen semi-structured interviews were carried out with the contractor's staff in the project to gather information about model-based deliveries. Interview results were analyzed to identify the respondent’s perception of model-based deliveries. An important starting point in the analysis of model-based deliveries is that the information together makes complete building documents for the project. The study shows that the implementation of model-based deliveries affects production in the construction project and require organizational changes at the contractor. The results provide insights on organizational and construction production-related changes contractors can face when implementing model-based deliveries. The contractor has digitized production methods and adapted the organization because of the implementation. Model-based deliveries have meant a digitalization for the contractor with new tools and software. The organization has added support functions in the organization for the transition to the model-based information delivery. New positions have been created to support and train the project organization, key positions have been affected with changed work routines and responsibilities and competence has to be added to staff in the project. The changes have been challenging for the contractor who is experiencing continuous development in the work with model-based deliveries. Information management has been the major obstacle and the visual properties of 3D models were considered the greatest opportunity for the contractor.
53

Thermal energy management and chemical reaction investigation of micro-proton exchange membrane fuel cell and fuel cell system using finite element modelling

McGee, Seán January 2015 (has links)
Fuel cell systems are becoming more commonplace as a power generation method and are being researched, developed, and explored for commercial use, including portable fuel cells that appear in laptops, phones, and of course, chargers. This thesis examines a model constructed on inspiration from the myFC PowerTrekk, a portable fuel cell charger, using COMSOL Multiphysics, a finite element analysis software. As an educational tool and in the form of zero-dimensional, two-dimensional, and three-dimensional models, an investigation was completed into the geometric construction, air conditions and compositions, and product materials with a best case scenario completed that summarizes the results identified. On the basis of the results of this research, it can be concluded that polyoximetylen and high-density polyethylene were considered as possible materials for the majority of the product, though a more thorough investigation is needed. Air flow of above 10 m/s, air water vapour mass fraction below 50% and initial temperature between 308K and 298K was considered in this best scenario. Suggestions on future expansions to this project are also given in the conclusion.
54

Parameterstyrd projektering av broar : Koppling mellan Rhinoceros-Grasshopper och Tekla Structures / Parametric design of bridges : Connection between Rhinoceros-Grasshopper and Tekla Structures

Abed, Mohamad Samir, Hosseinzade, Azita January 2017 (has links)
I byggbranschen har nya metoder för projektering utvecklats genom införandet av moderna och mer kraftfulla BIM-verktyg. Flera av dagens konstruktioner modelleras enligt tredimensionella principer.Tekla Structures är ett kraftfullt BIM-verktyg som klarar av att hantera både huskonstruktioner och anläggningskonstruktioner. Trots detta kan programmet inte hantera broar med dubbelkrökning på ett effektivt sätt. Projektörer behöver därför utgå från flera program för att kunna hantera komplexa brokonstruktioner.För att kunna utnyttja fördelar med Tekla Structures, behöver programmet att utvecklas eller kompletteras med andra tredjepartsprogram. Detta projekt syftar till att integrera nya arbetssätt och införa en metodik, i form av parametriserade modellering i Tekla Structures. En sådan form av modellering tillåter användaren att modifiera parametrar för en önskad modell.Ett skript är skapad genom ett visuellt programmeringstillägg, som genererar parametriskbaserade bromodeller. Brokonstruktionstyp som modellerades i detta projekt är en plattrambro.Resultatet av projektet pekar mot att parametriserad modellering är ett effektivt sätt att modellera och en lösning för att bland annat hantera broar med dubbelkrökningar. / New methods for project designing in the building construction industry have been developed by introducing modern and powerful BIM tools. Several of today’s constructions are designed according to three-dimensional principles.Tekla Structures is a powerful BIM tool that is capable of managing both house and infrastructure constructions. Despite this, the program cannot handle bridges with a horizontal and vertical curvature efficiently. The designers must instead rely on several other applications to manage complex bridge constructions.In order to use the advantages of Tekla Structures, the software needs to be evolved or complimented by other third party softwares. This project aims to integrate new working technics and introduce a method based on parametric design in Tekla Structures. Such form of modeling enables the modification of parameters to a desired model for the user.A script is created through a visual programming extension that generates a parametric based bridge models. The bridge type in this project was designed, is an integral bridge.The project has proved that parametric based design is more effectively and a solution to manage bridges with horizontal and vertical curvature.
55

Numerical Modelling of a Packed Bed Thermal Energy Storage for Applications in a Carnot Battery : KTH Thesis Report

Juul, Gabriel January 2023 (has links)
This thesis explores the heat transfer characteristics of a packed bed thermal energy storage device through the development of a 3D model in COMSOL Multiphysics. The model is based on a laboratory-scale device consisting of an aluminum box filled with sand, which acts as the thermal storage medium. The medium is heated using two resistance heaters that are embedded into the sand. The heaters are raised to approximately 500°C during the experiment. Three thermocouples placed in the sand record the temperature during charging, thus generating a time-dependent temperature curve at three points. The model simulates this experimental system, and the resulting temperature distribution is compared to the experimental data to assess the model validity. To determine the temperature throughout the storage system at all times, the model solves the heat equation. The density and heat capacity of the sand are measured and added to the model. The model uses the effective medium technique to estimate the thermal conductivity of the sand. A secondary model is developed in Excel to calculate the effective thermal conductivity using twelve different correlations, and the results are compared. The Zehner-Bauer correlation with an added Damköhler radiation term predicted an effective thermal conductivity of 0.218 W/(m·K) at 25°C and 0.451 W/(m·K) at 500°C, with slightly exponential growth due to the influence of thermal radiation. When these values for conductivity are applied to the COMSOL model, there is strong agreement (average percent error < 5%) with the experimental temperature distributions. A parametric study is performed, and shows that increasing grain size and emissivity could increase the thermal conductivity by making use of the exponential growth of thermal radiation. The model serves as a design and learning tool, and a starting point for improving the performance of the thermal energy storage system. / Detta examensarbete undersöker värmeöverföringsegenskaperna hos en termisk energilagringsenhet med packad bädd genom utveckling av en 3D-modell i COMSOL Multiphysics. Modellen är baserad på en enhet i laboratorieskala som består av en aluminiumlåda fylld med sand, som fungerar som det termiska lagringsmediet. Mediet värms upp med hjälp av två motståndsvärmare som är inbäddade i sanden. Värmeelementen höjs till ca 500°C under experimentet. Tre termoelement placerade i sanden registrerar temperaturen under laddningen och genererar på så sätt en tidsberoende temperaturkurva i tre punkter. Modellen simulerar detta experimentella system, och den resulterande temperaturfördelningen jämförs med experimentella data för att bedöma modellens giltighet. För att bestämma temperaturen i hela lagringssystemet vid alla tidpunkter löser modellen värmeekvationen. Sandens densitet och värmekapacitet mäts och läggs till i modellen. Modellen använder den effektiva mediumtekniken för att uppskatta sandens värmeledningsförmåga. En sekundär modell utvecklas i Excel för att beräkna den effektiva värmeledningsförmågan med hjälp av tolv olika korrelationer, och resultaten jämförs. Zehner-Bauer korrelationen med en tillagd Damköhler strålningsterm förutsade en effektiv värmeledningsförmåga på 0,218 W/(m·K) vid 25°C och 0,451 W/(m·K) vid 500°C, med en något exponentiell tillväxt på grund av påverkan från värmestrålning. När dessa värden för konduktivitet tillämpas på COMSOL-modellen finns det en stark överensstämmelse (genomsnittligt procentuellt fel < 5%) med de experimentella temperaturfördelningarna. En parametrisk studie har utförts som visar att ökad kornstorlek ock emissivitet kan öka värmeledningsförmågan genom att utnyttja den exponentiella tillväxten av värmestrålning. Modellen fungerar som ett design- och inlärningsverktyg och som en utgångspunkt för att förbättra prestandan hos det termiska energilagringssystemet.
56

Den juridiska statusen för 3D-modeller som bygghandlingar / The legal status and impact on 3D-models as construction documents

Aasa, Emma, Rosell, Michaela January 2023 (has links)
Introduction – This thesis in Building Engineering at Jönköping University, in collaboration with Tyréns Sweden AB, examines the issues surrounding 3D models as construction documents from a legal perspective and investigates how digitization affects stakeholders in the construction industry. The goal of the study is to explore a relevant and interesting research area in order to contribute to knowledge development and the advancement of new theories or methods in the field. Method – The study will employ qualitative research, including primary data collection through interviews, to address the research questions posed in the report. The authors have chosen this method to achieve a comprehensive understanding of the respondents' perspectives and identify important themes and patterns. The interviews were conducted with participants from various sectors of the construction industry to obtain a broader picture of the subject. Results – The study revealed that there are certain legal barriers to the use of 3D models as drawing documentation. These barriers are related to a lack of knowledge and uncertainty in handling the models. This includes issues of copyright, liability, and evidential value. There is a need to update current regulations to facilitate the management of digital models. Analysis – The analysis of the results clarifies that industry standards and clearer guidelines would prevent uncertainties and address knowledge gaps in the use of BIM and 3D models. An industry standard could have facilitated a smoother transition to a more digitized construction industry. There is also a need for education in the field for professionals and decision-making stakeholders. Discussion – The discussion focuses on possible solutions to the identified problems, such as the development of standards and guidelines, education, and regulatory updates. There is also a need to raise awareness about the legal aspects of using 3D models in the construction industry, as the uncertainty regarding their legal status is high. Legally, it is possible to use 3D models as contractual documents, but the study shows that concerns about the legal aspects are a reason for the weak implementation. Keywords – 3D model, 3D design, BIM, Building Information Modeling, construction documents, contractual law, and copyright. / Introduktion – Detta examensarbete inom Byggnadsteknik vid Jönköpings Tekniska högskola i samarbete med Tyréns Sverige AB undersöker problematiken med 3D-modeller (tredimensionell modell) som bygghandlingar ur ett juridiskt perspektiv och undersöker hur digitaliseringen påverkar aktörer inom konstruktion. Studiens mål är att undersöka ett relevant och intressant forskningsområde för att bidra till kunskapsutveckling och utveckling av nya teorier eller metoder inom området. Metod – Studien kommer att använda kvalitativ forskning som inkluderar primärdatainsamling genom intervjuer för att besvara frågeställningarna i rapporten. Författarna har valt denna metod för att uppnå en omfattande förståelse av respondenternas perspektiv och identifiera viktiga teman och mönster. Intervjuerna genomfördes med respondenter från olika delar av byggbranschen för att få en bredare bild av ämnet. Resultat – Studien visade att det fanns vissa juridiska hinder för användningen av 3D-modeller som ritningsunderlag. Dessa hinder kopplas till bristande kunskap och osäkerhet i hantering av modellerna. Detta inkluderar frågor om upphovsrätt, ansvar och bevisvärde. Det finns ett behov att uppdatera dagens regelverk för att lättare hantera digitala modeller. Analys – I analys av resultatet klargörs det att en branschstandard och tydligare riktlinjer skulle förebygga osäkerheterna och förebygga kunskapsluckor för användandet av BIM och 3D-modeller. En branschstandard hade kunnat leda till en säkrare övergång till en mer digitaliserad byggbransch. Det finns också ett behov av utbildning inom området för yrkesverksamma och beslutsfattande aktörer. Diskussion – Diskussionen fokuserar på möjliga lösningar på de identifierade problemen, så som utveckling av standarder och riktlinjer, utbildning och uppdatering av regelverk. Det finns också ett behov av att öka medvetenheten om de juridiska aspekterna av användningen av 3D-modeller inom byggbranschen då osäkerheten av den juridiska statusen är hög. Juridiskt sett går det att använda sig av 3D- modeller som kontraktshandling, men studien visar att oron för det juridiska är en anledning till den svaga implementeringen. Nyckelord – 3D-modell, 3D-projektering, BIM, Building Information Modeling,, bygghandling, kontraktsha juridik och upphovsrätt
57

Cell type-dependent differential activation of ERK by oncogenic KRAS or BRAF in the mouse intestinal epithelium

Brandt, Raphael 10 March 2023 (has links)
Kolorektale Karzinome (CRC) zeigen eine heterogene Ätiologie. Die Progression prämaligner Vorläufer zu CRC unterscheidet (U) sich in Morphologie, molekularen Veränderungen und Interaktion mit der Tumorumgebung. CRC weisen oft onkogene Mutationen in KRAS und BRAF auf. Diese steigern die MAPK Signalwegaktivität (Mpa). Obwohl sie im selben Signalweg wirken, sind KRAS und BRAF auf die CRC-Entitäten U verteilt. Dabei ist KRAS häufiger im sogenannten konventionellen und BRAF im serratierten Weg zu CRC mutiert. In dieser Studie nutzte ich murine intestinale Organoide (iO), die induzierbare (Ind) KRAS oder BRAF Onkogene exprimieren. Große U zwischen KRAS und BRAF zeigten sich sowohl in Signaltransduktion (ST) als auch im Phänotyp. Phosphoprotein-, ERK-Reporter-, scRNA-Seq und EM-Analysen ergaben eine starke Mpa durch BRAF, die zu hoher Expression von MAPK-Zielgenen und Verlust der epithelialen Integrität führte. iO nach KRAS-Ind blieben intakt, korrelierend mit moderater, zelltypspezifischer (ZS) Mpa in sekretorischen und undifferenzierten Zellen. Die meisten Enterozyten waren Mpa-negativ. ERK-Reporter zeigten: Das ZS Muster der Mpa ist nicht nur gegenüber KRAS, sondern auch dem Entzug von Wachstumsfaktoren stabil. Dies spricht für eine intrinsische, robuste Regulierung der Mpa. BRAF-Ind Mpa setzte die ZS Regulierung der MAPK außer Kraft und schädigte das Gewebe, im Einklang mit einer oberen Grenze tolerabler Mpa. Die ZS Mpa wurde in CRC-Zelllinien bestätigt, deren Mpa durch KRAS aber nicht BRAF U ausfiel. Ferner, nutzte ich iO mit bCatenin+KRAS-Ind, um den konventionellen Weg zu CRC zu modellieren. Die Kombination führte zu synergistischen Effekten, die sich in EGFR-unabhängigem Wachstum und der Aufhebung der ZS Mpa-Blockade äußerten, die durch eine Verschiebung der Differenzierung zu mehr Progenitorzellen bewirkt wurde. Zusammenfassend konnte ich U in der Mpa durch KRAS oder BRAF im Darmepithel feststellen, was dazu beiträgt, deren Rollen in der CRC-Genese zu bestimmen. / Colorectal cancer (CRC) is a disease with heterogeneous etiology. Premalignant lesions follow distinct routes of progression to carcinoma reflected by differences in morphology, molecular alterations and the tumor environment. Mutant KRAS and BRAF are frequent, leading to MAPK pathway activation (Mpa), which is relevant for CRC therapy. Despite acting in the same pathway, mutant KRAS and BRAF segregate to different entities, as KRAS is more frequent in the conventional- and BRAF being specific for the serrated route to CRC. I used murine intestinal organoids (iO) expressing inducible oncogenic KRAS or BRAF to study the impact of oncogenes in primary cells. I found marked differences in signal transduction and phenotype. Phospho-protein, ERK-reporter, scRNA-seq and EM data showed strong Mpa upon BRAF induction followed by ERK-target gene expression leading to tissue disruption. In contrast, KRAS left the tissue intact resulting in less and cell type-dependent Mpa limited to secretory cells, a subset of late-stage enterocytes and undifferentiated crypt cells. Most enterocytes were irresponsive to KRAS. The pattern of Mpa was robust towards KRAS or growth factor depletion arguing in favor of intrinsic, resilient MAPK regulation. In iO, BRAF-induced Mpa could break this cell type-specific regulation, indicating an upper limit of tolerable Mpa. I validated these findings in CRC cell lines that differed in Mpa in response to oncogenic KRAS but not BRAF. Finally, I used iO expressing an inducible form of stabilized bCatenin in combination with KRAS to mimic events frequently found in the conventional pathway to CRC. Expression of KRAS and bCatenin synergized in driving EGFR independent growth and breaking the villus-specific block of Mpa by altering differentiation towards progenitor cell types. In summary, this study emphasizes differences between Mpa induced by oncogenic KRAS or BRAF which helps clarifying their nature in different etiological routes to CRC genesis.

Page generated in 0.0744 seconds