• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 559
  • 175
  • 109
  • 18
  • 3
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 859
  • 346
  • 295
  • 162
  • 138
  • 114
  • 103
  • 101
  • 94
  • 92
  • 82
  • 76
  • 75
  • 57
  • 57
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
191

Studie av internt materialflöde vid Volvo Pentas fabrik i Vara

Berthou, Lina January 2007 (has links)
<p>Within today’s organizations there is continual development work to increase efficiency and the power to compete at the market. Production development with focus on continual improvements constitutes an important part of the daily work within a lot of organizations today.</p><p>The purpose of this study is to contribute to a part of the development process that Volvo Penta factory in Vara has in mind. A description of the current situation was compiled by mapping the internal runnings and material flow throughout the factory. A new suggestion for a layout and a comparison with the current situation will assist with creating a factual basis for the development of a new goods reception.</p><p>A study was made where the volumes and the quantity of the daily arrival goods were settled. Another study mapped the fork lift - and the moped traffic of the factory. The quantity and the volume of the material that was transported were also settled. The layout that was proposed was used during the comparison.</p><p>The compilation of the description of the current situation showed that the fork lift truck constitute 40 % of the total number of runnings. Empty box running and empty running constitute 15 % and 45% of the transportations respectively. The material-, empty box- and empty runnings of the moped are divided 40 %, 19 % and 41 %.</p><p>The result of the comparison of the existing with the planned goods reception showed that the new solution would decrease the use of fork lift truck transportations by as much as 16 %. The equivalent rate for the moped runnings would be 3 %.</p><p>The conclusion of the studies is that a new goods reception, placed close to the start point of the process, would make a contribution to a streamlining of the internal runnings in the factory. It was also established, by the layout flowchart, that the material- and the process flow would be more efficient.</p><p>The aim of the project was achieved through the extensive studies that were made. All of the transport stretches can now be studied in depth according to which factors are seen to be most important. The study contains separate information from each driver. A closer review by each driver is therefore suggested during the continued work. The development of new transport stretches where coordinated runnings may decrease and empty runnings may decrease is possible in order to reach even greater efficiency.</p>
192

Vad försiggår i produktionen? : En fallstudie på Aller Tryck AB

Wendel, Andreas January 2007 (has links)
<p>Att ha kontroll över informationen och se till att denna är korrekt är numera en förutsättning för att kunna bedriva en effektiv verksamhet. Utöver detta kräver en effektiv organisation även att man har kontroll och överblick över de processer vilka finns i organisationen.</p><p>Dessa processer måste kunna beskrivas och åskådliggöras för att på så sätt kunna se vart informationen skapas och om detta är ett bra tillvägagångssätt.</p><p>För att kunna göra detta har jag således studerat litteratur kring information och informationssystem för att på så sätt kunna redogöra för hur data bör hanteras för att kunna omvandlas till korrekt och bra information vilken kan användas såsom beslutsunderlag. Utöver detta har litteratur kring processbeskrivningar studerats för att på ett så korrekt sätt som möjligt kunna åskådliggöra de processer vilka finns i organisationen. Med detta som grund kunde sedan organisationen studeras för att finna problem i hanteringen och skapandet utav data och information.</p><p>Aller Tryck AB uttryckte tidigt ett önskemål om att erhålla en processbeskrivning över sin produktion och de informationsflöden vilka kan synliggöras här. De efterfrågade även en kontroll utav den data vilken ligger till grund för mycket av arbetet i produktionen och dennes planering.</p><p>En processbeskrivning gjordes således samt att en fallstudie genomfördes för att kunna påvisa de faktorer vilka påverkar den data vilken misstänktes för att vara inkorrekt.</p><p>Resultatet påvisade stora brister i mätmetoderna och hanteringen av denna information. De applikationer vilka finns i organisationen är inte integrerade och den manuella hanteringen spär således på felkällorna till den redan felaktiga datan.</p>
193

Korrektion och imitation som mätverktyg för diagnos av PT-nivå : Kan man korrigera eller imitera en grammatisk struktur som man inte kan producera i fri skriftlig produktion? / Correction and imitation as an instrument for the diagnosis of PT-level : Can a learner create utterances that the same learner is unable to produce in writing?

Hagelberg, Peter, Alfredsson, Maria, Jeppsson, Marie January 2009 (has links)
<p>The purpose of this study was to examine whether a L2 learner could correct or imitate structures of the language that they could not produce in written production defined by processability theori levels.The Informants had Arabic as their mother tongue. The study showed that the ability of correction developed slower than the capacity for imitation and the ability to written production. The ability of the correction developed by the duration of the stay. The result was a confirmation of theory formation in processability theory. Corrective elicitering could be developed into a useful diagnostic tool in the classroom and thus provide an education that followed a natural learning order according to processability theory by Pienemann.</p><p>Keywords: processability theori, imitation, correction, written production</p> / <p>Syftet med uppsatsen var att undersöka om andraspråksinlärare kunde korrigera eller imitera strukturer i språket som de inte kunde producera i skriftlig produktion enligt processbarhetsteorins nivåer. Informanterna hade arabiska som modersmål. Studien visade att förmågan till korrektion utvecklades långsammare än förmåga till imitation och förmåga till skriftlig produktion. Förmågan till korrektion utvecklades med vistelsetiden. Resultatet var en bekräftelse på teoribildningen i processbarhetsteorin. Korrektiv elicitering skulle kunna utvecklas till ett användbart diagnostiskt verktyg i klassrummet och därmed ge en undervisning som följde en naturlig inlärningsordning enligt Pienemanns processbarhetsteori.</p>
194

3D-skrivare ur ett tillverkningsperspektiv / 3D-printing from a manufacturing perspective

Helsing, Niklas, Nilsson, Simon January 2015 (has links)
I detta examensarbete har en studie genomförts av hur väl 3D-skrivning kan tillämpas i Volvo Cars i Skövdes produktion. En litteraturstudie har genomförts för att åskådliggöra de olika 3D-skrivningsteknikerna och deras användningsområde. För att på ett överskådligt sätt jämföra de olika teknikernas duglighet har en bedömningsskala utvecklad av Nasa använts. Denna skala benämns som Technology Readiness Level (TRL). Den teknik som bedöms som mest lämplig med avseende på fullskalig produktion samt prototyptillverkning är Selective laser melting (SLM). För att åskådliggöra fördelar med 3D-skrivare har en förenklad 3D-modell av Volvos cylinderblock I5D modellerats. Denna förenklade modell har sedan modifierats för att åstadkomma en temperatursänkning som kan möjliggöra ett högre effektuttag. Två varianter av topologiska modifieringar presenteras. För dessa modifieringar har sedan värmelaster och kylning applicerats för att analysera värmespridningen i cylinderblocket. Jämförande mellan originaldesignen och de topologiska modifieringarna har sedan utförts. Målet med detta var att sänka den kritiska temperaturen i cylinderväggarna med åtminstone . Beräkningar har utförts med PTC/Creo. Med hjälp av TRL-skalan bedöms Selective laser melting vara den teknik som är mest lämplig för Volvo Cars i Skövde att tillämpa med avseende på prototyptillverkning. Med avseende på fullskalig produktion anses ingen av de teknikern som benämns i arbetet vara lämpliga. Resultatet visar att genom topologiska modifieringar kan temperaturen i det kritiska området sänkas med upp till 51 . En enkel kostnadsberäkning har utförts för att uppskatta hur mycket ett cylinderblock skulle kosta om den traditionella tillverkningen ersattes med 3D-skrivare. Detta visar att ett cylinderblock av typen I5D skulle kosta cirka 10 853 kr att tillverka med 3D-skrivaren X line 1000 R. I det priset är inte inköp av 3D-skrivaren inräknat. Rapporten diskuteras också följderna av resultatet. Vilka de potentiella felkällorna kan vara och vad som kan ha gjorts annorlunda. Det diskuteras också hur framtiden ser ut för 3D-skrivning och vad som skulle kunna göras som en naturlig fortsättning på detta examensarbete.
195

Underentreprenörernas säkerhetsarbete genom arbetsberedningar : Riskinventering, riskbedömning och arbetsberedning / Subcontractorssafety work throughwork preparations : Risk inventory, risk assessment and work preparation

Omar, Yusuf, Bellvik, Emil January 2015 (has links)
Varje år sker det allvarliga olyckor på byggarbetsplatserna i Sverige. Detta examensarbete har utförts i samarbete med Skanska Hus Region Göteborg och har som mål att förbättra säkerheten hos underentreprenörer till Skanska.Syftet med arbetet är att hitta lämpliga metoder och redskap som Skanska som huvudentreprenör kan använda sig av för att stödja sina underentreprenörer till en bättre säkerhetsplanering.Arbetet inleds med en litteraturstudie över hur olycksstatistiken ser ut på Skanskas byggarbetsplatser, samt en teoretisk bakgrund till hur processen kring riskinventeringar, riskbedömningar och arbetsberedning hanteras. Tillvägagångssättet har varit att undersöka genom intervjuer, enkäter och platsbesök vid sju utvalda byggarbetsplatser i väst Sverige, hur underentreprenörer hanterar riskinventeringar, riskbedömningar och arbetsberedningar. Vi har även undersökt vad Skanska Hus Göteborg gör idag vid upphandlingsprocessen för att säkerställa att underentreprenörerna tar sitt ansvar när det gäller arbetsmiljön på byggarbetsplatserna och vad som kan förbättras.Resultatet av undersökningen är att det finns tydliga skillnader mellan hur säkerhetskulturen är bland de olika underentreprenörerna. Ett av problemen är att underentreprenörerna inte har tillräckligt med förståelse över vad deras ansvar är när det gäller att skapa en säker arbetsmiljö på byggarbetsplatserna. För att lösa detta problem har vi undersökt vad som är viktigt för att stärka underentreprenörernas delaktighet och engagemang som i sin tur leder till att de anställda får möjlighet till att förbättra sitt eget ansvar. / Each year there are serious accidents on building sites in Sweden. This thesis has been carried out in cooperation with Skanska House Region Gothenburg and aims to improve the safety of subcontractors to Skanska.The aim of the work was to find appropriate methods and tools that Skanska as the main contractor can use to support their subcontractors to a better security planning.The work begins with a literature study of how the accident statistics looks at construction sites, as well as a theoretical background to the process of risk inventories, risk assessments and work preparation is handled. The approach has been to examine through interviews, questionnaires and site visits to seven selected construction sites in western Sweden on how the subcontractors manages risk inventories, risk assessments and work preparations. We have also investigated what is being done today in the procurement process to ensure that subcontractors meet their responsibilities in terms of work environment at construction sites and what can be improved.The results of the research show that there are clear differences between how the safety cultures were among the various subcontractors. One of the problems is that the entrepreneurs do not have sufficient understanding of what they have for responsibility in the work environment at construction sites. To solve this, it has been investigated to what is important to strengthen subcontractor’s involvement and commitment that gives the employees the opportunity to improve their own responsibility.
196

Användning av Klimatverktyg

Magnusson, Björn January 2015 (has links)
A big part of Sweden's carbon dioxide is emitted by the construction business. Skanska is one of the biggest construction contractors in the world with an ambitious sustainability agenda. The purpose of this thesis is to evaluate how Skanska Väg och Anläggning, region Mellansverige, distrikt Uppsala uses Skanska’s own tools to reduce their climate impact from a project. The two tools that were carefully studied were Skanska’s color palette and a module to calculate the carbon emissions from a project. Data were collected through literature and interviews among Skanska employees. Collected data was analyzed by the author of the thesis and is presented in the last part of the report. Employees interviewed were positive towards the use of the tools. But the way the tools presented their information could be improved. Mainly by simplifying the information so it effortless could be applied by personnel running the construction.
197

Studie av internt materialflöde vid Volvo Pentas fabrik i Vara

Berthou, Lina January 2007 (has links)
Within today’s organizations there is continual development work to increase efficiency and the power to compete at the market. Production development with focus on continual improvements constitutes an important part of the daily work within a lot of organizations today. The purpose of this study is to contribute to a part of the development process that Volvo Penta factory in Vara has in mind. A description of the current situation was compiled by mapping the internal runnings and material flow throughout the factory. A new suggestion for a layout and a comparison with the current situation will assist with creating a factual basis for the development of a new goods reception. A study was made where the volumes and the quantity of the daily arrival goods were settled. Another study mapped the fork lift - and the moped traffic of the factory. The quantity and the volume of the material that was transported were also settled. The layout that was proposed was used during the comparison. The compilation of the description of the current situation showed that the fork lift truck constitute 40 % of the total number of runnings. Empty box running and empty running constitute 15 % and 45% of the transportations respectively. The material-, empty box- and empty runnings of the moped are divided 40 %, 19 % and 41 %. The result of the comparison of the existing with the planned goods reception showed that the new solution would decrease the use of fork lift truck transportations by as much as 16 %. The equivalent rate for the moped runnings would be 3 %. The conclusion of the studies is that a new goods reception, placed close to the start point of the process, would make a contribution to a streamlining of the internal runnings in the factory. It was also established, by the layout flowchart, that the material- and the process flow would be more efficient. The aim of the project was achieved through the extensive studies that were made. All of the transport stretches can now be studied in depth according to which factors are seen to be most important. The study contains separate information from each driver. A closer review by each driver is therefore suggested during the continued work. The development of new transport stretches where coordinated runnings may decrease and empty runnings may decrease is possible in order to reach even greater efficiency.
198

Value Stream Mapping – Alfa Laval : Kartläggning av produktion- och informationsflödet

Hagob, Sihak January 2014 (has links)
Med utgångspunkten att ständigt förbättras och öka konkurrenskraften arbetar Alfa Laval mot Leanprinciper. Vad som dock är ett problemområde är att se över fabriken ur ett helhetsperspektiv, närfabriken är uppdelad i många avdelningar. Lösningen till detta problem är att via olika metoder ellerverktyg kunna fastställa svaren på problemen.Denna examensrapport redogör för hur metoder inom Lean produktion kan vara lösningen förproblemområdet. Forskningen är huvudsakligen byggd på en bred värdeflödesanalys som syftar till attfånga in ett företags alla aspekter ur ett helhetsperspektiv, med syftet att minska risker försuboptimering och istället optimera produktionen som helhet.För att se gränssnitt mellan informationsflödet har i denna forskning metoden swimlane utgjort enkartläggning över ett företags hela kontorsavdelning, planerings och inköps avdelningar.Resultatet av denna forskning visar att värdeflödesanals är en bra metod för att kunna identifieraslöserier, ojämnheter i produktion, brister vid tillverkningen och flaskhalsar. För att sammankopplaolika avdelningar av ett företags informationsflöde, visas i resultaten att swimlane är en bra metod försyftet.
199

Förbättring av nybesöksprocessen för kortare patientväntetider

Münster, Gustav, Rad, Cameron January 2010 (has links)
Den svenska sjukvården kommer under de kommande decennierna att ställas inför stora utmaningar. Patientbelastningen väntas öka till följd av en åldrande befolkning som till största del utgörs av den stora generationen av 40-talister. Situationen kommer att kunna bli synnerligen allvarlig då många av Sveriges sjukhus och mottagningar redan idag har långa patientköer som i många fall inte klarar av att leva upp till vårdgarantin på maximalt 90 dagars väntan från inkommen remiss till genomfört läkarbesök. De senaste åren har emellertid ett trendbrott kunnat skönjas. Många sjukhus har startat omfattande förbättringsprogram med målsättningen att nå högre effektivitet och kvalitet i verksamheten, däribland Skånes universitetssjukhus i Lund och Capio S:t Görans sjukhus i Stockholm. Förbättringsprogrammen har visat mycket goda resultat såsom kortare patient-köer, kortare väntetider, högre kvalitet i vårdresultaten samt större patientnöjdhet. Dessa förbättringar har inte uppnåtts genom att personalen har jobbat snabbare och hårdare, utan smartare enligt principer hämtade från den japanska förbättringsfilosofin Lean production som visar hur ett resurseffektivt och lönsamt flöde ska organiseras. Ortopedkliniken vid Länssjukhuset Ryhov i Jönköping har liksom stora delar av sjukvården i Sverige långa patientköer och långa väntetider. Idag är ett ambitiöst förbättringsprogram sjösatt med målsättningen att minska patienternas väntetid från 90 till 30 dagar i november 2010. Det var inom ramen för detta utvecklingsprojekt som vi, parallellt med klinikens eget arbete, fick uppgiften att förbättra klinkens nybesöksprocess(remiss-bokning-besök). Målsätt-ningen med vårt examensarbete var att upptäcka och föreslå förbättringsmöjligheter för nybesöksprocessen som ska leda till att väntetiden för klinikens nybesökspatienter förkortas. Med bland annat förbättringsfilosofin Lean och flera kvalitetsförbättringsverktyg som utgångspunkt dokumenterade och analyserade vi nybesöksprocessen och dess förutsättningar. Analysen utmynnade i flera potentiella förbättringsmöjligheter som sammantaget visade att Ortopedklinken, efter implementering av nedanstående förbättringsförslag, idag kan ta emot samtliga länets patienter med specialistvårdsbehov med befintlig kapacitet. Förbättringarna handlar om en bestämd ansvarsfördelning mellan primärvården och Ortopedkliniken, tydliga direktiv om vad som ansvarsuppgifterna kräver samt hårda krav på att uppfylla ansvars-uppgifternas bestämmelser. På så sätt skapas rätt förutsättningar för att bedriva en effektiv verksamhet för kliniken. När rätt förutsättningar finns ska en ny effektivare processkarta implementeras som utnyttjar färre resurser, tar kortare tid och har längre framförhållning i sin planering. Remissinflödet ska utjämnas och en takt skapas för jämn arbetsbelastning och enklare planering. Läkarresursen, som utgör klinikens flaskhals, ska omfördelas för att höja kapaciteten och balansera flödet. De inbokade besökstiderna ska utnyttjas maximalt genom att förbättra kommunikationen med patienterna och förbättra omfallsplaneringen för återbud. Genom att införa alla nämnda förbättringsförslag har vi visat att kliniken har förmåga, att med befintlig kapacitet, möta vårdbehovet inom länet. Förbättringsarbete är en ledarskaps-fråga där de högsta cheferna måste visa trovärdighet och engagemang för att satsningen ska bli lyckad. Enligt Lean bör cheferna skapa en förbättringsanda där alla medarbetare ser sin roll i helheten och förstår hur viktig deras insats är för det gemensamma resultatet så att alla medarbetare arbetar mot samma verksamhetsmål. Ortopedkliniken har förutsättningarna för att bli framgångsrik och ansvaret ligger nu på klinikchefens bord för hur framgångsrikt förbättringsarbetet kommer att bli.
200

Utveckling av produktionflödeseffektivitet : En fallstudie / Development of production flow efficiency : A case study

Nielsen, Sofie, Beica, Mikaela January 2014 (has links)
Fallstudiens syfte är att skapa förståelse över hur ett internt produktionsflöde på ett tillverkande företag kan uppnå en hög produktionflödeseffektivitet. Målsättningen är att skapa en kartläggning av ett nuvarande flödestillstånd på fallföretaget. Utifrån detta ska empirin och den noggrant utvalda teorin generera i en analys som ska sammanställa de faktorer som är väsentliga att studera för att förbättra flödet i dagsläget. Med hjälp av TPS-huset och faktorer som grund ska det klargöras om företaget gynnas av att tillverka internt eller överlåta delar av sin produktion externt. / The globalization that exists in the contemporary society means that manufacturing companies in Sweden are forced to look over their production. This to reach a higher competitive advantage and retain jobs nationally. The case study is based on the social problem of an rising unemployment while outsourcing is becoming increasingly popular for manufacturing companies in Sweden. The case company is a medical technology company that manufactures supplies articles to disinfection equipment. The case study brings up opinions about what is essential to study in a manufacturing company when a long-term decision on flow efficiency is to be taken. The study aims to create an understanding of how an internal production flow in a manufacturing company can achieve high efficiency. Estimation is to be created on how the actual internal production flow is different in relation to the flow that occurs when processes are transferred externally. The determining between producing internally or removing parts of production must include an review of the factors that affect the company's profitability. Initially it is essential for manufacturing companies to evaluate their current situation carefully to develop in the right direction in the future. A disposition model is presented after the theory chapter to structure the work and give the reader a clear view of the coming parts in the case study. At first the current situation of the case company is studied. After that the empirical data linked with the relevant theory becomes an analysis of the current state. The analysis is then discussed by a comparison of the two different flows using the TPS-house to include the relevant factors of lean production. Finally the comparison is evaluated and the factors that have the greatest impact on the company's decision making are clarified. The result that the case study has generated is that the essential factors affect each other and that a business should focus on reviewing the factors together, to achieve a desired production flow efficiency. The reviewing of factors generates a support if outsourcing should be applied in a future corporate development. It also shows how the employees of the company are affected by this choice.

Page generated in 0.0414 seconds